Treasure Troves
Deedo IDDP-PUN-1479It is due for completion in Apr 2031, with no extension on record; no MahaRERA orders on record; 62% of its units are booked.
Wakad, Pune 411057 · by Realcon Homes Llp
Buying a flat here?
See every deed registered on it.
It is due for completion in Apr 2031, with no extension on record
- This projectRegistered 11 Sep 2023, completion promised 30 Apr 2031.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
5 buildings
Open a building to see every flat, floor by floor.
- A-Building - Amber23 floors · 94 units89% booked
- B-Building - Sapphire23 floors · 93 units90% booked
- C-Building - Emerald13 floors · 62 units40% booked
- D-Building - Pearl21 floors · 68 units29% booked
- E-Building - Ruby21 floors · 67 units37% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100052582
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100052582 | 11 Sep 2023 | 30 Apr 2031 | 30 Apr 2031 | Realcon Homes LLP | Project page |
Documents131
2 documents held by Deedo, 129 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
- PAN CardREALCON HOMES LLP PAN NO.pdf · uploaded 13 Jun 2023Source
Legal
- Declaration Form BForm-B 09-June-2023.pdf · uploaded 13 Jun 2023Source
- Legal Title reportTitle and search report Wakad 113 dated 190623_removed_rotated-1-3.pdf · uploaded 19 Jun 2023Source
- Legal Title reportTitle and search report Wakad 113 dated 190623_removed_rotated-28.pdf · uploaded 19 Jun 2023Source
- Legal Title reportTitle Report Treasure Troves Part I.pdf · uploaded 20 Jun 2024Source
- Legal Title reportTitle Report Treasure Troves Part II.pdf · uploaded 20 Jun 2024Source
Show all 131 documentsShow fewer documents
Migrated
- 1 PAN CardREALCON HOMES LLP PAN NO.pdf · uploaded 13 Jun 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 13 Jun 2023Source
- 1 Declaration about Commencement CertificateDECLARATION ABOUT CC.pdf · uploaded 13 Jun 2023Source
- 1 Declaration in FORM BForm-B 09-June-2023.pdf · uploaded 13 Jun 2023Source
- 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 13 Jun 2023Source
- 1 Deviation Report with respect to Allotment letterNO Deviation in Allotment letter format.pdf · uploaded 13 Jun 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 CA Certificate.pdf · uploaded 15 Jun 2023Source
- 1 Copy of the legal title reportTitle and search report Wakad 113 dated 190623_removed_rotated-1-3.pdf · uploaded 19 Jun 2023Source
- 2 Copy of the legal title reportTitle and search report Wakad 113 dated 190623_removed_rotated-28.pdf · uploaded 19 Jun 2023Source
- 1 a Details of encumbrances concerned to FinanceSelf Declaration Regarding Encumbrances.pdf · uploaded 19 Jun 2023Source
- 1 b Details of encumbrances concerned to LegalSelf Declaration Regarding Encumbrances.pdf · uploaded 19 Jun 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentComp 2-14 (1).pdf · uploaded 20 Jun 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentComp 3-14.pdf · uploaded 20 Jun 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentComp 4-14.pdf · uploaded 20 Jun 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentComp 5-14.pdf · uploaded 20 Jun 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentComp 10-14.pdf · uploaded 20 Jun 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentComp 13-14.pdf · uploaded 20 Jun 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentComp 14-14.pdf · uploaded 20 Jun 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Architect Certificate.pdf · uploaded 5 Jul 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Engineer Certificate.pdf · uploaded 5 Jul 2023Source
- 1 Proforma of Agreement for saleWakad TT Rera ATS draft dated 04072023.pdf · uploaded 5 Jul 2023Source
- 1 Deviation Report with respect to model copy of Agreement20230705070930.pdf · uploaded 5 Jul 2023Source
- 2 a Details of encumbrances concerned to Financeilovepdf_merged.pdf · uploaded 6 Jul 2023Source
- 2 b Details of encumbrances concerned to Legalilovepdf_merged.pdf · uploaded 6 Jul 2023Source
