The Centre Park
Deedo IDDP-THN-R802Completion was pushed back 4 years, to Dec 2027; no MahaRERA orders on record; 0% of its units are booked.
Bhayandar, Thane 401107 · by Salasar Unique Realtors Llp
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 years, to Dec 2027
- This projectRegistered 31 Aug 2017, completion promised 30 Dec 2023, revised to 31 Dec 2027.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- Building (P51700011284)Size not on record0% booked
- Hazel - D326 floors · 165 units0% booked
- Maple - F124 floors · 123 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700011284
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700011284 | 31 Aug 2017 | 30 Dec 2023 | 31 Dec 2027 | Salasar Unique Realtors LLP | Project page |
Documents163
3 documents held by Deedo, 160 filings listed on MahaRERA's project page
Show all 163 documentsShow fewer documents
Legal
- Declaration Form B4.pdf · uploaded 31 Jul 2017Source
- Declaration Form B5.pdf · uploaded 31 Jul 2017Source
- Declaration Form B6.pdf · uploaded 31 Jul 2017Source
- Declaration Form B7.pdf · uploaded 31 Jul 2017Source
- Declaration Form B8.pdf · uploaded 31 Jul 2017Source
- Declaration Form B9.pdf · uploaded 31 Jul 2017Source
- Declaration Form B10.pdf · uploaded 31 Jul 2017Source
- Declaration Form B11.pdf · uploaded 31 Jul 2017Source
- Declaration Form B12.pdf · uploaded 31 Jul 2017Source
- Declaration Form BFORM -B.pdf · uploaded 11 Apr 2024Source
- Declaration Form BFORM B.pdf · uploaded 29 May 2025Source
Migrated
- 1 PAN CardPAN CARD SU.pdf · uploaded 29 Jul 2017Source
- 1 Details of encumbrancesCASE FILE.pdf · uploaded 29 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)BLOCK PLAN.pdf · uploaded 29 Jul 2017Source
- 1 Building Plan Approval (IOD)CC COPY.pdf · uploaded 29 Jul 2017Source
- 1 Proforma of Allotment letterPERFORMA AGREMENT.pdf · uploaded 29 Jul 2017Source
- 1 Copy of the legal title reportTC.pdf · uploaded 31 Jul 2017Source
- 1 Declaration in FORM B1.pdf · uploaded 31 Jul 2017Source
- 2 Declaration in FORM B2.pdf · uploaded 31 Jul 2017Source
- 3 Declaration in FORM B3.pdf · uploaded 31 Jul 2017Source
- 4 Declaration in FORM B4.pdf · uploaded 31 Jul 2017Source
- 5 Declaration in FORM B5.pdf · uploaded 31 Jul 2017Source
- 6 Declaration in FORM B6.pdf · uploaded 31 Jul 2017Source
- 7 Declaration in FORM B7.pdf · uploaded 31 Jul 2017Source
- 8 Declaration in FORM B8.pdf · uploaded 31 Jul 2017Source
- 9 Declaration in FORM B9.pdf · uploaded 31 Jul 2017Source
- 10 Declaration in FORM B10.pdf · uploaded 31 Jul 2017Source
- 11 Declaration in FORM B11.pdf · uploaded 31 Jul 2017Source
- 12 Declaration in FORM B12.pdf · uploaded 31 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)1 (1).pdf · uploaded 31 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)1 (2).pdf · uploaded 31 Jul 2017Source
- 1 Certificates of CA (Form 3)THAR CA CERTIFICATE.pdf · uploaded 31 Jul 2017Source
- 1 Disclosure of sold/ booked inventorySold Unsold -31-12-2023.pdf · uploaded 15 Jan 2024Source
- 1 CERSAI detailsCERSAI - 13-01-2024.pdf · uploaded 19 Jan 2024Source
- 1 Commencement Certificates / NA Order for plotted development1 Building Plan Approval (IOD).pdf · uploaded 1 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A.pdf · uploaded 1 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 1 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A.pdf · uploaded 1 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 1 Apr 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration Bank Account.pdf · uploaded 1 Apr 2024Source
- 1 Declaration about Commencement CertificateCC Declaration.pdf · uploaded 11 Apr 2024Source
