Skip to content
Plotted · 150 unitsRERA P52000049721 +1

A Alibaug

Deedo IDDP-RAI-GKZE

MahaRERA shows it completed; no MahaRERA orders on record; 59% of its units are booked.

Munawali, Raigarh 402201 · by HOABL Landbuild Private Limited

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales59% booked89 of 150 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • P52000049721Registered 22 Feb 2023, completion promised 29 Jun 2026.
  • P52000052368Registered 21 Aug 2023, completion promised 30 Jun 2026.

No extension certificate on record.

2 registrations · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.
Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrations2
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5200004972122 Feb 202329 Jun 202629 Jun 2026HOABL Landbuild Private LimitedProject page
P5200005236821 Aug 202330 Jun 202630 Jun 2026HOABL Landbuild Private LimitedProject page
Documents271

4 documents held by Deedo, 267 filings listed on MahaRERA's project page

Registration certificate (2)

  • Registration certificateP52000052368 · 30 Jul 2025ViewSource
  • Registration certificateP52000049721 · 1 Aug 2025ViewSource

Other (2)

  • OtherP52000049721 · Date not statedView
  • OtherP52000052368 · Date not statedView

Finance

  • PAN CardP52000049721 · pan copy.pdf · uploaded 7 Feb 2023Source
  • PAN CardP52000049721 · PAN_Hoabl Arcade.pdf · uploaded 1 Jun 2023Source
  • PAN CardP52000052368 · Pan Hoabl Arcade.pdf · uploaded 15 Jul 2023Source

Legal

  • Legal Title reportP52000049721 · Title REPORT RERA.pdf · uploaded 10 Feb 2023Source
Show all 271 documentsShow fewer documents

Legal

  • Legal Title reportP52000049721 · 1 Deed of Conveyance_splendor_Aliabg (1)-1-12.pdf · uploaded 10 Feb 2023Source
  • Legal Title reportP52000049721 · 2 Deed of Conveyance_splendor_Aliabg (1)-13-24.pdf · uploaded 10 Feb 2023Source
  • Legal Title reportP52000049721 · 3 Deed of Conveyance_splendor_Aliabg (1)-25-36.pdf · uploaded 10 Feb 2023Source
  • Legal Title reportP52000049721 · 4 Deed of Conveyance_splendor_Aliabg (1)-37-48.pdf · uploaded 10 Feb 2023Source
  • Legal Title reportP52000049721 · 5 Deed of Conveyance_splendor_Aliabg (1)-37-48.pdf · uploaded 10 Feb 2023Source
  • Legal Title reportP52000049721 · 6 Deed of Conveyance_splendor_Aliabg (1)-49-60.pdf · uploaded 10 Feb 2023Source
  • Legal Title reportP52000049721 · 7 Deed of Conveyance_splendor_Aliabg (1)-61-72.pdf · uploaded 10 Feb 2023Source
  • Legal Title reportP52000049721 · 8 Deed of Conveyance_splendor_Aliabg (1)-73-84.pdf · uploaded 10 Feb 2023Source
  • Legal Title reportP52000049721 · 9 Deed of Conveyance_splendor_Aliabg (1)-85-94.pdf · uploaded 10 Feb 2023Source
  • Declaration Form BP52000049721 · form B_signed_rotated.pdf · uploaded 10 Feb 2023Source
  • Legal Title reportP52000052368 · Title Report.pdf · uploaded 16 Jul 2023Source
  • Legal Title reportP52000052368 · Search Report.pdf · uploaded 16 Jul 2023Source
  • Declaration Form BP52000052368 · Form B_Edited.pdf · uploaded 16 Jul 2023Source

Migrated

  • 1 PAN CardP52000049721 · pan copy.pdf · uploaded 7 Feb 2023Source
  • 1 a Details of encumbrances concerned to FinanceP52000049721 · Details of encumbrances concerned to Finance_signed.pdf · uploaded 7 Feb 2023Source
  • 2 a Details of encumbrances concerned to FinanceP52000049721 · Details of encumbrances concerned to Legal_signed.pdf · uploaded 7 Feb 2023Source
  • 1 b Details of encumbrances concerned to LegalP52000049721 · Details of encumbrances concerned to Finance_signed.pdf · uploaded 7 Feb 2023Source
  • 2 b Details of encumbrances concerned to LegalP52000049721 · Details of encumbrances concerned to Legal_signed.pdf · uploaded 7 Feb 2023Source
  • 1 Copy of Layout Approval (in case of layout)P52000049721 · 20230117 MUNAWALI TP APPROVAL ORDER_page-0001.pdf · uploaded 7 Feb 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52000049721 · 20230117 MUNAWALI TP APPROVAL ORDER_page-0001.pdf · uploaded 7 Feb 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52000049721 · 20230117 MUNAWALI TP APPROVAL PLAN_compressed.pdf · uploaded 7 Feb 2023Source
  • 1 Declaration about Commencement CertificateP52000049721 · Form D_signed.pdf · uploaded 7 Feb 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52000049721 · Separate Bank Account Declaration_signed.pdf · uploaded 7 Feb 2023Source
  • 1 Copy of the legal title reportP52000049721 · Title REPORT RERA.pdf · uploaded 10 Feb 2023Source
  • 2 Copy of the legal title reportP52000049721 · 1 Deed of Conveyance_splendor_Aliabg (1)-1-12.pdf · uploaded 10 Feb 2023Source
  • 3 Copy of the legal title reportP52000049721 · 2 Deed of Conveyance_splendor_Aliabg (1)-13-24.pdf · uploaded 10 Feb 2023Source
  • 4 Copy of the legal title reportP52000049721 · 3 Deed of Conveyance_splendor_Aliabg (1)-25-36.pdf · uploaded 10 Feb 2023Source
  • 5 Copy of the legal title reportP52000049721 · 4 Deed of Conveyance_splendor_Aliabg (1)-37-48.pdf · uploaded 10 Feb 2023Source
  • 6 Copy of the legal title reportP52000049721 · 5 Deed of Conveyance_splendor_Aliabg (1)-37-48.pdf · uploaded 10 Feb 2023Source
  • 7 Copy of the legal title reportP52000049721 · 6 Deed of Conveyance_splendor_Aliabg (1)-49-60.pdf · uploaded 10 Feb 2023Source
  • 8 Copy of the legal title reportP52000049721 · 7 Deed of Conveyance_splendor_Aliabg (1)-61-72.pdf · uploaded 10 Feb 2023Source
  • 9 Copy of the legal title reportP52000049721 · 8 Deed of Conveyance_splendor_Aliabg (1)-73-84.pdf · uploaded 10 Feb 2023Source
  • 10 Copy of the legal title reportP52000049721 · 9 Deed of Conveyance_splendor_Aliabg (1)-85-94.pdf · uploaded 10 Feb 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52000049721 · 20220110 NA Order (1).pdf · uploaded 10 Feb 2023Source
  • 1 Declaration in FORM BP52000049721 · form B_signed_rotated.pdf · uploaded 10 Feb 2023Source
  • 1 CERSAI detailsP52000049721 · CERSAI_Search_Report.pdf · uploaded 10 Feb 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000049721 · Form 3_Alibag_signed.pdf · uploaded 10 Feb 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP52000049721 · Other Real Estate (1).pdf · uploaded 10 Feb 2023Source
  • 1 Proforma of Agreement for saleP52000049721 · Munawali AFS - RERA Format - V2 080223.pdf · uploaded 10 Feb 2023Source
  • 1 Proforma of Allotment letterP52000049721 · Munawali Allotment Letter - RERA FORMAT_signed.pdf · uploaded 10 Feb 2023Source
  • 1 Deviation Report with respect to Allotment letterP52000049721 · Deviation for AL_signed.pdf · uploaded 10 Feb 2023Source
  • 1 Deviation Report with respect to model copy of AgreementP52000049721 · Deviation for AFS.pdf · uploaded 10 Feb 2023Source
  • 1 Other – TechnicalP52000049721 · Name change letter_hoabl Splendour.pdf · uploaded 4 May 2023Source
  • 2 PAN CardP52000049721 · PAN_Hoabl Arcade.pdf · uploaded 1 Jun 2023Source
  • 1 PAN CardP52000052368 · Pan Hoabl Arcade.pdf · uploaded 15 Jul 2023Source
  • 1 Copy of the legal title reportP52000052368 · Title Report.pdf · uploaded 16 Jul 2023Source
  • 2 Copy of the legal title reportP52000052368 · Search Report.pdf · uploaded 16 Jul 2023Source
  • 1 a Details of encumbrances concerned to FinanceP52000052368 · Details of encumbrances concerned to Finance - A Alibaug Phase 2.pdf · uploaded 16 Jul 2023Source
  • 2 a Details of encumbrances concerned to FinanceP52000052368 · Details of encumbrances concerned to Legal - A Alibaug Phase 2.pdf · uploaded 16 Jul 2023Source
  • 1 b Details of encumbrances concerned to LegalP52000052368 · Details of encumbrances concerned to Finance - A Alibaug Phase 2.pdf · uploaded 16 Jul 2023Source
  • 2 b Details of encumbrances concerned to LegalP52000052368 · Details of encumbrances concerned to Legal - A Alibaug Phase 2.pdf · uploaded 16 Jul 2023Source
  • 1 Declaration about Commencement CertificateP52000052368 · Form D - A Alibaug Phase 2.pdf · uploaded 16 Jul 2023Source
  • 1 Declaration in FORM BP52000052368 · Form B_Edited.pdf · uploaded 16 Jul 2023Source
  • 1 CERSAI detailsP52000052368 · CERSAI_Search_Report-1.pdf · uploaded 16 Jul 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000052368 · Final upload_Form 3 (1).pdf · uploaded 16 Jul 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP52000052368 · Disclosure of Interest in Other Real Estate Organizations -DG.pdf · uploaded 16 Jul 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsP52000052368 · Disclosure of Interest in Other Real Estate Organizations -Sagar.pdf · uploaded 16 Jul 2023Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsP52000052368 · Disclosure of Interest in Other Real Estate Organizations -Vishal.pdf · uploaded 16 Jul 2023Source
  • 1 Proforma of Agreement for saleP52000052368 · Clean - RERA AFS - (A Alibaug Phase 2).pdf · uploaded 16 Jul 2023Source
  • 1 Proforma of Allotment letterP52000052368 · Clean- RERA Allotment Letter - (A Alibaug Phase 2).pdf · uploaded 16 Jul 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52000052368 · Separate Bank Account Declaration - A Alibaug Phase 2.pdf · uploaded 16 Jul 2023Source
  • 1 Deviation Report with respect to Allotment letterP52000052368 · Clean- Deviation Report for Allotment Letter - (A Alibaug Phase 2).pdf · uploaded 16 Jul 2023Source
  • 1 Deviation Report with respect to model copy of AgreementP52000052368 · Deviation for AFS - A Alibaug Phase 2.pdf · uploaded 16 Jul 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52000052368 · 2023 07 20_20acres_ADTP_NA_RERA phases_R11.pdf · uploaded 20 Jul 2023Source
  • 1 Other – TechnicalP52000052368 · HOABL Splendour Arcade_clarification.pdf · uploaded 20 Jul 2023Source
  • 1 Copy of Layout Approval (in case of layout)P52000052368 · Layout Plan-210723.pdf · uploaded 22 Jul 2023Source
  • 2 Copy of Layout Approval (in case of layout)P52000052368 · Layout Plan.pdf · uploaded 25 Jul 2023Source
  • 2 Other – TechnicalP52000052368 · Clarification Letter-for Building plan (2).pdf · uploaded 25 Jul 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52000052368 · Munawali NA Order - 11082023.pdf · uploaded 11 Aug 2023Source
  • 3 Other – TechnicalP52000052368 · Munavali Sheet No 1.pdf · uploaded 11 Aug 2023Source
  • 4 Other – TechnicalP52000052368 · Munavali Sheet No 2.pdf · uploaded 11 Aug 2023Source
  • 5 Other – TechnicalP52000052368 · Munavali Sheet No 3.pdf · uploaded 11 Aug 2023Source
  • 6 Other – TechnicalP52000052368 · Munavali Sheet No 4.pdf · uploaded 11 Aug 2023Source
  • 7 Other – TechnicalP52000052368 · Form D_revised.pdf · uploaded 11 Aug 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52000052368 · CC-com.pdf · uploaded 16 Aug 2023Source
  • 8 Other – TechnicalP52000052368 · Clarification Letter_16082023.pdf · uploaded 16 Aug 2023Source
  • 9 Other – TechnicalP52000052368 · Munavali 01.pdf · uploaded 16 Aug 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000049721 · 1 AC_Hoabl.pdf · uploaded 8 Sep 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000049721 · 2 EC_Hoabl.pdf · uploaded 8 Sep 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000049721 · 3 CA_Hoabl.pdf · uploaded 8 Sep 2023Source
  • 1 Disclosure of sold/ booked inventoryP52000049721 · sold unsold data.pdf · uploaded 9 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52000049721 · Form5_A Alibaug P1.pdf · uploaded 1 Oct 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000049721 · EC_Alibaug 1.pdf · uploaded 17 Oct 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000049721 · A Alibaug Phase I Signed.pdf · uploaded 17 Oct 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsP52000049721 · Disclosure of Sold Booked Inventory-'A' Alibaug Phase 1.pdf · uploaded 17 Oct 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000052368 · A Alibaug Phase II Signed.pdf · uploaded 17 Oct 2023Source
  • 3 a Details of encumbrances concerned to FinanceP52000049721 · Financial Encumbrances - P-1.pdf · uploaded 18 Oct 2023Source
  • 3 b Details of encumbrances concerned to LegalP52000049721 · Financial Encumbrances - P-1.pdf · uploaded 18 Oct 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000049721 · Architect Certificate A Alibaug P1.pdf · uploaded 18 Oct 2023Source
  • 3 a Details of encumbrances concerned to FinanceP52000052368 · Financial Encumbrances - P-2.pdf · uploaded 18 Oct 2023Source
  • 3 b Details of encumbrances concerned to LegalP52000052368 · Financial Encumbrances - P-2.pdf · uploaded 18 Oct 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000052368 · Architect Certificate A Alibaug P2.pdf · uploaded 18 Oct 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000052368 · EC_Alibaug 2.pdf · uploaded 21 Oct 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000052368 · A Alibaug Phase II Signed.pdf · uploaded 25 Oct 2023Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52000052368 · Declaration for 70 Bank Account P2.pdf · uploaded 25 Oct 2023Source
  • 2 Proforma of Agreement for saleP52000049721 · Nov23_Draft AFS_RERA - 'A' Alibaug Phase 1.pdf · uploaded 29 Nov 2023Source
  • 2 Deviation Report with respect to model copy of AgreementP52000049721 · Nov23_Deviation Report - 'A' Alibuag Phase 1.pdf · uploaded 29 Nov 2023Source
  • 2 Proforma of Agreement for saleP52000052368 · Nov23_Draft AFS_RERA - A Alibaug - Phase 2.pdf · uploaded 29 Nov 2023Source
  • 2 Deviation Report with respect to model copy of AgreementP52000052368 · Nov23_Deviation Report - A Alibuag Phase 2.pdf · uploaded 29 Nov 2023Source
  • 2 Other – TechnicalP52000049721 · Buiding Plan FInal.pdf · uploaded 7 Dec 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000049721 · Architect Certificate Alibaug P1 OND23.pdf · uploaded 20 Jan 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000049721 · Engineer Certificate Alibaug P1 OND23.pdf · uploaded 20 Jan 2024Source
  • 2 Disclosure of sold/ booked inventoryP52000049721 · Disclosure of Sold Booked Inventory-‘A’ Alibaug Phase 1.pdf · uploaded 20 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000049721 · H_Arcade_P1.pdf · uploaded 20 Jan 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000052368 · Architect Certificate Alibaug P2 OND23.pdf · uploaded 20 Jan 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000052368 · Engineer Certificate Alibaug P2 OND23.pdf · uploaded 20 Jan 2024Source
  • 1 Disclosure of sold/ booked inventoryP52000052368 · Disclosure of Sold Booked Inventory-‘A’ Alibaug Phase 2.pdf · uploaded 20 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000052368 · H_Arcade_P2.pdf · uploaded 20 Jan 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000049721 · AR.pdf · uploaded 20 Apr 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000049721 · ER.pdf · uploaded 20 Apr 2024Source
  • 3 Disclosure of sold/ booked inventoryP52000049721 · Disclosure of Sold Booked Inventory - ‘A’ Alibaug Phase 1.pdf · uploaded 20 Apr 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000049721 · CA.pdf · uploaded 20 Apr 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000052368 · AR.pdf · uploaded 20 Apr 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000052368 · ER.pdf · uploaded 20 Apr 2024Source
  • 2 Disclosure of sold/ booked inventoryP52000052368 · Disclosure of Sold Booked Inventory - A Alibaug - Phase 2.pdf · uploaded 20 Apr 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000052368 · CA.pdf · uploaded 20 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52000049721 · Form 2A_A Alibaug Phase 1.pdf · uploaded 27 Jun 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52000052368 · Form 2A_A Alibaug Phase 2.pdf · uploaded 27 Jun 2024Source
  • 1 Home Buyer /Allottee Grievance Redressal CellP52000049721 · Hoabl Arcade.pdf · uploaded 5 Jul 2024Source
  • 1 Home Buyer /Allottee Grievance Redressal CellP52000052368 · Hoabl Arcade.pdf · uploaded 5 Jul 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000049721 · A Alibaug Phase 1_Architect certificate.pdf · uploaded 20 Jul 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000049721 · A Alibaug Phase 1_Engineer certificate.pdf · uploaded 20 Jul 2024Source
  • 4 Disclosure of sold/ booked inventoryP52000049721 · Disclosure of Sold Booked Inventory - A Alibaug Phase 1.pdf · uploaded 20 Jul 2024View
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000049721 · A Alibaug Phase 1_CA certificate.pdf · uploaded 20 Jul 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000052368 · A Alibaug - Phase 2 - Architect certificate.pdf · uploaded 20 Jul 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000052368 · A Alibaug - Phase 2 - Engineer certificate.pdf · uploaded 20 Jul 2024Source
  • 3 Disclosure of sold/ booked inventoryP52000052368 · Disclosure of Sold Booked Inventory - A Alibaug Phase 2.pdf · uploaded 20 Jul 2024View
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000052368 · A Alibaug - Phase 2 - CA certificate.pdf · uploaded 20 Jul 2024Source
  • Form 5 (FY 2023-2024)P52000049721 · Form 5_A Alibaug_Phase 1_signed.pdf · uploaded 30 Sep 2024Source
  • Form 5 (FY 2023-2024)P52000052368 · Form 5_A Alibaug_Phase 2_signed.pdf · uploaded 30 Sep 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52000049721 · 15 A' Alibaug Phase 1_Form 5_promoter signed.pdf · uploaded 7 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52000052368 · 16 A' Alibaug Phase 2_Form 5_promoter signed.pdf · uploaded 7 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000049721 · A' Alibaug Phase 1 - Architect Certificate.pdf · uploaded 19 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000049721 · A' Alibaug Phase 1 - CA Certificate.pdf · uploaded 19 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000049721 · A' Alibaug Phase 1 - Engineer Certificate.pdf · uploaded 19 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryP52000049721 · Disclosure of Sold Booked Inventory- A Alibaug Phase 1_signed.pdf · uploaded 19 Oct 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000052368 · A' Alibaug Phase 2 - Architect Certificate.pdf · uploaded 19 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000052368 · A' Alibaug Phase 2 - CA Certificate.pdf · uploaded 19 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000052368 · A' Alibaug Phase 2 - Engineer Certificate.pdf · uploaded 19 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryP52000052368 · Disclosure of Sold Booked Inventory- A Alibaug Phase 2_signed.pdf · uploaded 19 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000049721 · AR_Alibag 1.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000049721 · HOABL Arcade PHASE-1.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000049721 · ER_ALIBAUG 1.pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryP52000049721 · Disclosure of Sold Booked Inventory- A Alibaug Phase 1.pdf · uploaded 20 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000052368 · AR_Alibag 1.pdf · uploaded 20 Jan 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000052368 · AR_alibag 2.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000052368 · HOABL Arcade-PHASE-2.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000052368 · ER_ALIBAUG 1.pdf · uploaded 20 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000052368 · ER ALIBAUG 2.pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryP52000052368 · Disclosure of Sold Booked Inventory- A Alibaug Phase 2.pdf · uploaded 20 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000049721 · A' Alibaug P1 - Architect Certificate.pdf · uploaded 20 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000049721 · A Alibaug Phase1-P52000049721-CA certificate.pdf · uploaded 20 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000049721 · A' Alibaug P1 - Engineer Certificate.pdf · uploaded 20 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryP52000049721 · Disclosure of Sold Booked Inventory- A Alibaug Phase 1-signed.pdf · uploaded 20 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000052368 · A' Alibaug P2 - Architect Certificate.pdf · uploaded 20 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000052368 · CA Certificate.pdf · uploaded 20 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000052368 · A' Alibaug P2 - Engineer Certificate.pdf · uploaded 20 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryP52000052368 · Disclosure of Sold Booked Inventory- A Alibaug Phase 2-signed.pdf · uploaded 20 Apr 2025Source
  • Form 1P52000049721 · A' Alibaug P1 - Architect Certificate.pdf · uploaded 23 Jun 2025Source
  • Form 2P52000049721 · A' Alibaug P1 - Engineer Certificate.pdf · uploaded 23 Jun 2025Source
  • Form 3P52000049721 · A Alibaug Phase1-P52000049721-CA certificate.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52000049721 · Disclosure of Sold Booked Inventory- A Alibaug Phase 1-signed.pdf · uploaded 23 Jun 2025View
  • Form 1P52000049721 · AR_Alibag 1.pdf · uploaded 23 Jun 2025Source
  • Form 2P52000049721 · ER_ALIBAUG 1.pdf · uploaded 23 Jun 2025Source
  • Form 3P52000049721 · Form 3.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52000049721 · Disclosure of Sold Booked Inventory- A Alibaug Phase 1.pdf · uploaded 23 Jun 2025View
  • Form 1P52000049721 · A' Alibaug Phase 1 - Architect Certificate.pdf · uploaded 23 Jun 2025Source
  • Form 2P52000049721 · A' Alibaug Phase 1 - Engineer Certificate.pdf · uploaded 23 Jun 2025Source
  • Form 3P52000049721 · A' Alibaug Phase 1 - CA Certificate.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52000049721 · Disclosure of Sold Booked Inventory- A Alibaug Phase 1_signed.pdf · uploaded 23 Jun 2025View
  • Form 1P52000049721 · A Alibaug Phase 1_Architect certificate.pdf · uploaded 23 Jun 2025Source
  • Form 2P52000049721 · A Alibaug Phase 1_Engineer certificate.pdf · uploaded 23 Jun 2025Source
  • Form 3P52000049721 · A Alibaug Phase 1_CA certificate.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52000049721 · Disclosure of Sold Booked Inventory - A Alibaug Phase 1.pdf · uploaded 23 Jun 2025View
  • Form 1P52000052368 · A' Alibaug P2 - Architect Certificate.pdf · uploaded 23 Jun 2025Source
  • Form 2P52000052368 · A' Alibaug P2 - Engineer Certificate.pdf · uploaded 23 Jun 2025Source
  • Form 3P52000052368 · A' Alibaug Phase 2 -P52000052368-CA certificate.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52000052368 · Disclosure of Sold Booked Inventory- A Alibaug Phase 2-signed.pdf · uploaded 23 Jun 2025View
  • Form 1P52000052368 · AR_alibag 2.pdf · uploaded 23 Jun 2025Source
  • Form 2P52000052368 · ER ALIBAUG 2.pdf · uploaded 23 Jun 2025Source
  • Form 3P52000052368 · HOABL Arcade-PHASE-2.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52000052368 · Disclosure of Sold Booked Inventory- A Alibaug Phase 2.pdf · uploaded 23 Jun 2025View
  • Form 1P52000052368 · A' Alibaug Phase 2 - Architect Certificate.pdf · uploaded 23 Jun 2025Source
  • Form 2P52000052368 · A' Alibaug Phase 2 - Engineer Certificate.pdf · uploaded 23 Jun 2025Source
  • Form 3P52000052368 · A' Alibaug Phase 2 - CA Certificate.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52000052368 · Disclosure of Sold Booked Inventory- A Alibaug Phase 2_signed.pdf · uploaded 23 Jun 2025View
  • Form 1P52000052368 · A Alibaug - Phase 2 - Architect certificate.pdf · uploaded 23 Jun 2025Source
  • Form 2P52000052368 · A Alibaug - Phase 2 - Engineer certificate.pdf · uploaded 23 Jun 2025Source
  • Form 3P52000052368 · A Alibaug - Phase 2 - CA certificate.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventoryP52000052368 · Disclosure of Sold Booked Inventory - A Alibaug Phase 2.pdf · uploaded 23 Jun 2025View
  • Form 2A (FY 2024-2025)P52000049721 · A' Alibaug P1.pdf · uploaded 30 Jun 2025Source
  • Form 2A (FY 2024-2025)P52000052368 · A' Alibaug P1.pdf · uploaded 30 Jun 2025Source
  • Form 5 (FY 2024-2025)P52000049721 · Form 5_A Alibaug P1 - 2024-25.pdf · uploaded 29 Sep 2025Source
  • Form 5 (FY 2024-2025)P52000052368 · Form 5_A Alibaug P2 - 2024-25.pdf · uploaded 29 Sep 2025Source
  • Withdrawal Update Form 1P52000049721 · AC - Au0027 Alibaug Phase 1.pdf · uploaded 19 Oct 2025Source
  • Withdrawal Update Form 1P52000049721 · Architect Certificate_A Alibaug_P-1_Signed.pdf · uploaded 19 Oct 2025Source
  • Withdrawal Update Form 2P52000049721 · EC - Au0027 Alibaug Phase 1.pdf · uploaded 19 Oct 2025Source
  • Withdrawal Update Form 2P52000049721 · Engineer Certificate_A Alibaug_P-1_Signed.pdf · uploaded 19 Oct 2025Source
  • Withdrawal Update Form 3P52000049721 · CA - A Alibaug P1.pdf · uploaded 19 Oct 2025Source
  • Withdrawal Update Form 3P52000049721 · CA Certificate_A Alibaug-P1_Signed.pdf · uploaded 19 Oct 2025Source
  • Withdrawal Update Form 1P52000052368 · AC - Au0027 Alibaug Phase 2.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 2P52000052368 · EC - Au0027 Alibaug Phase 2.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 3P52000052368 · CA - A Alibaug P2.pdf · uploaded 28 Oct 2025Source
  • Withdrawal Update Form 1P52000049721 · A Alibaug P1 - Architect Certificate.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2P52000049721 · A Alibaug P1 - Engineer Certificate.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3P52000049721 · A Alibaug P1 - CA Certificate.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1P52000052368 · A Alibaug P2 - Architect Certificate.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1P52000052368 · Architect Certificate_A Alibaug_P-2_Signed.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1P52000052368 · A Alibaug P2 - Architect Certificate.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2P52000052368 · A Alibaug P2 - Engineer Certificate.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2P52000052368 · Engineer Certificate_A Alibaug_P-2_Signed.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2P52000052368 · A Alibaug P2 - Engineer Certificate.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3P52000052368 · A Alibaug P2 - CA Certificate.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3P52000052368 · CA Certificate_A Alibaug-P2_Signed.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3P52000052368 · A Alibaug P2 - CA Certificate.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1P52000052368 · Architect Certificate - Alibaug P2 Signed.pdf · uploaded 17 Apr 2026Source
  • Withdrawal Update Form 2P52000052368 · Engineer Certificate - A Alibaug P2_Signed.pdf · uploaded 17 Apr 2026Source
  • Withdrawal Update Form 3P52000052368 · CA Certificate - Alibaug P2_Signed.pdf · uploaded 17 Apr 2026Source
  • Withdrawal Update Form 1P52000049721 · Architect Certificate - Alibaug P1_Signed.pdf · uploaded 18 Apr 2026Source
  • Withdrawal Update Form 2P52000049721 · Engineer Certificate - Alibaug P1_Signed.pdf · uploaded 18 Apr 2026Source
  • Withdrawal Update Form 3P52000049721 · CA Certificate - Alibaug P1_Signed.pdf · uploaded 18 Apr 2026Source
  • Completion CertificateP52000049721 · Alibag - Munawali - Completion certificate.pdf · uploaded 7 May 2026Source
  • Completion CertificateP52000052368 · Alibag - Munawali - Completion certificate.pdf · uploaded 7 May 2026Source
  • Completion CertificateP52000049721 · Email from Tehsildar office to MahaRERA-dated 25 May 2026.pdf · uploaded 27 May 2026Source
  • Completion CertificateP52000052368 · Email from Tehsildar office to MahaRERA-dated 25 May 2026.pdf · uploaded 27 May 2026Source
  • Form 2A (FY 2025-2026)P52000049721 · Signed_Form 2A_Allibaug Ph1.pdf · uploaded 26 Jun 2026Source
  • Form 2A (FY 2025-2026)P52000052368 · Signed_Form 2A_Allibaug Ph2.pdf · uploaded 26 Jun 2026Source
  • Form 5 (FY 2025-2026)P52000049721 · A Alibaug - P1 Form 5.pdf · uploaded 22 Sep 2026Source
  • Form 5 (FY 2025-2026)P52000052368 · A Alibaug-P2 Form 5.pdf · uploaded 22 Sep 2026Source

Technical

  • DocumentP52000049721 · 20230117 MUNAWALI TP APPROVAL ORDER_page-0001.pdf · uploaded 7 Feb 2023Source
  • DocumentP52000049721 · 20230117 MUNAWALI TP APPROVAL ORDER_page-0001.pdf · uploaded 7 Feb 2023Source
  • Other – TechnicalP52000049721 · Name change letter_hoabl Splendour.pdf · uploaded 4 May 2023Source
  • DocumentP52000052368 · 2023 07 20_20acres_ADTP_NA_RERA phases_R11.pdf · uploaded 20 Jul 2023Source
  • Other – TechnicalP52000052368 · HOABL Splendour Arcade_clarification.pdf · uploaded 20 Jul 2023Source
  • DocumentP52000052368 · Layout Plan-210723.pdf · uploaded 22 Jul 2023Source
  • DocumentP52000052368 · Layout Plan.pdf · uploaded 25 Jul 2023Source
  • Other – TechnicalP52000052368 · Clarification Letter-for Building plan (2).pdf · uploaded 25 Jul 2023Source
  • Other – TechnicalP52000052368 · Munavali Sheet No 1.pdf · uploaded 11 Aug 2023Source
  • Other – TechnicalP52000052368 · Munavali Sheet No 2.pdf · uploaded 11 Aug 2023Source
  • Other – TechnicalP52000052368 · Munavali Sheet No 3.pdf · uploaded 11 Aug 2023Source
  • Other – TechnicalP52000052368 · Munavali Sheet No 4.pdf · uploaded 11 Aug 2023Source
  • Other – TechnicalP52000052368 · Form D_revised.pdf · uploaded 11 Aug 2023Source
  • Other – TechnicalP52000052368 · Clarification Letter_16082023.pdf · uploaded 16 Aug 2023Source
  • Other – TechnicalP52000052368 · Munavali 01.pdf · uploaded 16 Aug 2023Source
  • Other – TechnicalP52000049721 · Buiding Plan FInal.pdf · uploaded 7 Dec 2023Source

Technical (Architect)

  • DocumentP52000049721 · A' Alibaug Phase 1 - Architect Certificate.pdf · uploaded 19 Oct 2024Source
  • DocumentP52000052368 · A' Alibaug Phase 2 - Architect Certificate.pdf · uploaded 19 Oct 2024Source
  • DocumentP52000049721 · AR_Alibag 1.pdf · uploaded 20 Jan 2025Source
  • DocumentP52000052368 · AR_Alibag 1.pdf · uploaded 20 Jan 2025Source
  • DocumentP52000052368 · AR_alibag 2.pdf · uploaded 20 Jan 2025Source
  • DocumentP52000049721 · A' Alibaug P1 - Architect Certificate.pdf · uploaded 20 Apr 2025Source
  • DocumentP52000052368 · A' Alibaug P2 - Architect Certificate.pdf · uploaded 20 Apr 2025Source
  • DocumentP52000049721 · Architect Certificate - Alibaug P1_Signed.pdf · uploaded 16 Apr 2026Source
  • DocumentP52000052368 · Architect Certificate - Alibaug P2 Signed.pdf · uploaded 16 Apr 2026Source

Technical (Engineer)

  • DocumentP52000049721 · A' Alibaug Phase 1 - Engineer Certificate.pdf · uploaded 19 Oct 2024Source
  • DocumentP52000052368 · A' Alibaug Phase 2 - Engineer Certificate.pdf · uploaded 19 Oct 2024Source
  • DocumentP52000049721 · ER_ALIBAUG 1.pdf · uploaded 20 Jan 2025Source
  • DocumentP52000052368 · ER_ALIBAUG 1.pdf · uploaded 20 Jan 2025Source
  • DocumentP52000052368 · ER ALIBAUG 2.pdf · uploaded 20 Jan 2025Source
  • DocumentP52000049721 · A' Alibaug P1 - Engineer Certificate.pdf · uploaded 20 Apr 2025Source
  • DocumentP52000052368 · A' Alibaug P2 - Engineer Certificate.pdf · uploaded 20 Apr 2025Source
  • DocumentP52000052368 · Engineer Certificate - A Alibaug P2_Signed.pdf · uploaded 17 Apr 2026Source
  • DocumentP52000049721 · Engineer Certificate - Alibaug P1_Signed.pdf · uploaded 18 Apr 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 34/2, Survey No. 34 Gat No.2

As registered with MahaRERA and published on its project page

Project type
Plotted
Status on MahaRERA
Certificate Signed
Phases
2
Address
Survey No. 34 Gat No.2, situated at village Munavali, Taluka Alibag, District Raigad, Maharashtra 402201, Munawali, Chondi-Karlekar Road, MunawaliPIN 402201
Village
Munawali, Alibag taluka
Land area for this project
21,000 sq m (2,26,042 sq ft)
Permissible built-up area
12,370 sq m (1,33,149 sq ft)
Sanctioned built-up area
12,370 sq m (1,33,149 sq ft)
Designated bank account
76
Developed in phases
No
Also registered as
'A' Alibaug - Phase 1, A Alibaug - Phase 2

Survey, CTS, gat or plot numbers

34/2Survey No. 34 Gat No.2Survey No./Gat No. 34/1

Land as published on MahaRERA's project page

Survey No. 34 Gat No.2, situated at village Munavali, Taluka Alibag, District Raigad, Maharashtra 402201

Boundaries

North
Gat No 37
South
Boundary of Village Tudal
East
Gat No 34 oblique 1 and 34 oblique 3
West
Gat No 35 37 and 38

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals10

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectSubodh Mestry—P52000049721
ArchitectSubodh Mestry—P52000052368
Chartered accountantChirag Sarvaiya—P52000052368
Chartered accountantChirag Sarvaiya—P52000049721
Chartered accountantU S Mishra And Associates—P52000049721
Chartered accountantU S Mishra And Associates—P52000052368
EngineerAkil Ahmad—P52000052368
EngineerAkil Ahmad—P52000049721
OtherPritam Shetye—P52000049721
OtherPritam Shetye—P52000052368

Source: MahaRERA project page. Contact details are not shown.

Other projects in Munawali

All 2 projects in Munawali · Compare A Alibaug with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology