Vision One Next Phase 1
Deedo IDDP-PUN-RCRPCompletion was pushed back 4 months, to Feb 2027; no MahaRERA orders on record; 0% of its units are booked.
Tathwade, Pune 411003 · Property rates in Tathwade · by Ss Ventures Aop
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Feb 2027
- This projectRegistered 9 Oct 2019, completion promised 5 Oct 2026, revised to 5 Feb 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100022621
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100022621 | 9 Oct 2019 | 5 Oct 2026 | 5 Feb 2027 | Ss Ventures Aop | Project page |
Documents214
1 document held by Deedo, 213 filings listed on MahaRERA's project page
Finance
- PAN Card1 PAN Card.pdf · uploaded 4 Dec 2023Source
Legal
Migrated
- 1 Copy of the legal title reportSearch Report Sep 2019.pdf · uploaded 2 Oct 2019Source
- 1 Details of encumbrancesNo Encurbrances Cert SSV AOP.pdf · uploaded 2 Oct 2019Source
- 1 Building Plan Approval / NA Order for plotted development1-16_reduce.pdf · uploaded 2 Oct 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentComencement Certificate_reduce.pdf · uploaded 2 Oct 2019Source
Show all 214 documentsShow fewer documents
Migrated
- 1 Declaration in FORM BSS Ventures AOP Form B Developers.pdf · uploaded 2 Oct 2019Source
- 1 Copy of Layout Approval (in case of layout)HPSCANNER3453.pdf · uploaded 3 Oct 2019Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE.pdf · uploaded 3 Oct 2019Source
- 1 Proforma of Allotment letterSS VENTURE (DECLARATION) (1).pdf · uploaded 3 Oct 2019Source
- 2 Proforma of Allotment letterVision One Next RERA Agreement 30092019-1-20.pdf · uploaded 3 Oct 2019Source
- 3 Proforma of Allotment letterVision One Next RERA Agreement 30092019-21-40.pdf · uploaded 3 Oct 2019Source
- 4 Proforma of Allotment letterVision One Next RERA Agreement 30092019-41-60.pdf · uploaded 3 Oct 2019Source
- 5 Proforma of Allotment letterVision One Next RERA Agreement 30092019-101-118.pdf · uploaded 3 Oct 2019Source
- 6 Proforma of Allotment letterVision One Next RERA Agreement 30092019-61-80_compressed.pdf · uploaded 3 Oct 2019Source
- 1 Declaration about Commencement CertificateDecl About Commencement Vision one Next.pdf · uploaded 30 Sep 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Vision Next Phase 1 31 12 2020.pdf · uploaded 30 Sep 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Vision Next Phase 1 30 06 2021.pdf · uploaded 30 Sep 2021Source
- 1 Disclosure of sold/ booked inventoryVision one Next Decl about sold Unsold.pdf · uploaded 30 Sep 2021Source
- 1 PAN Card1 PAN Card.pdf · uploaded 4 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Vision One next Phase I 22-23.pdf · uploaded 6 Jan 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30032020.pdf · uploaded 20 Jan 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30062020.pdf · uploaded 20 Jan 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30092020.pdf · uploaded 20 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30122020.pdf · uploaded 20 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30032021.pdf · uploaded 20 Jan 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30062021.pdf · uploaded 20 Jan 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30092021.pdf · uploaded 20 Jan 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30122021.pdf · uploaded 20 Jan 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30032022.pdf · uploaded 20 Jan 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30062022.pdf · uploaded 20 Jan 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30092022.pdf · uploaded 20 Jan 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30122022.pdf · uploaded 20 Jan 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30032023.pdf · uploaded 20 Jan 2024Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30062023.pdf · uploaded 20 Jan 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30092023.pdf · uploaded 20 Jan 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30122023.pdf · uploaded 20 Jan 2024Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD 10082021.pdf · uploaded 20 Jan 2024Source
- 3 Disclosure of sold/ booked inventorySOLD UNSOLD 31122021.pdf · uploaded 20 Jan 2024Source
- 4 Disclosure of sold/ booked inventorySOLD UNSOLD 31032022.pdf · uploaded 20 Jan 2024Source
- 5 Disclosure of sold/ booked inventorySOLD UNSOLD 30062022.pdf · uploaded 20 Jan 2024Source
- 6 Disclosure of sold/ booked inventorySOLD UNSOLD 30092022.pdf · uploaded 20 Jan 2024Source
- 7 Disclosure of sold/ booked inventorySOLD UNSOLD 31122022.pdf · uploaded 20 Jan 2024Source
- 8 Disclosure of sold/ booked inventorySOLD UNSOLD 31032023.pdf · uploaded 20 Jan 2024Source
- 9 Disclosure of sold/ booked inventorySOLD UNSOLD 30062023.pdf · uploaded 20 Jan 2024Source
- 10 Disclosure of sold/ booked inventorySOLD UNSOLD 30092023.pdf · uploaded 20 Jan 2024Source
- 11 Disclosure of sold/ booked inventorySOLD UNSOLD 31122023.pdf · uploaded 20 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Cert - MARCH 2020.pdf · uploaded 31 Jan 2024Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quality Cert - MARCH 2021.pdf · uploaded 31 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Cert - MARCH 2022.pdf · uploaded 31 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Quality Cert March23.pdf · uploaded 31 Jan 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)01 ARCH CERT 30-03-2020.pdf · uploaded 2 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)02 ARCH CERT 30-06-2020.pdf · uploaded 2 Feb 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)03 ARCH CERT 30-09-2020.pdf · uploaded 2 Feb 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)04 ARCH CERT 31-12-2020.pdf · uploaded 2 Feb 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)05 ARCH CERT 30-03-2021.pdf · uploaded 2 Feb 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)06 ARCH CERT 30-06-2021.pdf · uploaded 2 Feb 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)07 ARCH CERT 30-09-2021.pdf · uploaded 2 Feb 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)08 ARCH CERT 31-12-2021.pdf · uploaded 2 Feb 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)09 ARCH CERT 31-03-2022.pdf · uploaded 2 Feb 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)10 ARCH CERT 30-06-2022.pdf · uploaded 2 Feb 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)11 ARCH CERT 30-09-2022.pdf · uploaded 2 Feb 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)12 ARCH CERT 30-12-2022.pdf · uploaded 2 Feb 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)13 ARCH CERT 31-03-2023.pdf · uploaded 2 Feb 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)14 ARCH CERT 30-06-2023.pdf · uploaded 2 Feb 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)15 ARCH CERT 30-09-2023.pdf · uploaded 2 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)CA Cert - 01-04-2019 - 31-03-2020.pdf · uploaded 2 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)CA Cert 01-04-2020 - 31-03-2021.pdf · uploaded 2 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)CA Cert - 01-04-2021 - 31-03-2022.pdf · uploaded 2 Feb 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH CERT 31-12-2023.pdf · uploaded 5 Feb 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH CERT 31-03-2024.pdf · uploaded 18 May 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - V1 Next Ph 1 31-03-2024.pdf · uploaded 18 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - Quality Cert 31-03-2024.pdf · uploaded 18 May 2024Source
- 12 Disclosure of sold/ booked inventoryDECLARATION SOLD UNSOLD 31-03-2024.pdf · uploaded 18 May 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Jun 20.pdf · uploaded 3 Jun 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sep 20.pdf · uploaded 3 Jun 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 20.pdf · uploaded 3 Jun 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mar 21.pdf · uploaded 3 Jun 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Jun 21.pdf · uploaded 3 Jun 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sep 21.pdf · uploaded 3 Jun 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 21_compressed.pdf · uploaded 3 Jun 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mar 22_compressed.pdf · uploaded 3 Jun 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Jun 22_compressed.pdf · uploaded 3 Jun 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sep 22_compressed.pdf · uploaded 3 Jun 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 22_compressed.pdf · uploaded 3 Jun 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mar 23_compressed.pdf · uploaded 3 Jun 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Jun 23_compressed.pdf · uploaded 3 Jun 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sep 23_compressed.pdf · uploaded 3 Jun 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 23_compressed.pdf · uploaded 3 Jun 2024Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 01-04-2024 TO 30-06-2024 (1).pdf · uploaded 9 Jul 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 01-04-2024 TO 30-06-2024.pdf · uploaded 9 Jul 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)2024-06-30 form 3_compressed.pdf · uploaded 20 Jul 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)DECLARATION ABOUT SEPARATE BANK ACCOUNT FOR REAL ESTATE PROJECTS.pdf · uploaded 20 Jul 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)S S VENTURES AOP ( C ) ARCHITECHS 30-09-2024.pdf · uploaded 7 Nov 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)S S VENTURES AOP (C) ENGINEERS CERTIFICATE 30-09-2024.pdf · uploaded 7 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 - Vision One Next Phae One signed.pdf · uploaded 8 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vision One next ph1 Form 1 Dec 24.pdf · uploaded 17 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vision one next ph 1 Form 2 Dec 24.pdf · uploaded 17 Apr 2025Source
- Form 1Vision One next ph1 Form 1 Dec 24.pdf · uploaded 11 Aug 2025Source
- Form 2Vision one next ph 1 Form 2 Dec 24.pdf · uploaded 11 Aug 2025Source
- Form 3CA Cert 31 12 2024_11zon.pdf · uploaded 11 Aug 2025Source
- Disclosure of Sold and Booked Inventorydiscl of sold-unsold Dec 24 Vision one next ph 1.pdf · uploaded 11 Aug 2025Source
- Form 1FORM 1 Arch Cert 31 03 2025.pdf · uploaded 11 Aug 2025Source
- Form 2V1 Next Ph 1 31 03 2025 FORM 2.pdf · uploaded 11 Aug 2025Source
- Form 3CA Cert 31 03 2025.pdf · uploaded 11 Aug 2025Source
- Disclosure of Sold and Booked InventorySold & Unsold 31 03 2025.pdf · uploaded 11 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
- Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventoryFORM 3.pdf · uploaded 18 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
- Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventoryFORM 3.pdf · uploaded 18 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
- Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventoryFORM 3.pdf · uploaded 18 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
- Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventoryFORM 3.pdf · uploaded 18 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
- Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventoryFORM 3.pdf · uploaded 18 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
- Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
- Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
- Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
- Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
- Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
- Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
- Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
- Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 18 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
- Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
- Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
- Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
- Form 1form 1 ARCH CERT 31-03-2024.pdf · uploaded 18 Aug 2025Source
- Form 2Form 2 - V1 Next Ph 1 31-03-2024.pdf · uploaded 18 Aug 2025Source
- Form 3Vision One Next Phase I Form 3 Mar 24_0001.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventoryDECLARATION SOLD UNSOLD 31-03-2024.pdf · uploaded 18 Aug 2025Source
- Form 1FORM 1 01-04-2024 TO 30-06-2024 (1).pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2 01-04-2024 TO 30-06-2024.pdf · uploaded 18 Aug 2025Source
- Form 32024-06-30 form 3_compressed.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventoryDECLARATION SOLD UNSOLD 31-03-2024.pdf · uploaded 18 Aug 2025Source
- Form 1FORM 1 01-04-2024 TO 30-06-2024 (1).pdf · uploaded 18 Aug 2025Source
- Form 2FORM 2 01-04-2024 TO 30-06-2024.pdf · uploaded 18 Aug 2025Source
- Form 32024-06-30 form 3_compressed.pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventoryDECLARATION SOLD UNSOLD 31-03-2024.pdf · uploaded 18 Aug 2025Source
- Withdrawal Update Form 1FORM 1 01-04-2024 TO 30-06-2024 (1).pdf · uploaded 18 Aug 2025Source
- Withdrawal Update Form 2FORM 2 01-04-2024 TO 30-06-2024.pdf · uploaded 18 Aug 2025Source
- Withdrawal Update Form 32024-06-30 form 3_compressed.pdf · uploaded 18 Aug 2025Source
- Withdrawal Update Form 1FORM 1 01-04-2024 TO 30-06-2024 (1).pdf · uploaded 22 Aug 2025Source
- Withdrawal Update Form 2FORM 2 01-04-2024 TO 30-06-2024.pdf · uploaded 22 Aug 2025Source
- Withdrawal Update Form 32024-06-30 form 3_compressed.pdf · uploaded 22 Aug 2025Source
- Withdrawal Update Form 1form 01 for vision one next phase 1.pdf · uploaded 23 Aug 2025Source
- Withdrawal Update Form 1form 01 for vision one next phase 1.pdf · uploaded 23 Aug 2025Source
- Withdrawal Update Form 2FORM 2 01-04-2024 TO 30-06-2024.pdf · uploaded 23 Aug 2025Source
- Withdrawal Update Form 2FORM 2 01-04-2024 TO 30-06-2024.pdf · uploaded 23 Aug 2025Source
- Withdrawal Update Form 3CA Cert 30 06 2025 Revised.pdf · uploaded 23 Aug 2025Source
- Withdrawal Update Form 3CA Cert 30 06 2025 Revised.pdf · uploaded 23 Aug 2025Source
- Withdrawal Update Form 1ARCH Cert 30-09-2025.pdf · uploaded 29 Nov 2025Source
- Withdrawal Update Form 2V1 Next Ph 1 30-09-2025_11zon.pdf · uploaded 29 Nov 2025Source
- Withdrawal Update Form 3Ca Cert 30-09-2025_compressed.pdf · uploaded 29 Nov 2025Source
- Form 5 (FY 2024-2025)FORM 5 Signed.pdf · uploaded 23 Dec 2025Source
- Withdrawal Update Form 1ARCH CERT 31 12 2025.pdf · uploaded 19 Feb 2026Source
- Withdrawal Update Form 2FORM 2 31 12 2025.pdf · uploaded 19 Feb 2026Source
- Withdrawal Update Form 3final form 3.pdf · uploaded 19 Feb 2026Source
- Withdrawal Update Form 1ARCH CERT 31 03 2026.pdf · uploaded 6 May 2026Source
- Withdrawal Update Form 2V1 Next Ph 1 31 03 2026.pdf · uploaded 6 May 2026Source
- Withdrawal Update Form 3SS VENTURE AOP RERA CA CERT FINAL SIGNED.pdf · uploaded 6 May 2026Source
- Form 5 (FY 2025-2026)Form 5 SIgned.pdf · uploaded 21 Sep 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 1 Oct 2026Source
- Withdrawal Update Form 2V1 Next Ph 1 30 06 2026.pdf · uploaded 1 Oct 2026Source
- Withdrawal Update Form 3CA Cert 30 06 2026.pdf · uploaded 1 Oct 2026Source
Technical
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvals
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Unit types
- Office space, Shop89 units in all
- Address
- S. NO. 56, HISSA NO. 3/16, 56/3/16(p) & 56(4)p, TATHWADEPIN 411003
- Village
- Tathwade, Mulshi taluka
- Location
- 18.63715, 73.74395
- Land area for this project
- 3,438 sq m (37,009 sq ft)
- Permissible built-up area
- 6,403 sq m (68,920 sq ft)
- Sanctioned built-up area
- 6,403 sq m (68,920 sq ft)
- Recreational open space
- 344 sq m (3,701 sq ft)
- Designated bank account
- 109
- Developed in phases
- No
Land as published on MahaRERA's project page
S. NO. 56, HISSA NO. 3/16
Boundaries
- North
- Land Hold By Mr Salunke
- South
- Land Hold By Varma Sakla And Sancheti
- East
- Land Hold By Balaji College
- West
- 41 Aar Land Out Of S No 56-3-16
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking89 units
0 of 89 units booked (0%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 14.96 sq m · 161 sq ft | 1 | 0 |
| Office space | 20.16 sq m · 217 sq ft | 1 | 0 |
| Office space | 20.62 sq m · 222 sq ft | 6 | 0 |
| Office space | 21.65 sq m · 233 sq ft | 14 | 0 |
| Office space | 24.15 sq m · 260 sq ft | 1 | 0 |
| Office space | 24.53 sq m · 264 sq ft | 13 | 0 |
| Office space | 27.03 sq m · 291 sq ft | 2 | 0 |
| Office space | 27.41 sq m · 295 sq ft | 1 | 0 |
Show all 32 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 27.68 sq m · 298 sq ft | 1 | 0 |
| Office space | 28.34 sq m · 305 sq ft | 1 | 0 |
| Office space | 28.71 sq m · 309 sq ft | 1 | 0 |
| Office space | 29.17 sq m · 314 sq ft | 2 | 0 |
| Office space | 30.47 sq m · 328 sq ft | 1 | 0 |
| Office space | 30.56 sq m · 329 sq ft | 2 | 0 |
| Office space | 30.94 sq m · 333 sq ft | 1 | 0 |
| Office space | 31.31 sq m · 337 sq ft | 1 | 0 |
| Office space | 32.05 sq m · 345 sq ft | 3 | 0 |
| Office space | 32.61 sq m · 351 sq ft | 1 | 0 |
| Office space | 32.79 sq m · 353 sq ft | 1 | 0 |
| Office space | 33.54 sq m · 361 sq ft | 1 | 0 |
| Office space | 34.19 sq m · 368 sq ft | 8 | 0 |
| Office space | 37.07 sq m · 399 sq ft | 11 | 0 |
| Office space | 38.18 sq m · 411 sq ft | 1 | 0 |
| Office space | 46.92 sq m · 505 sq ft | 1 | 0 |
| Office space | 53.6 sq m · 577 sq ft | 1 | 0 |
| Office space | 59.55 sq m · 641 sq ft | 1 | 0 |
| Office space | 102.75 sq m · 1,106 sq ft | 2 | 0 |
| Shop | 160.64 sq m · 1,729 sq ft | 1 | 0 |
| Shop | 168.83 sq m · 1,817 sq ft | 5 | 0 |
| Shop | 341.65 sq m · 3,677 sq ft | 1 | 0 |
| Shop | 1,110.58 sq m · 11,954 sq ft | 1 | 0 |
| Shop | 1,110.58 sq m · 11,954 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals15
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Hrisikesh Kulkarni | — |
| Chartered accountant | Ca Anuj Sushil Kumar Agrawal | — |
| Chartered accountant | Ca Preeti Gandhi | — |
| Chartered accountant | Dipali Shelar | — |
| Chartered accountant | Rahul Sarawgi | — |
| Engineer | Ajinkya Kalbhor | — |
| Engineer | Ajinkya Tanaji Kalbhor | — |
| Engineer | Dattatray Dondkar | — |
Show all 15 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Other | Dpi Daylighting Private Limited | — |
| Other | Navnirmitee Electricals (Abhijit Bagmar) | — |
| Other | Om Sai Fire System (Chetan Kunjir) | — |
| Other | Rk Painters (Navnath Wagh) | — |
| Other | Sairaj Fabrication (Sambhaji Buchute) | — |
| Other | Ss venture | — |
| Other | Swastik Suyog Venture (Kalpesh Patel) | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Tathwade
- Bhagawati ChambersRERA PC1260002601422
- SiennaRERA PC1260002601395
- Avenue 7RERA PM1260002601199
- The PrivveRERA PM1260002600993
- Oriana WorldRERA PR1261012600520
- Alpine 21RERA PR1260002600172
- 6 BoulevardRERA PR1261012600142
- NeopolisRERA PR1260002600009
All 171 projects in Tathwade · Compare Vision One Next Phase 1 with another project