- 13 Declaration in FORM BFORM -B.pdf · uploaded 11 Apr 2024Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1_compressed.pdf · uploaded 11 Apr 2024Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2.pdf · uploaded 11 Apr 2024Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 11 Apr 2024Source
- 1 Disclosure of Interest in Other Real Estate Organizationsilovepdf_merged (1).pdf · uploaded 11 Apr 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)FORM -5 CA.pdf · uploaded 11 Apr 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM -5 CA.pdf · uploaded 11 Apr 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM -5 CA.pdf · uploaded 11 Apr 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM -5 CA.pdf · uploaded 11 Apr 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM -5 CA.pdf · uploaded 11 Apr 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM -5 CA.pdf · uploaded 11 Apr 2024Source
- 2 Certificates of CA (Form 3)FORM 3.pdf · uploaded 24 Apr 2024Source
- 2 Building Plan Approval (IOD)12_compressed.pdf · uploaded 26 Apr 2024Source
- 3 Building Plan Approval (IOD)13_compressed.pdf · uploaded 26 Apr 2024Source
- 4 Building Plan Approval (IOD)14_compressed.pdf · uploaded 26 Apr 2024Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1_compressed.pdf · uploaded 27 Nov 2024Source
- 1 Certificates of CA (Form 3)FORM 3_compressed.pdf · uploaded 27 Nov 2024Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2.pdf · uploaded 27 Nov 2024Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 27 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf · uploaded 27 Nov 2024Source
- 1 Building Plan Approval (IOD)1.pdf · uploaded 12 Dec 2024Source
- 2 Building Plan Approval (IOD)2.pdf · uploaded 12 Dec 2024Source
- 3 Building Plan Approval (IOD)3.pdf · uploaded 12 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM -5 (2023-2024) The Centre Park.pdf · uploaded 12 Dec 2024Source
- 1 a Details of encumbrances concerned to Financefinance.pdf · uploaded 4 Feb 2025Source
- 1 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 4 Feb 2025Source
- 1 b Details of encumbrances concerned to Legalfinance.pdf · uploaded 4 Feb 2025Source
- 1 Proforma of Agreement for saleAGREEEMENT FOR SALE_RERA.pdf · uploaded 4 Feb 2025Source
- 1 Disclosure for secured/unsecured finance availed for the projectsec.pdf · uploaded 4 Feb 2025Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1_ JUNE 23_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1_ SEP 23_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1_ DEC 23_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1_ MARCH 24_SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1_ JUNE 24_SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1_ SEP 24_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1_ DEC 24_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1_ MARCH 25_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1_ MARCH 23_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2_ SEP 23_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2_ MARCH 25_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2_ DEC 24_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2_ SEP 24_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2_ JUNE 24_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2_ MARCH 24_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2_ DEC 23_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2_ JUNE 23_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 3_ MARCH 23_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A_ MARCH 20.pdf · uploaded 7 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A_ MARCH 21.pdf · uploaded 7 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A _ MARCH 22.pdf · uploaded 7 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A_ MARCH 24.pdf · uploaded 7 May 2025Source
- 2 Certificates of CA (Form 3)FORM 3_ JUNE 23_ SALASAR_ CENTERPARK_compressed.pdf · uploaded 8 May 2025Source
- 3 Certificates of CA (Form 3)FORM 3_ SEP 23_ SALASAR_ CENTERPARK_compressed.pdf · uploaded 8 May 2025Source
- 4 Certificates of CA (Form 3)FORM 3_ DEC 23_ SALASAR_ CENTER PARK_compressed.pdf · uploaded 8 May 2025Source
- 5 Certificates of CA (Form 3)FORM 3_ MARCH 24_ SALASAR_ CENTRE PARK_compressed.pdf · uploaded 8 May 2025Source
- 6 Certificates of CA (Form 3)FORM 3_ JUNE 24_ SALASAR_ CENTRE PARK_compressed.pdf · uploaded 8 May 2025Source
- 7 Certificates of CA (Form 3)FORM 3_ SEP 24_ SALASAR_ CENTRE PARK_compressed.pdf · uploaded 8 May 2025Source
- 8 Certificates of CA (Form 3)FORM 3_ DEC 24_ SALASAR_ CENTRE PARK_compressed.pdf · uploaded 8 May 2025Source
- 9 Certificates of CA (Form 3)FORM 3_ MARCH 25_ SALASAR_ CENTRE PARK.pdf · uploaded 8 May 2025Source
- 1 Certificates of CA (Form 3)FORM 3_ MARCH 23_ SALASAR_ CENTER PARK_compressed.pdf · uploaded 8 May 2025Source
- 9 Disclosure of sold/ booked inventory9 SOLD UNSOLD MARCH 2025.pdf · uploaded 8 May 2025Source
- 8 Disclosure of sold/ booked inventory8 SOLD UNSOLD DEC 2024.pdf · uploaded 8 May 2025Source
- 7 Disclosure of sold/ booked inventory7 SOLD UNSOLD SEP 2024.pdf · uploaded 8 May 2025Source
- 6 Disclosure of sold/ booked inventory6 SOLD UNSOLD JUNE 2024.pdf · uploaded 8 May 2025Source
- 5 Disclosure of sold/ booked inventory5 SOLD UNSOLD MARCH 2024.pdf · uploaded 8 May 2025Source
- 4 Disclosure of sold/ booked inventory4 SOLD UNSOLD DEC 2023.pdf · uploaded 8 May 2025Source
- 3 Disclosure of sold/ booked inventory3 SOLD UNSOLD SEP 2023.pdf · uploaded 8 May 2025Source
- 2 Disclosure of sold/ booked inventory2 SOLD UNSOLD JUNE 2023.pdf · uploaded 8 May 2025Source
- 1 Disclosure of sold/ booked inventory1 SOLD UNSOLD MARCH 2023.pdf · uploaded 8 May 2025Source
- 1 Declaration in FORM BFORM B.pdf · uploaded 29 May 2025Source
- 1 Certificates of CA (Form 3)FORM 3.pdf · uploaded 29 May 2025Source
- Form 1FORM 1_ DEC 25_ THE CENTRE PARK.pdf · uploaded 24 Feb 2026Source
- Form 2FORM 2_ DEC 25_ THE CENTRE PARK.pdf · uploaded 24 Feb 2026Source
- Form 3FORM 3_ DEC 25_ THE CENTRE PARK.pdf · uploaded 24 Feb 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD_ DEC 25_ THE CENTRE PARK.pdf · uploaded 24 Feb 2026View
- Form 1FORM 1_ MARCH_ THE CENTRE PARK.pdf · uploaded 8 May 2026Source
- Form 2FORM 2_ MARCH_ THE CENTRE PARK.pdf · uploaded 8 May 2026Source
- Form 3FORM 3_ MARCH_ THE CENTRE PARK.pdf · uploaded 8 May 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD_ DEC 25_ THE CENTRE PARK.pdf · uploaded 8 May 2026View
- Form 2A (FY 2025-2026)FORM 2A_ MARCH 2026_ THE CENTRE PARK.pdf · uploaded 8 May 2026Source
- Form 1FORM 1_ JUNE 2026_ THE CENTRE PARK.pdf · uploaded 28 Jul 2026Source
- Form 2FORM 2_ JUNE 2026_ THE CENTRE PARK.pdf · uploaded 28 Jul 2026Source
- Form 3FORM 3_ JUNE 2026_ THE CENTRE PARK.pdf · uploaded 28 Jul 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD_ JUNE 2026_ THE CENTRE PARK.pdf · uploaded 28 Jul 2026View
Technical
- DocumentBLOCK PLAN.pdf · uploaded 29 Jul 2017Source
- DocumentCC COPY.pdf · uploaded 29 Jul 2017Source
- Document12_compressed.pdf · uploaded 26 Apr 2024Source
- Document13_compressed.pdf · uploaded 26 Apr 2024Source
- Document14_compressed.pdf · uploaded 26 Apr 2024Source
- Document1.pdf · uploaded 12 Dec 2024Source
- Document2.pdf · uploaded 12 Dec 2024Source
- Document3.pdf · uploaded 12 Dec 2024Source
Technical (Architect)
- DocumentFORM 1_compressed.pdf · uploaded 11 Apr 2024Source
- DocumentFORM 1_compressed.pdf · uploaded 27 Nov 2024Source
- DocumentFORM 1_ MARCH 23_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- DocumentFORM 1_ JUNE 23_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- DocumentFORM 1_ SEP 23_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- DocumentFORM 1_ DEC 23_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- DocumentFORM 1_ MARCH 24_SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- DocumentFORM 1_ JUNE 24_SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- DocumentFORM 1_ SEP 24_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- DocumentFORM 1_ DEC 24_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- DocumentFORM 1_ MARCH 25_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
Technical (Engineer)
- DocumentFORM 2.pdf · uploaded 11 Apr 2024Source
- DocumentFORM 2.pdf · uploaded 27 Nov 2024Source
- DocumentFORM 3_ MARCH 23_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- DocumentFORM 2_ JUNE 23_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- DocumentFORM 2_ SEP 23_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- DocumentFORM 2_ DEC 23_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- DocumentFORM 2_ MARCH 24_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- DocumentFORM 2_ JUNE 24_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- DocumentFORM 2_ SEP 24_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- DocumentFORM 2_ DEC 24_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
- DocumentFORM 2_ MARCH 25_ SALASAR_ CENTRE PARK.pdf · uploaded 7 May 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 2, 2 113/1
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 3BHK, 0, —288 units in all
- Address
- New 114/1, 2 - 113/1, 2, 4. Old 481 Pt, 478 PtPIN 401107
- Village
- Bhayandar, Thane taluka
- Location
- 19.31047, 72.85404
- Land area for this project
- 70,790 sq m (7,61,976 sq ft)
- Permissible built-up area
- 1,20,001 sq m (12,91,679 sq ft)
- Sanctioned built-up area
- 29,638 sq m (3,19,023 sq ft)
- Recreational open space
- 12,492 sq m (1,34,458 sq ft)
- Designated bank account
- 19
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
NEW 114/1,2 - 113/1,2,4. OLD 481 PT, 478 PT
Boundaries
- North
- Survey No 479
- South
- Survey No 476
- East
- Survey No 474
- West
- Survey No 481
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking288 units
0 of 288 units booked (0%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Hazel - D3 | 2BHK | 54.7 sq m · 589 sq ft | 62 | 0 |
| Hazel - D3 | 2BHK | 55.26 sq m · 595 sq ft | 19 | 0 |
| Hazel - D3 | 3BHK | 77.44 sq m · 834 sq ft | 84 | 0 |
| Maple - F1 | 2BHK | 54.7 sq m · 589 sq ft | 94 | 0 |
| Maple - F1 | 2BHK | 55.26 sq m · 595 sq ft | 29 | 0 |
| — | 0 | — | 0 | 0 |
| — | 0 | — | 0 | 0 |
| — | 0 | — | 0 | 0 |
Show all 19 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| — | — | — | 0 | 0 |
| — | — | — | 0 | 0 |
| — | — | — | 0 | 0 |
| — | — | — | 0 | 0 |
| — | — | — | 0 | 0 |
| — | — | — | 0 | 0 |
| — | — | — | 0 | 0 |
| — | — | — | 0 | 0 |
| — | — | — | 0 | 0 |
| — | — | — | 0 | 0 |
| — | — | — | 0 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Avinash Mhatre & Associates | — |
| Chartered accountant | Ca Vivek | — |
| Chartered accountant | Sanjay Sharma & Co | — |
| Engineer | Pro Tech Consultants | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Bhayandar
- Prakash Bhavan Co-Operative Housing Society LimitedRERA PM1330002602503
- Salasar SiddharthRERA PM1330002602460
- 711 SkyviewRERA PR1330002602191
- ZenithRERA PR1330002602162
- LotusRERA PR1331012602116
- Shanti Signature By Ashit ShahRERA PC1330002601988
- Salasar Grandeur IIRERA PR1330002601948
- Chandresh TerraceRERA PR1330002601604
All 118 projects in Bhayandar · Compare The Centre Park with another project