Gokul
Deedo IDDP-RAI-PQRSMahaRERA shows it completed, after its date was pushed back 1 year and 5 months; no MahaRERA orders on record; 79% of its units are booked.
Pen (M Cl), Raigarh 402107 · by Suyash Builders And Developers
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed, after its date was pushed back 1 year and 5 months
- This projectRegistered 1 Nov 2018, completion promised 30 Oct 2024, revised to 6 Mar 2026.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
4 buildings
Open a building to see every flat, floor by floor.
- A Wing11 floors · 88 units80% booked
- B Wing16 floors · 56 units89% booked
- Commercial1 floor · 13 units0% booked
- C Wing13 floors · 88 units83% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52000018431
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000018431 | 1 Nov 2018 | 30 Oct 2024 | 6 Mar 2026 | Suyash Builders And Developers | Project page |
Documents267
2 documents held by Deedo, 265 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD.pdf · uploaded 25 Oct 2018Source
Legal
- Declaration Form BForm B-Rera.pdf · uploaded 29 Oct 2018Source
- Legal Title reportLegal Title Report Letter.pdf · uploaded 30 Oct 2018Source
- OtherPlinth Completion Certificate PMC A B Wing.pdf · uploaded 19 Feb 2022Source
- OtherPLINTH CERTIFICATE PMC C WING.pdf · uploaded 19 Feb 2022Source
- Legal Title reportTitle report - 2023.pdf · uploaded 28 Jul 2023Source
Show all 267 documentsShow fewer documents
Legal
Migrated
- 1 PAN CardPAN CARD.pdf · uploaded 25 Oct 2018Source
- 1 Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 25 Oct 2018Source
- 1 Building Plan Approval (IOD)01.pdf · uploaded 25 Oct 2018Source
- 2 Building Plan Approval (IOD)02.pdf · uploaded 25 Oct 2018Source
- 3 Building Plan Approval (IOD)03.pdf · uploaded 25 Oct 2018Source
- 4 Building Plan Approval (IOD)04.pdf · uploaded 25 Oct 2018Source
- 5 Building Plan Approval (IOD)05.pdf · uploaded 25 Oct 2018Source
- 6 Building Plan Approval (IOD)06.pdf · uploaded 25 Oct 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 25 Oct 2018Source
- 1 Details of encumbrancesEncumbrances.pdf · uploaded 27 Oct 2018Source
- 1 Proforma of Allotment letterAgreement for Sale - Declaration.pdf · uploaded 27 Oct 2018Source
- 1 Declaration in FORM BForm B-Rera.pdf · uploaded 29 Oct 2018Source
- 1 Copy of the legal title reportLegal Title Report Letter.pdf · uploaded 30 Oct 2018Source
- 1 Certificates of CA (Form 3)FORM 3_20181030011629 Reduce.pdf · uploaded 30 Oct 2018Source
- 2 Proforma of Allotment letterMaster Agreement 2 BHK.pdf · uploaded 9 Sep 2021Source
- 3 Proforma of Allotment letterMaster Agreement 1 BHK.pdf · uploaded 9 Sep 2021Source
- 1 Declaration about Commencement CertificateDeclaration about commencemnt certificate.pdf · uploaded 19 Feb 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A 2019-20.pdf · uploaded 19 Feb 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A 2020-21.pdf · uploaded 19 Feb 2022Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory.pdf · uploaded 19 Feb 2022Source
- 2 Certificates of CA (Form 3)Form 3 2018-19.pdf · uploaded 19 Feb 2022Source
- 3 Certificates of CA (Form 3)Form 3 2019-20.pdf · uploaded 19 Feb 2022Source
- 4 Certificates of CA (Form 3)Form 3 2020-21.pdf · uploaded 19 Feb 2022Source
- 5 Certificates of CA (Form 3)Form 3 Q- 1 2021-22.pdf · uploaded 19 Feb 2022Source
- 6 Certificates of CA (Form 3)Form 3 Q -2 2021-22.pdf · uploaded 19 Feb 2022Source
- 7 Certificates of CA (Form 3)Foem 3 Q-3 2021-22.pdf · uploaded 19 Feb 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Form 5 2017-18.pdf · uploaded 19 Feb 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 2018-19.pdf · uploaded 19 Feb 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 2019-20.pdf · uploaded 19 Feb 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 2020-21.pdf · uploaded 19 Feb 2022Source
- 1 OtherPlinth Completion Certificate PMC A B Wing.pdf · uploaded 19 Feb 2022Source
- 2 OtherPLINTH CERTIFICATE PMC C WING.pdf · uploaded 19 Feb 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentcommencement Certificate-2.pdf · uploaded 21 Feb 2022Source
- 2 Declaration about Commencement CertificateDeclaration about commencement Certificate.pdf · uploaded 21 Feb 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Q 3 2022.pdf · uploaded 23 Feb 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q3 2021-22.pdf · uploaded 26 Feb 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q-4 Architect Certificate.pdf · uploaded 21 May 2022Source
- 8 Certificates of CA (Form 3)Form - 3 -Q-4 CA certificate.pdf · uploaded 21 May 2022Source
- 3 Commencement Certificates / NA Order for plotted developmentNew CC.pdf · uploaded 12 Sep 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1.pdf · uploaded 17 Oct 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 17 Oct 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2.pdf · uploaded 17 Oct 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2.pdf · uploaded 17 Oct 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 17 Oct 2022Source
- 1 CERSAI detailsCREDAI BANM CERTIFICATE.pdf · uploaded 17 Oct 2022Source
- 9 Certificates of CA (Form 3)FORM-3_compressed_compressed.pdf · uploaded 17 Oct 2022Source
- 10 Certificates of CA (Form 3)FORM 3.pdf · uploaded 17 Oct 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 31 Oct 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 31 Oct 2022Source
- 11 Certificates of CA (Form 3)FORM 3.pdf · uploaded 31 Oct 2022Source
- 1 Proforma of Agreement for saleMaster Agreement 2 BHK.pdf · uploaded 31 Oct 2022Source
- 2 Proforma of Agreement for saleMaster Agreement 1 BHK .pdf · uploaded 31 Oct 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 DEC.pdf · uploaded 19 Jan 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2 DEC.pdf · uploaded 19 Jan 2023Source
- 12 Certificates of CA (Form 3)Form-3.pdf · uploaded 19 Jan 2023Source
- 7 Building Plan Approval (IOD)New CC plan.pdf · uploaded 24 Jul 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1.pdf · uploaded 24 Jul 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 24 Jul 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form- 2.pdf · uploaded 24 Jul 2023Source
- 13 Certificates of CA (Form 3)Form-3.pdf · uploaded 24 Jul 2023Source
- 14 Certificates of CA (Form 3)FORM 3 -q-4.pdf · uploaded 24 Jul 2023Source
- 2 Copy of the legal title reportTitle report - 2023.pdf · uploaded 28 Jul 2023Source
- 2 a Details of encumbrances concerned to FinanceEncumbered.pdf · uploaded 28 Jul 2023Source
- 1 b Details of encumbrances concerned to LegalEncumbered.pdf · uploaded 28 Jul 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form - 1.pdf · uploaded 28 Jul 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 28 Jul 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM -2 SIGN.pdf · uploaded 28 Jul 2023Source
- 15 Certificates of CA (Form 3)Form-3_compressed.pdf · uploaded 28 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM-5 FY 2021-22.pdf · uploaded 28 Jul 2023Source
- 8 Building Plan Approval (IOD)Ammended CC Plan with sign_compressed.pdf · uploaded 5 Aug 2023Source
- 3 Details of encumbrancesEncrumbance Certificate.pdf · uploaded 12 Aug 2023Source
- 2 Declaration in FORM BForm B.pdf · uploaded 12 Aug 2023Source
- 2 CERSAI detailsCersai.pdf · uploaded 12 Aug 2023Source
- 3 OtherCREDAI BANM CERTIFICATE.pdf · uploaded 14 Aug 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q-2 Form - 1.pdf · uploaded 6 Nov 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q-2 Form - 2.pdf · uploaded 6 Nov 2023Source
- 16 Certificates of CA (Form 3)Q-2 Form -3_compressed (2).pdf · uploaded 6 Nov 2023Source
- 9 Building Plan Approval (IOD)commencement certificate_compressed (1).pdf · uploaded 21 Dec 2023Source
- 4 Commencement Certificates / NA Order for plotted developmentcommencement certificate.pdf · uploaded 21 Dec 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q-3 FORM 1.pdf · uploaded 15 Feb 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q-3 FORM 2.pdf · uploaded 15 Feb 2024Source
- 17 Certificates of CA (Form 3)Q-3 FORM 3_11zon.pdf · uploaded 15 Feb 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)form-1.pdf · uploaded 3 Jun 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2.pdf · uploaded 3 Jun 2024Source
- 18 Certificates of CA (Form 3)Form-3_compressed.pdf · uploaded 3 Jun 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPART OCCUPANCY CERTIFICATE.pdf · uploaded 11 Oct 2024Source
- 2 Certificates of CA (Form 3)Form -III Q-1_compressed (1).pdf · uploaded 11 Nov 2024Source
- 3 Certificates of CA (Form 3)Form-III Q-2_compressed.pdf · uploaded 11 Nov 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Declaration about RERA Account.pdf · uploaded 11 Nov 2024Source
- 1 Deviation Report with respect to Allotment letterDeviation Report Allotment.pdf · uploaded 11 Nov 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report Agreement.pdf · uploaded 11 Nov 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in other REal Estate Organization.pdf · uploaded 11 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form-5 FY 2022-23.pdf · uploaded 11 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form -5 FY 2023-24.pdf · uploaded 11 Nov 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 with DPS sir sign.pdf · uploaded 16 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form II Q-2.pdf · uploaded 16 Nov 2024Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentA wing OC.pdf · uploaded 28 Nov 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A FY 2021-22.pdf · uploaded 7 Dec 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A FY 2022-23.pdf · uploaded 7 Dec 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A FY 2023-24.pdf · uploaded 7 Dec 2024Source
- 1 Architect’s Certificate on Completion of Project (Form 4)FORM - 4.pdf · uploaded 23 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1.pdf · uploaded 5 Feb 2025Source
- 2 Architect’s Certificate on Completion of Project (Form 4)Form -4.pdf · uploaded 5 Feb 2025Source
- 1 Certificates of CA (Form 3)Form-3_compressed (2).pdf · uploaded 5 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2.pdf · uploaded 5 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A - 2020.pdf · uploaded 7 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A - 2021.pdf · uploaded 7 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold.pdf · uploaded 7 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A - 2022.pdf · uploaded 7 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - 2023.pdf · uploaded 7 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - 2024.pdf · uploaded 7 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 6 Mar 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 6 Mar 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 6 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A FY-2019-2020.pdf · uploaded 6 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A FY-2020-21.pdf · uploaded 6 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A FY-2021-22.pdf · uploaded 6 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A FY-2022-23.pdf · uploaded 6 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A FY 2023-24.pdf · uploaded 6 Mar 2025Source
- Form 3Form-III Q-2_compressed.pdf · uploaded 21 May 2025Source
- Form 3Form-III Q-2_compressed.pdf · uploaded 21 May 2025Source
- Form 3Form-3_compressed.pdf · uploaded 28 May 2025Source
- Form 3Form -III Q-1_compressed (1).pdf · uploaded 28 May 2025Source
- Form 3Form-3_11zon.pdf · uploaded 28 May 2025Source
- Form 5 (FY 2018-2019)Form 5 2018-19.pdf · uploaded 10 Jul 2025Source
- Form 1Form 1 FY 2025-26 Q-1.pdf · uploaded 18 Jul 2025Source
- Form 2Form 2 FY-25-26 Q-1.pdf · uploaded 18 Jul 2025Source
- Form 3Form 3 FY 2025-26_11zon.pdf · uploaded 18 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold-booked inventory.pdf · uploaded 18 Jul 2025Source
- Form 1Form 1.pdf · uploaded 21 Jul 2025Source
- Form 2Form 2.pdf · uploaded 21 Jul 2025Source
- Form 3Form 3.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold-booked inventory.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold-booked inventory.pdf · uploaded 21 Jul 2025Source
- Form 1Form-1.pdf · uploaded 21 Jul 2025Source
- Form 2Form-2.pdf · uploaded 21 Jul 2025Source
- Form 3Form-3.pdf · uploaded 21 Jul 2025Source
- Form 1Form -1.pdf · uploaded 21 Jul 2025Source
- Form 2Form-2.pdf · uploaded 21 Jul 2025Source
- Form 3Form-3 Q-1.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold-booked inventory.pdf · uploaded 21 Jul 2025Source
- Form 1FORM-1.pdf · uploaded 21 Jul 2025Source
- Form 2FORM-2.pdf · uploaded 21 Jul 2025Source
- Form 3FORM-3_11zon.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold-booked inventory.pdf · uploaded 21 Jul 2025Source
- Form 1FORM 1.pdf · uploaded 21 Jul 2025Source
- Form 2FORM 2.pdf · uploaded 21 Jul 2025Source
- Form 3FORM 3.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold-booked inventory.pdf · uploaded 21 Jul 2025Source
- Form 1Form -1.pdf · uploaded 21 Jul 2025Source
- Form 2Form- 2.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold-booked inventory.pdf · uploaded 21 Jul 2025Source
- Form 3Form-3.pdf · uploaded 21 Jul 2025Source
- Form 1FORM 1.pdf · uploaded 21 Jul 2025Source
- Form 2FORM 2.pdf · uploaded 21 Jul 2025Source
- Form 3FORM 3.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold-booked inventory.pdf · uploaded 21 Jul 2025Source
- Form 1Form 1.pdf · uploaded 21 Jul 2025Source
- Form 2Form 2.pdf · uploaded 21 Jul 2025Source
- Form 3Form 3.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold-booked inventory.pdf · uploaded 21 Jul 2025Source
- Form 1Form 1.pdf · uploaded 21 Jul 2025Source
- Form 2FORM-2.pdf · uploaded 21 Jul 2025Source
- Form 3Form - 3.pdf · uploaded 21 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold-booked inventory.pdf · uploaded 21 Jul 2025Source
- Form 1Form 1.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3Form 3.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosuer of Booked inventory.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3Form 3.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosuer of Booked inventory.pdf · uploaded 23 Jul 2025Source
- Form 1Form-1.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3Form-3.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosuer of Booked inventory.pdf · uploaded 23 Jul 2025Source
- Form 1Form-1 -.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3Form 3.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosuer of Booked inventory.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3Form 3.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosuer of Booked inventory.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3Form 3.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosuer of Booked inventory.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3Form 3.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosuer of Booked inventory.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3Form 3.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosuer of Booked inventory.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3Form 3.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosuer of Booked inventory.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3Form 3.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosuer of Booked inventory.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3Form 3.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosuer of Booked inventory.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3Form 3.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosuer of Booked inventory.pdf · uploaded 23 Jul 2025Source
- Form 5 (FY 2019-2020)Form 5 2019-20.pdf · uploaded 23 Jul 2025Source
- Form 5 (FY 2020-2021)Form 5 2020-21.pdf · uploaded 23 Jul 2025Source
- Form 5 (FY 2021-2022)FORM-5 FY 2021-22.pdf · uploaded 23 Jul 2025Source
- Form 5 (FY 2022-2023)Form-5 FY 2022-23.pdf · uploaded 23 Jul 2025Source
- Form 5 (FY 2023-2024)Form -5 FY 2023-24.pdf · uploaded 23 Jul 2025Source
- Form 2A (FY 2018-2019)Form 2A FY-2019-2020.pdf · uploaded 14 Oct 2025Source
- Form 2A (FY 2019-2020)Form 2A FY-2019-2020.pdf · uploaded 14 Oct 2025Source
- Form 2A (FY 2020-2021)Form 2A FY-2020-21.pdf · uploaded 14 Oct 2025Source
- Form 2A (FY 2021-2022)Form 2A FY-2021-22.pdf · uploaded 14 Oct 2025Source
- Form 2A (FY 2022-2023)Form 2A FY-2022-23.pdf · uploaded 14 Oct 2025Source
- Form 2A (FY 2023-2024)Form 2A FY 2023-24.pdf · uploaded 14 Oct 2025Source
- Form 1Form-1.pdf · uploaded 1 Dec 2025Source
- Form 2Form-2.pdf · uploaded 1 Dec 2025Source
- Form 3Form-3-c.pdf · uploaded 1 Dec 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold inventory.pdf · uploaded 1 Dec 2025Source
- Form 2A (FY 2024-2025)FORM-2A FY 2024-25.pdf · uploaded 1 Dec 2025Source
- Form 1Form - 1.pdf · uploaded 4 Mar 2026Source
- Form 2Form -2.pdf · uploaded 4 Mar 2026Source
- Form 3Form-3_c.pdf · uploaded 4 Mar 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Inventory.pdf · uploaded 4 Mar 2026Source
- Occupational CertificateA wing OC.pdf · uploaded 4 Mar 2026Source
- Occupational CertificateB wing OC copy.pdf · uploaded 4 Mar 2026Source
- Occupational CertificateC wing OC copy.pdf · uploaded 4 Mar 2026Source
- Occupational CertificateFull OC with commercial.pdf · uploaded 4 Mar 2026Source
- Form 2A (FY 2025-2026)Form 2A.pdf · uploaded 1 Apr 2026Source
Technical
- DocumentLayout Plan.pdf · uploaded 25 Oct 2018Source
- Document01.pdf · uploaded 25 Oct 2018Source
- Document02.pdf · uploaded 25 Oct 2018Source
- Document03.pdf · uploaded 25 Oct 2018Source
- Document04.pdf · uploaded 25 Oct 2018Source
- Document05.pdf · uploaded 25 Oct 2018Source
- Document06.pdf · uploaded 25 Oct 2018Source
- DocumentNew CC plan.pdf · uploaded 24 Jul 2023Source
- DocumentAmmended CC Plan with sign_compressed.pdf · uploaded 5 Aug 2023Source
- Documentcommencement certificate_compressed (1).pdf · uploaded 21 Dec 2023Source
Technical (Architect)
Technical (Engineer)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 113/PART
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, Commercial245 units in all
- Address
- 113/Part, Chinchpada Road, PenPIN 402107
- Village
- Pen (M Cl), Pen taluka
- Location
- 18.73073, 73.09029
- Land area for this project
- 6,230 sq m (67,059 sq ft)
- Permissible built-up area
- 11,069 sq m (1,19,145 sq ft)
- Sanctioned built-up area
- 9,191 sq m (98,936 sq ft)
- Recreational open space
- 538 sq m (5,791 sq ft)
- Designated bank account
- 109
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
113/PART
Boundaries
- North
- Survey No 120
- South
- Survey No 111
- East
- Dp Road 12 Mtr
- West
- Survey No 114
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking245 units
193 of 245 units booked (79%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | 1BHK | 27.02 sq m · 291 sq ft | 4 | 3 |
| A Wing | 1BHK | 27.52 sq m · 296 sq ft | 5 | 4 |
| A Wing | 1BHK | 29.01 sq m · 312 sq ft | 12 | 10 |
| A Wing | 1BHK | 29.5 sq m · 318 sq ft | 15 | 12 |
| A Wing | 1BHK | 29.62 sq m · 319 sq ft | 5 | 5 |
| A Wing | 1BHK | 29.9 sq m · 322 sq ft | 5 | 4 |
| A Wing | 1BHK | 30.37 sq m · 327 sq ft | 4 | 4 |
| A Wing | 1BHK | 30.59 sq m · 329 sq ft | 4 | 3 |
Show all 39 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | 1BHK | 31.61 sq m · 340 sq ft | 8 | 7 |
| A Wing | 1BHK | 31.72 sq m · 341 sq ft | 10 | 10 |
| A Wing | 1BHK | 33.52 sq m · 361 sq ft | 4 | 2 |
| A Wing | 1BHK | 33.56 sq m · 361 sq ft | 8 | 3 |
| A Wing | 1BHK | 33.76 sq m · 363 sq ft | 2 | 2 |
| A Wing | 1BHK | 33.95 sq m · 365 sq ft | 2 | 1 |
| B Wing | 2BHK | 45.43 sq m · 489 sq ft | 27 | 23 |
| B Wing | 2BHK | 45.53 sq m · 490 sq ft | 24 | 23 |
| B Wing | 2BHK | 46.94 sq m · 505 sq ft | 2 | 1 |
| B Wing | 2BHK | 50.95 sq m · 548 sq ft | 3 | 3 |
| Commercial | Commercial | 30.94 sq m · 333 sq ft | 2 | 0 |
| Commercial | Commercial | 44.03 sq m · 474 sq ft | 2 | 0 |
| Commercial | Commercial | 57.12 sq m · 615 sq ft | 2 | 0 |
| Commercial | Commercial | 59.35 sq m · 639 sq ft | 2 | 0 |
| Commercial | Commercial | 62.1 sq m · 668 sq ft | 2 | 0 |
| Commercial | Commercial | 106.92 sq m · 1,151 sq ft | 2 | 0 |
| Commercial | Commercial | 400.45 sq m · 4,310 sq ft | 1 | 0 |
| C Wing | 1BHK | 27.02 sq m · 291 sq ft | 4 | 4 |
| C Wing | 1BHK | 27.52 sq m · 296 sq ft | 5 | 4 |
| C Wing | 1BHK | 29.01 sq m · 312 sq ft | 12 | 12 |
| C Wing | 1BHK | 29.5 sq m · 318 sq ft | 15 | 15 |
| C Wing | 1BHK | 29.62 sq m · 319 sq ft | 5 | 4 |
| C Wing | 1BHK | 29.9 sq m · 322 sq ft | 5 | 4 |
| C Wing | 1BHK | 30.37 sq m · 327 sq ft | 4 | 3 |
| C Wing | 1BHK | 30.59 sq m · 329 sq ft | 4 | 4 |
| C Wing | 1BHK | 31.61 sq m · 340 sq ft | 8 | 6 |
| C Wing | 1BHK | 31.72 sq m · 341 sq ft | 10 | 9 |
| C Wing | 1BHK | 33.52 sq m · 361 sq ft | 4 | 3 |
| C Wing | 1BHK | 33.56 sq m · 361 sq ft | 8 | 3 |
| C Wing | 1BHK | 33.76 sq m · 363 sq ft | 2 | 1 |
| C Wing | 1BHK | 33.95 sq m · 365 sq ft | 2 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals7
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Sopan Prabhu | — |
| Chartered accountant | Hitesh Chandra | — |
| Chartered accountant | Vikki Rambhau Said | — |
| Engineer | Saurabh Dashrath Shingade | — |
| Other | Durgesh Gadgil | — |
| Other | Monika Electricals | — |
| Other | New Nerul Electrical works | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Pen (M Cl)
- Jagdamba NakshatraRERA PM1270002602498
- Heyansh HeightsRERA PM1270002601359
- Sathe SukrutRERA PR1270002600944
- Mauli Laxmi PujaRERA PR1270002600734
- SwapnashilpaRERA PR1270002502942
- AvantikaRERA PR1270002502802
- Antilia - 1RERA P52000081104
- Haware GrandeRERA PM1270002500678
All 112 projects in Pen (M Cl) · Compare Gokul with another project