Deedo IDDP-THN-M6WTCompletion was pushed back 4 months, to Jul 2028; no MahaRERA orders on record; 90% of its units are booked.
Anjur, Thane 421302 · by Lodha Developers Limited · 93% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Jul 2028
- P51700034862Registered 28 Apr 2022, completion promised 31 Dec 2027.
- P51700045890Registered 15 Jun 2022, completion promised 31 Mar 2028, revised to 31 Jul 2028.
- P51700047779Registered 28 Nov 2022, completion promised 31 Dec 2026, revised to 30 Apr 2027.
- P51700047777Registered 28 Nov 2022, completion promised 31 Oct 2027.
No extension certificate on record.
4 registrations · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
5 buildings
Open a building to see every flat, floor by floor.
- Wing A24 floors · 138 units97% booked
- Wing B24 floors · 135 units98% booked
- Wing C of Sector D Cluster 5.03 Type I224 floors · 143 units89% booked
- Wing E of Cluster 514 floors · 135 units
- Wing E of Cluster 5 Point 03 of Sector D14 floors · 135 units78% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrations4
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700034862 | 28 Apr 2022 | 31 Dec 2027 | 31 Dec 2027 | Lodha Developers Limited | Project page |
| P51700045890 | 15 Jun 2022 | 31 Mar 2028 | 31 Jul 2028 | Lodha Developers Limited | Project page |
| P51700047779 | 28 Nov 2022 | 31 Dec 2026 | 30 Apr 2027 | Lodha Developers Limited | Project page |
| P51700047777 | 28 Nov 2022 | 31 Oct 2027 | 31 Oct 2027 | Lodha Developers Limited | Project page |
Documents325
4 documents held by Deedo, 321 filings listed on MahaRERA's project page
Registration certificate (4)
Finance
- PAN CardP51700034862 · Macrotech Developers Ltd PAN CARD.pdf · uploaded 21 Feb 2022Source
- PAN CardP51700045890 · Macrotech Developers Ltd PAN CARD.pdf · uploaded 2 Jun 2022Source
- PAN CardP51700047779 · Macrotech Developers Ltd PAN CARD.pdf · uploaded 2 Aug 2022Source
- PAN CardP51700047777 · 1 PAN Card.pdf · uploaded 9 Nov 2022Source
Show all 325 documentsShow fewer documents
Legal
- Legal Title reportP51700034862 · Legal Report on Title -IRIS A Wing-New.pdf · uploaded 1 Apr 2022Source
- Declaration Form BP51700034862 · New Form B.pdf · uploaded 1 Apr 2022Source
- Legal Title reportP51700045890 · Legal Report on Title -IRIS B Wing-New.pdf · uploaded 2 Jun 2022Source
- Declaration Form BP51700045890 · Form B.pdf · uploaded 6 Jun 2022Source
- Legal Title reportP51700047779 · Legal Title Report.pdf · uploaded 8 Nov 2022Source
- Legal Title reportP51700047777 · Legal Title Report.pdf · uploaded 9 Nov 2022Source
- Declaration Form BP51700047777 · Form B.pdf · uploaded 9 Nov 2022Source
- Declaration Form BP51700047779 · Fom B.pdf · uploaded 11 Nov 2022Source
- Declaration Form BP51700045890 · Satbara.pdf · uploaded 29 Sep 2026Source
- Declaration Form BP51700045890 · Anant Developers - Transferor 3.pdf · uploaded 1 Oct 2026Source
- Declaration Form BP51700045890 · COI_MDL.pdf · uploaded 1 Oct 2026Source
- Declaration Form BP51700045890 · 1 - COI MDL to Lodha Developers Limited.pdf · uploaded 1 Oct 2026Source
Migrated
- 1 PAN CardP51700034862 · Macrotech Developers Ltd PAN CARD.pdf · uploaded 21 Feb 2022Source
- 1 Proforma of Allotment letterP51700034862 · Sale Agreement and Allotment Letter.pdf · uploaded 22 Mar 2022Source
- 1 Copy of Layout Approval (in case of layout)P51700034862 · Sheet No2.pdf · uploaded 31 Mar 2022Source
- 1 Copy of the legal title reportP51700034862 · Legal Report on Title -IRIS A Wing-New.pdf · uploaded 1 Apr 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP51700034862 · Building Plan.pdf · uploaded 1 Apr 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700034862 · 2021-06-03 - MMRDA_Corrected Amended CC_compressed.pdf · uploaded 1 Apr 2022Source
- 1 Declaration in FORM BP51700034862 · New Form B.pdf · uploaded 1 Apr 2022Source
- 1 Details of encumbrancesP51700034862 · Emcumbrances.pdf · uploaded 12 Apr 2022Source
- 1 Declaration about Commencement CertificateP51700034862 · CC Decl.pdf · uploaded 12 Apr 2022Source
- 1 CERSAI detailsP51700034862 · Cersai Decl.pdf · uploaded 12 Apr 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034862 · New Form 3- IRISH Wing A_compressed.pdf · uploaded 12 Apr 2022Source
- 1 PAN CardP51700045890 · Macrotech Developers Ltd PAN CARD.pdf · uploaded 2 Jun 2022Source
- 1 Copy of the legal title reportP51700045890 · Legal Report on Title -IRIS B Wing-New.pdf · uploaded 2 Jun 2022Source
- 1 Copy of Layout Approval (in case of layout)P51700045890 · Layout 1-IRIS B.pdf · uploaded 2 Jun 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700045890 · 1 Commencement Certificates _ NA Order for plotted development (3) (2).pdf · uploaded 2 Jun 2022Source
- 1 Proforma of Allotment letterP51700045890 · Sale Agreement and Allotment Letter.pdf · uploaded 2 Jun 2022Source
- 1 Details of encumbrancesP51700045890 · Encumbrances.pdf · uploaded 3 Jun 2022Source
- 2 Copy of Layout Approval (in case of layout)P51700045890 · Layout 2 IRIS.pdf · uploaded 3 Jun 2022Source
- 1 Declaration about Commencement CertificateP51700045890 · Declaration to CC.pdf · uploaded 3 Jun 2022Source
- 1 CERSAI detailsP51700045890 · Decl For Cersai.pdf · uploaded 3 Jun 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP51700045890 · BUILD LAY- IRIS B (1).pdf · uploaded 6 Jun 2022Source
- 1 Declaration in FORM BP51700045890 · Form B.pdf · uploaded 6 Jun 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700045890 · Form 3 -For Upload.pdf · uploaded 7 Jun 2022Source
- 1 PAN CardP51700047779 · Macrotech Developers Ltd PAN CARD.pdf · uploaded 2 Aug 2022Source
- 1 Copy of the legal title reportP51700047779 · Legal Title Report.pdf · uploaded 8 Nov 2022Source
- 1 a Details of encumbrances concerned to FinanceP51700047779 · Fina Encum.pdf · uploaded 8 Nov 2022Source
- 2 a Details of encumbrances concerned to FinanceP51700047779 · Legal_encum.pdf · uploaded 8 Nov 2022Source
- 1 b Details of encumbrances concerned to LegalP51700047779 · Fina Encum.pdf · uploaded 8 Nov 2022Source
- 2 b Details of encumbrances concerned to LegalP51700047779 · Legal_encum.pdf · uploaded 8 Nov 2022Source
- 1 Copy of Layout Approval (in case of layout)P51700047779 · Layout 1.pdf · uploaded 8 Nov 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP51700047779 · Build Layout.pdf · uploaded 8 Nov 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700047779 · ITP_Bhiwandi_CC.PDF · uploaded 8 Nov 2022Source
- 1 CERSAI detailsP51700047779 · CERSAI.pdf · uploaded 8 Nov 2022Source
- 1 PAN CardP51700047777 · 1 PAN Card.pdf · uploaded 9 Nov 2022Source
- 1 Copy of the legal title reportP51700047777 · Legal Title Report.pdf · uploaded 9 Nov 2022Source
- 1 a Details of encumbrances concerned to FinanceP51700047777 · Fina Encum.pdf · uploaded 9 Nov 2022Source
- 2 a Details of encumbrances concerned to FinanceP51700047777 · Encumbrances of Concern to Legal.pdf · uploaded 9 Nov 2022Source
- 1 b Details of encumbrances concerned to LegalP51700047777 · Fina Encum.pdf · uploaded 9 Nov 2022Source
- 2 b Details of encumbrances concerned to LegalP51700047777 · Encumbrances of Concern to Legal.pdf · uploaded 9 Nov 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP51700047777 · Build Lay.pdf · uploaded 9 Nov 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700047777 · ITP_Bhiwandi_CC.PDF · uploaded 9 Nov 2022Source
- 1 Declaration in FORM BP51700047777 · Form B.pdf · uploaded 9 Nov 2022Source
- 1 CERSAI detailsP51700047777 · CERSAI.pdf · uploaded 9 Nov 2022Source
- 1 Proforma of Allotment letterP51700047777 · 1 Proforma of Allotment letter.pdf · uploaded 11 Nov 2022Source
- 1 Deviation Report with respect to Allotment letterP51700047777 · Deviation Allotment.pdf · uploaded 11 Nov 2022Source
- 1 Declaration in FORM BP51700047779 · Fom B.pdf · uploaded 11 Nov 2022Source
- 1 Proforma of Allotment letterP51700047779 · 1 Proforma of Allotment letter.pdf · uploaded 11 Nov 2022Source
- 1 Deviation Report with respect to Allotment letterP51700047779 · Deviation Allotment.pdf · uploaded 11 Nov 2022Source
- 1 Declaration about Commencement CertificateP51700047777 · Latest CC Decla.pdf · uploaded 16 Nov 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700047777 · Form 3.pdf · uploaded 16 Nov 2022Source
- 1 Declaration about Commencement CertificateP51700047779 · Latest CC Decla.pdf · uploaded 16 Nov 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700047779 · Form 3 IRIS C.pdf · uploaded 16 Nov 2022Source
- 1 Proforma of Agreement for saleP51700047777 · NEW ATS 17112022.pdf · uploaded 17 Nov 2022Source
- 1 Deviation Report with respect to model copy of AgreementP51700047777 · NEW ATS Deviation IRIS D.pdf · uploaded 17 Nov 2022Source
- 2 Copy of Layout Approval (in case of layout)P51700047779 · IRIS Layout Upload.pdf · uploaded 17 Nov 2022Source
- 1 Proforma of Agreement for saleP51700047779 · NEW ATS 17112022.pdf · uploaded 17 Nov 2022Source
- 1 Deviation Report with respect to model copy of AgreementP51700047779 · NEW ATS Deviation IRIS C.pdf · uploaded 17 Nov 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP51700047777 · IRIS D Bank.pdf · uploaded 23 Nov 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP51700047779 · 1019_001.pdf · uploaded 23 Nov 2022Source
- 1 Copy of Layout Approval (in case of layout)P51700047777 · For IRIS D.pdf · uploaded 24 Nov 2022Source
- 2 Copy of Layout Approval (in case of layout)P51700047777 · 2 Copy of Layout Approval (in case of layout).pdf · uploaded 24 Nov 2022Source
- 3 Copy of Layout Approval (in case of layout)P51700047777 · 3 Copy of Layout Approval (in case of layout).pdf · uploaded 24 Nov 2022Source
- 1 Disclosure of sold/ booked inventoryP51700047777 · Upper Thane -IRIS Wing D.pdf · uploaded 8 Mar 2023Source
- 1 Disclosure of sold/ booked inventoryP51700045890 · Upper Thane - IRIS Wing B.pdf · uploaded 8 Mar 2023Source
- 1 Disclosure of sold/ booked inventoryP51700034862 · Upper Thane - IRIS Wing A.pdf · uploaded 8 Mar 2023Source
- 1 Disclosure of sold/ booked inventoryP51700047779 · Upper Thane - IRIS Wing C.pdf · uploaded 8 Mar 2023Source
- 2 Disclosure of sold/ booked inventoryP51700047777 · Upper Thane -IRIS Wing D.pdf · uploaded 20 Mar 2023Source
- 2 Disclosure of sold/ booked inventoryP51700045890 · Upper Thane - IRIS Wing B.pdf · uploaded 20 Mar 2023Source
- 2 Disclosure of sold/ booked inventoryP51700034862 · Upper Thane - IRIS Wing A.pdf · uploaded 20 Mar 2023Source
- 2 Disclosure of sold/ booked inventoryP51700047779 · Upper Thane - IRIS Wing C.pdf · uploaded 20 Mar 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP51700034862 · 49 iris A.pdf · uploaded 27 Apr 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034862 · IRIS A - Form3.pdf · uploaded 22 Jul 2023Source
- 3 Disclosure of sold/ booked inventoryP51700034862 · IRIS A - March23 (2).pdf · uploaded 24 Jul 2023Source
- 4 Disclosure of sold/ booked inventoryP51700034862 · Upper Thane - IRIS Wing A - June23.pdf · uploaded 24 Jul 2023Source
- 5 Disclosure of sold/ booked inventoryP51700034862 · Upper Thane - IRIS Wing A - June23.pdf · uploaded 25 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51700047777 · Upper Thane -IRIS Wing D.pdf · uploaded 16 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51700045890 · Upper Thane -IRIS Wing B.pdf · uploaded 16 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51700034862 · Upper Thane - IRIS Wing A.pdf · uploaded 16 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51700047779 · Upper Thane -IRIS Wing C.pdf · uploaded 16 Oct 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700047777 · Upper Thane IRIS Wing D - Form1 - Sep23.pdf · uploaded 21 Nov 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700045890 · Upper Thane IRIS Wing B - Form1 - Sep23.pdf · uploaded 21 Nov 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034862 · Upper Thane IRIS Wing A - Form1 - Sep23.pdf · uploaded 21 Nov 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700047779 · Upper thane IRIS wing C - Form1 - Sep23.pdf · uploaded 21 Nov 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034862 · Casa Belvedere - P51700046311 - Form2 - Sep23.pdf · uploaded 8 Dec 2023Source
- 3 Disclosure of sold/ booked inventoryP51700047777 · Upper Thane - IRIS Wing D-P51700047777-Sep23.pdf · uploaded 12 Dec 2023Source
- 3 Disclosure of sold/ booked inventoryP51700045890 · Upper Thane - IRIS Wing B-P51700045890-Sep23.pdf · uploaded 12 Dec 2023Source
- 6 Disclosure of sold/ booked inventoryP51700034862 · Upper Thane - IRIS Wing A-P51700034862-Sep23.pdf · uploaded 12 Dec 2023Source
- 3 Disclosure of sold/ booked inventoryP51700047779 · Upper Thane - IRIS Wing C-P51700047779-Sep23.pdf · uploaded 12 Dec 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700047777 · Form1 - Upper Thane -IRIS Wing D - P51700047777 - Dec23.pdf · uploaded 26 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700045890 · Form1 - Upper Thane -IRIS Wing B - P51700045890 - Dec23.pdf · uploaded 26 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034862 · Form1 - Upper Thane - IRIS Wing A - P51700034862 - Dec23.pdf · uploaded 26 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700047779 · Form1 - Upper Thane -IRIS Wing C - P51700047779 - Dec23.pdf · uploaded 26 Feb 2024Source
- 4 Disclosure of sold/ booked inventoryP51700047777 · Sold Unsold - Upper Thane -IRIS Wing D - P51700047777 - Dec23.pdf · uploaded 27 Feb 2024Source
- 4 Disclosure of sold/ booked inventoryP51700045890 · Sold Unsold - Upper Thane -IRIS Wing B - P51700045890 - Dec23.pdf · uploaded 27 Feb 2024Source
- 7 Disclosure of sold/ booked inventoryP51700034862 · Sold Unsold - Upper Thane - IRIS Wing A - P51700034862 - Dec23.pdf · uploaded 27 Feb 2024Source
- 4 Disclosure of sold/ booked inventoryP51700047779 · Sold Unsold - Upper Thane -IRIS Wing C - P51700047779 - Dec23.pdf · uploaded 27 Feb 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700047777 · Form1 - Upper Thane -IRIS Wing D - P51700047777 - March 24.pdf · uploaded 15 May 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700045890 · Form1 - Upper Thane -IRIS Wing B - P51700045890 - March 24.pdf · uploaded 15 May 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034862 · Form1 - Upper Thane - IRIS Wing A - P51700034862 - march 24.pdf · uploaded 15 May 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700047779 · Form1 - Upper Thane -IRIS Wing C - P51700047779 - March 24.pdf · uploaded 15 May 2024Source
- 5 Disclosure of sold/ booked inventoryP51700047777 · Sold Unsold - Upper Thane -IRIS Wing D - P51700047777 - March 24.pdf · uploaded 28 May 2024Source
- 5 Disclosure of sold/ booked inventoryP51700045890 · Sold Unsold - Upper Thane -IRIS Wing B - P51700045890 - March 24.pdf · uploaded 28 May 2024Source
- 8 Disclosure of sold/ booked inventoryP51700034862 · Sold Unsold - Upper Thane - IRIS Wing A - P51700034862 - March 24.pdf · uploaded 28 May 2024Source
- 5 Disclosure of sold/ booked inventoryP51700047779 · Sold Unsold - Upper Thane -IRIS Wing C - P51700047779 - March 24.pdf · uploaded 28 May 2024Source
- 6 Disclosure of sold/ booked inventoryP51700047777 · Upper Thane -IRIS Wing D - P51700047777 - June24.pdf · uploaded 8 Aug 2024Source
- 6 Disclosure of sold/ booked inventoryP51700045890 · Upper Thane -IRIS Wing B - P51700045890 - June24.pdf · uploaded 8 Aug 2024Source
- 9 Disclosure of sold/ booked inventoryP51700034862 · Upper Thane - IRIS Wing A - P51700034862 - June24.pdf · uploaded 8 Aug 2024Source
- 6 Disclosure of sold/ booked inventoryP51700047779 · Upper Thane -IRIS Wing C - P51700047779 - June24.pdf · uploaded 8 Aug 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700047777 · Upper Thane -IRIS Wing D - P51700047777 - June24.pdf · uploaded 10 Aug 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700045890 · Upper Thane -IRIS Wing B - P51700045890 - June24.pdf · uploaded 10 Aug 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034862 · Upper Thane - IRIS Wing A - P51700034862 - June24.pdf · uploaded 10 Aug 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700047779 · Upper Thane -IRIS Wing C - P51700047779 - June24.pdf · uploaded 10 Aug 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51700047777 · Form 2A - Upper Thane -IRIS Wing D - P51700047777.pdf · uploaded 17 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51700045890 · Form 2A - Upper Thane -IRIS Wing B - P51700045890.pdf · uploaded 17 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51700034862 · Form 2A - Upper Thane - IRIS Wing A - P51700034862.pdf · uploaded 17 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51700047779 · Form 2A - Upper Thane -IRIS Wing C - P51700047779.pdf · uploaded 17 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51700047777 · P51700047777 - Upper Thane -IRIS Wing D.pdf · uploaded 19 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51700045890 · P51700045890 - Upper Thane -IRIS Wing B.pdf · uploaded 19 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51700034862 · P51700034862 - Upper Thane - IRIS Wing A.pdf · uploaded 19 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51700047779 · P51700047779 - Upper Thane -IRIS Wing C.pdf · uploaded 19 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700045890 · Upper Thane -IRIS Wing B - P51700045890 - June24.pdf · uploaded 24 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP51700045890 · Upper Thane - IRIS Wing B.pdf · uploaded 24 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034862 · Upper Thane - IRIS Wing A - P51700034862 - June24.pdf · uploaded 24 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP51700034862 · Upper Thane - IRIS Wing A.pdf · uploaded 24 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700047779 · Upper Thane -IRIS Wing C - P51700047779 - June24.pdf · uploaded 24 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP51700047779 · Upper Thane - IRIS Wing C.pdf · uploaded 24 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700047777 · UT Iris wing D.pdf · uploaded 4 Nov 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700045890 · Iris wing B.pdf · uploaded 4 Nov 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034862 · Iris wing A.pdf · uploaded 4 Nov 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700047779 · UT iris wing C.pdf · uploaded 4 Nov 2024Source
- 3 Disclosure of sold/ booked inventoryP51700047779 · Upper Thane - IRIS Wing C.pdf · uploaded 16 Dec 2024Source
- 1 Disclosure of sold/ booked inventoryP51700045890 · Sold-Unsold_IRIS B Dec 2024.pdf · uploaded 23 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP51700034862 · Sold-Unsold_IRIS A Dec 2024.pdf · uploaded 23 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP51700047779 · Sold-Unsold_IRIS C Dec 2024.pdf · uploaded 23 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700045890 · UT Iris Wing B.pdf · uploaded 24 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034862 · UT Iris Wing A.pdf · uploaded 24 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700047779 · UT Iris Wing C.pdf · uploaded 24 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700047777 · Signed Iris D Declaration - Form 2 and 3 - Dec 24.pdf · uploaded 20 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700047777 · Signed Iris D Declaration - Form 2 and 3 - Dec 24.pdf · uploaded 20 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryP51700047777 · Sold-Unsold_IRIS D Dec 2024.pdf · uploaded 20 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700045890 · Signed Iris B Declaration - Form 2 and 3 - Dec 24.pdf · uploaded 20 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700045890 · Signed Iris B Declaration - Form 2 and 3 - Dec 24.pdf · uploaded 20 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700034862 · Signed Iris A Declaration - Form 2 and 3 - Dec 24.pdf · uploaded 20 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700034862 · Signed Iris A Declaration - Form 2 and 3 - Dec 24.pdf · uploaded 20 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700047779 · Signed Iris C Declaration - Form 2 and 3 - Dec 24.pdf · uploaded 20 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700047779 · Signed Iris C Declaration - Form 2 and 3 - Dec 24.pdf · uploaded 20 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700047777 · Form 1 (Upper Thane -IRIS - Wing D).pdf · uploaded 2 May 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700045890 · Form 1 (Upper Thane -IRIS - Wing B).pdf · uploaded 2 May 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700034862 · Form 1 (Upper Thane -IRIS - Wing A).pdf · uploaded 2 May 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700047779 · Form 1 (Upper Thane -IRIS - Wing C).pdf · uploaded 2 May 2025Source
- Form 1P51700047777 · Form 1 -Upper Thane -IRIS - Wing D - March 25.pdf · uploaded 6 Jun 2025Source
- Form 2P51700047777 · Signed Form 2 - (Iris D )March 2025.pdf · uploaded 6 Jun 2025Source
- Form 3P51700047777 · Signed Form 3 - (Iris D )March 2025.pdf · uploaded 6 Jun 2025Source
- Disclosure of Sold and Booked InventoryP51700047777 · Signed Sold Unsold Iris D March 2025.pdf · uploaded 6 Jun 2025Source
- Self-declaration of Quarterly ProgressP51700047777 · Declaration.pdf · uploaded 6 Jun 2025Source
- Form 1P51700045890 · Form 1 -Upper Thane -IRIS - Wing B- March 25.pdf · uploaded 6 Jun 2025Source
- Form 2P51700045890 · Signed Form 2 - (Iris B) March 2025.pdf · uploaded 6 Jun 2025Source
- Form 3P51700045890 · Signed Form 3 (Iris B) March 2025.pdf · uploaded 6 Jun 2025Source
- Disclosure of Sold and Booked InventoryP51700045890 · Signed Sold Unsold Iris B March 2025.pdf · uploaded 6 Jun 2025Source
- Self-declaration of Quarterly ProgressP51700045890 · Declaration.pdf · uploaded 6 Jun 2025Source
- Form 1P51700034862 · Form 1 -Upper Thane -IRIS - Wing A -March 25.pdf · uploaded 6 Jun 2025Source
- Form 2P51700034862 · Signed Form 2 - (Iris A )March 2025.pdf · uploaded 6 Jun 2025Source
- Form 3P51700034862 · Signed Form 3-( Iris A )March 2025.pdf · uploaded 6 Jun 2025Source
- Disclosure of Sold and Booked InventoryP51700034862 · Signed Sold Unsold Iris A March 2025.pdf · uploaded 6 Jun 2025Source
- Self-declaration of Quarterly ProgressP51700034862 · Declaration.pdf · uploaded 6 Jun 2025Source
- Form 1P51700047779 · Form 1 -Upper Thane -IRIS - Wing C -March 25.pdf · uploaded 6 Jun 2025Source
- Form 2P51700047779 · Signed Form 2 - ( Iris C )March 2025.pdf · uploaded 6 Jun 2025Source
- Form 3P51700047779 · Signed Form 3 -( Iris C) March 2025.pdf · uploaded 6 Jun 2025Source
- Disclosure of Sold and Booked InventoryP51700047779 · Signed Sold Unsold Iris C March 2025.pdf · uploaded 6 Jun 2025Source
- Self-declaration of Quarterly ProgressP51700047779 · Declaration.pdf · uploaded 6 Jun 2025Source
- Form 1P51700047777 · Upper Thane - IRIS Wing D - Form1 - June 25 - P51700047777 -okk.pdf · uploaded 18 Jul 2025Source
- Form 2P51700047777 · Form 2 Iris D June 2025.pdf · uploaded 18 Jul 2025Source
- Form 3P51700047777 · Form 3 Iris D June 2025.pdf · uploaded 18 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700047777 · Signed Sold Unsold Iris D June 2025.pdf · uploaded 18 Jul 2025Source
- Form 1P51700045890 · IRIS Wing B - Form1 - June 25 - P51700045890.pdf · uploaded 18 Jul 2025Source
- Form 2P51700045890 · Form 2 Iris B June 2025.pdf · uploaded 18 Jul 2025Source
- Form 3P51700045890 · Form 3 Iris B June 2025.pdf · uploaded 18 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700045890 · Signed Sold Unsold Iris B June 2025.pdf · uploaded 18 Jul 2025Source
- Form 1P51700034862 · Upper Thane - IRIS Wing A - Form1 - June 25 - P51700034862.pdf · uploaded 18 Jul 2025Source
- Form 2P51700034862 · Form 2Iris A June 2025.pdf · uploaded 18 Jul 2025Source
- Form 3P51700034862 · Form 3 Iris A June 2025.pdf · uploaded 18 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700034862 · Sold Unsold Iris A June 2025.pdf · uploaded 18 Jul 2025Source
- Form 1P51700047779 · Upper Thane - IRIS Wing C - Form1 - June 25 - P51700047779 -okk.pdf · uploaded 18 Jul 2025Source
- Form 2P51700047779 · Form 2 Iris C June 2025.pdf · uploaded 18 Jul 2025Source
- Form 3P51700047779 · Form 3 Iris C June 2025.pdf · uploaded 18 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700047779 · Sold Unsold Iris C June 2025.pdf · uploaded 18 Jul 2025Source
- Form 2A (FY 2024-2025)P51700047777 · Upper Thane -IRIS Wing D - P51700047777 - Form 2A.pdf · uploaded 25 Jul 2025Source
- Form 2A (FY 2024-2025)P51700034862 · Upper Thane - IRIS Wing A - P51700034862 - Form 2A.pdf · uploaded 25 Jul 2025Source
- Form 2A (FY 2024-2025)P51700047779 · Upper Thane -IRIS Wing C - P51700047779 - Form 2A.pdf · uploaded 25 Jul 2025Source
- Form 5 (FY 2024-2025)P51700047777 · Iris wing D.pdf · uploaded 14 Oct 2025Source
- Form 5 (FY 2024-2025)P51700034862 · Iris Wing A.pdf · uploaded 14 Oct 2025Source
- Form 5 (FY 2024-2025)P51700047779 · UT - Iris WIng C.pdf · uploaded 14 Oct 2025Source
- Form 1P51700034862 · Form 1-Upper Thane - IRIS Wing A -Sep 25.pdf · uploaded 31 Oct 2025Source
- Form 2P51700034862 · Form 02 - Iris A - Sep 25 signed.pdf · uploaded 31 Oct 2025Source
- Form 3P51700034862 · Form 03 - Iris A - Sep 25 signed.pdf · uploaded 31 Oct 2025Source
- Disclosure of Sold and Booked InventoryP51700034862 · Sold Unsold - Iris A - Sep 25 signed.pdf · uploaded 31 Oct 2025Source
- Withdrawal Update Form 1P51700047777 · Upper Thane -IRIS Wing D.pdf · uploaded 1 Nov 2025Source
- Withdrawal Update Form 2P51700047777 · Form 02 - Iris D - Sep 25 signed.pdf · uploaded 1 Nov 2025Source
- Withdrawal Update Form 3P51700047777 · Form 03 - Iris D - Sep 25 signed.pdf · uploaded 1 Nov 2025Source
- Form 1P51700045890 · Form 1-Upper Thane -IRIS Wing B -Sep 25.pdf · uploaded 1 Nov 2025Source
- Form 2P51700045890 · Form 02 - Iris B - Sep 25 signed.pdf · uploaded 1 Nov 2025Source
- Form 3P51700045890 · Form 03 - Iris B - Sep 25 signed.pdf · uploaded 1 Nov 2025Source
- Disclosure of Sold and Booked InventoryP51700045890 · Sold Unsold - Iris B - Sep 25 signed.pdf · uploaded 1 Nov 2025Source
- Withdrawal Update Form 1P51700047779 · Upper Thane -IRIS Wing C Form-1 Sep-25.pdf · uploaded 1 Nov 2025Source
- Withdrawal Update Form 2P51700047779 · Form 02 - Iris C - Sep 25 signed.pdf · uploaded 1 Nov 2025Source
- Withdrawal Update Form 3P51700047779 · Form 03 - Iris C - Sep 25 signed.pdf · uploaded 1 Nov 2025Source
- Withdrawal Update Form 1P51700047777 · Form-1 Iris D- Dec-25.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 2P51700047777 · Iris D Form 02 Signed Dec 25.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 3P51700047777 · Iris D Form 03 Signed Dec 25.pdf · uploaded 27 Jan 2026Source
- Form 1P51700045890 · Upper Thane - IRIS Wing B - Form1 - Dec25 - P51700045890 -FF.pdf · uploaded 27 Jan 2026Source
- Form 2P51700045890 · Iris B Form 02 Signed Dec 25.pdf · uploaded 27 Jan 2026Source
- Form 3P51700045890 · Iris B Form 03 Signed Dec 25.pdf · uploaded 27 Jan 2026Source
- Disclosure of Sold and Booked InventoryP51700045890 · Iris B Sold Unsold Signed Dec 25.pdf · uploaded 27 Jan 2026Source
- Form 1P51700034862 · form-1 -j.pdf · uploaded 27 Jan 2026Source
- Form 2P51700034862 · Iris A Form 02 Signed Dec 25.pdf · uploaded 27 Jan 2026Source
- Form 3P51700034862 · Iris A Form 03 Signed Dec 25.pdf · uploaded 27 Jan 2026Source
- Disclosure of Sold and Booked InventoryP51700034862 · Iris A Sold Unsold Signed Dec 25.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 1P51700047779 · Form-1 Iris C- Dec-25.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 2P51700047779 · Iris C Form 02 Signed Dec 25.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 3P51700047779 · Iris C Form 03 Signed Dec 25.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 1P51700047777 · Form1 - Upper Thane -IRIS Wing D - P51700047777-Mar-26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P51700047777 · Iris D Mar 2026 - Form 02 Signed.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P51700047777 · Iris D Mar 2026 - Form 03 Signed.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P51700047779 · Form1- Upper Thane -IRIS Wing C- P51700047779-Mar-26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P51700047779 · Iris C Mar 2026 - Form 02 Signed.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P51700047779 · Iris C Mar 2026 - Form 03 Signed.pdf · uploaded 20 Apr 2026Source
- Form 1P51700045890 · Upper Thane - IRIS Wing B - Form1 -March 26 - P51700045890 -ok.pdf · uploaded 21 Apr 2026Source
- Form 2P51700045890 · Iris B Mar 2026 - Form 02 Signed.pdf · uploaded 21 Apr 2026Source
- Form 3P51700045890 · Iris B Mar 2026 - Form 03 Signed.pdf · uploaded 21 Apr 2026Source
- Disclosure of Sold and Booked InventoryP51700045890 · Iris B Mar 2026 - SoldUnsold Signed.pdf · uploaded 21 Apr 2026Source
- Form 1P51700034862 · IRIS Wing A Form1.pdf · uploaded 21 Apr 2026Source
- Form 2P51700034862 · Iris A Mar 2026 - Form 02 Signed.pdf · uploaded 21 Apr 2026Source
- Form 3P51700034862 · Iris A Mar 2026 - Form 03 Signed.pdf · uploaded 21 Apr 2026Source
- Disclosure of Sold and Booked InventoryP51700034862 · Iris A Mar 2026 - SoldUnsold Signed.pdf · uploaded 21 Apr 2026Source
- Form 2A (FY 2025-2026)P51700047777 · Form 2A - Upper Thane-IRIS Wing D - P51700047777.pdf · uploaded 25 Jun 2026Source
- Form 2A (FY 2025-2026)P51700045890 · Form 2A - UPPER THANE-IRIS WING B - P51700045890.pdf · uploaded 25 Jun 2026Source
- Form 2A (FY 2025-2026)P51700034862 · Form 2A - Upper Thane-IRIS Wing A - P51700034862.pdf · uploaded 25 Jun 2026Source
- Form 2A (FY 2025-2026)P51700047779 · Form 2A - Upper Thane-IRIS Wing C - P51700047779.pdf · uploaded 25 Jun 2026Source
- Withdrawal Update Form 1P51700047777 · Form1 - Upper Thane -IRIS Wing D - P51700047777.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2P51700047777 · form 2 iris wing d Signed.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3P51700047777 · form 3 iris wing d Signed.pdf · uploaded 20 Jul 2026Source
- Form 1P51700045890 · Upper Thane - IRIS Wing B - Form1 - June-26 - P51700045890.pdf · uploaded 20 Jul 2026Source
- Form 2P51700045890 · form 2 iris wing B Signed.pdf · uploaded 20 Jul 2026Source
- Form 3P51700045890 · form 3 iris wing B Signed.pdf · uploaded 20 Jul 2026Source
- Disclosure of Sold and Booked InventoryP51700045890 · Upper Thane - IRIS Wing B - Form1 - June-26 - P51700045890.pdf · uploaded 20 Jul 2026Source
- Form 1P51700034862 · Upper Thane - IRIS Wing A - Form1 - June-26 - P51700034862 - Final.pdf · uploaded 20 Jul 2026Source
- Form 2P51700034862 · form 2 iris wing A Signed.pdf · uploaded 20 Jul 2026Source
- Form 3P51700034862 · form 3 iris wing A Signed.pdf · uploaded 20 Jul 2026Source
- Disclosure of Sold and Booked InventoryP51700034862 · Upper Thane - IRIS Wing A - Form1 - June-26 - P51700034862 - Final.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 1P51700047779 · Form1 - Upper Thane -IRIS Wing C - P51700047779.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2P51700047779 · form 2 iris wing C Signed.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3P51700047779 · form 3 iris wing C Signed.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 1P51700045890 · Upper Thane - IRIS Wing B - Form1 - June-26 - P51700045890.pdf · uploaded 25 Jul 2026Source
- Withdrawal Update Form 2P51700045890 · Form 2 - Iris B June2026.pdf · uploaded 25 Jul 2026Source
- Withdrawal Update Form 3P51700045890 · Form-3 Iris B- Signed.pdf · uploaded 25 Jul 2026Source
- Form 5 (FY 2025-2026)P51700047777 · Upper Thane -IRIS Wing D.pdf · uploaded 28 Sep 2026Source
- Form 5 (FY 2025-2026)P51700045890 · Upper Thane -IRIS Wing B.pdf · uploaded 28 Sep 2026Source
- Form 5 (FY 2025-2026)P51700034862 · Upper Thane - IRIS Wing A.pdf · uploaded 28 Sep 2026Source
- Form 5 (FY 2025-2026)P51700047779 · Upper Thane -IRIS Wing C.pdf · uploaded 28 Sep 2026Source
Technical
- DocumentP51700034862 · Sheet No2.pdf · uploaded 31 Mar 2022Source
- DocumentP51700034862 · Building Plan.pdf · uploaded 1 Apr 2022Source
- DocumentP51700045890 · Layout 1-IRIS B.pdf · uploaded 2 Jun 2022Source
- DocumentP51700045890 · Layout 2 IRIS.pdf · uploaded 3 Jun 2022Source
- DocumentP51700045890 · BUILD LAY- IRIS B (1).pdf · uploaded 6 Jun 2022Source
- DocumentP51700047779 · Layout 1.pdf · uploaded 8 Nov 2022Source
- DocumentP51700047779 · Build Layout.pdf · uploaded 8 Nov 2022Source
- DocumentP51700047777 · Build Lay.pdf · uploaded 9 Nov 2022Source
- DocumentP51700047779 · IRIS Layout Upload.pdf · uploaded 17 Nov 2022Source
- DocumentP51700047777 · For IRIS D.pdf · uploaded 24 Nov 2022Source
- DocumentP51700047777 · 2 Copy of Layout Approval (in case of layout).pdf · uploaded 24 Nov 2022Source
- DocumentP51700047777 · 3 Copy of Layout Approval (in case of layout).pdf · uploaded 24 Nov 2022Source
- DocumentP51700045890 · Layout - IRIS B.pdf · uploaded 25 Jul 2026Source
- DocumentP51700045890 · Sheet no 2.pdf · uploaded 25 Jul 2026Source
- DocumentP51700045890 · Sheet no 40.pdf · uploaded 25 Jul 2026Source
- DocumentP51700045890 · Sheet no 41.pdf · uploaded 25 Jul 2026Source
- DocumentP51700045890 · Sheet no 42.pdf · uploaded 25 Jul 2026Source
- DocumentP51700047779 · 1 IRIS-C_Layout - Compress.pdf · uploaded 12 Aug 2026Source
- DocumentP51700047779 · 2 Master Layout - Sheet 02.pdf · uploaded 12 Aug 2026Source
- DocumentP51700047779 · 3 Sheet 43 - Gr 1st.pdf · uploaded 12 Aug 2026Source
- DocumentP51700047779 · 4 Sheet 44 - Typing Floor Unit BUA Parking.pdf · uploaded 12 Aug 2026Source
- DocumentP51700047779 · 5 Sheet 45.pdf · uploaded 12 Aug 2026Source
- DocumentP51700045890 · IRIS-B_Layout-merged (1) - converted.pdf · uploaded 29 Sep 2026Source
Technical (Architect)
- DocumentP51700034862 · Upper Thane - IRIS Wing A - P51700034862 - June24.pdf · uploaded 10 Aug 2024Source
- DocumentP51700045890 · Upper Thane -IRIS Wing B - P51700045890 - June24.pdf · uploaded 24 Oct 2024Source
- DocumentP51700034862 · Upper Thane - IRIS Wing A - P51700034862 - June24.pdf · uploaded 24 Oct 2024Source
- DocumentP51700047779 · Upper Thane -IRIS Wing C - P51700047779 - June24.pdf · uploaded 24 Oct 2024Source
- DocumentP51700047777 · UT Iris wing D.pdf · uploaded 4 Nov 2024Source
- DocumentP51700045890 · Iris wing B.pdf · uploaded 4 Nov 2024Source
- DocumentP51700034862 · Iris wing A.pdf · uploaded 4 Nov 2024Source
- DocumentP51700047779 · UT iris wing C.pdf · uploaded 4 Nov 2024Source
- DocumentP51700045890 · UT Iris Wing B.pdf · uploaded 24 Jan 2025Source
- DocumentP51700034862 · UT Iris Wing A.pdf · uploaded 24 Jan 2025Source
- DocumentP51700047779 · UT Iris Wing C.pdf · uploaded 24 Jan 2025Source
- DocumentP51700047777 · Form 1 (Upper Thane -IRIS - Wing D).pdf · uploaded 2 May 2025Source
- DocumentP51700045890 · Form 1 (Upper Thane -IRIS - Wing B).pdf · uploaded 2 May 2025Source
- DocumentP51700034862 · Form 1 (Upper Thane -IRIS - Wing A).pdf · uploaded 2 May 2025Source
- DocumentP51700047779 · Form 1 (Upper Thane -IRIS - Wing C).pdf · uploaded 2 May 2025Source
- DocumentP51700047777 · Form1 - Upper Thane -IRIS Wing D - P51700047777.pdf · uploaded 20 Jul 2026Source
- DocumentP51700047779 · Form1 - Upper Thane -IRIS Wing C - P51700047779.pdf · uploaded 20 Jul 2026Source
- DocumentP51700045890 · Upper Thane - IRIS Wing B - Form1 - June-26 - P51700045890.pdf · uploaded 25 Jul 2026Source
Technical (Engineer)
- DocumentP51700034862 · Casa Belvedere - P51700046311 - Form2 - Sep23.pdf · uploaded 8 Dec 2023Source
- DocumentP51700034862 · Signed Iris A Declaration - Form 2 and 3 - Dec 24.pdf · uploaded 20 Feb 2025Source
- DocumentP51700047777 · form 2 iris wing d Signed.pdf · uploaded 20 Jul 2026Source
- DocumentP51700047779 · form 2 iris wing C Signed.pdf · uploaded 20 Jul 2026Source
- DocumentP51700045890 · Form 2 - Iris B June2026.pdf · uploaded 25 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 291, 293/1
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Phases
- 4
- Unit types
- —551 units in all
- Address
- 293/1 and 293/3, ., .PIN 421302
- Village
- Anjur, Bhiwandi taluka
- Land area for this project
- 3,824 sq m (41,157 sq ft)
- Permissible built-up area
- 24,064 sq m (2,59,022 sq ft)
- Sanctioned built-up area
- 21,876 sq m (2,35,471 sq ft)
- Recreational open space
- 1,545 sq m (16,630 sq ft)
- Designated bank account
- 76
- Developed in phases
- No
- Also registered as
- Upper Thane-IRIS Wing A, Upper Thane-Iris Wing B, Upper Thane-IRIS Wing C, Upper Thane-IRIS Wing D
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
293/1 and 293/3
Boundaries
- North
- 263
- South
- 293
- East
- 292
- West
- 298by3
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking551 units
551 units registered
| RERA | Building | Type | Carpet area | Units |
|---|---|---|---|---|
| P51700034862 | Wing A | — | — | 138 |
| P51700045890 | Wing B | — | — | 135 |
| P51700047779 | Wing C of Sector D Cluster 5.03 Type I2 | — | — | 143 |
| P51700047777 | Wing E of Cluster 5 Point 03 of Sector D | — | — | 135 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals21
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Pradeep Kamble | — | P51700034862 |
| Architect | Pradeep Kamble | — | P51700047779 |
| Architect | Pradeep Kamble | — | P51700047777 |
| Architect | Pradeep Kamble | — | P51700045890 |
| Architect | Vilas Desai & Associate | — | P51700045890 |
| Architect | Vilas Desai & Associate | — | P51700034862 |
| Architect | Vilas Desai & Associate | — | P51700047777 |
| Architect | Vilas Desai & Associate | — | P51700047779 |
Show all 21 professionalsShow fewer professionals
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Vilas Desai & Associates | — | P51700047779 |
| Chartered accountant | Chirag Sarvaiya | — | P51700047779 |
| Chartered accountant | Chirag Sarvaiya & Co | — | P51700047777 |
| Chartered accountant | Chirag Sarvaiya & Co | — | P51700034862 |
| Chartered accountant | Chirag Sarvaiya & Co | — | P51700045890 |
| Engineer | Amit Patil | — | P51700034862 |
| Engineer | Amit Patil | — | P51700047777 |
| Engineer | Amit Patil | — | P51700047779 |
| Engineer | K C Shah Consultants | — | P51700045890 |
| Engineer | K C Shah Consultants | — | P51700034862 |
| Engineer | K C Shah Consultants | — | P51700047777 |
| Engineer | Mehul Kaivant Kaivant | — | P51700045890 |
| Engineer | Mehul Shah | — | P51700047779 |
Source: MahaRERA project page. Contact details are not shown.