Others · 1 building · 107 unitsRERA P51700020706

Sai Heritage

Its promised completion date, Mar 2023, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 63% of its units are booked.

Badlapur (M Cl), Thane 421503 · Promoter: Mitra Homes

Delivery3 yrs 7 mo past duePromised Mar 2023 · no extension on record · not shown completedRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales63% booked67 of 107 units · as the promoter reported to MahaRERA
Sai Heritage project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

Its promised completion date, Mar 2023, has passed and MahaRERA does not show it completed

  • This projectRegistered 6 May 2019, completion promised 30 Mar 2023, and still not shown completed today.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700020706
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000207066 May 201930 Mar 202330 Mar 2023Mitra HomesProject page
Documents43

1 document held by Deedo, 42 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPARTNERSHIP FIRM PAN.pdf · uploaded 26 Apr 2019Source
  • Other – FinanceMitra Homes Letter.pdf · uploaded 18 Apr 2023Source

Legal

  • Declaration Form BDeclaration Form B Builder Final.pdf · uploaded 26 Apr 2019Source
  • Legal Title reportTITLE CERTIFICATE.pdf · uploaded 26 Apr 2019Source

Migrated

  • 1 PAN CardPARTNERSHIP FIRM PAN.pdf · uploaded 26 Apr 2019Source
  • 1 Copy of the legal title reportTITLE CERTIFICATE.pdf · uploaded 26 Apr 2019Source
  • 1 Details of encumbrancesNON CUM Final.pdf · uploaded 26 Apr 2019Source
Show all 43 documentsShow fewer documents

Migrated

  • 1 Copy of Layout Approval (in case of layout)Floorwise Plan 1 Final.pdf · uploaded 26 Apr 2019Source
  • 2 Copy of Layout Approval (in case of layout)Floor wise Plan 2 Final.pdf · uploaded 26 Apr 2019Source
  • 1 Building Plan Approval (IOD)Blue Print.pdf · uploaded 26 Apr 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate Final.pdf · uploaded 26 Apr 2019Source
  • 1 Declaration in FORM BDeclaration Form B Builder Final.pdf · uploaded 26 Apr 2019Source
  • 1 Proforma of Allotment letterALLOTMENT Final.pdf · uploaded 26 Apr 2019Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)A C FINAL.pdf · uploaded 27 Apr 2019Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate FINAL.pdf · uploaded 27 Apr 2019Source
  • 1 Certificates of CA (Form 3)C A Certificate Final.pdf · uploaded 27 Apr 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 mitra 19-20.pdf · uploaded 1 Sep 2021Source
  • 1 Declaration about Commencement CertificateDeclaration of CC.pdf · uploaded 6 Sep 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)30 06 19.pdf · uploaded 7 Sep 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)31 12 20.pdf · uploaded 7 Sep 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)30 6 20.pdf · uploaded 7 Sep 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)30 9 20.pdf · uploaded 7 Sep 2021Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)31 12 20.pdf · uploaded 7 Sep 2021Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)31 03 21.pdf · uploaded 7 Sep 2021Source
  • 1 Disclosure of sold/ booked inventoryDeclaration of Inventory.pdf · uploaded 20 Oct 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 20-21.pdf · uploaded 31 Dec 2021Source
  • 1 CERSAI detailsCERSAI REPORT.pdf · uploaded 2 Jun 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5.pdf · uploaded 15 Nov 2022Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of Inventory.pdf · uploaded 7 Feb 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 21-22.pdf · uploaded 28 Mar 2023Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate.pdf · uploaded 18 Apr 2023Source
  • 1 Other – FinanceMitra Homes Letter.pdf · uploaded 18 Apr 2023Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 22 Apr 2023Source
  • 1 Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 22 Apr 2023Source
  • 3 Disclosure of sold/ booked inventoryDisclosure of Inventory.pdf · uploaded 25 Apr 2023Source
  • 2 Architect’s Certificate on Completion of Project (Form 4)Architech Certificate Form 4.pdf · uploaded 25 Apr 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 22-23.pdf · uploaded 30 Sep 2023Source

Technical

  • DocumentFloor wise Plan 2 Final.pdf · uploaded 26 Apr 2019Source
  • DocumentBlue Print.pdf · uploaded 26 Apr 2019Source
  • DocumentFloorwise Plan 1 Final.pdf · uploaded 26 Apr 2019Source

Technical (Architect)

  • DocumentForm 1.pdf · uploaded 22 Apr 2023Source

Technical (Engineer)

  • DocumentEngineer Certificate FINAL.pdf · uploaded 27 Apr 2019Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsSurvey No 59 Hissa No 1 B

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1002 BHK 1, 1003 BHK 1, 1004 BHK 1, 1005 BHK 2, 1006 BHK 1, 1007 BHK 1, 1008 BHK 2, 1009 BHK 2, 101 bhk 2, 102 bhk 1, 103 bhk 1, 104 bhk 2, 10 FR 1001 BHK 1, 1101 BHK 1, 1102 BHK 1, 1104 BHK 1, 1105 BHK 2, 1106 BHK 1, 1107 BHK 1, 1108 BHK 2, 1109 BHK, 11 FR 1103 BHK 1, 1 FR Community Hall, 202 bhk 1, 203 bhk 1, 203 BHK 1, 204 bhk 1, 205 bhk 2, 206 BHK 1, 207 BHK 1, 208 BHK 2, 209 BHK 2, 2 Fr 201 bhk 1, 302 BHK 1, 303 BHK 1, 304 BHK 1, 305 BHK 2, 306 BHK 1, 307 BHK 1, 308 BHK 2, 309 BHK 2, 3 FR 301 BHK 1, 402 BHK 1, 403 BHK 1, 404 BHK 1, 405 BHK 2, 406 BHK 1, 407 BHK 1, 408 BHK 2, 409 BHK 2, 4 FR 401 BHK 1, 502 BHK 1, 503 BHK 1, 504 BHK 1, 505 BHK 2, 506 BHK 1, 507 BHK 1, 508 BHK 2, 509 BHK 2, 5 FR 501 BHK 1, 602 BHK 1, 603 BHK 1, 604 BHK 1, 605 BHK 2, 606 BHK 1, 607 BHK 1, 608 BHK 2, 609 BHK 2, 6 FR 601 BHK 1, 702 BHK 1, 703 BHK 1, 704 BHK 1, 705 BHK 2, 706 BHK 1, 707 BHK 1, 708 BHK 2, 709 BHK 2, 7 FR 701 BHK 1, 801 BHK 1, 802 BHK 1, 804 BHK 1, 805 BHK 1, 806 BHK 1, 807 BHK 2, 808 BHK 2, 8 FR 803 BHK 1, 902 BHK 1, 903 BHK 1, 904 BHK 1, 905 BHK 2, 906 BHK 1, 907 BHK 1, 908 BHK 2, 909 BHK 2, 9 FR 901 BHK 1, Office 1, Office 2, Shop 1, Shop 10, Shop 2, Shop 3, Shop 4, Shop 5, Shop 6, Shop 7, Shop 8, Shop9107 units in all
Address
Survey No 59 Hissa No 1 B, Katrap, KulgaonPIN 421503
Village
Badlapur (M Cl), Ambarnath taluka
Designated bank account
21
Developed in phases
No

Survey, CTS, gat or plot numbers

Survey No 59 Hissa No 1 B

Boundaries

North
15 M W D P Road
South
Survey no 59 Hissa no 1 A
East
Survey No 59 Hissa No 1 B
West
Survey No 69

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking107 units

67 of 107 units booked (63%), as the promoter reported to MahaRERA

1002 BHK 1 · 1 unit1003 BHK 1 · 1 unit1004 BHK 1 · 1 unit1005 BHK 2 · 1 unit1006 BHK 1 · 1 unit1007 BHK 1 · 1 unit1008 BHK 2 · 1 unit1009 BHK 2 · 1 unit101 bhk 2 · 1 unit102 bhk 1 · 1 unit103 bhk 1 · 1 unit104 bhk 2 · 1 unit10 FR 1001 BHK 1 · 1 unit1101 BHK 1 · 1 unit1102 BHK 1 · 1 unit1104 BHK 1 · 1 unit1105 BHK 2 · 1 unit1106 BHK 1 · 1 unit1107 BHK 1 · 1 unit1108 BHK 2 · 1 unit1109 BHK · 1 unit11 FR 1103 BHK 1 · 1 unit1 FR Community Hall · 1 unit202 bhk 1 · 1 unit203 bhk 1 · 1 unit203 BHK 1 · 1 unit204 bhk 1 · 1 unit205 bhk 2 · 1 unit206 BHK 1 · 1 unit207 BHK 1 · 1 unit208 BHK 2 · 1 unit209 BHK 2 · 1 unit2 Fr 201 bhk 1 · 1 unit302 BHK 1 · 1 unit303 BHK 1 · 1 unit304 BHK 1 · 1 unit305 BHK 2 · 1 unit306 BHK 1 · 1 unit307 BHK 1 · 1 unit308 BHK 2 · 1 unit309 BHK 2 · 1 unit3 FR 301 BHK 1 · 1 unit402 BHK 1 · 1 unit403 BHK 1 · 1 unit404 BHK 1 · 1 unit405 BHK 2 · 1 unit406 BHK 1 · 1 unit407 BHK 1 · 1 unit408 BHK 2 · 1 unit409 BHK 2 · 1 unit4 FR 401 BHK 1 · 1 unit502 BHK 1 · 1 unit503 BHK 1 · 1 unit504 BHK 1 · 1 unit505 BHK 2 · 1 unit506 BHK 1 · 1 unit507 BHK 1 · 1 unit508 BHK 2 · 1 unit509 BHK 2 · 1 unit5 FR 501 BHK 1 · 1 unit602 BHK 1 · 1 unit603 BHK 1 · 1 unit604 BHK 1 · 1 unit605 BHK 2 · 1 unit606 BHK 1 · 1 unit607 BHK 1 · 1 unit608 BHK 2 · 1 unit609 BHK 2 · 1 unit6 FR 601 BHK 1 · 1 unit702 BHK 1 · 1 unit703 BHK 1 · 1 unit704 BHK 1 · 1 unit705 BHK 2 · 1 unit706 BHK 1 · 1 unit707 BHK 1 · 1 unit708 BHK 2 · 1 unit709 BHK 2 · 1 unit7 FR 701 BHK 1 · 1 unit801 BHK 1 · 1 unit802 BHK 1 · 1 unit804 BHK 1 · 1 unit805 BHK 1 · 1 unit806 BHK 1 · 1 unit807 BHK 2 · 1 unit808 BHK 2 · 1 unit8 FR 803 BHK 1 · 1 unit902 BHK 1 · 1 unit903 BHK 1 · 1 unit904 BHK 1 · 1 unit905 BHK 2 · 1 unit906 BHK 1 · 1 unit907 BHK 1 · 1 unit908 BHK 2 · 1 unit909 BHK 2 · 1 unit9 FR 901 BHK 1 · 1 unitOffice 1 · 1 unitOffice 2 · 1 unitShop 1 · 1 unitShop 10 · 1 unitShop 2 · 1 unitShop 3 · 1 unitShop 4 · 1 unitShop 5 · 1 unitShop 6 · 1 unitShop 7 · 1 unitShop 8 · 1 unitShop9 · 1 unit
TypeCarpet areaUnitsBooked
1002 BHK 136.32 sq m · 391 sq ft11
1003 BHK 135.4 sq m · 381 sq ft11
1004 BHK 137.75 sq m · 406 sq ft11
1005 BHK 248.28 sq m · 520 sq ft11
1006 BHK 133.28 sq m · 358 sq ft11
1007 BHK 137.23 sq m · 401 sq ft11
1008 BHK 260.06 sq m · 646 sq ft10
1009 BHK 245.92 sq m · 494 sq ft11
Show all 107 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
101 bhk 248.28 sq m · 520 sq ft11
102 bhk 133.28 sq m · 358 sq ft10
103 bhk 137.23 sq m · 401 sq ft10
104 bhk 250.26 sq m · 541 sq ft10
10 FR 1001 BHK 137.65 sq m · 405 sq ft11
1101 BHK 137.65 sq m · 405 sq ft10
1102 BHK 136.32 sq m · 391 sq ft10
1104 BHK 137.75 sq m · 406 sq ft11
1105 BHK 248.28 sq m · 520 sq ft11
1106 BHK 133.28 sq m · 358 sq ft10
1107 BHK 137.23 sq m · 401 sq ft10
1108 BHK 250.26 sq m · 541 sq ft10
1109 BHK45.92 sq m · 494 sq ft10
11 FR 1103 BHK 135.4 sq m · 381 sq ft10
1 FR Community Hall247.89 sq m · 2,668 sq ft10
202 bhk 139 sq m · 420 sq ft10
203 bhk 135.4 sq m · 381 sq ft10
203 BHK 155.3 sq m · 595 sq ft10
204 bhk 146.44 sq m · 500 sq ft10
205 bhk 248.28 sq m · 520 sq ft10
206 BHK 133.28 sq m · 358 sq ft11
207 BHK 137.23 sq m · 401 sq ft10
208 BHK 250.26 sq m · 541 sq ft10
209 BHK 251.79 sq m · 557 sq ft10
2 Fr 201 bhk 159.58 sq m · 641 sq ft10
302 BHK 139 sq m · 420 sq ft11
303 BHK 155.3 sq m · 595 sq ft11
304 BHK 146.44 sq m · 500 sq ft10
305 BHK 248.28 sq m · 520 sq ft11
306 BHK 133.28 sq m · 358 sq ft11
307 BHK 137.23 sq m · 401 sq ft11
308 BHK 250.26 sq m · 541 sq ft11
309 BHK 251.79 sq m · 557 sq ft10
3 FR 301 BHK 159.58 sq m · 641 sq ft11
402 BHK 139 sq m · 420 sq ft11
403 BHK 155.3 sq m · 595 sq ft11
404 BHK 146.44 sq m · 500 sq ft11
405 BHK 248.28 sq m · 520 sq ft11
406 BHK 133.28 sq m · 358 sq ft11
407 BHK 137.23 sq m · 401 sq ft11
408 BHK 250.26 sq m · 541 sq ft11
409 BHK 251.79 sq m · 557 sq ft11
4 FR 401 BHK 159.58 sq m · 641 sq ft11
502 BHK 139 sq m · 420 sq ft10
503 BHK 155.3 sq m · 595 sq ft11
504 BHK 146.44 sq m · 500 sq ft11
505 BHK 248.28 sq m · 520 sq ft11
506 BHK 133.28 sq m · 358 sq ft11
507 BHK 137.23 sq m · 401 sq ft11
508 BHK 250.26 sq m · 541 sq ft11
509 BHK 251.79 sq m · 557 sq ft11
5 FR 501 BHK 159.48 sq m · 640 sq ft10
602 BHK 139 sq m · 420 sq ft11
603 BHK 155.3 sq m · 595 sq ft11
604 BHK 146.44 sq m · 500 sq ft11
605 BHK 248.28 sq m · 520 sq ft11
606 BHK 133.28 sq m · 358 sq ft11
607 BHK 137.23 sq m · 401 sq ft11
608 BHK 250.26 sq m · 541 sq ft11
609 BHK 251.79 sq m · 557 sq ft11
6 FR 601 BHK 159.58 sq m · 641 sq ft11
702 BHK 139 sq m · 420 sq ft11
703 BHK 155.3 sq m · 595 sq ft11
704 BHK 146.44 sq m · 500 sq ft11
705 BHK 248.28 sq m · 520 sq ft11
706 BHK 133.28 sq m · 358 sq ft11
707 BHK 137.23 sq m · 401 sq ft11
708 BHK 250.26 sq m · 541 sq ft11
709 BHK 251.79 sq m · 557 sq ft11
7 FR 701 BHK 159.58 sq m · 641 sq ft11
801 BHK 137.65 sq m · 405 sq ft10
802 BHK 136.32 sq m · 391 sq ft10
804 BHK 137.75 sq m · 406 sq ft11
805 BHK 133.28 sq m · 358 sq ft11
806 BHK 137.23 sq m · 401 sq ft11
807 BHK 250.26 sq m · 541 sq ft11
808 BHK 245.92 sq m · 494 sq ft10
8 FR 803 BHK 135.4 sq m · 381 sq ft11
902 BHK 139 sq m · 420 sq ft11
903 BHK 155.3 sq m · 595 sq ft11
904 BHK 146.44 sq m · 500 sq ft11
905 BHK 248.28 sq m · 520 sq ft11
906 BHK 133.28 sq m · 358 sq ft11
907 BHK 137.23 sq m · 401 sq ft11
908 BHK 250.26 sq m · 541 sq ft11
909 BHK 251.79 sq m · 557 sq ft11
9 FR 901 BHK 159.58 sq m · 641 sq ft11
Office 131.53 sq m · 339 sq ft10
Office 229.62 sq m · 319 sq ft10
Shop 119.99 sq m · 215 sq ft10
Shop 1021.11 sq m · 227 sq ft10
Shop 228.51 sq m · 307 sq ft10
Shop 319.34 sq m · 208 sq ft10
Shop 419.34 sq m · 208 sq ft10
Shop 516.14 sq m · 174 sq ft10
Shop 620.31 sq m · 219 sq ft10
Shop 720.31 sq m · 219 sq ft10
Shop 816.22 sq m · 175 sq ft10
Shop919.34 sq m · 208 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPramod Patil—
Chartered accountantPritam A Nevrekar—
EngineerS V Patel—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology