Skip to content
Others · 1 building · 118 unitsRERA P52000033365

Autograph

Deedo IDDP-RAI-21DK

It is due for completion in Dec 2026, with no extension on record; no MahaRERA orders on record; 76% of its units are booked.

New Panvel, Raigarh 410206 · by Sairama Housing Estates Private Limited

DeliveryDue Dec 2026No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales76% booked90 of 118 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

It is due for completion in Dec 2026, with no extension on record

  • This projectRegistered 16 Feb 2022, completion promised 31 Dec 2026.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52000033365
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5200003336516 Feb 202231 Dec 202631 Dec 2026Sairama Housing Estates Private LimitedProject page
Documents108

1 document held by Deedo, 107 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Cardpancard.pdf · uploaded 28 Jan 2022Source

Legal

  • Legal Title reportlegal title and Search Report plot no -7.pdf · uploaded 28 Jan 2022Source
  • Declaration Form BDeclaration in FORM B.pdf · uploaded 28 Jan 2022Source
  • Legal Title reportLEGAL SEARCH REPORT FORMAT A plot no 7 sector 17.pdf · uploaded 9 Feb 2022Source

Migrated

  • 1 PAN Cardpancard.pdf · uploaded 28 Jan 2022Source
  • 1 Copy of the legal title reportlegal title and Search Report plot no -7.pdf · uploaded 28 Jan 2022Source
  • 1 Details of encumbrancesDetails of encumbrances final.pdf · uploaded 28 Jan 2022Source
Show all 108 documentsShow fewer documents

Migrated

  • 1 Copy of Layout Approval (in case of layout)Building plan1.pdf · uploaded 28 Jan 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentBuilding plan1.pdf · uploaded 28 Jan 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentBuilding plan2.pdf · uploaded 28 Jan 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentBuilding plan3.pdf · uploaded 28 Jan 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentBuilding plan4.pdf · uploaded 28 Jan 2022Source
  • 5 Building Plan Approval / NA Order for plotted developmentBuilding plan5.pdf · uploaded 28 Jan 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC copy.pdf · uploaded 28 Jan 2022Source
  • 1 Declaration about Commencement CertificateDeclaration About CC Form D.pdf · uploaded 28 Jan 2022Source
  • 1 Declaration in FORM BDeclaration in FORM B.pdf · uploaded 28 Jan 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report.pdf · uploaded 28 Jan 2022Source
  • 1 Proforma of Allotment letterAGRREMENT DRAFT-AUTOGRAPH NEW -21-1-22 (1).pdf · uploaded 28 Jan 2022Source
  • 2 Proforma of Allotment letterALLOTEMENT LETTER-AUTOGRAPH NEW 21-1-22.pdf · uploaded 28 Jan 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Atul Certificate Form1.pdf · uploaded 29 Jan 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate From 2.pdf · uploaded 29 Jan 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate From 3.pdf · uploaded 29 Jan 2022Source
  • 2 Copy of the legal title reportLEGAL SEARCH REPORT FORMAT A plot no 7 sector 17.pdf · uploaded 9 Feb 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)New format- Form 3 Sairama Autograph 31st March 2022.pdf · uploaded 22 Apr 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)AG_Form_1 _March 22.pdf · uploaded 27 Apr 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)AG_Form_2 _March 22.pdf · uploaded 27 Apr 2022Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Sairama Autograph- June 2022.pdf · uploaded 23 Jul 2022Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)New format- Form 3 Sairama Autograph 30th June 2022.pdf · uploaded 23 Jul 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-Autograph June 22.pdf · uploaded 25 Jul 2022Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Rera Form 02 autograph_compressed_organized_organized.pdf · uploaded 9 Aug 2022Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Sairama Autograph- September 2022.pdf · uploaded 21 Oct 2022Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sairama Autograph 30th September 2022.pdf · uploaded 21 Oct 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 01 Autograph.pdf · uploaded 2 Nov 2022Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Autograph.pdf · uploaded 2 Nov 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Certificate 286.pdf · uploaded 2 Nov 2022Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 -7-17 sairama autograph 3Qtr Dec-22.pdf · uploaded 31 Jan 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- 7-17 Sairama Autograph as on dec-22.pdf · uploaded 31 Jan 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Sairama Autograph as on December 2022.pdf · uploaded 31 Jan 2023Source
  • 1 Disclosure of sold/ booked inventoryCircular 29- Autograph.pdf · uploaded 17 Feb 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsRera Discloser Letter.pdf · uploaded 30 Mar 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Autograph as on March 2023.pdf · uploaded 2 May 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 PLOT NO 07 AUTOGRAPH MAR-23.pdf · uploaded 3 May 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 PLOT NO 07 AUTOGRAPH DEC-22.pdf · uploaded 3 May 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 PLOT NO 07 AUTOGRAPH MAR-23.pdf · uploaded 3 May 2023Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Autograph 30th June.pdf · uploaded 17 Jul 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Autograph as on 30-06-2023.pdf · uploaded 17 Jul 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Form 3 Autograph 30-06-2023.pdf · uploaded 17 Jul 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Autograph.pdf · uploaded 24 Jul 2023Source
  • 2 Disclosure of sold/ booked inventoryCIRCULAR 29 AUTOGRAPH.pdf · uploaded 6 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5- Sairama Autograph 22-23.pdf · uploaded 25 Sep 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Sairama Autograph as on Sep 2023.pdf · uploaded 19 Oct 2023Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Autograph 2nd QTR Signed.pdf · uploaded 20 Oct 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Autograph 2nd QTR Signed.pdf · uploaded 21 Oct 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Autograph as on Dec 2023.pdf · uploaded 13 Jan 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)New format- Form 3 Autograph Dec 2023.pdf · uploaded 19 Jan 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Signed Form 2 RERA Sairama Autograph Plot 07 Sector 17 New Panvel Q3.pdf · uploaded 20 Jan 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Autograph as on March 2024.pdf · uploaded 19 Apr 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Autograph as on March 2024.pdf · uploaded 25 Apr 2024Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Autograph as on March 2024.pdf · uploaded 25 Apr 2024Source
  • 2 Copy of Layout Approval (in case of layout)Pages from new floor plan_compressed.pdf · uploaded 6 May 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentnew floor plan_compressed.pdf · uploaded 6 May 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentSKMBT_C28024050409250.pdf · uploaded 6 May 2024Source
  • 2 Declaration about Commencement CertificateFormat D.pdf · uploaded 11 May 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Signed Autograph Form 01 - March 2024.pdf · uploaded 11 May 2024Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Signed Autograph Form 2 - March 24.pdf · uploaded 11 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A (FY 2022-23).pdf · uploaded 11 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A (FY 2023-24).pdf · uploaded 11 May 2024Source
  • 3 Disclosure of sold/ booked inventoryCircular 29.pdf · uploaded 11 May 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Autograph Form 03 - March 2024.pdf · uploaded 11 May 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 2022-23.pdf · uploaded 11 May 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Rera Sairama (1).pdf · uploaded 20 Jul 2024Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 RERA Sairama - Autograph.pdf · uploaded 20 Jul 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Autograph as on 30-06-2024.pdf · uploaded 20 Jul 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)New format- Form 3 Autograph 30-09-2024.pdf · uploaded 26 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Signed - SHEPL - Autograph Q2 Form 1.pdf · uploaded 30 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed - SHEPL - Autograph Q2 Form 3.pdf · uploaded 30 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Signed - SHEPL - Autograph Q2 Form 2.pdf · uploaded 30 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Autograph 31-12-2024.pdf · uploaded 18 Jan 2025Source
  • Form 1Form 1 - Autograph as on June 2025.pdf · uploaded 20 Jul 2025Source
  • Form 2Form 2 - Autograph as on June 2025.pdf · uploaded 20 Jul 2025Source
  • Form 3Form 3 - Autograph as on June 2025.pdf · uploaded 20 Jul 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Autograph as on June 2025.pdf · uploaded 20 Jul 2025Source
  • Form 1Form 1 - Autograph as on March 2025.pdf · uploaded 1 Sep 2025Source
  • Form 2Form 2 - Autograph as on March 2025.pdf · uploaded 1 Sep 2025Source
  • Form 3Form 3 - Autograph as on March 2025.pdf · uploaded 1 Sep 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Autograph as on March 2025.pdf · uploaded 1 Sep 2025Source
  • Withdrawal Update Form 1Form 1 - Sairam Autograph as on Sep 2025.pdf · uploaded 18 Dec 2025Source
  • Withdrawal Update Form 2Form 2 - Sairam Autograph as on Sep 2025.pdf · uploaded 18 Dec 2025Source
  • Withdrawal Update Form 3Form 3 - Sairam Autograph as on Sep 2025.pdf · uploaded 18 Dec 2025Source
  • Withdrawal Update Form 1Form 1 - Sairama Autograph as on Dec 2025 (signed).pdf · uploaded 28 Jan 2026Source
  • Withdrawal Update Form 2Form 2 - Sairama Autograph as on Dec 2025 (signed).pdf · uploaded 28 Jan 2026Source
  • Withdrawal Update Form 3Form 3 - Sairama Autograph as on Dec 2025 (signed).pdf · uploaded 28 Jan 2026Source
  • Withdrawal Update Form 1Form 1 - Sairama Autograph as on 26-02-2026.pdf · uploaded 11 May 2026Source
  • Withdrawal Update Form 2Form 2 - Sairama Autograph as on 26-02-2026.pdf · uploaded 11 May 2026Source
  • Withdrawal Update Form 3Form 3 - Sairama Autograph as on 26-02-2026 (1).pdf · uploaded 11 May 2026Source

Technical

  • DocumentBuilding plan1.pdf · uploaded 28 Jan 2022Source
  • DocumentBuilding plan1.pdf · uploaded 28 Jan 2022Source
  • DocumentBuilding plan2.pdf · uploaded 28 Jan 2022Source
  • DocumentBuilding plan3.pdf · uploaded 28 Jan 2022Source
  • DocumentBuilding plan4.pdf · uploaded 28 Jan 2022Source
  • DocumentBuilding plan5.pdf · uploaded 28 Jan 2022Source
  • Documentnew floor plan_compressed.pdf · uploaded 6 May 2024Source
  • DocumentPages from new floor plan_compressed.pdf · uploaded 6 May 2024Source

Technical (Architect)

  • DocumentSigned - SHEPL - Autograph Q2 Form 1.pdf · uploaded 30 Oct 2024Source
  • DocumentForm 1 - Sairama Autograph as on 26-02-2026.pdf · uploaded 11 May 2026Source

Technical (Engineer)

  • DocumentSigned - SHEPL - Autograph Q2 Form 2.pdf · uploaded 30 Oct 2024Source
  • DocumentForm 2 - Sairama Autograph as on 26-02-2026.pdf · uploaded 11 May 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel PLOT NO 7

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
2BHK, Office space, Shop118 units in all
Address
Plot No 7, Sector-17, New Panvel WestPIN 410206
Village
New Panvel, Panvel taluka
Land area for this project
2,338 sq m (25,164 sq ft)
Permissible built-up area
9,079 sq m (97,729 sq ft)
Sanctioned built-up area
9,079 sq m (97,729 sq ft)
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

PLOT NO 7

Land as published on MahaRERA's project page

PLOT NO 7

Boundaries

North
Plot No 6
South
Plot No 8
East
Plot No 5
West
30m Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking118 units

90 of 118 units booked (76%), as the promoter reported to MahaRERA

2BHK · 106 unitsOffice space · 1 unitShop · 11 units
TypeCarpet areaUnitsBooked
2BHK46.64 sq m · 502 sq ft123
2BHK47.19 sq m · 508 sq ft2415
2BHK48.22 sq m · 519 sq ft1210
2BHK49.24 sq m · 530 sq ft119
2BHK50.35 sq m · 542 sq ft1110
2BHK54.63 sq m · 588 sq ft1212
2BHK65.31 sq m · 703 sq ft2419
Office space48.96 sq m · 527 sq ft11
Show all 19 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Shop32.33 sq m · 348 sq ft11
Shop32.7 sq m · 352 sq ft11
Shop35.77 sq m · 385 sq ft11
Shop41.34 sq m · 445 sq ft11
Shop42.09 sq m · 453 sq ft11
Shop42.55 sq m · 458 sq ft11
Shop43.85 sq m · 472 sq ft11
Shop45.15 sq m · 486 sq ft11
Shop46.08 sq m · 496 sq ft11
Shop60.39 sq m · 650 sq ft11
Shop61.13 sq m · 658 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Other projects in New Panvel

All 76 projects in New Panvel · Compare Autograph with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology