Others · 1 building · 88 unitsRERA P52000046549

Delta Elite

Deedo IDDP-RAI-FCP8

Its promised completion date, Aug 2026, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 18% of its units are booked.

Dapoli, Raigarh 410206 · by Shree Ganesh Enterprises

Delivery3 mo past duePromised Aug 2026 · no extension on record · not shown completedRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales18% booked16 of 88 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Its promised completion date, Aug 2026, has passed and MahaRERA does not show it completed

  • This projectRegistered 12 Aug 2022, completion promised 31 Aug 2026, and still not shown completed today.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52000046549
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5200004654912 Aug 202231 Aug 202631 Aug 2026Shree Ganesh EnterprisesProject page
Documents135

1 document held by Deedo, 134 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Cardpan card of Shree Ganesh Enterprises.pdf · uploaded 3 Aug 2022Source
  • PAN CardNBG PAN and Aadhar.pdf · uploaded 3 Aug 2022Source
  • PAN CardPrashant PAN ADDHAR CARD.pdf · uploaded 3 Aug 2022Source
  • PAN Cardshantam stock pan card.pdf · uploaded 3 Aug 2022Source

Legal

  • Other – LegalTripartite 1.pdf · uploaded 3 Aug 2022Source
  • Other – LegalTripartite 2.pdf · uploaded 3 Aug 2022Source
  • Other – LegalTripartite 3.pdf · uploaded 3 Aug 2022Source
Show all 135 documentsShow fewer documents

Legal

  • Other – LegalTripartite 4.pdf · uploaded 3 Aug 2022Source
  • Other – LegalDevelopment 1.pdf · uploaded 3 Aug 2022Source
  • Other – LegalDevelopment 2.pdf · uploaded 3 Aug 2022Source
  • Other – LegalDevelopment 3.pdf · uploaded 3 Aug 2022Source
  • Other – LegalDevelopment 4.pdf · uploaded 3 Aug 2022Source
  • Legal Title reportTitle Search Report Plot 1 Sector 4 Pushpak.pdf · uploaded 3 Aug 2022Source
  • Declaration Form BForm B.pdf · uploaded 3 Aug 2022Source
  • Declaration Form BFORM B LAND OWNERS.pdf · uploaded 3 Aug 2022Source

Migrated

  • 1 PAN Cardpan card of Shree Ganesh Enterprises.pdf · uploaded 3 Aug 2022Source
  • 2 PAN CardNBG PAN and Aadhar.pdf · uploaded 3 Aug 2022Source
  • 3 PAN CardPrashant PAN ADDHAR CARD.pdf · uploaded 3 Aug 2022Source
  • 4 PAN Cardshantam stock pan card.pdf · uploaded 3 Aug 2022Source
  • 1 Copy of the legal title reportTitle Search Report Plot 1 Sector 4 Pushpak.pdf · uploaded 3 Aug 2022Source
  • 1 a Details of encumbrances concerned to FinanceDeclaration Encumbrances Finance.pdf · uploaded 3 Aug 2022Source
  • 2 a Details of encumbrances concerned to FinanceDeclaration Finance - Owner.pdf · uploaded 3 Aug 2022Source
  • 1 b Details of encumbrances concerned to LegalDeclaration Legal - Owner.pdf · uploaded 3 Aug 2022Source
  • 2 b Details of encumbrances concerned to LegalDeclaration encumbrances Legal.pdf · uploaded 3 Aug 2022Source
  • 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 3 Aug 2022Source
  • 1 Building Plan Approval / NA Order for plotted development1 CC COPY DWG.pdf · uploaded 3 Aug 2022Source
  • 2 Building Plan Approval / NA Order for plotted development2 CC COPY DWG.pdf · uploaded 3 Aug 2022Source
  • 3 Building Plan Approval / NA Order for plotted development3 CC COPY DWG.pdf · uploaded 3 Aug 2022Source
  • 4 Building Plan Approval / NA Order for plotted development4 CC COPY DWG.pdf · uploaded 3 Aug 2022Source
  • 5 Building Plan Approval / NA Order for plotted development5 CC COPY DWG.pdf · uploaded 3 Aug 2022Source
  • 6 Building Plan Approval / NA Order for plotted development6 CC COPY DWG.pdf · uploaded 3 Aug 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC COPY.pdf · uploaded 3 Aug 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentNOC for Ancillary FSI Plot 1 Sector 4 Pushpak.pdf · uploaded 3 Aug 2022Source
  • 1 Declaration about Commencement CertificateDeclaration about CC.pdf · uploaded 3 Aug 2022Source
  • 1 Declaration in FORM BForm B.pdf · uploaded 3 Aug 2022Source
  • 2 Declaration in FORM BFORM B LAND OWNERS.pdf · uploaded 3 Aug 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 01 RERA D E.pdf · uploaded 3 Aug 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Delta Elite.pdf · uploaded 3 Aug 2022Source
  • 1 CERSAI detailsCRESAI Declaration.pdf · uploaded 3 Aug 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate.pdf · uploaded 3 Aug 2022Source
  • 1 Proforma of Allotment letterAgreement For Sale Delta Elite Shree Ganesh Enterprises.pdf · uploaded 3 Aug 2022Source
  • 2 Proforma of Allotment letterAllotment Letter Delta Elite.pdf · uploaded 3 Aug 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORMAT A SEPARATE BANK AC.pdf · uploaded 3 Aug 2022Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report - Allotment Letter.pdf · uploaded 3 Aug 2022Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report - Agreement.pdf · uploaded 3 Aug 2022Source
  • 1 Other – LegalTripartite 1.pdf · uploaded 3 Aug 2022Source
  • 2 Other – LegalTripartite 2.pdf · uploaded 3 Aug 2022Source
  • 3 Other – LegalTripartite 3.pdf · uploaded 3 Aug 2022Source
  • 4 Other – LegalTripartite 4.pdf · uploaded 3 Aug 2022Source
  • 5 Other – LegalDevelopment 1.pdf · uploaded 3 Aug 2022Source
  • 6 Other – LegalDevelopment 2.pdf · uploaded 3 Aug 2022Source
  • 7 Other – LegalDevelopment 3.pdf · uploaded 3 Aug 2022Source
  • 8 Other – LegalDevelopment 4.pdf · uploaded 3 Aug 2022Source
  • 3 Proforma of Allotment letterAgreement For Sale_Delta Elite_Shree Ganesh Enterprises.pdf · uploaded 17 Aug 2022Source
  • 4 Proforma of Allotment letterAgreement For Sale_Delta Elite_Shree Ganesh Enterprises.pdf · uploaded 15 Oct 2022Source
  • 5 Proforma of Allotment letterAllotment Letter_Delta Elite.pdf · uploaded 15 Oct 2022Source
  • 2 Deviation Report with respect to Allotment letterDeviation Report - Allotment Letter Elite.pdf · uploaded 15 Oct 2022Source
  • 2 Deviation Report with respect to model copy of AgreementDeviation Report Agreement for Sale Elite.pdf · uploaded 15 Oct 2022Source
  • 6 Proforma of Allotment letterAllotment Letter_Delta Elite.pdf · uploaded 26 Oct 2022Source
  • 1 Proforma of Agreement for saleAgreement For Sale_Delta Elite_Shree Ganesh Enterprises.pdf · uploaded 26 Oct 2022Source
  • 3 Deviation Report with respect to model copy of AgreementDeviation Report Agreement for Sale.pdf · uploaded 26 Oct 2022Source
  • 7 Building Plan Approval / NA Order for plotted developmentAmended CC Drawing.pdf · uploaded 24 Nov 2022Source
  • 3 Commencement Certificates / NA Order for plotted developmentAmended CC - Plot 1 Sector 4.pdf · uploaded 24 Nov 2022Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsCRESAI Declaration.pdf · uploaded 16 Sep 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ELITE 02 FORM 1.pdf · uploaded 4 Nov 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)D Elite Form 2.pdf · uploaded 4 Nov 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 D Elite compressed.pdf · uploaded 4 Nov 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Delta Elite_Form 5_FY 2022-23 scanned copy.pdf · uploaded 4 Nov 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Delta Elite RERA CERTIFICATE.pdf · uploaded 20 Jan 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Signed Q4 2023 D Elite Form No 2 Eng Certificate.pdf · uploaded 20 Jan 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Delta Elite Form 3 Q3 FY 2023-24 signed scan.pdf · uploaded 22 Jan 2024Source
  • 2 Proforma of Agreement for saleDRAFT OF AGREEMENT - DELTA ELITE.pdf · uploaded 15 Mar 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q1 2024 Form 1 RERA DELTA ELITE.pdf · uploaded 20 Apr 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q1 2024 Form 2 D Elite FINAL.pdf · uploaded 20 Apr 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q1 2024 Form 3 D Elite below 3MB.pdf · uploaded 25 Apr 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)D Elite FORM 1.pdf · uploaded 19 Jul 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)D Elite - Form No 2 Eng Certificate.pdf · uploaded 19 Jul 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Delta Elite (Q1) FY 24-25_compressed.pdf · uploaded 26 Jul 2024Source
  • Form 5 (FY 2023-2024)RERA Form5 delta elite.pdf · uploaded 30 Sep 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentFinal CC.pdf · uploaded 19 Nov 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentFinal CC Drawing 1_11zon.pdf · uploaded 19 Nov 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentFinal CC Drawing 2_11zon.pdf · uploaded 19 Nov 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentFinal CC.pdf · uploaded 19 Nov 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentFinal CC Drawing 1_11zon.pdf · uploaded 19 Nov 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentFinal CC Drawing 2_11zon.pdf · uploaded 19 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ELITE 06 RERA FORM 1.pdf · uploaded 25 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Delta Elite Q3- FY 24-25 signed.pdf · uploaded 5 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2-DE.pdf · uploaded 5 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Elite.pdf · uploaded 6 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Delta Elite Form 1.pdf · uploaded 19 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Delta Elite Q4 March 2025.pdf · uploaded 30 Apr 2025Source
  • Form 1de.pdf · uploaded 21 Jul 2025Source
  • Form 2Form2-DE.pdf · uploaded 21 Jul 2025Source
  • Form 3FORM 3 Delta Elite Q4 March 2025.pdf · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked InventoryNo Encumbrance Declaration - ELite.pdf · uploaded 21 Jul 2025Source
  • Self-declaration of Quarterly ProgressForm2-DE.pdf · uploaded 21 Jul 2025Source
  • Form 1Form 1 Sep 25.pdf · uploaded 18 Dec 2025Source
  • Form 2form-2 Delta Signature.pdf · uploaded 18 Dec 2025Source
  • Form 3Form 3.pdf · uploaded 18 Dec 2025Source
  • Disclosure of Sold and Booked InventoryNotary Form B.pdf · uploaded 18 Dec 2025Source
  • Withdrawal Update Form 1Q1 2024 Form 1 RERA DELTA ELITE.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2Q1 2024 Form 2 D Elite below 1MB.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3Q1 2024 Form 3 D Elite below 3MB.pdf · uploaded 20 Apr 2026Source
  • Form 2A (FY 2022-2023)Form 2A - FY 2022-23.pdf · uploaded 6 Aug 2026Source
  • Form 2A (FY 2023-2024)Form 2A - FY 2023-24.pdf · uploaded 6 Aug 2026Source
  • Form 2A (FY 2024-2025)Form 2A - FY 2024-25.pdf · uploaded 6 Aug 2026Source
  • Form 2A (FY 2025-2026)Form 2A - FY 2024-25.pdf · uploaded 6 Aug 2026Source
  • Withdrawal Update Form 1Form-1_Dec 2025.pdf · uploaded 10 Aug 2026Source
  • Withdrawal Update Form 1Form-1_Dec 2025.pdf · uploaded 10 Aug 2026Source
  • Withdrawal Update Form 2Form-2 DE Q3 FY 25-26 signed.pdf · uploaded 10 Aug 2026Source
  • Withdrawal Update Form 2Form-2 DE Q3 FY 25-26 signed.pdf · uploaded 10 Aug 2026Source
  • Withdrawal Update Form 3Form 3 Signed Q3 Rev Signed (1).pdf · uploaded 10 Aug 2026Source
  • Withdrawal Update Form 3Form 3 Signed Q3 Rev Signed (1).pdf · uploaded 10 Aug 2026Source

Technical

  • DocumentLayout.pdf · uploaded 3 Aug 2022Source
  • Document1 CC COPY DWG.pdf · uploaded 3 Aug 2022Source
  • Document2 CC COPY DWG.pdf · uploaded 3 Aug 2022Source
  • Document3 CC COPY DWG.pdf · uploaded 3 Aug 2022Source
  • Document4 CC COPY DWG.pdf · uploaded 3 Aug 2022Source
  • Document5 CC COPY DWG.pdf · uploaded 3 Aug 2022Source
  • Document6 CC COPY DWG.pdf · uploaded 3 Aug 2022Source
  • DocumentAmended CC Drawing.pdf · uploaded 24 Nov 2022Source
  • DocumentFinal CC Drawing 1_11zon.pdf · uploaded 19 Nov 2024Source
  • DocumentFinal CC Drawing 2_11zon.pdf · uploaded 19 Nov 2024Source
  • DocumentFinal CC Drawing 1_11zon.pdf · uploaded 19 Nov 2024Source
  • DocumentFinal CC Drawing 2_11zon.pdf · uploaded 19 Nov 2024Source
  • DocumentOC Plan 1 - Built up area highlighted.pdf · uploaded 10 Aug 2026Source
  • DocumentOC Plan 2 - Parking highlighted.pdf · uploaded 10 Aug 2026Source
  • DocumentOC Plan 3-11.pdf · uploaded 10 Aug 2026Source

Technical (Architect)

  • DocumentELITE 06 RERA FORM 1.pdf · uploaded 25 Jan 2025Source
  • DocumentDelta Elite Form 1.pdf · uploaded 19 Apr 2025Source
  • DocumentForm-1_Dec 2025.pdf · uploaded 10 Aug 2026Source

Technical (Engineer)

  • DocumentForm2-DE.pdf · uploaded 5 Feb 2025Source
  • DocumentForm 2 - Elite.pdf · uploaded 6 Feb 2025Source
  • DocumentForm-2 DE Q3 FY 25-26 signed.pdf · uploaded 10 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 01

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, 3BHK, Shop88 units in all
Address
01, Plot No 01 Sector 04 Pushpak Dapoli Panvel 410206, Pushpak DapoliPIN 410206
Village
Dapoli, Panvel taluka
Land area for this project
3,210 sq m (34,552 sq ft)
Permissible built-up area
12,771 sq m (1,37,463 sq ft)
Sanctioned built-up area
12,335 sq m (1,32,777 sq ft)
Recreational open space
850 sq m (9,153 sq ft)
Designated bank account
148
Developed in phases
No

Survey, CTS, gat or plot numbers

01

Land as published on MahaRERA's project page

01

Boundaries

North
Plot No 26 and 27
South
24 Mtr Wide Road
East
Plot No 02
West
18 Mtr Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking88 units

16 of 88 units booked (18%), as the promoter reported to MahaRERA

1BHK · 20 units2BHK · 26 units3BHK · 21 unitsShop · 21 units
TypeCarpet areaUnitsBooked
1BHK36.43 sq m · 392 sq ft51
1BHK36.9 sq m · 397 sq ft105
1BHK38.15 sq m · 411 sq ft52
2BHK53.74 sq m · 578 sq ft51
2BHK58.91 sq m · 634 sq ft212
3BHK74.71 sq m · 804 sq ft70
3BHK77.21 sq m · 831 sq ft70
3BHK77.79 sq m · 837 sq ft75
Show all 24 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Shop28.71 sq m · 309 sq ft30
Shop30.19 sq m · 325 sq ft10
Shop30.34 sq m · 327 sq ft10
Shop30.43 sq m · 328 sq ft20
Shop30.78 sq m · 331 sq ft10
Shop31.58 sq m · 340 sq ft10
Shop34.95 sq m · 376 sq ft20
Shop35.37 sq m · 381 sq ft10
Shop35.47 sq m · 382 sq ft10
Shop35.83 sq m · 386 sq ft10
Shop39.48 sq m · 425 sq ft10
Shop40.71 sq m · 438 sq ft10
Shop44.34 sq m · 477 sq ft10
Shop45.52 sq m · 490 sq ft20
Shop46.9 sq m · 505 sq ft10
Shop94.55 sq m · 1,018 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSatish V Ahuja And Associates Architects & Designers—
Chartered accountantChetan Joshi & Co—
EngineerAkshay Barkade—
EngineerAnis Kumar Yadav—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Dapoli

All 143 projects in Dapoli · Compare Delta Elite with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology