Nirvana Lakeview Retreat

Deedo IDDP-PUN-55F5

Completion was pushed back 4 months, to Jul 2028; no MahaRERA orders on record; 81% of its units are booked.

Valane, Pune 412108 · by Nirvana Creators And Developers

DeliveryExtended 4 moPromised Mar 2028 · now due Jul 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales81% booked54 of 67 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Jul 2028

  • This projectRegistered 17 Mar 2022, completion promised 30 Mar 2028, revised to 30 Jul 2028.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100033999
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210003399917 Mar 202230 Mar 202830 Jul 2028Nirvana Creators And DevelopersProject page
Documents140

2 documents held by Deedo, 138 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN Cardpan card.pdf · uploaded 14 Mar 2022Source

Legal

  • OtherTax Return_compressed.pdf · uploaded 14 Mar 2022Source
  • OtherGst 2.pdf · uploaded 14 Mar 2022Source
  • Legal Title reportlegal title search.pdf · uploaded 14 Mar 2022Source
  • Declaration Form BForm B Affidevit_compressed.pdf · uploaded 14 Mar 2022Source

Migrated

  • 1 PAN Cardpan card.pdf · uploaded 14 Mar 2022Source
Show all 140 documentsShow fewer documents

Migrated

  • 1 Copy of the legal title reportlegal title search.pdf · uploaded 14 Mar 2022Source
  • 1 Details of encumbrancesNon Encumbrances.pdf · uploaded 14 Mar 2022Source
  • 1 Copy of Layout Approval (in case of layout)plan 5_compressed.pdf · uploaded 14 Mar 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentplan 5_compressed.pdf · uploaded 14 Mar 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentPMRDA CC_compressed.pdf · uploaded 14 Mar 2022Source
  • 1 Declaration about Commencement CertificateForm D.pdf · uploaded 14 Mar 2022Source
  • 1 Declaration in FORM BForm B Affidevit_compressed.pdf · uploaded 14 Mar 2022Source
  • 1 CERSAI detailscersai.pdf · uploaded 14 Mar 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 14 Mar 2022Source
  • 1 OtherTax Return_compressed.pdf · uploaded 14 Mar 2022Source
  • 2 OtherGst 2.pdf · uploaded 14 Mar 2022Source
  • 1 Proforma of Allotment letterAGREEMENT 2_compressed.pdf · uploaded 15 Mar 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 28 Jul 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form No 2.pdf · uploaded 28 Jul 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Form 3.pdf · uploaded 28 Jul 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 5 Nov 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 5 Nov 2022Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)From 3.pdf · uploaded 5 Nov 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 21 Jan 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 21 Jan 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 21 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5.pdf · uploaded 24 Feb 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 22 May 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 22 May 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 22 May 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 11 Aug 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 11 Aug 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form No 3.pdf · uploaded 11 Aug 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form no 5.pdf · uploaded 23 Sep 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 3 Nov 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 3 Nov 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 3 Nov 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form No 2.pdf · uploaded 19 Apr 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)From 1.pdf · uploaded 19 Apr 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form No 2.pdf · uploaded 19 Apr 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 19 Apr 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 22 Apr 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 22 Apr 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 22 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 23 Apr 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 25 Apr 2024Source
  • 2 Copy of Layout Approval (in case of layout)MAIN SITE PLAN (1)_compressed.pdf · uploaded 4 May 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentA building 1.pdf · uploaded 4 May 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentA building_1.pdf · uploaded 4 May 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentC building.pdf · uploaded 4 May 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentHPSC1135_compressed.pdf · uploaded 4 May 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentHPSC1138_compressed.pdf · uploaded 4 May 2024Source
  • 7 Building Plan Approval / NA Order for plotted developmentHPSC1139_compressed.pdf · uploaded 4 May 2024Source
  • 8 Building Plan Approval / NA Order for plotted developmentHPSC1140.pdf · uploaded 4 May 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentfresh cc.pdf · uploaded 4 May 2024Source
  • 2 Declaration about Commencement CertificateDeclaration Form.pdf · uploaded 4 May 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1.pdf · uploaded 21 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 21 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 21 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 21 Oct 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 4 Dec 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 4 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 4 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)From No 1.pdf · uploaded 26 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form No 3.pdf · uploaded 26 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form No 2.pdf · uploaded 26 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.pdf · uploaded 23 Apr 2025Source
  • Form 1Q4 Form No 1.pdf · uploaded 18 Aug 2025Source
  • Form 113 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 18 Aug 2025Source
  • Form 1Q4 Form No 1.pdf · uploaded 18 Aug 2025Source
  • Form 112 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 18 Aug 2025Source
  • Form 112 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 18 Aug 2025Source
  • Form 2Q4 Form 2.pdf · uploaded 18 Aug 2025Source
  • Form 211 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 18 Aug 2025Source
  • Form 2Q4 Form 2.pdf · uploaded 18 Aug 2025Source
  • Form 210 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 18 Aug 2025Source
  • Form 210 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 18 Aug 2025Source
  • Form 3Q4 Form 3_compressed.pdf · uploaded 18 Aug 2025Source
  • Form 312 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf · uploaded 18 Aug 2025Source
  • Form 3Q4 Form 3_compressed.pdf · uploaded 18 Aug 2025Source
  • Form 39 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf · uploaded 18 Aug 2025Source
  • Form 39 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventorySold - Unsold Disclosure_compressed.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventorySold - Unsold Disclosure_compressed.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventorySold - Unsold Disclosure_compressed.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked Inventory9 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked Inventory9 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf · uploaded 18 Aug 2025Source
  • Withdrawal Update Form 1arch.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 2Form 2 (2).pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 3ca_compressed.pdf · uploaded 22 Aug 2025Source
  • Form 5 (FY 2024-2025)Form 5.pdf · uploaded 12 Nov 2025Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 8 Dec 2025Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 8 Dec 2025Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 8 Dec 2025Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 8 Dec 2025Source
  • Withdrawal Update Form 3From 3.pdf · uploaded 8 Dec 2025Source
  • Withdrawal Update Form 3From 3.pdf · uploaded 8 Dec 2025Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 12 Mar 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 12 Mar 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 12 Mar 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 12 Mar 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 12 Mar 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 12 Mar 2026Source
  • Form 2A (FY 2024-2025)2A.pdf · uploaded 21 May 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 19 Jun 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 19 Jun 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 19 Jun 2026Source

Technical

  • Documentplan 5_compressed.pdf · uploaded 14 Mar 2022Source
  • Documentplan 5_compressed.pdf · uploaded 14 Mar 2022Source
  • DocumentMAIN SITE PLAN (1)_compressed.pdf · uploaded 4 May 2024Source
  • DocumentA building 1.pdf · uploaded 4 May 2024Source
  • DocumentA building_1.pdf · uploaded 4 May 2024Source
  • DocumentC building.pdf · uploaded 4 May 2024Source
  • DocumentHPSC1135_compressed.pdf · uploaded 4 May 2024Source
  • DocumentHPSC1138_compressed.pdf · uploaded 4 May 2024Source
  • DocumentHPSC1139_compressed.pdf · uploaded 4 May 2024Source
  • DocumentHPSC1140.pdf · uploaded 4 May 2024Source
  • DocumentHPSC0086_compressed.pdf · uploaded 19 Aug 2025Source
  • DocumentHPSC0087.pdf · uploaded 19 Aug 2025Source
  • DocumentHPSC0088.pdf · uploaded 19 Aug 2025Source
  • DocumentHPSC0089_compressed.pdf · uploaded 19 Aug 2025Source
  • DocumentHPSC0090_compressed.pdf · uploaded 19 Aug 2025Source
  • DocumentHPSC0091_compressed.pdf · uploaded 19 Aug 2025Source
  • Documentplan 1.pdf · uploaded 11 May 2026Source
  • DocumentHPSC0087.pdf · uploaded 11 May 2026Source
  • DocumentHPSC0088.pdf · uploaded 11 May 2026Source
  • Documentplan 4.pdf · uploaded 11 May 2026Source
  • Documentplan 6.pdf · uploaded 11 May 2026Source

Technical (Architect)

  • DocumentForm -1.pdf · uploaded 21 Oct 2024Source
  • DocumentForm 1.pdf · uploaded 21 Oct 2024Source
  • DocumentForm 1.pdf · uploaded 4 Dec 2024Source
  • DocumentFrom No 1.pdf · uploaded 26 Feb 2025Source
  • DocumentForm 1.pdf · uploaded 12 Mar 2026Source

Technical (Engineer)

  • DocumentForm 2.pdf · uploaded 21 Oct 2024Source
  • DocumentForm 2.pdf · uploaded 4 Dec 2024Source
  • DocumentForm No 2.pdf · uploaded 26 Feb 2025Source
  • DocumentForm 2.pdf · uploaded 19 Jun 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 189/4

As registered with MahaRERA and published on its project page

Project type
Mixed
Status on MahaRERA
Certificate Signed
Unit types
1RK, 1BHK, 2BHK, Banquet, Restaurant, Bungalow67 units in all
Address
189/4, Valane Lonavala Road, Mauje ValanePIN 412108
Village
Valane, Mulshi taluka
Land area for this project
6,500 sq m (69,965 sq ft)
Permissible built-up area
6,175 sq m (66,469 sq ft)
Sanctioned built-up area
5,256 sq m (56,580 sq ft)
Recreational open space
431 sq m (4,636 sq ft)
Designated bank account
82
Developed in phases
Yes

Survey, CTS, gat or plot numbers

189/4

Land as published on MahaRERA's project page

189/4

Boundaries

North
12 Mtr Existing Road
South
Adjoining Ploy
East
Adjoining Plot
West
Adjoining Plot

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking67 units

54 of 67 units booked (81%), as the promoter reported to MahaRERA

1RK · 36 units1BHK · 13 units2BHK · 11 unitsBanquet · 1 unitRestaurant · 1 unitBungalow · 5 units
BuildingTypeCarpet areaUnitsBooked
A1RK32.33 sq m · 348 sq ft2020
A1RK34 sq m · 366 sq ft1615
B1BHK53.9 sq m · 580 sq ft75
B1BHK56.39 sq m · 607 sq ft33
B1BHK58 sq m · 624 sq ft33
B2BHK60.5 sq m · 651 sq ft117
BBanquet405 sq m · 4,359 sq ft11
BRestaurant403 sq m · 4,338 sq ft10
CBungalow165.56 sq m · 1,782 sq ft50

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNILESH Saswade—
Chartered accountantJaydeep Hingne—
Chartered accountantJaydeep Narayan Hinge—
EngineerShankar Dayal—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Valane

All 2 projects in Valane · Compare Nirvana Lakeview Retreat with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology