Deedo IDDP-RAI-4VWGCompletion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 75% of its units are booked.
Chawane, Raigarh 410206 · by Jmj Projects
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2027
- This projectRegistered 19 Jul 2019, completion promised 31 Dec 2026, revised to 30 Apr 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52000021687
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000021687 | 19 Jul 2019 | 31 Dec 2026 | 30 Apr 2027 | Jmj Projects | Project page |
Documents112
1 document held by Deedo, 111 filings listed on MahaRERA's project page
Finance
Legal
- Legal Title reportLEGAL TITLE REPORT - 37-5A - JMJ PROJECTS.pdf · uploaded 2 Jul 2019Source
- Legal Title reportLEGAL TITLE REPORT - 37-5B- JMJ PROJECTS.pdf · uploaded 2 Jul 2019Source
- Declaration Form BFORM B - JMJ PROJECTS.pdf · uploaded 9 Jul 2019Source
- Legal Title reportLEGAL TITLE REPORT - JMJ PROJECT.pdf · uploaded 12 Jul 2019Source
- Declaration Form BFORM B-AFFIDAVIT CUM DECLARATION.pdf · uploaded 28 Feb 2025Source
Show all 112 documentsShow fewer documents
Migrated
- 1 PAN CardPAN CARD - JMJ PROJECTS.pdf · uploaded 2 Jul 2019Source
- 1 Copy of the legal title reportLEGAL TITLE REPORT - 37-5A - JMJ PROJECTS.pdf · uploaded 2 Jul 2019Source
- 2 Copy of the legal title reportLEGAL TITLE REPORT - 37-5B- JMJ PROJECTS.pdf · uploaded 2 Jul 2019Source
- 1 Details of encumbrancesLETTER OF ENCUMBRANCES - JMJ PROJECTS.pdf · uploaded 2 Jul 2019Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT PLAN - JMJ PROJECTS.PDF · uploaded 2 Jul 2019Source
- 1 Building Plan Approval (IOD)COMMENCEMENT CERTIFICATE - JMJ PROJECTS.pdf · uploaded 2 Jul 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE - JMJ PROJECTS.pdf · uploaded 2 Jul 2019Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE - JMJ PROJECTS.pdf · uploaded 2 Jul 2019Source
- 1 Declaration in FORM BFORM B - JMJ PROJECTS.pdf · uploaded 9 Jul 2019Source
- 1 Certificates of CA (Form 3)CA CERTIFICATE - JMJ PROJECTS.pdf · uploaded 9 Jul 2019Source
- 3 Copy of the legal title reportLEGAL TITLE REPORT - JMJ PROJECT.pdf · uploaded 12 Jul 2019Source
- 1 Proforma of Allotment letterPROFORMA OF AGREEMENT FOR SALE - JMJ PROJECTS.pdf · uploaded 13 Jul 2019Source
- 2 Proforma of Allotment letterPROFORMA OF AGREEMENT FOR SALE - JMJ PROJECTS.pdf · uploaded 13 Jul 2019Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 31-03-2023 (1).pdf · uploaded 12 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A 31-03-2020 (1).pdf · uploaded 12 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A 31-03-21 (1).pdf · uploaded 12 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 31-03-2022 (1).pdf · uploaded 12 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form No 2A 31-03-2023 (1).pdf · uploaded 12 Jun 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Signed_19 JULY 2019 TO MARCH 2020 FORM NO 5.pdf · uploaded 12 Jun 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)signed_F Y 2020-2021 FORM NO 5.pdf · uploaded 12 Jun 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)signed_F Y 2021-2022 FORM NO 5.pdf · uploaded 12 Jun 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)signed_F Y 2022-2023 FORM NO 5.pdf · uploaded 12 Jun 2024Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)MAR-2020 FORM NO 1 (1).pdf · uploaded 13 Jun 2024Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)MAR-2021 FORM NO 1.pdf · uploaded 13 Jun 2024Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)MAR-2022 FORM NO 1.pdf · uploaded 13 Jun 2024Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)MAR-2023 FORM NO 1.pdf · uploaded 13 Jun 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 31-03-2020 (1).pdf · uploaded 13 Jun 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 31-03-2021 (1).pdf · uploaded 13 Jun 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 31-03-2022 (1).pdf · uploaded 13 Jun 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 31-03-2023 (1).pdf · uploaded 13 Jun 2024Source
- 1 Disclosure of sold/ booked inventoryDISCLOSURE OF FLAT.pdf · uploaded 13 Jun 2024Source
- 2 Certificates of CA (Form 3)jmj form 3 19-20 (2).pdf · uploaded 13 Jun 2024Source
- 3 Certificates of CA (Form 3)JMJ FORM 3 20-21_11zon (1).pdf · uploaded 13 Jun 2024Source
- 4 Certificates of CA (Form 3)JMJ FORM 3 21-22_11zon (1).pdf · uploaded 13 Jun 2024Source
- 5 Certificates of CA (Form 3)JMJ FORM 3 22-23_11zon.pdf · uploaded 13 Jun 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 20.pdf · uploaded 24 Jun 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 21.pdf · uploaded 24 Jun 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 22.pdf · uploaded 24 Jun 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)fORM 2 23.pdf · uploaded 24 Jun 2024Source
- 6 Certificates of CA (Form 3)form 3.pdf · uploaded 24 Jun 2024Source
- 7 Certificates of CA (Form 3)form 3 fy 21-22.pdf · uploaded 24 Jun 2024Source
- 8 Certificates of CA (Form 3)form 3 fy 20-21.pdf · uploaded 24 Jun 2024Source
- 9 Certificates of CA (Form 3)form 3 fy 22-23.pdf · uploaded 24 Jun 2024Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 - DATE 30-06-2023.pdf · uploaded 15 Jul 2024Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 - DATE 31-12-2023.pdf · uploaded 15 Jul 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - DATE 30-06-2023.pdf · uploaded 15 Jul 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - DATE 31-12-2023.pdf · uploaded 15 Jul 2024Source
- 10 Certificates of CA (Form 3)Form - 3 CA Certificate as on 06-09-2023_11zon.pdf · uploaded 15 Jul 2024Source
- 11 Certificates of CA (Form 3)FORM-dec-23.pdf · uploaded 15 Jul 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)JMJ Format A.pdf · uploaded 10 Aug 2024Source
- 1 Other – Financeself declaration for change in bank account.pdf · uploaded 10 Aug 2024Source
- 1 Certificates of CA (Form 3)Form-3, Infinity group 30-09-2024_11zon (1).pdf · uploaded 6 Dec 2024Source
- 2 Certificates of CA (Form 3)Form-3, Infinity group (31-12-2023)_11zon.pdf · uploaded 6 Dec 2024Source
- 3 Certificates of CA (Form 3)Form-3, Infinity group 31-03-2024_11zon.pdf · uploaded 6 Dec 2024Source
- 4 Certificates of CA (Form 3)Form-3, JMJ Projects (31-03-2024)_11zon (1).pdf · uploaded 6 Dec 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - ENGINEERS CERTIFICATE 31-03-2024_11zon (2).pdf · uploaded 6 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM - 2 A QUALITY ASSURANCE 31-03-2024 (1)_11zon.pdf · uploaded 6 Dec 2024Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)JMJ SUNCITY _ ARCHITECT'S CERTIFICATE_FORM 1 - 30-06-2024_11zon.pdf · uploaded 27 Dec 2024Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Revised JMJ FORM NO 1 SEPT- 2024.pdf · uploaded 27 Dec 2024Source
- 5 Certificates of CA (Form 3)Form 3 30-06-2024 _11zon.pdf · uploaded 27 Dec 2024Source
- 6 Certificates of CA (Form 3)Signed JMJ FORM NO 3 SEPT- 2024.pdf · uploaded 27 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)JMJ PROJECTS FORM 2 30-6-2024 .pdf · uploaded 27 Dec 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Revised JMJ FORM NO 2 SEPT 2024.pdf · uploaded 27 Dec 2024Source
- 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD-UNSOLD UNITS.pdf · uploaded 28 Dec 2024Source
- 1 Declaration in FORM BFORM B-AFFIDAVIT CUM DECLARATION.pdf · uploaded 28 Feb 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Dec 24.pdf · uploaded 8 Mar 2025Source
- 1 Certificates of CA (Form 3)Form-3 Dec 24.pdf · uploaded 8 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 24.pdf · uploaded 8 Mar 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest - Mr Ratneshkumar Valji Vaviya.pdf · uploaded 8 Mar 2025Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest - Mr Rajendra Choudhary.pdf · uploaded 8 Mar 2025Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest - Mr Mahendra Sinh Jadeja.pdf · uploaded 8 Mar 2025Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest - Mr Kalimullah Naushad.pdf · uploaded 8 Mar 2025Source
- 5 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest - Mr K R Jairam.pdf · uploaded 8 Mar 2025Source
- 6 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest - Mr Dhiraj Manjeri.pdf · uploaded 8 Mar 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Jmj Projects F Y 23-24.pdf · uploaded 12 Mar 2025Source
- Form 1FORM 1- 30-09 -2025.pdf · uploaded 16 Feb 2026Source
- Form 2Form 2_Sep 2025.pdf · uploaded 16 Feb 2026Source
- Form 3Form 3_Sep 2025 compressed.pdf · uploaded 16 Feb 2026Source
- Disclosure of Sold and Booked InventorySold Unsold Sep 2025.pdf · uploaded 16 Feb 2026Source
- Form 1FORM 1 - 30-12-2025.pdf · uploaded 16 Feb 2026Source
- Form 3Form 3_Dec 2025.pdf · uploaded 16 Feb 2026Source
- Disclosure of Sold and Booked Inventorysold unsold dec 2025.pdf · uploaded 16 Feb 2026Source
- Form 2Form 2_Dec 2025 (1).pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 1FORM 1 A - 30-06-2025.pdf · uploaded 24 Feb 2026Source
- Withdrawal Update Form 2FORM -2 JUNE 2025.pdf · uploaded 24 Feb 2026Source
- Withdrawal Update Form 3Form 3_Sep 2025 compressed.pdf · uploaded 24 Feb 2026Source
- Form 2A (FY 2019-2020)FORM-2A (2019-20).pdf · uploaded 16 Mar 2026Source
- Form 2A (FY 2020-2021)FORM-2A (2020-21).pdf · uploaded 16 Mar 2026Source
- Form 2A (FY 2021-2022)FORM-2A (2021-22).pdf · uploaded 16 Mar 2026Source
- Form 2A (FY 2022-2023)FORM-2A (2022-23).pdf · uploaded 16 Mar 2026Source
- Form 2A (FY 2023-2024)FORM-2A (2023-24).pdf · uploaded 16 Mar 2026Source
- Form 2A (FY 2024-2025)FORM-2A (2024-25).pdf · uploaded 16 Mar 2026Source
- Form 2A (FY 2025-2026)FORM-2A (2025-26).pdf · uploaded 15 Apr 2026Source
Technical
Technical (Architect)
Technical (Engineer)
- DocumentFORM 2 - ENGINEERS CERTIFICATE 31-03-2024_11zon (2).pdf · uploaded 6 Dec 2024Source
- DocumentJMJ PROJECTS FORM 2 30-6-2024 .pdf · uploaded 27 Dec 2024Source
- DocumentRevised JMJ FORM NO 2 SEPT 2024.pdf · uploaded 27 Dec 2024Source
- DocumentForm 2 Dec 24.pdf · uploaded 8 Mar 2025Source
- DocumentFORM -2 JUNE 2025.pdf · uploaded 24 Feb 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 5 B, GAT NO 37 HISSA NO 5 A
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 1 BHK A WING, 1 BHK B WING, 1 RK A WING, 1 RK B WING, 2 BHK A WING, 2 BHK B WING, Office a wing, Office b wing, Shop a wing, Shop b wing, 1 BHK C WING, 1 BHK D WING, 1 RK C WING, 2 BHK C WING, 2 BHK D WING, Office c wing, Office d wing, Shop c wing, Shop d wing263 units in all
- Address
- Gat No 37 Hissa No 5 A And 5 B, Panvel, RaigadPIN 410206
- Village
- Chawane, Panvel taluka
- Location
- 18.86291, 73.16005
- Land area for this project
- 7,180 sq m (77,285 sq ft)
- Permissible built-up area
- 8,721 sq m (93,867 sq ft)
- Sanctioned built-up area
- 8,721 sq m (93,867 sq ft)
- Recreational open space
- 593 sq m (6,383 sq ft)
- Designated bank account
- 85
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
GAT NO 37 HISSA NO 5 A AND 5 B
Boundaries
- North
- Survey No 37-6
- South
- Survey No 37-3
- East
- Savroli Kharpada Road
- West
- Survey No 37 And 37-6
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking263 units
198 of 263 units booked (75%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building No - 1 | 1BHK | 24.58 sq m · 265 sq ft | 7 | 7 |
| Building No - 1 | 1BHK | 26.74 sq m · 288 sq ft | 1 | 1 |
| Building No - 1 | 1BHK | 26.74 sq m · 288 sq ft | 13 | 13 |
| Building No - 1 | 1 BHK A WING | 24.43 sq m · 263 sq ft | 14 | 10 |
| Building No - 1 | 1 BHK A WING | 27.03 sq m · 291 sq ft | 6 | 4 |
| Building No - 1 | 1 BHK B WING | 24.43 sq m · 263 sq ft | 14 | 11 |
| Building No - 1 | 1 BHK B WING | 24.58 sq m · 265 sq ft | 7 | 4 |
| Building No - 1 | 1 BHK B WING | 26.74 sq m · 288 sq ft | 14 | 14 |
Show all 56 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building No - 1 | 1 BHK B WING | 27.03 sq m · 291 sq ft | 6 | 6 |
| Building No - 1 | 1 RK A WING | 16.69 sq m · 180 sq ft | 14 | 4 |
| Building No - 1 | 1 RK B WING | 16.69 sq m · 180 sq ft | 14 | 7 |
| Building No - 1 | 2 BHK A WING | 39.29 sq m · 423 sq ft | 6 | 4 |
| Building No - 1 | 2 BHK B WING | 39.29 sq m · 423 sq ft | 6 | 3 |
| Building No - 1 | Office a wing | 22.26 sq m · 240 sq ft | 1 | 0 |
| Building No - 1 | Office a wing | 23.85 sq m · 257 sq ft | 1 | 0 |
| Building No - 1 | Office a wing | 24.25 sq m · 261 sq ft | 1 | 0 |
| Building No - 1 | Office a wing | 55.91 sq m · 602 sq ft | 1 | 1 |
| Building No - 1 | Office b wing | 22.26 sq m · 240 sq ft | 1 | 0 |
| Building No - 1 | Office b wing | 23.85 sq m · 257 sq ft | 1 | 0 |
| Building No - 1 | Office b wing | 24.25 sq m · 261 sq ft | 1 | 0 |
| Building No - 1 | Office b wing | 24.65 sq m · 265 sq ft | 1 | 0 |
| Building No - 1 | Office b wing | 55.91 sq m · 602 sq ft | 1 | 0 |
| Building No - 1 | Shop a wing | 25.62 sq m · 276 sq ft | 1 | 0 |
| Building No - 1 | Shop a wing | 27.45 sq m · 295 sq ft | 1 | 0 |
| Building No - 1 | Shop a wing | 27.91 sq m · 300 sq ft | 3 | 1 |
| Building No - 1 | Shop b wing | 25.62 sq m · 276 sq ft | 1 | 1 |
| Building No - 1 | Shop b wing | 27.45 sq m · 295 sq ft | 1 | 0 |
| Building No - 1 | Shop b wing | 27.91 sq m · 300 sq ft | 3 | 1 |
| Building No - 1 | Shop b wing | 28.37 sq m · 305 sq ft | 1 | 1 |
| Building No - 2 | 1 BHK C WING | 24.43 sq m · 263 sq ft | 14 | 13 |
| Building No - 2 | 1 BHK C WING | 24.58 sq m · 265 sq ft | 7 | 7 |
| Building No - 2 | 1 BHK C WING | 26.74 sq m · 288 sq ft | 14 | 13 |
| Building No - 2 | 1 BHK C WING | 27.03 sq m · 291 sq ft | 6 | 6 |
| Building No - 2 | 1 BHK D WING | 24.43 sq m · 263 sq ft | 14 | 13 |
| Building No - 2 | 1 BHK D WING | 24.58 sq m · 265 sq ft | 7 | 7 |
| Building No - 2 | 1 BHK D WING | 27.03 sq m · 291 sq ft | 6 | 6 |
| Building No - 2 | 1 RK C WING | 16.69 sq m · 180 sq ft | 14 | 10 |
| Building No - 2 | 2 BHK C WING | 39.84 sq m · 429 sq ft | 6 | 3 |
| Building No - 2 | 2 BHK D WING | 34.62 sq m · 373 sq ft | 7 | 7 |
| Building No - 2 | 2 BHK D WING | 39.84 sq m · 429 sq ft | 6 | 4 |
| Building No - 2 | Office c wing | 22.26 sq m · 240 sq ft | 1 | 1 |
| Building No - 2 | Office c wing | 23.85 sq m · 257 sq ft | 1 | 0 |
| Building No - 2 | Office c wing | 24.25 sq m · 261 sq ft | 1 | 1 |
| Building No - 2 | Office c wing | 24.65 sq m · 265 sq ft | 1 | 0 |
| Building No - 2 | Office c wing | 55.91 sq m · 602 sq ft | 1 | 0 |
| Building No - 2 | Office d wing | 22.26 sq m · 240 sq ft | 1 | 1 |
| Building No - 2 | Office d wing | 23.85 sq m · 257 sq ft | 1 | 1 |
| Building No - 2 | Office d wing | 24.25 sq m · 261 sq ft | 1 | 1 |
| Building No - 2 | Office d wing | 55.91 sq m · 602 sq ft | 1 | 0 |
| Building No - 2 | Shop c wing | 25.62 sq m · 276 sq ft | 1 | 1 |
| Building No - 2 | Shop c wing | 27.45 sq m · 295 sq ft | 1 | 1 |
| Building No - 2 | Shop c wing | 27.91 sq m · 300 sq ft | 3 | 3 |
| Building No - 2 | Shop c wing | 28.37 sq m · 305 sq ft | 1 | 1 |
| Building No - 2 | Shop d wing | 25.62 sq m · 276 sq ft | 1 | 1 |
| Building No - 2 | Shop d wing | 27.45 sq m · 295 sq ft | 1 | 1 |
| Building No - 2 | Shop d wing | 27.91 sq m · 300 sq ft | 3 | 3 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Destination | — |
| Chartered accountant | SHALU ANAND & Co | — |
| Engineer | B S Sukthankar And Associates | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Chawane
- Shikhar PalmsRERA PM1270002502739
- Shikhar GardenRERA PM1270002502607
- Shikhar GreensRERA P52000034020
- Akshar Rivergate Plot BRERA P52000032008
- Imperial CrownRERA P52000021766
- The OrbisRERA P52000021134
- Akshar Rivergate Plot ERERA P52000020031
- Akshar Rivergate - Plot FRERA P52000014488
All 9 projects in Chawane · Compare Sun City with another project