Kreston Tower

Deedo IDDP-RAI-DEE7

It is due for completion in Dec 2030, with no extension on record; no MahaRERA orders on record; 0% of its units are booked.

Dronagiri, Raigarh 401072 · by Heritage Constech LLP

DeliveryDue Dec 2030No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales0% booked0 of 42 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

It is due for completion in Dec 2030, with no extension on record

  • This projectRegistered 30 Oct 2019, completion promised 31 Dec 2030.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52000022841
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5200002284130 Oct 201931 Dec 203031 Dec 2030Heritage Constech LLPProject page
Documents167

1 document held by Deedo, 166 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardCompany Pan Card.pdf · uploaded 18 Oct 2019Source

Legal

  • Legal Title reportHeritage Constech LLP - Search Report.pdf · uploaded 18 Oct 2019Source
  • Declaration Form BForm B.pdf · uploaded 21 Oct 2019Source
  • Declaration Form BFORM -B.pdf · uploaded 4 Dec 2024Source

Migrated

  • 1 PAN CardCompany Pan Card.pdf · uploaded 18 Oct 2019Source
  • 1 Copy of the legal title reportHeritage Constech LLP - Search Report.pdf · uploaded 18 Oct 2019Source
  • 1 Copy of Layout Approval (in case of layout)Approved Layout.pdf · uploaded 18 Oct 2019Source
Show all 167 documentsShow fewer documents

Migrated

  • 1 Building Plan Approval / NA Order for plotted developmentCC and IOD.pdf · uploaded 18 Oct 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC and IOD.pdf · uploaded 18 Oct 2019Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate.pdf · uploaded 18 Oct 2019Source
  • 1 Proforma of Allotment letterAllotment letter and Sales Agreement.pdf · uploaded 18 Oct 2019Source
  • 1 Details of encumbrancesSelf Declartion_encumbrance.pdf · uploaded 21 Oct 2019Source
  • 2 Commencement Certificates / NA Order for plotted developmentHeritage CC old.pdf · uploaded 21 Oct 2019Source
  • 1 Declaration in FORM BForm B.pdf · uploaded 21 Oct 2019Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 21 Oct 2019Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 21 Oct 2019Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A 2019-20.pdf · uploaded 30 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A 2020-21.pdf · uploaded 30 Nov 2024Source
  • 2 Declaration about Commencement CertificateFORMAT D for 05-09-2019.pdf · uploaded 30 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 2021-22.pdf · uploaded 30 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 2022-23.pdf · uploaded 30 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 2023-24.pdf · uploaded 30 Nov 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Heritage LLP_ Nov-2024.pdf · uploaded 2 Dec 2024Source
  • 1 Declaration in FORM BFORM -B.pdf · uploaded 4 Dec 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Signed Form 1.pdf · uploaded 4 Dec 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Form 3.pdf · uploaded 4 Dec 2024Source
  • 1 Disclosure of sold/ booked inventoryCir 29.pdf · uploaded 4 Dec 2024Source
  • 1 CERSAI detailsDECLARATION of Cersai.pdf · uploaded 4 Dec 2024Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A - Seperate Bank Account Details.pdf · uploaded 4 Dec 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Format N.pdf · uploaded 4 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Beatum Heights as on Sep 2024.pdf · uploaded 14 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 FY 2019-20.pdf · uploaded 14 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 FY 2020-21.pdf · uploaded 14 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 FY 2021-22.pdf · uploaded 14 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 2022-23.pdf · uploaded 14 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 FY 2023-24.pdf · uploaded 14 Dec 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Signed Form 2.pdf · uploaded 16 Dec 2024Source
  • 1 Copy of Layout Approval (in case of layout)Plan 1.pdf · uploaded 31 Jan 2025Source
  • 1 Commencement Certificates / NA Order for plotted development1 Commencement Certificates _ NA Order for plotted development (1).pdf · uploaded 31 Jan 2025Source
  • 2 Commencement Certificates / NA Order for plotted developmentNew CC.pdf · uploaded 31 Jan 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentPlan 2.pdf · uploaded 31 Jan 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentPlan 3.pdf · uploaded 31 Jan 2025Source
  • 3 Building Plan Approval / NA Order for plotted developmentPlan 4.pdf · uploaded 31 Jan 2025Source
  • 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 31 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 21 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf · uploaded 21 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 21 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)01 ARCHITECT'S CERTIFICATE - march 2023.pdf · uploaded 6 May 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)02 ARCHITECT'S CERTIFICATE - june 2023.pdf · uploaded 6 May 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)03 ARCHITECT'S CERTIFICATE - september 2023.pdf · uploaded 6 May 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)04 ARCHITECT'S CERTIFICATE - december 2023.pdf · uploaded 6 May 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)05 ARCHITECT'S CERTIFICATE - march 2024.pdf · uploaded 6 May 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)01 ARCHITECT'S CERTIFICATE - march 2023.pdf · uploaded 7 May 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)02 ARCHITECT'S CERTIFICATE - june 2023.pdf · uploaded 7 May 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)03 ARCHITECT'S CERTIFICATE - september 2023.pdf · uploaded 7 May 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)04 ARCHITECT'S CERTIFICATE - december 2023.pdf · uploaded 7 May 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)05 ARCHITECT'S CERTIFICATE - march 2024.pdf · uploaded 7 May 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)06 ARCHITECT'S CERTIFICATE - june 2024.pdf · uploaded 7 May 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)07 ARCHITECT'S CERTIFICATE - december 2024.pdf · uploaded 7 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 Form 3 - Mar 2023_11zon.pdf · uploaded 9 Jun 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)2 Form 3 - Jun 2023_11zon.pdf · uploaded 9 Jun 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 Form 3 - Sep 2023_11zon.pdf · uploaded 9 Jun 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)4 Form 3 - Dec 2023_11zon.pdf · uploaded 9 Jun 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)5 Form 3 - Mar 2024_11zon.pdf · uploaded 9 Jun 2025Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)6 Form 3 - Jun 2024_11zon.pdf · uploaded 9 Jun 2025Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)7 Form 3 - Nov 2024_11zon.pdf · uploaded 9 Jun 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 31-03-2023.pdf · uploaded 9 Jun 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 30-06-2023.pdf · uploaded 9 Jun 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 30-09-2023.pdf · uploaded 9 Jun 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 31-12-2023.pdf · uploaded 9 Jun 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)5 31-03-2024.pdf · uploaded 9 Jun 2025Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 30-06-2024.pdf · uploaded 9 Jun 2025Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 30-09-2024.pdf · uploaded 9 Jun 2025Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 31-12-2024.pdf · uploaded 9 Jun 2025Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)9 31-03-2025.pdf · uploaded 9 Jun 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Form 1 - June 2023.pdf · uploaded 14 Jun 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 Form 1 - Septemeber 2023.pdf · uploaded 14 Jun 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 Form 1 - December 2023.pdf · uploaded 14 Jun 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)5 Form 1 - March 2024.pdf · uploaded 14 Jun 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 Form 1 - June 2024.pdf · uploaded 14 Jun 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)7 Form 1 - December 2024.pdf · uploaded 14 Jun 2025Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)8 Form 1 - March 2025.pdf · uploaded 14 Jun 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Form 1 - March 2023.pdf · uploaded 14 Jun 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)9 Form 3 - Mar 2025.pdf · uploaded 14 Jun 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)8 Form 3 - Dec 2024.pdf · uploaded 14 Jun 2025Source
  • 1 Disclosure of sold/ booked inventory1 Circular 29 - March 2023.pdf · uploaded 14 Jun 2025Source
  • 2 Disclosure of sold/ booked inventory2 Circular 29 - June 2023.pdf · uploaded 14 Jun 2025Source
  • 3 Disclosure of sold/ booked inventory3 Circular 29 - September 2023.pdf · uploaded 14 Jun 2025Source
  • 4 Disclosure of sold/ booked inventory4 Circular 29 - December 2023.pdf · uploaded 14 Jun 2025Source
  • 5 Disclosure of sold/ booked inventory5 Circular 29 - March 2024.pdf · uploaded 14 Jun 2025Source
  • 6 Disclosure of sold/ booked inventory6 Circular 29 - June 2024.pdf · uploaded 14 Jun 2025Source
  • 7 Disclosure of sold/ booked inventory7 Circular 29 - September 2024.pdf · uploaded 14 Jun 2025Source
  • 8 Disclosure of sold/ booked inventory8 Circular 29 - December 2024.pdf · uploaded 14 Jun 2025Source
  • 9 Disclosure of sold/ booked inventory9 Circular 29 - March 2025.pdf · uploaded 14 Jun 2025Source
  • Form 1Form 1 - Kreston Tower as on June 2025.pdf · uploaded 29 Jul 2025Source
  • Form 2Form 2 - Kreston Tower as on June 2025.pdf · uploaded 29 Jul 2025Source
  • Form 3Form 3 - Kreston Tower as on June 2025.pdf · uploaded 29 Jul 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Kreston Tower as on June 2025.pdf · uploaded 29 Jul 2025Source
  • Form 5 (FY 2024-2025)Form 5 - Kreston Tower FY 2024-25.pdf · uploaded 29 Sep 2025Source
  • Form 1Form 1 - Kreston Tower as on Sep 2025.pdf · uploaded 23 Jan 2026Source
  • Form 2Form 2 - Kreston Tower as on Sep 2025.pdf · uploaded 23 Jan 2026Source
  • Form 3Form 3 - Kreston Tower as on Sep 2025.pdf · uploaded 23 Jan 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Kreston Tower as on Sep 2025.pdf · uploaded 23 Jan 2026Source
  • Form 1Form 1 - Kreston Tower as on Dec 2025.pdf · uploaded 21 Feb 2026Source
  • Form 2Form 2 - Kreston Tower as on Dec 2025 (SIGNED).pdf · uploaded 21 Feb 2026Source
  • Form 3Form 3 - Kreston Tower as on Dec 2025.pdf · uploaded 21 Feb 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Kreston Tower as on Dec 2025.pdf · uploaded 21 Feb 2026Source
  • Withdrawal Update Form 1Form 1 Architect Certificate.pdf · uploaded 10 Mar 2026Source
  • Withdrawal Update Form 2Engineers Certificate.pdf · uploaded 10 Mar 2026Source
  • Withdrawal Update Form 3Form-3 CA Certificate.pdf · uploaded 10 Mar 2026Source
  • Withdrawal Update Form 1Form 1 - Kreston Tower as on March 2026.pdf · uploaded 3 May 2026Source
  • Withdrawal Update Form 2Form 2 - Kreston Tower as on March 2026.pdf · uploaded 3 May 2026Source
  • Withdrawal Update Form 3Form 3 - Kreston Tower as on March 2026.pdf · uploaded 3 May 2026Source
  • Withdrawal Update Form 1Form 1 - Kreston Tower June 2026.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 2Form 2 - Kreston Tower June 2026.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 3Form 3 - Kreston Tower June 2026.pdf · uploaded 18 Jul 2026Source
  • Form 2A (FY 2024-2025)Form 2A FY 2024-25.pdf · uploaded 12 Aug 2026Source
  • Form 2A (FY 2025-2026)Form 2A FY 2025-26.pdf · uploaded 12 Aug 2026Source
  • Form 5 (FY 2025-2026)Form-5 Kreston Tower on FY 2025-26.pdf · uploaded 11 Sep 2026Source
  • Form 2A (FY 2019-2020)Form-2A Kreston Tower of FY 2019-20.pdf · uploaded 18 Sep 2026Source
  • Form 2A (FY 2020-2021)Form-2A Kreston Tower of FY 2020-21.pdf · uploaded 18 Sep 2026Source
  • Form 2A (FY 2021-2022)Form-2A Kreston Tower of FY 2021-22.pdf · uploaded 18 Sep 2026Source
  • Form 2A (FY 2022-2023)Form-2A Kreston Tower of FY 2022-23.pdf · uploaded 18 Sep 2026Source
  • Form 2A (FY 2023-2024)Form-2A Kreston Tower of FY 2023-24.pdf · uploaded 18 Sep 2026Source

Technical

  • DocumentApproved Layout.pdf · uploaded 18 Oct 2019Source
  • DocumentCC and IOD.pdf · uploaded 18 Oct 2019Source
  • DocumentPlan 1.pdf · uploaded 31 Jan 2025Source
  • DocumentPlan 2.pdf · uploaded 31 Jan 2025Source
  • DocumentPlan 3.pdf · uploaded 31 Jan 2025Source
  • DocumentPlan 4.pdf · uploaded 31 Jan 2025Source

Technical (Architect)

  • DocumentSigned Form 1.pdf · uploaded 4 Dec 2024Source
  • Document2 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 21 Feb 2025Source
  • Document01 ARCHITECT'S CERTIFICATE - march 2023.pdf · uploaded 6 May 2025Source
  • Document02 ARCHITECT'S CERTIFICATE - june 2023.pdf · uploaded 6 May 2025Source
  • Document03 ARCHITECT'S CERTIFICATE - september 2023.pdf · uploaded 6 May 2025Source
  • Document04 ARCHITECT'S CERTIFICATE - december 2023.pdf · uploaded 6 May 2025Source
  • Document05 ARCHITECT'S CERTIFICATE - march 2024.pdf · uploaded 6 May 2025Source
  • Document01 ARCHITECT'S CERTIFICATE - march 2023.pdf · uploaded 7 May 2025Source
  • Document02 ARCHITECT'S CERTIFICATE - june 2023.pdf · uploaded 7 May 2025Source
  • Document03 ARCHITECT'S CERTIFICATE - september 2023.pdf · uploaded 7 May 2025Source
  • Document04 ARCHITECT'S CERTIFICATE - december 2023.pdf · uploaded 7 May 2025Source
  • Document05 ARCHITECT'S CERTIFICATE - march 2024.pdf · uploaded 7 May 2025Source
  • Document06 ARCHITECT'S CERTIFICATE - june 2024.pdf · uploaded 7 May 2025Source
  • Document07 ARCHITECT'S CERTIFICATE - december 2024.pdf · uploaded 7 May 2025Source
  • Document1 Form 1 - March 2023.pdf · uploaded 14 Jun 2025Source
  • Document2 Form 1 - June 2023.pdf · uploaded 14 Jun 2025Source
  • Document3 Form 1 - Septemeber 2023.pdf · uploaded 14 Jun 2025Source
  • Document4 Form 1 - December 2023.pdf · uploaded 14 Jun 2025Source
  • Document5 Form 1 - March 2024.pdf · uploaded 14 Jun 2025Source
  • Document6 Form 1 - June 2024.pdf · uploaded 14 Jun 2025Source
  • Document7 Form 1 - December 2024.pdf · uploaded 14 Jun 2025Source
  • Document8 Form 1 - March 2025.pdf · uploaded 14 Jun 2025Source
  • DocumentForm 1 - Kreston Tower June 2026.pdf · uploaded 18 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 - Beatum Heights as on Sep 2024.pdf · uploaded 14 Dec 2024Source
  • DocumentSigned Form 2.pdf · uploaded 16 Dec 2024Source
  • Document3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 21 Feb 2025Source
  • Document1 31-03-2023.pdf · uploaded 9 Jun 2025Source
  • Document2 30-06-2023.pdf · uploaded 9 Jun 2025Source
  • Document3 30-09-2023.pdf · uploaded 9 Jun 2025Source
  • Document4 31-12-2023.pdf · uploaded 9 Jun 2025Source
  • Document5 31-03-2024.pdf · uploaded 9 Jun 2025Source
  • Document6 30-06-2024.pdf · uploaded 9 Jun 2025Source
  • Document7 30-09-2024.pdf · uploaded 9 Jun 2025Source
  • Document8 31-12-2024.pdf · uploaded 9 Jun 2025Source
  • Document9 31-03-2025.pdf · uploaded 9 Jun 2025Source
  • DocumentForm 2 - Kreston Tower June 2026.pdf · uploaded 18 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel Plot No. 4 at Uran

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, Shop42 units in all
Address
Plot No. 4, Sector 50, DronagiriPIN 401072
Land area for this project
1,099 sq m (11,832 sq ft)
Permissible built-up area
5,315 sq m (57,215 sq ft)
Sanctioned built-up area
5,303 sq m (57,078 sq ft)
Recreational open space
0 sq m (0 sq ft)
Designated bank account
86
Developed in phases
No

Survey, CTS, gat or plot numbers

Plot No. 4 at Uran

Land as published on MahaRERA's project page

Plot No. 4

Boundaries

North
Plot No 5
South
Plot No 3
East
22 meter wide road
West
Plot No 7-8-9

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking42 units

0 of 42 units booked (0%), as the promoter reported to MahaRERA

1BHK · 24 units2BHK · 12 unitsShop · 6 units
TypeCarpet areaUnitsBooked
1BHK29.41 sq m · 317 sq ft80
1BHK29.42 sq m · 317 sq ft120
1BHK31.39 sq m · 338 sq ft40
2BHK38.5 sq m · 414 sq ft20
2BHK44.75 sq m · 482 sq ft20
2BHK48.96 sq m · 527 sq ft80
Shop13.5 sq m · 145 sq ft10
Shop24.38 sq m · 262 sq ft10
Show all 12 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Shop24.75 sq m · 266 sq ft10
Shop37.13 sq m · 400 sq ft10
Shop44.42 sq m · 478 sq ft10
Shop55.45 sq m · 597 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals2

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
Chartered accountantJayesh Rathod—
EngineerAftab Ansari—

Source: MahaRERA project page. Contact details are not shown.

Data through12 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology