Completed7 floorsRERA P51700008312

Gure Dev, Guru Dev

Deedo IDDP-THN-5V26-GD

MahaRERA has not published a flat-by-flat record for this tower, and no registered deed names it yet.

All of Guru Dev
Median saleNot on recordneeds 3 or more sales
Completion28 Dec 2018as registered
Units & parking in Gure Dev
TypeCarpet areaUnitsBooked
1RK17.5 m² (188 sq.ft)1Not on record
1RK19.9 m² (214 sq.ft)1Not on record
1RK32.1 m² (346 sq.ft)2Not on record
1RK32.2 m² (346 sq.ft)2Not on record
1RK33.2 m² (357 sq.ft)3Not on record
1RK37.4 m² (403 sq.ft)18Not on record
1RK45.3 m² (488 sq.ft)1Not on record
1RK47.2 m² (508 sq.ft)1Not on record

Parking: Closed/Covered 0 · Open Space 1 (as declared to MahaRERA)

Construction progress (declared)

Work completed, as the promoter reported it to MahaRERA (Form 1). Not verified on site.

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
As registered with MahaRERA
RERA registration
P51700008312 · registered 18 Aug 2017
Promised completion
28 Dec 2018
Sanctioned habitable floors
7
Deedo ID
DP-THN-5V26-GD
Questions about Gure Dev

When is Gure Dev due for completion?

The MahaRERA registration promises 28 Dec 2018.

How many floors does Gure Dev have?

7 sanctioned habitable floors, as registered with MahaRERA.

Data through11 Oct 2026SourcesMahaRERA registration and project page · IGR Maharashtra Index IIFloors and units are as registered; a promoter can revise them in later filings. Party names appear only inside an unlocked Index II.Report a problemMethodology