- 1 Copy of Layout Approval (in case of layout)IOD.pdf · uploaded 6 Jul 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure-A Rajesh Goyal_.pdf · uploaded 6 Jul 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration About Saparate Bank Account.pdf · uploaded 6 Jul 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsAnnexure-A Pritam Rathod.pdf · uploaded 7 Jul 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsAnnexure-A Vilas Rathod.pdf · uploaded 7 Jul 2023Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsAnnexure-A Jaydeep Modak.pdf · uploaded 7 Jul 2023Source
- 5 Disclosure of Interest in Other Real Estate OrganizationsAnnexure-A Kanhaiyalal Matani.pdf · uploaded 7 Jul 2023Source
- 6 Disclosure of Interest in Other Real Estate OrganizationsAnnexure-A Vashu Matani.pdf · uploaded 7 Jul 2023Source
- 1 CERSAI detailsNon - Encumbrance Letter.pdf · uploaded 31 Aug 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form - 1 Treasure Troves.pdf · uploaded 11 Oct 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2 Treasure Troves.pdf · uploaded 11 Oct 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form - 3 Treasure Troves.pdf · uploaded 11 Oct 2023Source
- 1 Disclosure of sold/ booked inventoryTreasure Troves.pdf · uploaded 12 Oct 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Treasure Toves 1-1-2024.pdf · uploaded 6 Jan 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2 of Treasure Troves 6th Jan 2024.pdf · uploaded 8 Jan 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Treasure Troves 5-1-2024.pdf · uploaded 8 Jan 2024Source
- 2 Disclosure of sold/ booked inventoryTreasureTroves.pdf · uploaded 18 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Treasure Troves_compressed.pdf · uploaded 17 Apr 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2 Treasure Troves.pdf · uploaded 17 Apr 2024Source
- 3 Disclosure of sold/ booked inventoryTreasure Troves 31-3-2024.pdf · uploaded 17 Apr 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Treasure Troves 16-4-2024-C.pdf · uploaded 17 Apr 2024Source
- 3 a Details of encumbrances concerned to FinanceEncumbrances of Bajab Finance.pdf · uploaded 6 Jun 2024Source
- 3 b Details of encumbrances concerned to LegalEncumbrances of Bajab Finance.pdf · uploaded 6 Jun 2024Source
- 3 Copy of the legal title reportTitle Report Treasure Troves Part I.pdf · uploaded 20 Jun 2024Source
- 4 Copy of the legal title reportTitle Report Treasure Troves Part II.pdf · uploaded 20 Jun 2024Source
- 2 Proforma of Agreement for saleTreasure Troves Revised Agreement draft 20062024 (1).pdf · uploaded 20 Jun 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Treasure Troves.pdf · uploaded 12 Jul 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Treasure Troves.pdf · uploaded 12 Jul 2024Source
- 4 Disclosure of sold/ booked inventoryTreasure Troves_compressed.pdf · uploaded 12 Jul 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Treasure Troves_compressed.pdf · uploaded 12 Jul 2024Source
- 2 Disclosure of sold/ booked inventoryTT_Disclosure of Sold booked Inventory_Sep-24.pdf · uploaded 14 Nov 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)TT_Form-1_Sep-24.pdf · uploaded 26 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)TT_Form 3_Sep-24.pdf · uploaded 26 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)TT_Form-2_Sep-24.pdf · uploaded 26 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)TT_Form 2A_Sep-24.pdf · uploaded 26 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)TT_Form 5.pdf · uploaded 26 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Treasure Troves_Q3 24-25.pdf · uploaded 21 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Treasure Troves_Q3 24-25.pdf · uploaded 21 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Treasure Troves_Q3 24-25.pdf · uploaded 21 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold booked Inventory_TT_Dec-24.pdf · uploaded 21 Jan 2025Source
- 1 Proforma of Agreement for saleTreasure Troves Draft Agreement For A and B Building Rera Purpose.pdf · uploaded 21 Mar 2025Source
- 1 Proforma of Agreement for saleSD_Treasure_Troves_Wakad_113_Flat_Agreement_Draft For A and B Building Rera Purpose March 25.pdf · uploaded 25 Mar 2025Source
- 2 Proforma of Agreement for saleSD_Treasure_Troves_Wakad_113_Flat_Agreement_Draft For C Building Rera Purpose March 25.pdf · uploaded 25 Mar 2025Source
- 3 Proforma of Agreement for saleSD_Treasure_Troves_Wakad_113_Flat_Agreement_Draft For D and E Building Rera Purpose March 25.pdf · uploaded 25 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_TT_Q4_24-25.pdf · uploaded 14 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_TT_Q4_24-25.pdf · uploaded 14 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_TT_Q4_24-25.pdf · uploaded 14 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold booked Inventory_TT_March-25.pdf · uploaded 14 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_TT_Q1 25-26.pdf · uploaded 16 Jul 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_TT_Q1 25-26.pdf · uploaded 16 Jul 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_TT_Q1 25-26.pdf · uploaded 16 Jul 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold booked Inventory_TT_Jun-25.pdf · uploaded 16 Jul 2025Source
- Withdrawal Update Form 1Treasure Trove - form 1 S.pdf · uploaded 2 May 2026Source
- Withdrawal Update Form 1Treasure Trove - form 1 S.pdf · uploaded 2 May 2026Source
- Withdrawal Update Form 2REALCON HOMES LLP FORM 2 s.pdf · uploaded 2 May 2026Source
- Withdrawal Update Form 2REALCON HOMES LLP FORM 2 s.pdf · uploaded 2 May 2026Source
- Withdrawal Update Form 3REALCON HOMES LLP FORM 3 s_compressed.pdf · uploaded 2 May 2026Source
- Withdrawal Update Form 3REALCON HOMES LLP FORM 3 s_compressed.pdf · uploaded 2 May 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 5 May 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 5 May 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 5 May 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 5 May 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 5 May 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 5 May 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 5 May 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 5 May 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 5 May 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 19 May 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 19 May 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 19 May 2026Source
- Withdrawal Update Form 1Final ARCHITECT CERTIFICATE TT.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 2Realcon Homes LLP - Form - 2 (1) (1).pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 3Final Realcon Homes LLP - Form - 3_compressed.pdf · uploaded 28 May 2026Source
- Withdrawal Update Form 1REALCON HOMES LLP FORM 1 JUNE 2026.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 2REALCON HOMES LLP FORM 2 JUNE 2026.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 3REALCON HOMES LLP FORM 3 JUNE 2026 (1)_11zon.pdf · uploaded 18 Jul 2026Source
- Form 5 (FY 2023-2024)Form 5 F y 2023-2024.pdf · uploaded 5 Aug 2026Source
- Form 5 (FY 2024-2025)Form 5 F y 2024-2025.pdf · uploaded 5 Aug 2026Source
- Form 2A (FY 2023-2024)Form 2 A F y 2023-2024.pdf · uploaded 8 Aug 2026Source
- Form 2A (FY 2024-2025)Form 2 A F y 2024-2025.pdf · uploaded 8 Aug 2026Source
- Form 2A (FY 2025-2026)Form 2 A F y 2025-2026.pdf · uploaded 8 Aug 2026Source
Technical
- DocumentComp 2-14 (1).pdf · uploaded 20 Jun 2023Source
- DocumentComp 3-14.pdf · uploaded 20 Jun 2023Source
- DocumentComp 4-14.pdf · uploaded 20 Jun 2023Source
- DocumentComp 5-14.pdf · uploaded 20 Jun 2023Source
- DocumentComp 10-14.pdf · uploaded 20 Jun 2023Source
- DocumentComp 13-14.pdf · uploaded 20 Jun 2023Source
- DocumentComp 14-14.pdf · uploaded 20 Jun 2023Source
- DocumentIOD.pdf · uploaded 6 Jul 2023Source
Technical (Architect)
- DocumentTT_Form-1_Sep-24.pdf · uploaded 26 Nov 2024Source
- DocumentForm 1_Treasure Troves_Q3 24-25.pdf · uploaded 21 Jan 2025Source
- DocumentForm 1_TT_Q4_24-25.pdf · uploaded 14 Apr 2025Source
- DocumentForm 1_TT_Q1 25-26.pdf · uploaded 16 Jul 2025Source
- DocumentREALCON HOMES LLP FORM 1 JUNE 2026.pdf · uploaded 18 Jul 2026Source
Technical (Engineer)
- DocumentTT_Form-2_Sep-24.pdf · uploaded 26 Nov 2024Source
- DocumentForm 2_Treasure Troves_Q3 24-25.pdf · uploaded 21 Jan 2025Source
- DocumentForm 2_TT_Q4_24-25.pdf · uploaded 14 Apr 2025Source
- DocumentForm 2_TT_Q1 25-26.pdf · uploaded 16 Jul 2025Source
- DocumentREALCON HOMES LLP FORM 2 JUNE 2026.pdf · uploaded 18 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 113/4/1A, 113/4/2(P) AT WAKAD
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 3BHK, Shop, 1BHK384 units in all
- Address
- Survey No 113/1/1(P), 113/4/1A, 113/4/2(P) AT WAKAD, 113/1 PART. BHUMKAR DAS GUGRE ROAD, BHAGVAN NAGAR, OPP SUKHAWANI SKYLINES, WAKAD, PUNEPIN 411057
- Village
- Wakad, Mulshi taluka
- Location
- 18.52043, 73.85674
- Land area for this project
- 13,647 sq m (1,46,895 sq ft)
- Permissible built-up area
- 51,972 sq m (5,59,426 sq ft)
- Sanctioned built-up area
- 51,972 sq m (5,59,426 sq ft)
- Recreational open space
- 1,228 sq m (13,221 sq ft)
- Designated bank account
- 85
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Survey No 113/1/1(P), 113/4/1A, 113/4/2(P) AT WAKAD
Boundaries
- North
- S No 112
- South
- 113 Part 4-2
- East
- S No 113-4-1 A1-1 Part 113-4-1A-1-28
- West
- 113 Part 1
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking384 units
238 of 384 units booked (62%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A-Building - Amber | 2BHK | 66.52 sq m · 716 sq ft | 25 | 24 |
| A-Building - Amber | 2BHK | 66.7 sq m · 718 sq ft | 22 | 22 |
| A-Building - Amber | 3BHK | 91.97 sq m · 990 sq ft | 41 | 38 |
| A-Building - Amber | Shop | 24.53 sq m · 264 sq ft | 1 | 0 |
| A-Building - Amber | Shop | 28.71 sq m · 309 sq ft | 1 | 0 |
| A-Building - Amber | Shop | 56.39 sq m · 607 sq ft | 1 | 0 |
| A-Building - Amber | Shop | 65.87 sq m · 709 sq ft | 1 | 0 |
| A-Building - Amber | Shop | 74.6 sq m · 803 sq ft | 1 | 0 |
Show all 41 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A-Building - Amber | Shop | 78.78 sq m · 848 sq ft | 1 | 0 |
| B-Building - Sapphire | 2BHK | 66.52 sq m · 716 sq ft | 22 | 21 |
| B-Building - Sapphire | 2BHK | 66.7 sq m · 718 sq ft | 22 | 21 |
| B-Building - Sapphire | 3BHK | 78.97 sq m · 850 sq ft | 37 | 36 |
| B-Building - Sapphire | 3BHK | 79.9 sq m · 860 sq ft | 7 | 6 |
| B-Building - Sapphire | Shop | 58.9 sq m · 634 sq ft | 1 | 0 |
| B-Building - Sapphire | Shop | 62.89 sq m · 677 sq ft | 1 | 0 |
| B-Building - Sapphire | Shop | 65.87 sq m · 709 sq ft | 1 | 0 |
| B-Building - Sapphire | Shop | 78.78 sq m · 848 sq ft | 1 | 0 |
| B-Building - Sapphire | Shop | 81.75 sq m · 880 sq ft | 1 | 0 |
| C-Building - Emerald | 1BHK | 40.41 sq m · 435 sq ft | 26 | 12 |
| C-Building - Emerald | 1BHK | 40.6 sq m · 437 sq ft | 26 | 9 |
| C-Building - Emerald | 3BHK | 91.79 sq m · 988 sq ft | 4 | 4 |
| C-Building - Emerald | Shop | 31.77 sq m · 342 sq ft | 2 | 0 |
| C-Building - Emerald | Shop | 32.05 sq m · 345 sq ft | 2 | 0 |
| C-Building - Emerald | Shop | 67.26 sq m · 724 sq ft | 1 | 0 |
| C-Building - Emerald | Shop | 70.88 sq m · 763 sq ft | 1 | 0 |
| D-Building - Pearl | 2BHK | 66.52 sq m · 716 sq ft | 15 | 6 |
| D-Building - Pearl | 2BHK | 66.7 sq m · 718 sq ft | 16 | 1 |
| D-Building - Pearl | 3BHK | 78.97 sq m · 850 sq ft | 27 | 12 |
| D-Building - Pearl | 3BHK | 79.9 sq m · 860 sq ft | 5 | 1 |
| D-Building - Pearl | Shop | 62.89 sq m · 677 sq ft | 1 | 0 |
| D-Building - Pearl | Shop | 66.8 sq m · 719 sq ft | 1 | 0 |
| D-Building - Pearl | Shop | 75.44 sq m · 812 sq ft | 1 | 0 |
| D-Building - Pearl | Shop | 90.02 sq m · 969 sq ft | 1 | 0 |
| D-Building - Pearl | Shop | 91.51 sq m · 985 sq ft | 1 | 0 |
| E-Building - Ruby | 2BHK | 66.52 sq m · 716 sq ft | 17 | 12 |
| E-Building - Ruby | 2BHK | 66.7 sq m · 718 sq ft | 16 | 5 |
| E-Building - Ruby | 3BHK | 91.97 sq m · 990 sq ft | 30 | 8 |
| E-Building - Ruby | Shop | 36.32 sq m · 391 sq ft | 1 | 0 |
| E-Building - Ruby | Shop | 62.71 sq m · 675 sq ft | 1 | 0 |
| E-Building - Ruby | Shop | 75.33 sq m · 811 sq ft | 1 | 0 |
| E-Building - Ruby | Shop | 90.02 sq m · 969 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Milind Patil | — |
| Chartered accountant | Madhusudan Jhanwar | — |
| Chartered accountant | Rushabh Dugad | — |
| Engineer | Sudhir Kulkarni | — |
Source: MahaRERA project page. Contact details are not shown.