Commercial · 1 building · 89 unitsRERA P52100022621

Vision One Next Phase 1

Deedo IDDP-PUN-RCRP

Completion was pushed back 4 months, to Feb 2027; no MahaRERA orders on record; 0% of its units are booked.

Tathwade, Pune 411003 · Property rates in Tathwade · by Ss Ventures Aop

DeliveryExtended 4 moPromised Oct 2026 · now due Feb 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales0% booked0 of 89 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Feb 2027

  • This projectRegistered 9 Oct 2019, completion promised 5 Oct 2026, revised to 5 Feb 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100022621
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000226219 Oct 20195 Oct 20265 Feb 2027Ss Ventures AopProject page
Documents214

1 document held by Deedo, 213 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Card1 PAN Card.pdf · uploaded 4 Dec 2023Source

Legal

  • Legal Title reportSearch Report Sep 2019.pdf · uploaded 2 Oct 2019Source
  • Declaration Form BSS Ventures AOP Form B Developers.pdf · uploaded 2 Oct 2019Source

Migrated

  • 1 Copy of the legal title reportSearch Report Sep 2019.pdf · uploaded 2 Oct 2019Source
  • 1 Details of encumbrancesNo Encurbrances Cert SSV AOP.pdf · uploaded 2 Oct 2019Source
  • 1 Building Plan Approval / NA Order for plotted development1-16_reduce.pdf · uploaded 2 Oct 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentComencement Certificate_reduce.pdf · uploaded 2 Oct 2019Source
Show all 214 documentsShow fewer documents

Migrated

  • 1 Declaration in FORM BSS Ventures AOP Form B Developers.pdf · uploaded 2 Oct 2019Source
  • 1 Copy of Layout Approval (in case of layout)HPSCANNER3453.pdf · uploaded 3 Oct 2019Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE.pdf · uploaded 3 Oct 2019Source
  • 1 Proforma of Allotment letterSS VENTURE (DECLARATION) (1).pdf · uploaded 3 Oct 2019Source
  • 2 Proforma of Allotment letterVision One Next RERA Agreement 30092019-1-20.pdf · uploaded 3 Oct 2019Source
  • 3 Proforma of Allotment letterVision One Next RERA Agreement 30092019-21-40.pdf · uploaded 3 Oct 2019Source
  • 4 Proforma of Allotment letterVision One Next RERA Agreement 30092019-41-60.pdf · uploaded 3 Oct 2019Source
  • 5 Proforma of Allotment letterVision One Next RERA Agreement 30092019-101-118.pdf · uploaded 3 Oct 2019Source
  • 6 Proforma of Allotment letterVision One Next RERA Agreement 30092019-61-80_compressed.pdf · uploaded 3 Oct 2019Source
  • 1 Declaration about Commencement CertificateDecl About Commencement Vision one Next.pdf · uploaded 30 Sep 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Vision Next Phase 1 31 12 2020.pdf · uploaded 30 Sep 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Vision Next Phase 1 30 06 2021.pdf · uploaded 30 Sep 2021Source
  • 1 Disclosure of sold/ booked inventoryVision one Next Decl about sold Unsold.pdf · uploaded 30 Sep 2021Source
  • 1 PAN Card1 PAN Card.pdf · uploaded 4 Dec 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Vision One next Phase I 22-23.pdf · uploaded 6 Jan 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30032020.pdf · uploaded 20 Jan 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30062020.pdf · uploaded 20 Jan 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30092020.pdf · uploaded 20 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30122020.pdf · uploaded 20 Jan 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30032021.pdf · uploaded 20 Jan 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30062021.pdf · uploaded 20 Jan 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30092021.pdf · uploaded 20 Jan 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30122021.pdf · uploaded 20 Jan 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30032022.pdf · uploaded 20 Jan 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30062022.pdf · uploaded 20 Jan 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30092022.pdf · uploaded 20 Jan 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30122022.pdf · uploaded 20 Jan 2024Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30032023.pdf · uploaded 20 Jan 2024Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30062023.pdf · uploaded 20 Jan 2024Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30092023.pdf · uploaded 20 Jan 2024Source
  • 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)V1 Next Ph 1 30122023.pdf · uploaded 20 Jan 2024Source
  • 2 Disclosure of sold/ booked inventorySOLD UNSOLD 10082021.pdf · uploaded 20 Jan 2024Source
  • 3 Disclosure of sold/ booked inventorySOLD UNSOLD 31122021.pdf · uploaded 20 Jan 2024Source
  • 4 Disclosure of sold/ booked inventorySOLD UNSOLD 31032022.pdf · uploaded 20 Jan 2024Source
  • 5 Disclosure of sold/ booked inventorySOLD UNSOLD 30062022.pdf · uploaded 20 Jan 2024Source
  • 6 Disclosure of sold/ booked inventorySOLD UNSOLD 30092022.pdf · uploaded 20 Jan 2024Source
  • 7 Disclosure of sold/ booked inventorySOLD UNSOLD 31122022.pdf · uploaded 20 Jan 2024Source
  • 8 Disclosure of sold/ booked inventorySOLD UNSOLD 31032023.pdf · uploaded 20 Jan 2024Source
  • 9 Disclosure of sold/ booked inventorySOLD UNSOLD 30062023.pdf · uploaded 20 Jan 2024Source
  • 10 Disclosure of sold/ booked inventorySOLD UNSOLD 30092023.pdf · uploaded 20 Jan 2024Source
  • 11 Disclosure of sold/ booked inventorySOLD UNSOLD 31122023.pdf · uploaded 20 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Cert - MARCH 2020.pdf · uploaded 31 Jan 2024Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quality Cert - MARCH 2021.pdf · uploaded 31 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Cert - MARCH 2022.pdf · uploaded 31 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Quality Cert March23.pdf · uploaded 31 Jan 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)01 ARCH CERT 30-03-2020.pdf · uploaded 2 Feb 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)02 ARCH CERT 30-06-2020.pdf · uploaded 2 Feb 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)03 ARCH CERT 30-09-2020.pdf · uploaded 2 Feb 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)04 ARCH CERT 31-12-2020.pdf · uploaded 2 Feb 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)05 ARCH CERT 30-03-2021.pdf · uploaded 2 Feb 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)06 ARCH CERT 30-06-2021.pdf · uploaded 2 Feb 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)07 ARCH CERT 30-09-2021.pdf · uploaded 2 Feb 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)08 ARCH CERT 31-12-2021.pdf · uploaded 2 Feb 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)09 ARCH CERT 31-03-2022.pdf · uploaded 2 Feb 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)10 ARCH CERT 30-06-2022.pdf · uploaded 2 Feb 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)11 ARCH CERT 30-09-2022.pdf · uploaded 2 Feb 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)12 ARCH CERT 30-12-2022.pdf · uploaded 2 Feb 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)13 ARCH CERT 31-03-2023.pdf · uploaded 2 Feb 2024Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)14 ARCH CERT 30-06-2023.pdf · uploaded 2 Feb 2024Source
  • 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)15 ARCH CERT 30-09-2023.pdf · uploaded 2 Feb 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)CA Cert - 01-04-2019 - 31-03-2020.pdf · uploaded 2 Feb 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)CA Cert 01-04-2020 - 31-03-2021.pdf · uploaded 2 Feb 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)CA Cert - 01-04-2021 - 31-03-2022.pdf · uploaded 2 Feb 2024Source
  • 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH CERT 31-12-2023.pdf · uploaded 5 Feb 2024Source
  • 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH CERT 31-03-2024.pdf · uploaded 18 May 2024Source
  • 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - V1 Next Ph 1 31-03-2024.pdf · uploaded 18 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - Quality Cert 31-03-2024.pdf · uploaded 18 May 2024Source
  • 12 Disclosure of sold/ booked inventoryDECLARATION SOLD UNSOLD 31-03-2024.pdf · uploaded 18 May 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Jun 20.pdf · uploaded 3 Jun 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sep 20.pdf · uploaded 3 Jun 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 20.pdf · uploaded 3 Jun 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mar 21.pdf · uploaded 3 Jun 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Jun 21.pdf · uploaded 3 Jun 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sep 21.pdf · uploaded 3 Jun 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 21_compressed.pdf · uploaded 3 Jun 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mar 22_compressed.pdf · uploaded 3 Jun 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Jun 22_compressed.pdf · uploaded 3 Jun 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sep 22_compressed.pdf · uploaded 3 Jun 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 22_compressed.pdf · uploaded 3 Jun 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mar 23_compressed.pdf · uploaded 3 Jun 2024Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Jun 23_compressed.pdf · uploaded 3 Jun 2024Source
  • 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sep 23_compressed.pdf · uploaded 3 Jun 2024Source
  • 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 23_compressed.pdf · uploaded 3 Jun 2024Source
  • 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 01-04-2024 TO 30-06-2024 (1).pdf · uploaded 9 Jul 2024Source
  • 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 01-04-2024 TO 30-06-2024.pdf · uploaded 9 Jul 2024Source
  • 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)2024-06-30 form 3_compressed.pdf · uploaded 20 Jul 2024Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)DECLARATION ABOUT SEPARATE BANK ACCOUNT FOR REAL ESTATE PROJECTS.pdf · uploaded 20 Jul 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)S S VENTURES AOP ( C ) ARCHITECHS 30-09-2024.pdf · uploaded 7 Nov 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)S S VENTURES AOP (C) ENGINEERS CERTIFICATE 30-09-2024.pdf · uploaded 7 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 - Vision One Next Phae One signed.pdf · uploaded 8 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vision One next ph1 Form 1 Dec 24.pdf · uploaded 17 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vision one next ph 1 Form 2 Dec 24.pdf · uploaded 17 Apr 2025Source
  • Form 1Vision One next ph1 Form 1 Dec 24.pdf · uploaded 11 Aug 2025Source
  • Form 2Vision one next ph 1 Form 2 Dec 24.pdf · uploaded 11 Aug 2025Source
  • Form 3CA Cert 31 12 2024_11zon.pdf · uploaded 11 Aug 2025Source
  • Disclosure of Sold and Booked Inventorydiscl of sold-unsold Dec 24 Vision one next ph 1.pdf · uploaded 11 Aug 2025Source
  • Form 1FORM 1 Arch Cert 31 03 2025.pdf · uploaded 11 Aug 2025Source
  • Form 2V1 Next Ph 1 31 03 2025 FORM 2.pdf · uploaded 11 Aug 2025Source
  • Form 3CA Cert 31 03 2025.pdf · uploaded 11 Aug 2025Source
  • Disclosure of Sold and Booked InventorySold & Unsold 31 03 2025.pdf · uploaded 11 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
  • Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventoryFORM 3.pdf · uploaded 18 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
  • Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventoryFORM 3.pdf · uploaded 18 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
  • Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventoryFORM 3.pdf · uploaded 18 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
  • Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventoryFORM 3.pdf · uploaded 18 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
  • Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventoryFORM 3.pdf · uploaded 18 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
  • Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
  • Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
  • Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
  • Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
  • Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
  • Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
  • Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
  • Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 18 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
  • Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
  • Form 1FORM 1.pdf · uploaded 18 Aug 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Aug 2025Source
  • Form 3FORM 3.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Aug 2025Source
  • Form 1form 1 ARCH CERT 31-03-2024.pdf · uploaded 18 Aug 2025Source
  • Form 2Form 2 - V1 Next Ph 1 31-03-2024.pdf · uploaded 18 Aug 2025Source
  • Form 3Vision One Next Phase I Form 3 Mar 24_0001.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventoryDECLARATION SOLD UNSOLD 31-03-2024.pdf · uploaded 18 Aug 2025Source
  • Form 1FORM 1 01-04-2024 TO 30-06-2024 (1).pdf · uploaded 18 Aug 2025Source
  • Form 2FORM 2 01-04-2024 TO 30-06-2024.pdf · uploaded 18 Aug 2025Source
  • Form 32024-06-30 form 3_compressed.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventoryDECLARATION SOLD UNSOLD 31-03-2024.pdf · uploaded 18 Aug 2025Source
  • Form 1FORM 1 01-04-2024 TO 30-06-2024 (1).pdf · uploaded 18 Aug 2025Source
  • Form 2FORM 2 01-04-2024 TO 30-06-2024.pdf · uploaded 18 Aug 2025Source
  • Form 32024-06-30 form 3_compressed.pdf · uploaded 18 Aug 2025Source
  • Disclosure of Sold and Booked InventoryDECLARATION SOLD UNSOLD 31-03-2024.pdf · uploaded 18 Aug 2025Source
  • Withdrawal Update Form 1FORM 1 01-04-2024 TO 30-06-2024 (1).pdf · uploaded 18 Aug 2025Source
  • Withdrawal Update Form 2FORM 2 01-04-2024 TO 30-06-2024.pdf · uploaded 18 Aug 2025Source
  • Withdrawal Update Form 32024-06-30 form 3_compressed.pdf · uploaded 18 Aug 2025Source
  • Withdrawal Update Form 1FORM 1 01-04-2024 TO 30-06-2024 (1).pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 2FORM 2 01-04-2024 TO 30-06-2024.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 32024-06-30 form 3_compressed.pdf · uploaded 22 Aug 2025Source
  • Withdrawal Update Form 1form 01 for vision one next phase 1.pdf · uploaded 23 Aug 2025Source
  • Withdrawal Update Form 1form 01 for vision one next phase 1.pdf · uploaded 23 Aug 2025Source
  • Withdrawal Update Form 2FORM 2 01-04-2024 TO 30-06-2024.pdf · uploaded 23 Aug 2025Source
  • Withdrawal Update Form 2FORM 2 01-04-2024 TO 30-06-2024.pdf · uploaded 23 Aug 2025Source
  • Withdrawal Update Form 3CA Cert 30 06 2025 Revised.pdf · uploaded 23 Aug 2025Source
  • