Skip to content
Deedo home
Menu

Delta Tower 2

Certificate Signed

Ulawe, Raigarh 410206 |Promoter: Vansh Enterprises

9 Aug 2017Registered with MahaRERA
30 Sep 2022Promised completion
5Buildings
260Units registered65 booked (25%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
5
Unit types
2 BHK, 2BHK, 3BHK, Shop type 1, Shop type 2, Shop type 3, Shop type 4, Shop type 5, Shop type 6, Shop type 7, 3 BHK260 units in all
Address
PLOT NO 02, Plot No. 02, Sector - 08PIN 410206
Designated bank account
148
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.96969, 73.01330
Delta Tower 2 is at latitude 18.96969, longitude 73.01330.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Sep 2022

The latest completion date on record passed 4 years and 1 month ago.

Registered
9 Aug 2017
Promised
30 Sep 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P520000047569 Aug 201730 Sep 202230 Sep 2022Vansh EnterprisesProject page

5 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing A1555
Wing B1552
Wing C1552
Wing D1556
Wing E1545

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

65 of 260 units booked (25%), as the promoter reported to MahaRERA

2 BHK · 1 unit2BHK · 180 units3BHK · 45 unitsShop type 1 · 11 unitsShop type 2 · 7 unitsShop type 3 · 5 unitsShop type 4 · 3 unitsShop type 5 · 2 unitsShop type 6 · 4 unitsShop type 7 · 1 unit3 BHK · 1 unit
BuildingTypeCarpet areaUnitsBooked
Wing A2 BHK45.05 sq m · 485 sq ft11
Wing A2BHK48.58 sq m · 523 sq ft114
Wing A2BHK55.44 sq m · 597 sq ft102
Wing A3BHK64.24 sq m · 691 sq ft20
Wing A3BHK64.25 sq m · 692 sq ft104
Wing A3BHK64.28 sq m · 692 sq ft10
Wing A3BHK74.32 sq m · 800 sq ft103
Wing AShop type 135.17 sq m · 379 sq ft22
Show all 57 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Wing AShop type 236.36 sq m · 391 sq ft11
Wing AShop type 331.81 sq m · 342 sq ft22
Wing AShop type 433.8 sq m · 364 sq ft11
Wing AShop type 532.23 sq m · 347 sq ft11
Wing AShop type 631.55 sq m · 340 sq ft21
Wing AShop type 745.5 sq m · 490 sq ft10
Wing B2BHK44.51 sq m · 479 sq ft10
Wing B2BHK45.19 sq m · 486 sq ft10
Wing B2BHK45.75 sq m · 492 sq ft10
Wing B2BHK46.38 sq m · 499 sq ft114
Wing B2BHK46.42 sq m · 500 sq ft10
Wing B2BHK47.05 sq m · 506 sq ft103
Wing B2BHK55.44 sq m · 597 sq ft205
Wing BShop type 131.55 sq m · 340 sq ft30
Wing BShop type 232.23 sq m · 347 sq ft30
Wing BShop type 345.5 sq m · 490 sq ft10
Wing C2BHK44.51 sq m · 479 sq ft10
Wing C2BHK45.19 sq m · 486 sq ft10
Wing C2BHK45.73 sq m · 492 sq ft20
Wing C2BHK46.36 sq m · 499 sq ft103
Wing C2BHK46.41 sq m · 500 sq ft10
Wing C2BHK47.04 sq m · 506 sq ft102
Wing C2BHK55.39 sq m · 596 sq ft50
Wing C2BHK55.44 sq m · 597 sq ft153
Wing CShop type 131.55 sq m · 340 sq ft43
Wing CShop type 232.23 sq m · 347 sq ft22
Wing CShop type 345.5 sq m · 490 sq ft10
Wing D2BHK45.75 sq m · 492 sq ft10
Wing D2BHK46.67 sq m · 502 sq ft194
Wing D2BHK55.44 sq m · 597 sq ft153
Wing D3BHK66.67 sq m · 718 sq ft73
Wing D3BHK74.04 sq m · 797 sq ft54
Wing DShop type 131.55 sq m · 340 sq ft20
Wing DShop type 232.23 sq m · 347 sq ft10
Wing DShop type 333.81 sq m · 364 sq ft10
Wing DShop type 431.81 sq m · 342 sq ft20
Wing DShop type 540 sq m · 431 sq ft10
Wing DShop type 635.17 sq m · 379 sq ft20
Wing E2BHK44.37 sq m · 478 sq ft10
Wing E2BHK45.11 sq m · 486 sq ft10
Wing E2BHK45.23 sq m · 487 sq ft10
Wing E2BHK45.94 sq m · 494 sq ft103
Wing E2BHK48.21 sq m · 519 sq ft10
Wing E2BHK49.04 sq m · 528 sq ft50
Wing E2BHK55.39 sq m · 596 sq ft150
Wing E3 BHK64.4 sq m · 693 sq ft10
Wing E3BHK65.18 sq m · 702 sq ft31
Wing E3BHK65.19 sq m · 702 sq ft20
Wing E3BHK74.32 sq m · 800 sq ft50

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 137 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Cardvansh enterprises pancard.pdf · uploaded 23 Jul 2017Source
  • PAN CardMIDTOWN PAN.pdf · uploaded 23 Jul 2017Source

Legal

  • OtherJV for RERA.pdf · uploaded 23 Jul 2017Source
  • OtherTP 1 2.pdf · uploaded 23 Jul 2017Source
  • Otherfinal Order Delta 2.pdf · uploaded 23 Jul 2017Source
  • OtherPOA MID TO VNS 1 16.pdf · uploaded 23 Jul 2017Source
  • OtherPOA MID TO VNS 17 34.pdf · uploaded 23 Jul 2017Source
Show all 138 documentsShow fewer documents

Legal

  • OtherPOA VNS TO MID 1 18.pdf · uploaded 23 Jul 2017Source
  • OtherPOA VNS TO MID 19 39.pdf · uploaded 23 Jul 2017Source
  • Legal Title reportTitle Report.PDF · uploaded 23 Jul 2017Source
  • Declaration Form BFORM B DELTA 2 final.pdf · uploaded 28 Jul 2017Source

Migrated

  • 1 PAN Cardvansh enterprises pancard.pdf · uploaded 23 Jul 2017Source
  • 2 PAN CardMIDTOWN PAN.pdf · uploaded 23 Jul 2017Source
  • 1 Copy of the legal title reportTitle Report.PDF · uploaded 23 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)LAY OUT PLAN.PDF · uploaded 23 Jul 2017Source
  • 1 Building Plan Approval (IOD)CC PLAN 1 OLD.pdf · uploaded 23 Jul 2017Source
  • 2 Building Plan Approval (IOD)CC PLAN 2 OLD.pdf · uploaded 23 Jul 2017Source
  • 3 Building Plan Approval (IOD)CC PLAN 3 OLD.pdf · uploaded 23 Jul 2017Source
  • 4 Building Plan Approval (IOD)CC PLAN 4 OLD.pdf · uploaded 23 Jul 2017Source
  • 5 Building Plan Approval (IOD)CC PLAN 5 OLD.pdf · uploaded 23 Jul 2017Source
  • 6 Building Plan Approval (IOD)CC PLAN 6 OLD.pdf · uploaded 23 Jul 2017Source
  • 7 Building Plan Approval (IOD)CC PLAN 7 OLD.pdf · uploaded 23 Jul 2017Source
  • 8 Building Plan Approval (IOD)CC PLAN 8 OLD.pdf · uploaded 23 Jul 2017Source
  • 9 Building Plan Approval (IOD)CC PLAN 11 OLD.pdf · uploaded 23 Jul 2017Source
  • 10 Building Plan Approval (IOD)CC PLAN 12 OLD.pdf · uploaded 23 Jul 2017Source
  • 11 Building Plan Approval (IOD)CC PLAN 14 OLD.pdf · uploaded 23 Jul 2017Source
  • 12 Building Plan Approval (IOD)2nd CC 1.PDF · uploaded 23 Jul 2017Source
  • 13 Building Plan Approval (IOD)2nd CC 2.PDF · uploaded 23 Jul 2017Source
  • 14 Building Plan Approval (IOD)2nd CC 3.PDF · uploaded 23 Jul 2017Source
  • 15 Building Plan Approval (IOD)2nd CC 4.PDF · uploaded 23 Jul 2017Source
  • 16 Building Plan Approval (IOD)2nd CC 5.PDF · uploaded 23 Jul 2017Source
  • 17 Building Plan Approval (IOD)2nd CC 6.PDF · uploaded 23 Jul 2017Source
  • 18 Building Plan Approval (IOD)2nd CC 7.PDF · uploaded 23 Jul 2017Source
  • 19 Building Plan Approval (IOD)2nd CC 8.PDF · uploaded 23 Jul 2017Source
  • 20 Building Plan Approval (IOD)2nd CC 9.PDF · uploaded 23 Jul 2017Source
  • 21 Building Plan Approval (IOD)2ND CC 10.PDF · uploaded 23 Jul 2017Source
  • 22 Building Plan Approval (IOD)2nd CC 11.PDF · uploaded 23 Jul 2017Source
  • 23 Building Plan Approval (IOD)2nd CC 12.PDF · uploaded 23 Jul 2017Source
  • 24 Building Plan Approval (IOD)2nd CC 13.PDF · uploaded 23 Jul 2017Source
  • 25 Building Plan Approval (IOD)2nd CC 14.PDF · uploaded 23 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC COPY OLD.pdf · uploaded 23 Jul 2017Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC COPY RVSD.pdf · uploaded 23 Jul 2017Source
  • 1 OtherJV for RERA.pdf · uploaded 23 Jul 2017Source
  • 2 OtherTP 1 2.pdf · uploaded 23 Jul 2017Source
  • 3 Otherfinal Order Delta 2.pdf · uploaded 23 Jul 2017Source
  • 4 OtherPOA MID TO VNS 1 16.pdf · uploaded 23 Jul 2017Source
  • 5 OtherPOA MID TO VNS 17 34.pdf · uploaded 23 Jul 2017Source
  • 6 OtherPOA VNS TO MID 1 18.pdf · uploaded 23 Jul 2017Source
  • 7 OtherPOA VNS TO MID 19 39.pdf · uploaded 23 Jul 2017Source
  • 1 Details of encumbrancesDeclaration Delta 2.pdf · uploaded 28 Jul 2017Source
  • 1 Declaration in FORM BFORM B DELTA 2 final.pdf · uploaded 28 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)delta 2 final archi.pdf · uploaded 28 Jul 2017Source
  • 2 Details of encumbrancesDELARATION ENSM MIDTOWN.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGG CERTI DELTA 2 FINAL.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of CA (Form 3)MIDTOWN CA CERTIFICATE REHAB FINAL.pdf · uploaded 29 Jul 2017Source
  • 2 Certificates of CA (Form 3)DELTA TOWER II FINAL CA.pdf · uploaded 29 Jul 2017Source
  • 1 Proforma of Allotment letterWITH ANNE DRAFT RERA- BELOW 1 MB.pdf · uploaded 29 Jul 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certi for Q1 D2.PDF · uploaded 4 Dec 2017Source
  • 3 Certificates of CA (Form 3)CA Certi For Q1 D2.PDF · uploaded 4 Dec 2017Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA ARCHITECT CERTI.pdf · uploaded 31 Mar 2018Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng Certi 2nd Up.pdf · uploaded 31 Mar 2018Source
  • 4 Certificates of CA (Form 3)D2 CA Certi.pdf · uploaded 31 Mar 2018Source
  • 26 Building Plan Approval (IOD)1.PDF · uploaded 25 Sep 2018Source
  • 27 Building Plan Approval (IOD)2.PDF · uploaded 25 Sep 2018Source
  • 28 Building Plan Approval (IOD)3.PDF · uploaded 25 Sep 2018Source
  • 29 Building Plan Approval (IOD)4.PDF · uploaded 25 Sep 2018Source
  • 30 Building Plan Approval (IOD)5.PDF · uploaded 25 Sep 2018Source
  • 31 Building Plan Approval (IOD)6.PDF · uploaded 25 Sep 2018Source
  • 32 Building Plan Approval (IOD)7.PDF · uploaded 25 Sep 2018Source
  • 33 Building Plan Approval (IOD)8.PDF · uploaded 25 Sep 2018Source
  • 34 Building Plan Approval (IOD)9.PDF · uploaded 25 Sep 2018Source
  • 35 Building Plan Approval (IOD)10.PDF · uploaded 25 Sep 2018Source
  • 36 Building Plan Approval (IOD)11.PDF · uploaded 25 Sep 2018Source
  • 37 Building Plan Approval (IOD)12.PDF · uploaded 25 Sep 2018Source
  • 38 Building Plan Approval (IOD)13.PDF · uploaded 25 Sep 2018Source
  • 39 Building Plan Approval (IOD)14.PDF · uploaded 25 Sep 2018Source
  • 40 Building Plan Approval (IOD)15.PDF · uploaded 25 Sep 2018Source
  • 41 Building Plan Approval (IOD)16.PDF · uploaded 25 Sep 2018Source
  • 42 Building Plan Approval (IOD)17.PDF · uploaded 25 Sep 2018Source
  • 43 Building Plan Approval (IOD)18.PDF · uploaded 25 Sep 2018Source
  • 44 Building Plan Approval (IOD)19.PDF · uploaded 25 Sep 2018Source
  • 45 Building Plan Approval (IOD)20.PDF · uploaded 25 Sep 2018Source
  • 3 Commencement Certificates / NA Order for plotted developmentAmended CC D2.pdf · uploaded 25 Sep 2018Source
  • 1 Certificates of CA (Form 5)Form 5- Delta Tower 2.pdf · uploaded 15 Oct 2018Source
  • 1 Architect’s Certificate on Completion of Project (Form 4)Virtual completion certificate - Delta Tower 2.pdf · uploaded 31 Jan 2020Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentDelta Tower 2 OC.pdf · uploaded 24 Sep 2020Source
  • 2 Architect’s Certificate on Completion of Project (Form 4)Form 4 with OC.pdf · uploaded 24 Sep 2020Source
  • 1 Disclosure of sold/ booked inventoryDisclosure.pdf · uploaded 28 May 2021Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)Delta Tower 2 Society Registration Certificate.pdf · uploaded 26 Apr 2023Source

Technical

  • Document2nd CC 14.PDF · uploaded 23 Jul 2017Source
  • Document2nd CC 13.PDF · uploaded 23 Jul 2017Source
  • Document2ND CC 10.PDF · uploaded 23 Jul 2017Source
  • Document2nd CC 11.PDF · uploaded 23 Jul 2017Source
  • Document2nd CC 12.PDF · uploaded 23 Jul 2017Source
  • DocumentLAY OUT PLAN.PDF · uploaded 23 Jul 2017Source
  • DocumentCC PLAN 1 OLD.pdf · uploaded 23 Jul 2017Source
  • DocumentCC PLAN 2 OLD.pdf · uploaded 23 Jul 2017Source
  • DocumentCC PLAN 3 OLD.pdf · uploaded 23 Jul 2017Source
  • DocumentCC PLAN 4 OLD.pdf · uploaded 23 Jul 2017Source
  • DocumentCC PLAN 5 OLD.pdf · uploaded 23 Jul 2017Source
  • DocumentCC PLAN 6 OLD.pdf · uploaded 23 Jul 2017Source
  • DocumentCC PLAN 7 OLD.pdf · uploaded 23 Jul 2017Source
  • DocumentCC PLAN 8 OLD.pdf · uploaded 23 Jul 2017Source
  • DocumentCC PLAN 11 OLD.pdf · uploaded 23 Jul 2017Source
  • DocumentCC PLAN 12 OLD.pdf · uploaded 23 Jul 2017Source
  • DocumentCC PLAN 14 OLD.pdf · uploaded 23 Jul 2017Source
  • Document2nd CC 1.PDF · uploaded 23 Jul 2017Source
  • Document2nd CC 2.PDF · uploaded 23 Jul 2017Source
  • Document2nd CC 3.PDF · uploaded 23 Jul 2017Source
  • Document2nd CC 4.PDF · uploaded 23 Jul 2017Source
  • Document2nd CC 5.PDF · uploaded 23 Jul 2017Source
  • Document2nd CC 6.PDF · uploaded 23 Jul 2017Source
  • Document2nd CC 7.PDF · uploaded 23 Jul 2017Source
  • Document2nd CC 8.PDF · uploaded 23 Jul 2017Source
  • Document2nd CC 9.PDF · uploaded 23 Jul 2017Source
  • Document1.PDF · uploaded 25 Sep 2018Source
  • Document2.PDF · uploaded 25 Sep 2018Source
  • Document3.PDF · uploaded 25 Sep 2018Source
  • Document4.PDF · uploaded 25 Sep 2018Source
  • Document5.PDF · uploaded 25 Sep 2018Source
  • Document6.PDF · uploaded 25 Sep 2018Source
  • Document7.PDF · uploaded 25 Sep 2018Source
  • Document8.PDF · uploaded 25 Sep 2018Source
  • Document9.PDF · uploaded 25 Sep 2018Source
  • Document10.PDF · uploaded 25 Sep 2018Source
  • Document11.PDF · uploaded 25 Sep 2018Source
  • Document12.PDF · uploaded 25 Sep 2018Source
  • Document13.PDF · uploaded 25 Sep 2018Source
  • Document14.PDF · uploaded 25 Sep 2018Source
  • Document15.PDF · uploaded 25 Sep 2018Source
  • Document16.PDF · uploaded 25 Sep 2018Source
  • Document17.PDF · uploaded 25 Sep 2018Source
  • Document18.PDF · uploaded 25 Sep 2018Source
  • Document19.PDF · uploaded 25 Sep 2018Source
  • Document20.PDF · uploaded 25 Sep 2018Source

Technical (Architect)

  • DocumentRERA ARCHITECT CERTI.pdf · uploaded 31 Mar 2018Source

Technical (Engineer)

  • DocumentEng Certi 2nd Up.pdf · uploaded 31 Mar 2018Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Ulawe, Panvel taluka

Survey, CTS, gat or plot numbers

PLOT NO 02

Boundaries

North
Plot No 1
South
Plot No 3
East
Plot No 9 10 11 12
West
30 mts wide road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSoyuz Talib Architect Pvt Ltd—
EngineerEpicons Consultants Pvt Ltd—
OtherRameshwar Infra—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology