Residential / Group Housing · 1 building · 189 unitsRERA P52000052175

Vinayak Aangan

Deedo IDDP-RAI-1Y4D

MahaRERA shows it completed; no MahaRERA orders on record; 50% of its units are booked.

Dapoli, Raigarh 410206 · by Shri Harikrishna Enterrises

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales50% booked94 of 189 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 27 Jul 2023, completion promised 31 Dec 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52000052175
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5200005217527 Jul 202331 Dec 202831 Dec 2028Shri Harikrishna EnterrisesProject page
Documents124

1 document held by Deedo, 123 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Cardshri harikrishna enterprises.pdf · uploaded 12 Jun 2023Source

Legal

  • Legal Title reportTITLE CERTIFICATE_compressed.pdf · uploaded 12 Jun 2023Source
  • Legal Title reportSEARCH CERTIFICATE.pdf · uploaded 12 Jun 2023Source
  • Declaration Form BFORM B DECLARATON.pdf · uploaded 12 Jun 2023Source
  • Other – LegalVINAYAK AANGAN.pdf · uploaded 8 Apr 2024Source

Migrated

  • 1 PAN Cardshri harikrishna enterprises.pdf · uploaded 12 Jun 2023Source
  • 1 Copy of the legal title reportTITLE CERTIFICATE_compressed.pdf · uploaded 12 Jun 2023Source
Show all 124 documentsShow fewer documents

Migrated

  • 2 Copy of the legal title reportSEARCH CERTIFICATE.pdf · uploaded 12 Jun 2023Source
  • 1 a Details of encumbrances concerned to FinanceLEGAL DECLARATION.pdf · uploaded 12 Jun 2023Source
  • 1 b Details of encumbrances concerned to LegalLEGAL DECLARATION.pdf · uploaded 12 Jun 2023Source
  • 1 Copy of Layout Approval (in case of layout)pushpak agreement 1-25.pdf · uploaded 12 Jun 2023Source
  • 1 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 12 Jun 2023Source
  • 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 12 Jun 2023Source
  • 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 12 Jun 2023Source
  • 1 Commencement Certificates / NA Order for plotted development3-5-PUSHPAK-CC.pdf · uploaded 12 Jun 2023Source
  • 1 Declaration about Commencement CertificateCC DECLARATION.pdf · uploaded 12 Jun 2023Source
  • 1 Declaration in FORM BFORM B DECLARATON.pdf · uploaded 12 Jun 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)3-5-PUSHPAK RERA.pdf · uploaded 12 Jun 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Adobe Scan 09 Jun 2023 (1).pdf · uploaded 12 Jun 2023Source
  • 1 CERSAI detailsCERSAI ALL.pdf · uploaded 12 Jun 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsANNEXTURE A JRP.pdf · uploaded 12 Jun 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsANNEXTURE A KHP.pdf · uploaded 12 Jun 2023Source
  • 1 Proforma of Agreement for saleRera Act -Agreement for Sale.pdf · uploaded 12 Jun 2023Source
  • 1 Proforma of Allotment letterAllotment Letter (New)-P-3.pdf · uploaded 12 Jun 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBANK AC DECLARATION.pdf · uploaded 12 Jun 2023Source
  • 1 Deviation Report with respect to Allotment letterALLOTMENT DEVIATION.pdf · uploaded 12 Jun 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA LETTER_NEW.pdf · uploaded 14 Jun 2023Source
  • 2 Proforma of Allotment letterRera Act -Agreement for Sale (2).pdf · uploaded 3 Jul 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDEVIATION REPORT UPDATED.pdf · uploaded 3 Jul 2023Source
  • 3 Proforma of Allotment letterANNEXTURE A PROJECT.pdf · uploaded 5 Jul 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect certificate (1).pdf · uploaded 15 Dec 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentNEW CC 3-5 DRW_compressed-1-2.pdf · uploaded 10 Jan 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentNEW CC 3-5 DRW_compressed-5-6.pdf · uploaded 10 Jan 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentNEW CC 3-5 DRW_compressed-3-4-1.pdf · uploaded 10 Jan 2024Source
  • 7 Building Plan Approval / NA Order for plotted developmentNEW CC 3-5 DRW_compressed-3-4-2.pdf · uploaded 10 Jan 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentNEW CC 3-5.pdf · uploaded 10 Jan 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE 2903.pdf · uploaded 29 Mar 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE 2903 NEW.pdf · uploaded 2 Apr 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)VINAYAK AANGAN.pdf · uploaded 8 Apr 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)VINAYAK AANGAN CA CERTIFICATE.pdf · uploaded 8 Apr 2024Source
  • 1 Other – LegalVINAYAK AANGAN.pdf · uploaded 8 Apr 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Vinayak Aangan as on Sep 2024.pdf · uploaded 19 Nov 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Vinayak Aangan as on March 2024.pdf · uploaded 28 Nov 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Vinayak Aangan as on June 2024.pdf · uploaded 28 Nov 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Vinayak Aangan as on Sep 2024.pdf · uploaded 28 Nov 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Vinayak Aangan as on March 2024.pdf · uploaded 28 Nov 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Vinayak Aangan as on June 2024.pdf · uploaded 28 Nov 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Vinayak Aangan as on Sep 2024.pdf · uploaded 28 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Vinayak Aangan for FY 2023-24.pdf · uploaded 28 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Vinayak Aangan as on 31-12-2024.pdf · uploaded 18 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Vinayak Aangan as on 31-12-2024.pdf · uploaded 18 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Vinayak Aangan as on 31-12-2024.pdf · uploaded 18 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Vinayak Aangan as on March 2025.pdf · uploaded 15 Apr 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 15 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Vinayak Aangan as on 31-03-2025.pdf · uploaded 18 Apr 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Vinayak Aangan as on 31-12-2024 Previously Uploaded.pdf · uploaded 18 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Vinayak Aangan as on March 2025.pdf · uploaded 18 Apr 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Vinayak Aangan as on 31-12-2024 Previously Uploaded.pdf · uploaded 18 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Vinayak Aangan as on March 2025.pdf · uploaded 7 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Vinayak Aangan as on 31-03-2025.pdf · uploaded 7 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Vinayak Aangan as on March 2025.pdf · uploaded 7 May 2025Source
  • Form 1Form 1 - Vinayak angan as on June 2025.pdf · uploaded 8 Aug 2025Source
  • Form 2Form 2 - Vinayak Aangan as on June 2025.pdf · uploaded 8 Aug 2025Source
  • Form 3Form 3 - Vinayak Aangan as on June 2025.pdf · uploaded 8 Aug 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Vinayak Aangan as on June 2025.pdf · uploaded 8 Aug 2025Source
  • Form 1Form 1 - Vinayak Aangan as on Sep 2025.pdf · uploaded 20 Oct 2025Source
  • Form 2Form 2 - Vinayak Aangan as on Sep 2025.pdf · uploaded 20 Oct 2025Source
  • Form 3Form 3 - Vinayak Aangan as on Sep 2025.pdf · uploaded 20 Oct 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Vinayak Aangan as on Sep 2025.pdf · uploaded 20 Oct 2025Source
  • Form 1Form 1 - Vinayak Aangan as on Dec 2025.pdf · uploaded 16 Jan 2026Source
  • Form 2Form 2 - Vinayak Aangan as on Dec 2025.pdf · uploaded 16 Jan 2026Source
  • Form 3Form 3 - Vinayak Aangan as on Dec 2025.pdf · uploaded 16 Jan 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Vinayak Aangan as on Dec 2025.pdf · uploaded 16 Jan 2026Source
  • Form 1Form 1 -Vinayak Aangan as on March 2026.pdf · uploaded 15 Apr 2026Source
  • Form 2Form 2 -Vinayak Aangan as on March 2026.pdf · uploaded 15 Apr 2026Source
  • Form 3Form 3 -Vinayak Aangan as on March 2026.pdf · uploaded 15 Apr 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Vinayak Aangan as on March 2026.pdf · uploaded 15 Apr 2026Source
  • Form 5 (FY 2024-2025)Form 5 - Vinayak Aangan for FY 2024-25.pdf · uploaded 6 Jun 2026Source
  • Form 1Form 1 - Vinayak Aangan as on June 2026.pdf · uploaded 24 Jul 2026Source
  • Form 2Form 2 - Vinayak Aangan as on June 2026.pdf · uploaded 24 Jul 2026Source
  • Form 3Form 3 - Vinayak Aangan as on June 2026.pdf · uploaded 24 Jul 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Vinayak Aangan as on June 2026.pdf · uploaded 24 Jul 2026Source
  • Form 2A (FY 2025-2026)Form 2A FY 2025-26.pdf · uploaded 10 Aug 2026Source
  • Form 2A (FY 2024-2025)Vinayak_Aangan_Form2A_2024-25_30-07-2026_10-56.pdf · uploaded 9 Sep 2026Source
  • Occupational CertificateOC.pdf · uploaded 11 Sep 2026Source
  • Occupational CertificateOC Plan 1.pdf · uploaded 11 Sep 2026Source
  • Occupational CertificateOC Plan 2.pdf · uploaded 11 Sep 2026Source
  • Occupational CertificateOC Plan 3.pdf · uploaded 11 Sep 2026Source
  • Occupational CertificateOC Plan 4.pdf · uploaded 11 Sep 2026Source
  • Occupational CertificateCommencement Certificate.pdf · uploaded 11 Sep 2026Source
  • Occupational CertificateCC Plan 1.pdf · uploaded 11 Sep 2026Source
  • Occupational CertificateCC Plan 2.pdf · uploaded 11 Sep 2026Source
  • Occupational CertificateOC Verification Mail Screenshot.pdf · uploaded 17 Sep 2026Source

Technical

  • Documentpushpak agreement 1-25.pdf · uploaded 12 Jun 2023Source
  • Document1.pdf · uploaded 12 Jun 2023Source
  • Document2.pdf · uploaded 12 Jun 2023Source
  • Document3.pdf · uploaded 12 Jun 2023Source
  • DocumentNEW CC 3-5 DRW_compressed-1-2.pdf · uploaded 10 Jan 2024Source
  • DocumentNEW CC 3-5 DRW_compressed-5-6.pdf · uploaded 10 Jan 2024Source
  • DocumentNEW CC 3-5 DRW_compressed-3-4-1.pdf · uploaded 10 Jan 2024Source
  • DocumentNEW CC 3-5 DRW_compressed-3-4-2.pdf · uploaded 10 Jan 2024Source
  • DocumentPage 1 - Plot Area Permissible Sanctioned BUA Tenement and Parking Highlighted.pdf · uploaded 10 Aug 2026Source
  • DocumentPage 2.pdf · uploaded 10 Aug 2026Source
  • DocumentPage 3 - Floor Wise Tenement Highlighted.pdf · uploaded 10 Aug 2026Source
  • DocumentPage 4.pdf · uploaded 10 Aug 2026Source
  • DocumentPage 5.pdf · uploaded 10 Aug 2026Source
  • DocumentPage 6.pdf · uploaded 10 Aug 2026Source
  • DocumentPage 7 - Sanctioned and Habitable Floors Highlighted.pdf · uploaded 10 Aug 2026Source
  • DocumentPage 8.pdf · uploaded 10 Aug 2026Source

Technical (Architect)

  • Documentarchitect certificate (1).pdf · uploaded 15 Dec 2023Source
  • DocumentForm 1 - Vinayak Aangan as on Sep 2024.pdf · uploaded 19 Nov 2024Source
  • DocumentForm 1 - Vinayak Aangan as on 31-12-2024.pdf · uploaded 18 Jan 2025Source
  • DocumentForm 1 - Vinayak Aangan as on March 2025.pdf · uploaded 15 Apr 2025Source
  • Document4 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 15 Apr 2025Source
  • DocumentForm 1 - Vinayak Aangan as on March 2025.pdf · uploaded 7 May 2025Source

Technical (Engineer)

  • DocumentAdobe Scan 09 Jun 2023 (1).pdf · uploaded 12 Jun 2023Source
  • DocumentForm 2 - Vinayak Aangan as on March 2024.pdf · uploaded 28 Nov 2024Source
  • DocumentForm 2 - Vinayak Aangan as on June 2024.pdf · uploaded 28 Nov 2024Source
  • DocumentForm 2 - Vinayak Aangan as on Sep 2024.pdf · uploaded 28 Nov 2024Source
  • DocumentForm 2 - Vinayak Aangan as on 31-12-2024.pdf · uploaded 18 Jan 2025Source
  • DocumentForm 2 - Vinayak Aangan as on March 2025.pdf · uploaded 18 Apr 2025Source
  • DocumentForm 2 - Vinayak Aangan as on 31-12-2024 Previously Uploaded.pdf · uploaded 18 Apr 2025Source
  • DocumentForm 2 - Vinayak Aangan as on March 2025.pdf · uploaded 7 May 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel PLOT NO 3 SECTOR 5 PUSHPAK

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, Shop189 units in all
Address
Plot No 3 Sector 5 Pushpak, Plot No 3 Sector 5 Pushpak Nagar, Pushpak NagarPIN 410206
Village
Dapoli, Panvel taluka
Land area for this project
2,478 sq m (26,672 sq ft)
Permissible built-up area
10,018 sq m (1,07,833 sq ft)
Sanctioned built-up area
10,004 sq m (1,07,683 sq ft)
Recreational open space
266 sq m (2,859 sq ft)
Designated bank account
148
Developed in phases
No

Survey, CTS, gat or plot numbers

PLOT NO 3 SECTOR 5 PUSHPAK

Land as published on MahaRERA's project page

PLOT NO 3 SECTOR 5 PUSHPAK

Boundaries

North
Plot No 02
South
Plot No 04
East
18 M Wide Service Road
West
Plot No 38

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking189 units

94 of 189 units booked (50%), as the promoter reported to MahaRERA

1BHK · 125 units2BHK · 44 unitsShop · 20 units
TypeCarpet areaUnitsBooked
1BHK28.95 sq m · 312 sq ft116
1BHK29.28 sq m · 315 sq ft198
1BHK29.36 sq m · 316 sq ft2214
1BHK29.37 sq m · 316 sq ft112
1BHK29.72 sq m · 320 sq ft105
1BHK29.8 sq m · 321 sq ft3019
1BHK30.18 sq m · 325 sq ft113
1BHK30.22 sq m · 325 sq ft114
Show all 13 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
2BHK46.67 sq m · 502 sq ft117
2BHK46.77 sq m · 503 sq ft117
2BHK48.95 sq m · 527 sq ft2214
Shop40.63 sq m · 437 sq ft100
Shop45.9 sq m · 494 sq ft105

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals1

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
EngineerBalu Kundalik Rathod—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Dapoli

All 143 projects in Dapoli · Compare Vinayak Aangan with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology