Deedo IDDP-RAI-RQ50Completion was pushed back 4 years, to Mar 2027; no MahaRERA orders on record; 71% of its units are booked.
Neral, Raigarh 410101 · by Malhar Enterprises
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 years, to Mar 2027
- This projectRegistered 10 Feb 2021, completion promised 30 Mar 2023, revised to 31 Mar 2027.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52000028210
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000028210 | 10 Feb 2021 | 30 Mar 2023 | 31 Mar 2027 | Malhar Enterprises | Project page |
Documents128
2 documents held by Deedo, 126 filings listed on MahaRERA's project page
Finance
- PAN CardMalharent - pancard.pdf · uploaded 18 Jan 2021Source
Legal
Show all 128 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)plan copy.PDF · uploaded 18 Jan 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentMalhar Ent - COMMENCEMENT_compressed.pdf · uploaded 18 Jan 2021Source
- 1 Proforma of Allotment letterrera draft malhar ent.pdf · uploaded 18 Jan 2021Source
- 1 Details of encumbrancesNon encumbrance - Malhar Ent.pdf · uploaded 30 Jan 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentplan copy.PDF · uploaded 30 Jan 2021Source
- 1 Declaration in FORM BForm B Malhar Ent.pdf · uploaded 30 Jan 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Malhar Architect cert.pdf · uploaded 30 Jan 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Malhar Engg cert.pdf · uploaded 30 Jan 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Malhar Ent Form3.pdf · uploaded 2 Feb 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Malhar ent form 3 Mar 21.pdf · uploaded 15 Aug 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)malhar ent form 3 June 21.pdf · uploaded 15 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Malhar Ent Fom 5 2021-22.pdf · uploaded 15 Feb 2023Source
- 1 Declaration about Commencement Certificatedeclaration about commencement format D malhar.pdf · uploaded 17 Mar 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sep 21.pdf · uploaded 17 Mar 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 21.pdf · uploaded 17 Mar 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Mar 22.pdf · uploaded 17 Mar 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 June 22.pdf · uploaded 17 Mar 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sep 22.pdf · uploaded 17 Mar 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 22.pdf · uploaded 17 Mar 2023Source
- 1 Disclosure of sold/ booked inventorydisclosure of sold or booked inventory.pdf · uploaded 17 Mar 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)malhar ent form 3 sep 21_compressed.pdf · uploaded 17 Mar 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)malhar ent form 3 dec 21_compressed.pdf · uploaded 17 Mar 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)malhar ent form 3 Mar 22_compressed.pdf · uploaded 17 Mar 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Malhar Form 3 June 22_compressed.pdf · uploaded 17 Mar 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Malhar Form 3 Sep 22_compressed.pdf · uploaded 17 Mar 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Malhar Form 3 Dec 22_compressed.pdf · uploaded 17 Mar 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure on interest in other real estate org.pdf · uploaded 17 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Malhar ent form 5 20-21 .pdf · uploaded 17 Mar 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameformat A Declaration about seperate bank account_compressed.pdf · uploaded 17 Mar 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Malhar Ent.pdf · uploaded 24 Mar 2023Source
- 1 Proforma of Agreement for saleAgreement For Sale.pdf · uploaded 24 Mar 2023Source
- 2 Proforma of Allotment letterProforma of Allotment Letter.pdf · uploaded 24 Mar 2023Source
- 1 Deviation Report with respect to Allotment letterdeviation report with respect allotment letter.pdf · uploaded 24 Mar 2023Source
- 1 Deviation Report with respect to model copy of Agreementdeviation report with respect agreement malhar ent.pdf · uploaded 24 Mar 2023Source
- 2 Deviation Report with respect to model copy of Agreementdeviation report with respect agreement malhar ent.pdf · uploaded 24 Mar 2023Source
- 2 Copy of Layout Approval (in case of layout)HPSCANNER2936- plan copy.pdf · uploaded 24 May 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentHPSCANNER2936- plan copy.pdf · uploaded 24 May 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sep 21.pdf · uploaded 24 May 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 21.pdf · uploaded 24 May 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Mar 22.pdf · uploaded 24 May 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 22.pdf · uploaded 24 May 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sep 22.pdf · uploaded 24 May 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 22.pdf · uploaded 24 May 2023Source
- 2 Disclosure of sold/ booked inventorymalhar rera sold unsold.pdf · uploaded 24 May 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 malhar ent Mar 23.pdf · uploaded 17 Jun 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Malhar ent Mar 23.pdf · uploaded 17 Jun 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Malhar ent form 3 Mar 23.pdf · uploaded 17 Jun 2023Source
- 3 Copy of Layout Approval (in case of layout)HPSCANNER2936- plan copy.pdf · uploaded 19 Jun 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentHPSCANNER2936- plan copy.pdf · uploaded 19 Jun 2023Source
- 3 Disclosure of sold/ booked inventoryMalhar new sold unsold.pdf · uploaded 19 Jun 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)malhar ent form 5 22-23 .pdf · uploaded 23 Oct 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Malhar Ent Fom 1 June 23.pdf · uploaded 1 Dec 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Malhar Ent Fom 1 Sep 23.pdf · uploaded 1 Dec 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Malhar Ent Fom 2 June 23.pdf · uploaded 1 Dec 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Malhar Ent Fom 2 Sep 23.pdf · uploaded 1 Dec 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Malhar Ent Fom 3 Sep 23_compressed.pdf · uploaded 1 Dec 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Malhar Ent Fom 3 June 23_compressed.pdf · uploaded 1 Dec 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsMalhar Ent Fom 3 June 23_compressed.pdf · uploaded 1 Dec 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Malhar Form 1 Dec 23.pdf · uploaded 27 Jan 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Malhar Form 2 Dec 23.pdf · uploaded 27 Jan 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Malhar Form 3 Dec 23_compressed.pdf · uploaded 27 Jan 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Malhar Mar 24.pdf · uploaded 10 May 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Malhar Mar 24.pdf · uploaded 10 May 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Malhar Mar 24.pdf · uploaded 10 May 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Malhar Form 5 23-24.pdf · uploaded 29 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 June _compressed.pdf · uploaded 13 Dec 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sep 24_compressed.pdf · uploaded 13 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 June 24_compressed.pdf · uploaded 13 Dec 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sep 24_compressed.pdf · uploaded 13 Dec 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 24_compressed.pdf · uploaded 21 Dec 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sep 24_compressed.pdf · uploaded 21 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Malhar Ent Dec 2024_compressed.pdf · uploaded 18 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Malhar Ent Dec 2024compressed.pdf · uploaded 18 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Malhar Ent Dec 2024_compressed.pdf · uploaded 18 Feb 2025Source
- 1 Declaration in FORM BForm B 24june25.pdf · uploaded 7 Jul 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 25.pdf · uploaded 7 Jul 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 March 25.pdf · uploaded 7 Jul 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31march25.pdf · uploaded 7 Jul 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 25.pdf · uploaded 7 Jul 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold and Unsold Inventory 24june25.pdf · uploaded 7 Jul 2025Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A Bank Ac 24june25.pdf · uploaded 7 Jul 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Org Rajesh Vishe.pdf · uploaded 7 Jul 2025Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of interst in other Org Kishor Mahtre.pdf · uploaded 7 Jul 2025Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsDiscolsure of Intererst in other org Tanaji Kathore.pdf · uploaded 7 Jul 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A March 24.pdf · uploaded 7 Jul 2025Source
- Withdrawal Update Form 1Form 1 June 2025 Malhar ent.pdf · uploaded 21 Nov 2025Source
- Withdrawal Update Form 1Form 1 Sep 2025.pdf · uploaded 21 Nov 2025Source
- Withdrawal Update Form 2form 2 June 2025 Malhar ent.pdf · uploaded 21 Nov 2025Source
- Withdrawal Update Form 2Form 2 Sep 2025.pdf · uploaded 21 Nov 2025Source
- Withdrawal Update Form 3Form 3 June 2025 Mhallar_compressed.pdf · uploaded 21 Nov 2025Source
- Withdrawal Update Form 3Form 3 Sept 2025.pdf · uploaded 21 Nov 2025Source
- Withdrawal Update Form 1Form 1 Dec 25.pdf · uploaded 26 Mar 2026Source
- Withdrawal Update Form 2Form 2 Dec 25.pdf · uploaded 26 Mar 2026Source
- Withdrawal Update Form 3Form 3 Dec 25.pdf · uploaded 26 Mar 2026Source
- Withdrawal Update Form 1Form 1 March 2026.pdf · uploaded 22 Aug 2026Source
- Withdrawal Update Form 2Form 2 March 2026.pdf · uploaded 22 Aug 2026Source
- Withdrawal Update Form 3Form 3 March 2026.pdf · uploaded 22 Aug 2026Source
- Withdrawal Update Form 1Form 1 Malhar June 2026.pdf · uploaded 24 Aug 2026Source
- Withdrawal Update Form 1Form 1 Malhar June 2026.pdf · uploaded 24 Aug 2026Source
- Withdrawal Update Form 2Form 2 Malhar June 2026.pdf · uploaded 24 Aug 2026Source
- Withdrawal Update Form 2Form 2 Malhar June 2026.pdf · uploaded 24 Aug 2026Source
- Withdrawal Update Form 3Form 3 Malhar June 2026_compressed.pdf · uploaded 24 Aug 2026Source
- Withdrawal Update Form 3Form 3 Malhar June 2026_compressed.pdf · uploaded 24 Aug 2026Source
- Form 5 (FY 2025-2026)Malhar Form 5 For FY 25-26 final.pdf · uploaded 2 Sep 2026Source
Technical
- Documentplan copy.PDF · uploaded 18 Jan 2021Source
- Documentplan copy.PDF · uploaded 30 Jan 2021Source
- DocumentHPSCANNER2936- plan copy.pdf · uploaded 24 May 2023Source
- DocumentHPSCANNER2936- plan copy.pdf · uploaded 24 May 2023Source
- DocumentHPSCANNER2936- plan copy.pdf · uploaded 19 Jun 2023Source
- DocumentHPSCANNER2936- plan copy.pdf · uploaded 19 Jun 2023Source
Technical (Architect)
- DocumentForm 1 June 24_compressed.pdf · uploaded 21 Dec 2024Source
- DocumentForm 1 Sep 24_compressed.pdf · uploaded 21 Dec 2024Source
- DocumentForm 1 Malhar Ent Dec 2024_compressed.pdf · uploaded 18 Feb 2025Source
- DocumentForm 1 March 25.pdf · uploaded 7 Jul 2025Source
- DocumentForm 1 Malhar June 2026.pdf · uploaded 24 Aug 2026Source
Technical (Engineer)
- DocumentForm 2 June 24_compressed.pdf · uploaded 13 Dec 2024Source
- DocumentForm 2 Sep 24_compressed.pdf · uploaded 13 Dec 2024Source
- DocumentForm 2 Malhar Ent Dec 2024_compressed.pdf · uploaded 18 Feb 2025Source
- DocumentForm 2 March 25.pdf · uploaded 7 Jul 2025Source
- DocumentForm 2 Malhar June 2026.pdf · uploaded 24 Aug 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel S no 416 H no 1
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, Shop24 units in all
- Address
- S no 416 H no 1, Neral, Neral Registration OfficePIN 410101
- Village
- Neral, Karjat taluka
- Land area for this project
- 486 sq m (5,231 sq ft)
- Permissible built-up area
- 910 sq m (9,792 sq ft)
- Sanctioned built-up area
- 910 sq m (9,792 sq ft)
- Designated bank account
- 82
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S no 416 H no 1
Boundaries
- North
- Lake
- South
- 9 Mtr Wide Road
- East
- Samarth Krupa Apt
- West
- Shaikh Farm
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking24 units
17 of 24 units booked (71%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 23.07 sq m · 248 sq ft | 1 | 1 |
| 1BHK | 26.69 sq m · 287 sq ft | 4 | 3 |
| 1BHK | 28.05 sq m · 302 sq ft | 1 | 0 |
| 1BHK | 28.24 sq m · 304 sq ft | 1 | 0 |
| 1BHK | 29.02 sq m · 312 sq ft | 1 | 0 |
| 1BHK | 29.23 sq m · 315 sq ft | 1 | 1 |
| 1BHK | 29.4 sq m · 316 sq ft | 1 | 1 |
| 1BHK | 29.49 sq m · 317 sq ft | 1 | 1 |
Show all 13 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 29.54 sq m · 318 sq ft | 3 | 2 |
| 1BHK | 29.86 sq m · 321 sq ft | 4 | 4 |
| 1BHK | 30.88 sq m · 332 sq ft | 1 | 0 |
| 1BHK | 32.64 sq m · 351 sq ft | 4 | 4 |
| Shop | 11.34 sq m · 122 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Thorat Mathew And Associates | — |
| Chartered accountant | Ashwini Prabhu | — |
| Chartered accountant | Mukesh Jain | — |
| Engineer | Atul Kudtarkar | — |
Source: MahaRERA project page. Contact details are not shown.