Residential / Group Housing · 13 buildings · 184 unitsRERA P51900002485

Sound Delight

Deedo IDDP-RAI-CH16

It is due for completion in Dec 2030, with no extension on record; no MahaRERA orders on record; 53% of its units are booked.

Ashte, Raigarh 410206 · by Soundlines Ecohomes

DeliveryDue Dec 2030No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales53% booked98 of 184 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

It is due for completion in Dec 2030, with no extension on record

  • This projectRegistered 1 Aug 2017, completion promised 31 Dec 2030.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

13 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51900002485
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P519000024851 Aug 201731 Dec 203031 Dec 2030Soundlines EcohomesProject page
Documents192

1 document held by Deedo, 191 filings listed on MahaRERA's project page

Extension certificate

Finance

  • PAN CardEcohomes PAN.pdf · uploaded 29 Jul 2017Source

Legal

  • OtherCovering letter to MSRDC from Architect.pdf · uploaded 29 Jul 2017Source
  • OtherDeclaration Certificate Soundlines Ecohomes.pdf · uploaded 29 Jul 2017Source
  • OtherMSRDC Submition for Plan Approval.pdf · uploaded 29 Jul 2017Source
  • Legal Title reportTitle Certificate Soundlines Ecohomes.pdf · uploaded 29 Jul 2017Source
  • Declaration Form BForm B Notory Soundlines Ecohomes.pdf · uploaded 29 Jul 2017Source
  • Legal Title reporttitle certificate panvel.pdf · uploaded 8 Jun 2022Source
Show all 192 documentsShow fewer documents

Migrated

  • 1 PAN CardEcohomes PAN.pdf · uploaded 29 Jul 2017Source
  • 1 Copy of the legal title reportTitle Certificate Soundlines Ecohomes.pdf · uploaded 29 Jul 2017Source
  • 1 Details of encumbrancesEncumbrance Cetificate Soundlines Ecohomes.pdf · uploaded 29 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)Approved Plan Soundlines Ecohomes.pdf · uploaded 29 Jul 2017Source
  • 1 Building Plan Approval (IOD)Approved Plan Soundlines Ecohomes.pdf · uploaded 29 Jul 2017Source
  • 1 Declaration in FORM BForm B Notory Soundlines Ecohomes.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Soundlines Ecohomes.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Soundlines Ecohomes.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of CA (Form 3)CA Certificate Form 3 Soundlines Ecohomes.pdf · uploaded 29 Jul 2017Source
  • 1 Proforma of Allotment letterAllotment Agreement Soundlines Ecohomes.pdf · uploaded 29 Jul 2017Source
  • 2 Proforma of Allotment letterAgrrement of Sale Soundlines Ecohomes 1.pdf · uploaded 29 Jul 2017Source
  • 3 Proforma of Allotment letterAgrrement of Sale Soundlines Ecohomes 2.pdf · uploaded 29 Jul 2017Source
  • 4 Proforma of Allotment letterAgrrement of Sale Soundlines Ecohomes 3.pdf · uploaded 29 Jul 2017Source
  • 1 OtherDeclaration Certificate Soundlines Ecohomes.pdf · uploaded 29 Jul 2017Source
  • 2 OtherCovering letter to MSRDC from Architect.pdf · uploaded 29 Jul 2017Source
  • 3 OtherMSRDC Submition for Plan Approval.pdf · uploaded 29 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentSoundlines Ecohomes CC.pdf · uploaded 23 Mar 2018Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 26 Mar 2019Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 26 Mar 2019Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 26 Mar 2019Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate.pdf · uploaded 26 Mar 2019Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate.pdf · uploaded 26 Mar 2019Source
  • 2 Certificates of CA (Form 3)CA RERA Certificate.pdf · uploaded 26 Mar 2019Source
  • 1 Details of Restarting of Construction work post lockdownSoundlines Ecohomes MahaRERA_Details of Restarting of Construction work post lockdown.pdf · uploaded 29 Jul 2020Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)ashte_1229__engineers_certificate_.pdf · uploaded 26 May 2021Source
  • 3 Certificates of CA (Form 3)Previous Form -3 Rera_1.pdf · uploaded 26 May 2021Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect certificate form 1 (1).pdf · uploaded 7 Jun 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Engineer certificatee 2A.pdf · uploaded 30 Jun 2021Source
  • 1 Disclosure of sold/ booked inventoryInventory Disclosure.pdf · uploaded 30 Jun 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)FORM-5 2017-18.pdf · uploaded 30 Jun 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM-5 2018-19.pdf · uploaded 30 Jun 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM-5 2019-20.pdf · uploaded 30 Jun 2021Source
  • 1 Declaration about Commencement Certificateformat D CC DECLARATION.pdf · uploaded 7 Jul 2021Source
  • 4 Certificates of CA (Form 3)signed CA Certificate-SOUNDLINES THEM.pdf · uploaded 15 Jul 2021Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2021-07-06-RERA Certificate PH-1 GHIE.pdf · uploaded 16 Jul 2021Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2021-07-06-RERA Certificate PH-2 ABCD.pdf · uploaded 16 Jul 2021Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2021-07-06-RERA Certificate PH-3.pdf · uploaded 16 Jul 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)form 2A.pdf · uploaded 16 Jul 2021Source
  • 5 Certificates of CA (Form 3)signed CA Certificate-SOUNDLINES JUNE.pdf · uploaded 26 Jul 2021Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 (1).pdf · uploaded 11 Aug 2021Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ilovepdf_merged (3)_compressed.pdf · uploaded 7 Oct 2021Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer certificate form 2.pdf · uploaded 7 Oct 2021Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Engineer_Cert_Form_2A July.pdf · uploaded 7 Oct 2021Source
  • 6 Certificates of CA (Form 3)signed CA Certificate-SOUNDLINES Sept'21.pdf · uploaded 7 Oct 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5.pdf · uploaded 7 Oct 2021Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2022-01-01- Rera Certificate- ABCD Wing.pdf · uploaded 6 Jan 2022Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2022-01-01- Rera Certificate- PH3.pdf · uploaded 6 Jan 2022Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2022-01-01- Rera Certificate- GHIE wing.pdf · uploaded 6 Jan 2022Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 8 Jan 2022Source
  • 2 Disclosure of sold/ booked inventoryRera Inventory dsiclosure.pdf · uploaded 8 Jan 2022Source
  • 7 Certificates of CA (Form 3)CA FORM 3.pdf · uploaded 8 Jan 2022Source
  • 2 Copy of Layout Approval (in case of layout)1 of 14 GROUNDFLOOR.pdf · uploaded 12 Mar 2022Source
  • 3 Copy of Layout Approval (in case of layout)2 of 14 GROUNDFLOOR.pdf · uploaded 12 Mar 2022Source
  • 4 Copy of Layout Approval (in case of layout)3 of 14 GROUNDFLOOR.pdf · uploaded 12 Mar 2022Source
  • 5 Copy of Layout Approval (in case of layout)4 of 14 GROUNDFLOOR.pdf · uploaded 12 Mar 2022Source
  • 6 Copy of Layout Approval (in case of layout)5 of 14 GROUNDFLOOR.pdf · uploaded 12 Mar 2022Source
  • 7 Copy of Layout Approval (in case of layout)6 of 14 GROUNDFLOOR.pdf · uploaded 12 Mar 2022Source
  • 8 Copy of Layout Approval (in case of layout)7 of 14 F WING.pdf · uploaded 12 Mar 2022Source
  • 9 Copy of Layout Approval (in case of layout)8 of 14 F WING.pdf · uploaded 12 Mar 2022Source
  • 10 Copy of Layout Approval (in case of layout)9 of 14 f WING 2.pdf · uploaded 12 Mar 2022Source
  • 11 Copy of Layout Approval (in case of layout)11 of 14 I WING.pdf · uploaded 12 Mar 2022Source
  • 12 Copy of Layout Approval (in case of layout)12 of 14 J WING.pdf · uploaded 12 Mar 2022Source
  • 13 Copy of Layout Approval (in case of layout)13 of 14 L WING.pdf · uploaded 12 Mar 2022Source
  • 14 Copy of Layout Approval (in case of layout)14 of 14 BUNGALOW.pdf · uploaded 12 Mar 2022Source
  • 15 Copy of Layout Approval (in case of layout)10 of 14 G AND H WING.pdf · uploaded 12 Mar 2022Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ABCD.pdf · uploaded 7 Apr 2022Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)EGHI.pdf · uploaded 7 Apr 2022Source
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)JFL.pdf · uploaded 7 Apr 2022Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)SOUNDLINES_-2A.pdf · uploaded 7 Apr 2022Source
  • 8 Certificates of CA (Form 3)ca form 3(2).pdf · uploaded 8 Apr 2022Source
  • 2 Copy of the legal title reporttitle certificate panvel.pdf · uploaded 8 Jun 2022Source
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate PH-2 for A,B,C,D.pdf · uploaded 6 Jul 2022Source
  • 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate PH-1 for E,G,H,I.pdf · uploaded 6 Jul 2022Source
  • 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate PH-3 for J,F,L.pdf · uploaded 6 Jul 2022Source
  • 9 Certificates of CA (Form 3)Ca certificate.pdf · uploaded 7 Jul 2022Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 for period 1-4-2022 to 30-6-2022.pdf · uploaded 9 Jul 2022Source
  • 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2022-10-07-RERA Certificate PH-1 for E,G,H,I.pdf · uploaded 7 Oct 2022Source
  • 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2022-10-07-RERA Certificate PH-2 for A,B,C,D.pdf · uploaded 7 Oct 2022Source
  • 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2022-10-07-RERA Certificate PH-3 for J,F,L.pdf · uploaded 7 Oct 2022Source
  • 3 Disclosure of sold/ booked inventoryInventory Disclosure.pdf · uploaded 8 Oct 2022Source
  • 10 Certificates of CA (Form 3)CA certificate (2).pdf · uploaded 8 Oct 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5.pdf · uploaded 12 Oct 2022Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer certificate form (JAN) 3-10-2022 (jul-sept22).pdf · uploaded 13 Dec 2022Source
  • 22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2023-01-04-RERA Certificate PH-1 for E,G,H,I.pdf · uploaded 7 Jan 2023Source
  • 23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2023-01-04-RERA Certificate PH-2 for A,B,C,D.pdf · uploaded 7 Jan 2023Source
  • 24 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2023-01-04-RERA Certificate PH-3 for J,F,L.pdf · uploaded 7 Jan 2023Source
  • 4 Disclosure of sold/ booked inventoryInventory Disclosure.pdf · uploaded 7 Jan 2023Source
  • 11 Certificates of CA (Form 3)Form_3 CA certificate RERA Submission Q3.pdf · uploaded 7 Jan 2023Source
  • 5 Disclosure of sold/ booked inventoryInventory Disclosure.pdf · uploaded 14 Apr 2023Source
  • 12 Certificates of CA (Form 3)CA certificate.pdf · uploaded 14 Apr 2023Source
  • 13 Certificates of CA (Form 3)CA certificate.pdf · uploaded 14 Apr 2023Source
  • 25 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch Certificate _ A B C D.pdf · uploaded 15 Apr 2023Source
  • 26 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch Certificate _G H I E.pdf · uploaded 15 Apr 2023Source
  • 27 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch Certificate_ J,F,L.pdf · uploaded 15 Apr 2023Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 15 Apr 2023Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Ecohomes Engineer Certificate Form 2.pdf · uploaded 12 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineer Certificate 2A 2022-23.pdf · uploaded 12 Jul 2023Source
  • 14 Certificates of CA (Form 3)Ecohomes Form3 CA Certificate.pdf · uploaded 12 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 22-23.pdf · uploaded 12 Jul 2023Source
  • 6 Disclosure of sold/ booked inventoryEcohomes Inventory Disclosures.pdf · uploaded 13 Jul 2023Source
  • 28 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect Certificate (1).pdf · uploaded 15 Jul 2023Source
  • 29 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate for Q2_compressed.pdf · uploaded 13 Oct 2023Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer certificate form (oct) 3-10-2023 (July - Sept 2023).pdf · uploaded 13 Oct 2023Source
  • 7 Disclosure of sold/ booked inventoryInventory Disclosure.pdf · uploaded 13 Oct 2023Source
  • 15 Certificates of CA (Form 3)CA certificate for Q2_compressed.pdf · uploaded 13 Oct 2023Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Form 2.pdf · uploaded 13 Jan 2024Source
  • 8 Disclosure of sold/ booked inventoryInvesntory Disclosure.pdf · uploaded 13 Jan 2024Source
  • 16 Certificates of CA (Form 3)CA certificate Form 3.pdf · uploaded 13 Jan 2024Source
  • 30 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 ARCHITECT Certificate DEC 23.pdf · uploaded 16 Jan 2024Source
  • 31 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 ABC D.pdf · uploaded 19 Apr 2024Source
  • 32 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 EGF I.pdf · uploaded 19 Apr 2024Source
  • 33 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 JKL.pdf · uploaded 19 Apr 2024Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 19 Apr 2024Source
  • 17 Certificates of CA (Form 3)Form 3 (1) (1).pdf · uploaded 19 Apr 2024Source
  • 34 Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 1.pdf · uploaded 19 Jul 2024Source
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form 2.pdf · uploaded 19 Jul 2024Source
  • 18 Certificates of CA (Form 3)form 3.pdf · uploaded 19 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form -2A.pdf · uploaded 2 Aug 2024Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form -1.pdf · uploaded 15 Oct 2024Source
  • 2 Certificates of CA (Form 3)Form-3.pdf · uploaded 15 Oct 2024Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2.pdf · uploaded 15 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form -5 23-24.pdf · uploaded 15 Oct 2024Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form-1_Architect Cert.pdf · uploaded 20 Jan 2025Source
  • 1 Certificates of CA (Form 3)Form-3 CA Cert (1).pdf · uploaded 20 Jan 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2_Engineer cert.pdf · uploaded 20 Jan 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 A B C D.pdf · uploaded 12 Apr 2025Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 E G H I.pdf · uploaded 12 Apr 2025Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 J F L.pdf · uploaded 12 Apr 2025Source
  • 1 Certificates of CA (Form 3)Form -3-compressed.pdf · uploaded 12 Apr 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 12 Apr 2025Source
  • Withdrawal Update Form 1form1 a wing to f wing final.pdf · uploaded 18 Dec 2025Source
  • Withdrawal Update Form 2Form -2.pdf · uploaded 18 Dec 2025Source
  • Withdrawal Update Form 3form no 3 final echo light compressed.pdf · uploaded 18 Dec 2025Source
  • Withdrawal Update Form 1sound delight merge pdf form1 sept 25.pdf · uploaded 23 Dec 2025Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 23 Dec 2025Source
  • Withdrawal Update Form 3Form 3 final 1.pdf · uploaded 23 Dec 2025Source
  • Withdrawal Update Form 1FORM 1 final jan 26.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 3Form 3 final.pdf · uploaded 13 Jan 2026Source
  • Form 2A (FY 2024-2025)Form 2A FY 24-25_11zon.pdf · uploaded 6 Mar 2026Source
  • Form 5 (FY 2024-2025)Form 5.pdf · uploaded 6 Mar 2026Source
  • Withdrawal Update Form 1form 1_compressed (3).pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 2Form 2 Signed.pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 3FORM 3_compressed (16).pdf · uploaded 28 Apr 2026Source
  • Form 2A (FY 2025-2026)Quality assurance certificate panvel.pdf · uploaded 20 May 2026Source
  • Withdrawal Update Form 1Form 1 Architects Certificate.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 1Form 1 Architects Certificate.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 1Form 1 Architects Certificate.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 2Form 2 Engneer Certificate.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 2Form 2 Engneer Certificate.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 2Form 2 Engneer Certificate.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 3Form 3 CA Certificate.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 3Form 3 CA Certificate.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 3Form 3 CA Certificate.pdf · uploaded 11 Jul 2026Source
  • Form 5 (FY 2025-2026)Form 5 Annual Report 25-26.pdf · uploaded 25 Sep 2026Source
  • Withdrawal Update Form 1Form 1 Architects Certificate (1).pdf · uploaded 13 Oct 2026Source
  • Withdrawal Update Form 2Form-2 Engineer Certificate.pdf · uploaded 13 Oct 2026Source
  • Withdrawal Update Form 3Form 3 CA Certificate (1).pdf · uploaded 13 Oct 2026Source

Technical

  • DocumentApproved Plan Soundlines Ecohomes.pdf · uploaded 29 Jul 2017Source
  • DocumentApproved Plan Soundlines Ecohomes.pdf · uploaded 29 Jul 2017Source
  • Document1 of 14 GROUNDFLOOR.pdf · uploaded 12 Mar 2022Source
  • Document2 of 14 GROUNDFLOOR.pdf · uploaded 12 Mar 2022Source
  • Document3 of 14 GROUNDFLOOR.pdf · uploaded 12 Mar 2022Source
  • Document4 of 14 GROUNDFLOOR.pdf · uploaded 12 Mar 2022Source
  • Document5 of 14 GROUNDFLOOR.pdf · uploaded 12 Mar 2022Source
  • Document6 of 14 GROUNDFLOOR.pdf · uploaded 12 Mar 2022Source
  • Document7 of 14 F WING.pdf · uploaded 12 Mar 2022Source
  • Document8 of 14 F WING.pdf · uploaded 12 Mar 2022Source
  • Document9 of 14 f WING 2.pdf · uploaded 12 Mar 2022Source
  • Document11 of 14 I WING.pdf · uploaded 12 Mar 2022Source
  • Document12 of 14 J WING.pdf · uploaded 12 Mar 2022Source
  • Document13 of 14 L WING.pdf · uploaded 12 Mar 2022Source
  • Document14 of 14 BUNGALOW.pdf · uploaded 12 Mar 2022Source
  • Document10 of 14 G AND H WING.pdf · uploaded 12 Mar 2022Source

Technical (Architect)

  • DocumentForm -1.pdf · uploaded 15 Oct 2024Source
  • DocumentForm-1_Architect Cert.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 1 A B C D.pdf · uploaded 12 Apr 2025Source
  • DocumentForm 1 E G H I.pdf · uploaded 12 Apr 2025Source
  • DocumentForm 1 J F L.pdf · uploaded 12 Apr 2025Source
  • DocumentForm 1 Architects Certificate (1).pdf · uploaded 10 Oct 2026Source

Technical (Engineer)

  • DocumentForm-2.pdf · uploaded 15 Oct 2024Source
  • DocumentForm-2_Engineer cert.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 2.pdf · uploaded 12 Apr 2025Source
  • DocumentForm-2 Engineer Certificate.pdf · uploaded 10 Oct 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel GUT NO 32

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
2.5 BHK, Bungalow, 1.5, 2.5, 1BHK, duplex, 2.5BHK184 units in all
Address
Gut No 32, Nagar Rachna Ani Mulya Nirdharan Vibhag Raigad - AlibagPIN 410206
Village
Ashte, Panvel taluka
Land area for this project
15,930 sq m (1,71,469 sq ft)
Permissible built-up area
26,733 sq m (2,87,746 sq ft)
Sanctioned built-up area
15,605 sq m (1,67,971 sq ft)
Recreational open space
3,710 sq m (39,934 sq ft)
Designated bank account
76
Developed in phases
Yes

Survey, CTS, gat or plot numbers

GUT NO 32

Land as published on MahaRERA's project page

GUT NO 32

Boundaries

North
Gut No 26
South
Gut No 31
East
Gut No 25
West
9 Mtr Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking184 units

98 of 184 units booked (53%), as the promoter reported to MahaRERA

2.5 BHK · 18 unitsBungalow · 4 units1.5 · 24 units2.5 · 78 units1BHK · 52 unitsduplex · 6 units2.5BHK · 2 units
BuildingTypeCarpet areaUnitsBooked
A Wing2.5 BHK68.15 sq m · 734 sq ft22
A Wing2.5 BHK68.47 sq m · 737 sq ft63
A Wing2.5 BHK73.6 sq m · 792 sq ft21
A Wing2.5 BHK73.92 sq m · 796 sq ft64
BunglowsBungalow152.68 sq m · 1,643 sq ft40
B Wing1.551.57 sq m · 555 sq ft44
B Wing2.568.47 sq m · 737 sq ft64
B Wing2.573.92 sq m · 796 sq ft62
Show all 36 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
C Wing1.551.57 sq m · 555 sq ft42
C Wing2.568.15 sq m · 734 sq ft21
C Wing2.568.47 sq m · 737 sq ft81
C Wing2.571.19 sq m · 766 sq ft40
C Wing2.573.6 sq m · 792 sq ft20
C Wing2.573.92 sq m · 796 sq ft40
D Wing2.568.39 sq m · 736 sq ft22
D Wing2.568.47 sq m · 737 sq ft103
D Wing2.573.83 sq m · 795 sq ft21
D Wing2.573.92 sq m · 796 sq ft102
E Wing1BHK42.79 sq m · 461 sq ft88
E Wing1BHK43.88 sq m · 472 sq ft88
F Wing2.568.47 sq m · 737 sq ft20
F Wing2.573.95 sq m · 796 sq ft21
F Wingduplex124.51 sq m · 1,340 sq ft60
G Wing1BHK44.58 sq m · 480 sq ft1211
G Wing1BHK44.74 sq m · 482 sq ft66
H Wing1BHK44.58 sq m · 480 sq ft127
H Wing1BHK44.74 sq m · 482 sq ft65
I Wing1.551.57 sq m · 555 sq ft1212
I Wing2.563.15 sq m · 680 sq ft20
J Wing2.568.15 sq m · 734 sq ft20
J Wing2.568.48 sq m · 737 sq ft20
J Wing2.571.85 sq m · 773 sq ft82
J Wing2.573.92 sq m · 796 sq ft42
K Wing2.5 BHK72.5 sq m · 780 sq ft22
K Wing2.5BHK68.57 sq m · 738 sq ft22
L Wing1.552.09 sq m · 561 sq ft40

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectApices Studio Pvt Ltd—
Chartered accountantNehali Doshi—
EngineerHanware Consultants—
EngineerZainuddin Tole—

Source: MahaRERA project page. Contact details are not shown.