Royal Palm
Deedo IDDP-RAI-CRCCMahaRERA shows it completed; no MahaRERA orders on record; 36% of its units are booked.
Ulawe, Raigarh 410206 · by Marquis Builders
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 22 Feb 2022, completion promised 31 Dec 2026.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52000033516
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000033516 | 22 Feb 2022 | 31 Dec 2026 | 31 Dec 2026 | Marquis Builders | Project page |
Documents195
1 document held by Deedo, 194 filings listed on MahaRERA's project page
Finance
- PAN CardPan Card_CompressPdf.pdf · uploaded 27 Jan 2022Source
Legal
- Legal Title reportTitle Report_compressed.pdf · uploaded 6 Jan 2022Source
- Legal Title reportSearch Report_compressed.pdf · uploaded 27 Jan 2022Source
- Declaration Form BForm-B_Brijesh Mavani_compressed.pdf · uploaded 12 Feb 2022Source
- OthersEncumbrances to Legal.pdf · uploaded 1 Oct 2025Source
- OthersDECELERATION ABOUT COMMENCEMENT CERTIFICATE FORM D.pdf · uploaded 1 Oct 2025Source
- OthersDisclosure of interest kapupara.pdf · uploaded 1 Oct 2025Source
Show all 195 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportTitle Report_compressed.pdf · uploaded 6 Jan 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)From-3_compressed.pdf · uploaded 6 Jan 2022Source
- 1 Details of encumbrancesMARQUIS BUILDERS.pdf · uploaded 8 Jan 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCC_compressed.pdf · uploaded 8 Jan 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200227643237_For_Asset_Based_Search_07_01_2022_12_36_27_777.pdf · uploaded 8 Jan 2022Source
- 1 Proforma of Allotment letterdraft agreement.pdf · uploaded 8 Jan 2022Source
- 1 PAN CardPan Card_CompressPdf.pdf · uploaded 27 Jan 2022Source
- 2 Copy of the legal title reportSearch Report_compressed.pdf · uploaded 27 Jan 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentLatest CC.pdf · uploaded 27 Jan 2022Source
- 2 Proforma of Allotment letterAllotment Letter as per RERA ACT.pdf · uploaded 27 Jan 2022Source
- 1 Copy of Layout Approval (in case of layout)Plan_01_compressed.pdf · uploaded 11 Feb 2022Source
- 2 Copy of Layout Approval (in case of layout)Plan_02_compressed.pdf · uploaded 11 Feb 2022Source
- 3 Copy of Layout Approval (in case of layout)Plan_03_compressed.pdf · uploaded 11 Feb 2022Source
- 4 Copy of Layout Approval (in case of layout)Plan_04_compressed.pdf · uploaded 11 Feb 2022Source
- 5 Copy of Layout Approval (in case of layout)Plan_05_compressed.pdf · uploaded 11 Feb 2022Source
- 6 Copy of Layout Approval (in case of layout)Plan_06_compressed.pdf · uploaded 11 Feb 2022Source
- 7 Copy of Layout Approval (in case of layout)Plan_07_compressed.pdf · uploaded 11 Feb 2022Source
- 8 Copy of Layout Approval (in case of layout)Plan_08_compressed.pdf · uploaded 11 Feb 2022Source
- 9 Copy of Layout Approval (in case of layout)Plan_09_compressed.pdf · uploaded 11 Feb 2022Source
- 10 Copy of Layout Approval (in case of layout)Plan_10_compressed.pdf · uploaded 11 Feb 2022Source
- 11 Copy of Layout Approval (in case of layout)Plan_11_compressed.pdf · uploaded 11 Feb 2022Source
- 12 Copy of Layout Approval (in case of layout)Plan_12_compressed.pdf · uploaded 11 Feb 2022Source
- 13 Copy of Layout Approval (in case of layout)Plan_13_compressed.pdf · uploaded 11 Feb 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan_01_compressed.pdf · uploaded 11 Feb 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentPlan_02_compressed.pdf · uploaded 11 Feb 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentPlan_03_compressed.pdf · uploaded 11 Feb 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentPlan_04_compressed.pdf · uploaded 11 Feb 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentPlan_05_compressed.pdf · uploaded 11 Feb 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentPlan_06_compressed.pdf · uploaded 11 Feb 2022Source
- 7 Building Plan Approval / NA Order for plotted developmentPlan_07_compressed.pdf · uploaded 11 Feb 2022Source
- 8 Building Plan Approval / NA Order for plotted developmentPlan_08_compressed.pdf · uploaded 11 Feb 2022Source
- 9 Building Plan Approval / NA Order for plotted developmentPlan_09_compressed.pdf · uploaded 11 Feb 2022Source
- 10 Building Plan Approval / NA Order for plotted developmentPlan_10_compressed.pdf · uploaded 11 Feb 2022Source
- 11 Building Plan Approval / NA Order for plotted developmentPlan_11_compressed.pdf · uploaded 11 Feb 2022Source
- 12 Building Plan Approval / NA Order for plotted developmentPlan_12_compressed.pdf · uploaded 11 Feb 2022Source
- 13 Building Plan Approval / NA Order for plotted developmentPlan_13_compressed.pdf · uploaded 11 Feb 2022Source
- 1 Declaration in FORM BForm-B_Brijesh Mavani_compressed.pdf · uploaded 12 Feb 2022Source
- 1 Declaration about Commencement CertificateDocScanner 16 Feb 2022 11-11 am.pdf · uploaded 16 Feb 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate(Royal palm) Signed.pdf · uploaded 23 Dec 2024Source
- 2 a Details of encumbrances concerned to FinanceSELF DECLARATION ABOUT ENCUMBRANCE CONCERNED TO FINANCE.pdf · uploaded 3 Jan 2025Source
- 1 a Details of encumbrances concerned to Finance1 Details of encumbrances (2).pdf · uploaded 3 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 Sept 24.pdf · uploaded 3 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Sep 24.pdf · uploaded 3 Jan 2025Source
- 1 Declaration about Commencement CertificateDECELERATION ABOUT COMMENCEMENT CERTIFICATE FORM D.pdf · uploaded 3 Jan 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)DECLARATION ABOUT SEPRATE BANK STATEMENT FOR REAL ESTATE PROJECT FORMAT A.pdf · uploaded 3 Jan 2025Source
- 1 Deviation Report with respect to Allotment letterNO DEVIATION FROM MODEL ALLOTMENT LETTER.pdf · uploaded 3 Jan 2025Source
- 1 b Details of encumbrances concerned to Legal1 Details of encumbrances (2).pdf · uploaded 3 Jan 2025Source
- 2 b Details of encumbrances concerned to LegalSELF DECLARATION ABOUT ENCUMBRANCE CONCERNED TO FINANCE.pdf · uploaded 3 Jan 2025Source
- 1 Other – TechnicalDECELERATION CUM UNDER TAKING ANNEXURE A.pdf · uploaded 3 Jan 2025Source
- 1 Deviation Report with respect to model copy of AgreementNO DEVIATION FROM AGREEMENT FOR SALE.pdf · uploaded 3 Jan 2025Source
- 1 Proforma of Agreement for sale1 Proforma of Allotment letter (1).pdf · uploaded 3 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form - 2A (2023 - -2024).pdf · uploaded 3 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Fy 23-24 - Signed.pdf · uploaded 3 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3(Signed).pdf · uploaded 7 Jan 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsBrijesh.pdf · uploaded 7 Jan 2025Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsRajesh.pdf · uploaded 7 Jan 2025Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsPraful.pdf · uploaded 7 Jan 2025Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsMukesh.pdf · uploaded 7 Jan 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentHighlighted CC.pdf · uploaded 8 Jan 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentHighlighted Plan 2.pdf · uploaded 8 Jan 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentHighlighted Plan- 3.pdf · uploaded 8 Jan 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentHighlighted Plan-1.pdf · uploaded 8 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD DISCLOSURE.pdf · uploaded 8 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 fy 22-23.pdf · uploaded 8 Jan 2025Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 fy 22-23.pdf · uploaded 8 Jan 2025Source
- 3 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 22-23_page-0001.pdf · uploaded 8 Jan 2025Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD DISCLOSURE.pdf · uploaded 11 Jan 2025Source
- 3 Disclosure of sold/ booked inventorySOLD UNSOLD DISCLOSURE - Revised Final.pdf · uploaded 11 Jan 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 23.pdf · uploaded 18 Jan 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1 June 23.pdf · uploaded 18 Jan 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 23.pdf · uploaded 18 Jan 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 23.pdf · uploaded 18 Jan 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 24.pdf · uploaded 20 Jan 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 24.pdf · uploaded 20 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 March 23.pdf · uploaded 20 Jan 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 June 23.pdf · uploaded 20 Jan 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Sept 23.pdf · uploaded 20 Jan 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Dec 23.pdf · uploaded 20 Jan 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 24.pdf · uploaded 20 Jan 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 June 24.pdf · uploaded 20 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 2022-23- RP.pdf · uploaded 20 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Signed_compressed (1).pdf · uploaded 22 Jan 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Dec 24.pdf · uploaded 23 Jan 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3(Signed).pdf · uploaded 25 Jan 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf · uploaded 25 Jan 2025Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FINAL.pdf · uploaded 25 Jan 2025Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 25 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Mar 25.pdf · uploaded 21 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Royal palm.pdf · uploaded 21 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2.pdf · uploaded 21 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySold Unsold 25.pdf · uploaded 23 Apr 2025Source
- Form 1Form - 1.pdf · uploaded 19 Sep 2025Source
- Form 2FORM 2.pdf · uploaded 19 Sep 2025Source
- Form 3Form 3_Royal Palm_Signed.pdf · uploaded 19 Sep 2025Source
- Disclosure of Sold and Booked InventorySOLD BOOK.pdf · uploaded 19 Sep 2025Source
- Form 1Form 1 Mar 25.pdf · uploaded 25 Sep 2025Source
- Form 2Form - 2.pdf · uploaded 25 Sep 2025Source
- Form 3Form 3 Royal palm.pdf · uploaded 25 Sep 2025Source
- Disclosure of Sold and Booked InventorySold Unsold 25.pdf · uploaded 25 Sep 2025Source
- Form 1Form -1 Sept 24.pdf · uploaded 29 Sep 2025Source
- Form 1Form 1 - Dec 24.pdf · uploaded 29 Sep 2025Source
- Form 2form 2.pdf · uploaded 29 Sep 2025Source
- Form 2form 2 (1).pdf · uploaded 29 Sep 2025Source
- Form 3CA Certificate(Royal palm) Signed.pdf · uploaded 29 Sep 2025Source
- Form 3Form-3(Signed).pdf · uploaded 29 Sep 2025Source
- Disclosure of Sold and Booked InventorySold unsold.pdf · uploaded 29 Sep 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold_ booked inventory.pdf · uploaded 29 Sep 2025Source
- Withdrawal Update Form 1Form - 1.pdf · uploaded 29 Sep 2025Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 29 Sep 2025Source
- Withdrawal Update Form 3Form 3_Royal Palm_Signed.pdf · uploaded 29 Sep 2025Source
- Form 5 (FY 2024-2025)Form 5 royal palm_fy 2024-25_Scanned.pdf · uploaded 4 Oct 2025Source
- Withdrawal Update Form 1form 1 2025 SEPTEMBER.pdf · uploaded 18 Nov 2025Source
- Withdrawal Update Form 2Form 2 Sept 2025.pdf · uploaded 18 Nov 2025Source
- Withdrawal Update Form 3Form 3 Royal Palm (30-09-2025)_Cleint Signed (1).pdf · uploaded 18 Nov 2025Source
- Withdrawal Update Form 1ROYAL PALM - Q3 FORM 1 (Proper Sign).pdf · uploaded 5 Feb 2026Source
- Withdrawal Update Form 2ROYAL PALM - Q3 - FORM 2 _compressed.pdf · uploaded 5 Feb 2026Source
- Withdrawal Update Form 3ROYAL PALM - Q3 FORM 3.pdf · uploaded 5 Feb 2026Source
- Form 2A (FY 2024-2025)Form 2 A 2024-25 final.pdf · uploaded 9 Mar 2026Source
- Withdrawal Update Form 1Royal Palm - Q4 - Form 1.pdf · uploaded 30 Apr 2026Source
- Withdrawal Update Form 2Royal Palm - Q4 - Form 2.pdf · uploaded 30 Apr 2026Source
- Withdrawal Update Form 3Royal Palm - Q4 - Form 3.pdf · uploaded 30 Apr 2026Source
- Occupational CertificatePLAN-pages-2.pdf · uploaded 10 Jun 2026Source
- Occupational CertificatePLAN-pages-3.pdf · uploaded 10 Jun 2026Source
- Occupational CertificatePLAN-pages-4.pdf · uploaded 10 Jun 2026Source
- Occupational CertificatePLAN-pages-5.pdf · uploaded 10 Jun 2026Source
- Occupational CertificatePLAN-pages-6.pdf · uploaded 10 Jun 2026Source
- Occupational CertificatePLAN-pages-7.pdf · uploaded 10 Jun 2026Source
- Occupational CertificatePLAN-pages-8.pdf · uploaded 10 Jun 2026Source
- Occupational CertificatePLAN-pages-9.pdf · uploaded 10 Jun 2026Source
- Occupational CertificatePLAN-pages-10.pdf · uploaded 10 Jun 2026Source
- Occupational CertificateForm 1 Royal Palm.pdf · uploaded 10 Jun 2026Source
- Occupational CertificateForm 2 Royal Palm.pdf · uploaded 10 Jun 2026Source
- Occupational CertificateForm 3 Royal Palm.pdf · uploaded 10 Jun 2026Source
- Occupational CertificateOC mail verification.pdf · uploaded 10 Jun 2026Source
- Occupational CertificatePLAN-pages-1.pdf · uploaded 10 Jun 2026Source
- Occupational CertificateOC.pdf · uploaded 10 Jun 2026Source
- Form 2A (FY 2025-2026)Form 2 A.pdf · uploaded 6 Oct 2026Source
Technical
- DocumentPlan_01_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_02_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_03_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_04_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_05_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_06_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_07_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_08_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_09_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_10_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_11_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_12_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_13_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_01_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_02_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_03_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_04_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_05_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_06_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_07_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_08_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_09_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_10_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_11_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_12_compressed.pdf · uploaded 11 Feb 2022Source
- DocumentPlan_13_compressed.pdf · uploaded 11 Feb 2022Source
- Other – TechnicalDECELERATION CUM UNDER TAKING ANNEXURE A.pdf · uploaded 3 Jan 2025Source
- DocumentHighlighted Plan-1.pdf · uploaded 8 Jan 2025Source
- DocumentHighlighted Plan 2.pdf · uploaded 8 Jan 2025Source
- DocumentHighlighted Plan- 3.pdf · uploaded 8 Jan 2025Source
Technical (Architect)
- DocumentForm 1 March 23.pdf · uploaded 18 Jan 2025Source
- DocumentForm1 June 23.pdf · uploaded 18 Jan 2025Source
- DocumentForm 1 Sept 23.pdf · uploaded 18 Jan 2025Source
- DocumentForm 1 Dec 23.pdf · uploaded 18 Jan 2025Source
- DocumentForm 1 June 24.pdf · uploaded 20 Jan 2025Source
- DocumentForm 1 March 24.pdf · uploaded 20 Jan 2025Source
- DocumentForm 1 - Dec 24.pdf · uploaded 23 Jan 2025Source
- DocumentForm 1 Mar 25.pdf · uploaded 21 Apr 2025Source
- DocumentRoyal Palm - Q4 - Form 1.pdf · uploaded 30 Apr 2026Source
Technical (Engineer)
- DocumentFORM 2 March 23.pdf · uploaded 20 Jan 2025Source
- DocumentFORM 2 June 23.pdf · uploaded 20 Jan 2025Source
- DocumentFORM 2 Sept 23.pdf · uploaded 20 Jan 2025Source
- DocumentFORM 2 Dec 23.pdf · uploaded 20 Jan 2025Source
- DocumentForm 2 March 24.pdf · uploaded 20 Jan 2025Source
- DocumentFORM 2 June 24.pdf · uploaded 20 Jan 2025Source
- Document1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf · uploaded 25 Jan 2025Source
- DocumentForm 2 FINAL.pdf · uploaded 25 Jan 2025Source
- Document8 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 25 Jan 2025Source
- DocumentForm - 2.pdf · uploaded 21 Apr 2025Source
- DocumentRoyal Palm - Q4 - Form 2.pdf · uploaded 30 Apr 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel PLOT NO-98, SECTOR-18
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK Landowner, 2BHK promoter, 2BHK Promoter, 3BHK landowner, 3BHK Landowner, 3BHK promoter, Shop, Shop landowner, Shop promoter140 units in all
- Address
- Plot No-98, Sector-18, Ulwe Node, Panvel, Raigad 410206, Plot No-98, Sector-18, , Ulwe NodePIN 410206
- Village
- Ulawe, Panvel taluka
- Location
- 18.96621, 73.02212
- Land area for this project
- 3,650 sq m (39,288 sq ft)
- Permissible built-up area
- 12,428 sq m (1,33,774 sq ft)
- Sanctioned built-up area
- 12,379 sq m (1,33,251 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 220
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
PLOT NO-98, SECTOR-18, ULWE NODE, PANVEL, RAIGAD 410206
Boundaries
- North
- Plot No-97
- South
- 30 Mtr Wide Road
- East
- 15 Mtr Wide Road
- West
- Plot No-99
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking140 units
51 of 140 units booked (36%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK Landowner | 56.57 sq m · 609 sq ft | 5 | 0 |
| 2BHK Landowner | 56.58 sq m · 609 sq ft | 10 | 0 |
| 2BHK Landowner | 56.69 sq m · 610 sq ft | 5 | 0 |
| 2BHK Landowner | 58.07 sq m · 625 sq ft | 5 | 0 |
| 2BHK promoter | 56.57 sq m · 609 sq ft | 6 | 4 |
| 2BHK promoter | 56.69 sq m · 610 sq ft | 6 | 4 |
| 2BHK promoter | 58.07 sq m · 625 sq ft | 7 | 5 |
| 2BHK promoter | 58.88 sq m · 634 sq ft | 11 | 0 |
Show all 34 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK promoter | 61.35 sq m · 660 sq ft | 9 | 0 |
| 2BHK Promoter | 56.12 sq m · 604 sq ft | 2 | 0 |
| 2BHK Promoter | 56.58 sq m · 609 sq ft | 1 | 1 |
| 2BHK Promoter | 56.58 sq m · 609 sq ft | 14 | 10 |
| 3BHK landowner | 79.9 sq m · 860 sq ft | 5 | 0 |
| 3BHK landowner | 81.84 sq m · 881 sq ft | 6 | 4 |
| 3BHK Landowner | 81.84 sq m · 881 sq ft | 5 | 0 |
| 3BHK promoter | 79.9 sq m · 860 sq ft | 1 | 1 |
| 3BHK promoter | 79.9 sq m · 860 sq ft | 6 | 5 |
| 3BHK promoter | 81.84 sq m · 881 sq ft | 1 | 1 |
| Shop | 61.18 sq m · 659 sq ft | 1 | 0 |
| Shop landowner | 37.14 sq m · 400 sq ft | 2 | 0 |
| Shop landowner | 42.7 sq m · 460 sq ft | 4 | 1 |
| Shop landowner | 43.36 sq m · 467 sq ft | 2 | 0 |
| Shop landowner | 47.04 sq m · 506 sq ft | 1 | 0 |
| Shop landowner | 49.84 sq m · 536 sq ft | 2 | 0 |
| Shop landowner | 56.69 sq m · 610 sq ft | 4 | 0 |
| Shop promoter | 33.49 sq m · 360 sq ft | 1 | 1 |
| Shop promoter | 35.74 sq m · 385 sq ft | 1 | 1 |
| Shop promoter | 37.14 sq m · 400 sq ft | 2 | 0 |
| Shop promoter | 43.36 sq m · 467 sq ft | 2 | 2 |
| Shop promoter | 47 sq m · 506 sq ft | 1 | 1 |
| Shop promoter | 56.69 sq m · 610 sq ft | 1 | 1 |
| Shop promoter | 56.69 sq m · 610 sq ft | 8 | 6 |
| Shop promoter | 61.46 sq m · 662 sq ft | 2 | 2 |
| Shop promoter | 97.06 sq m · 1,045 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Atul Patel | — |
| Chartered accountant | CA Rishabh Lodaya | — |
| Chartered accountant | J B Patel And Associates | — |
| Engineer | CSE Consultants | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Ulawe
- Vertis SkyeRERA PM1270002602722
- Shivesh MahavirRERA PM1270002602135
- Reddy's Gurukrupa HeightsRERA PR1270002601976
- Wind CastleRERA PR1270002601802
- YashodhamRERA PM1270002601243
- Varniraj VivantRERA PM1270002601106
- Progressive AuraRERA PM1270002601038
- North OneRERA PM1270002600964
All 697 projects in Ulawe · Compare Royal Palm with another project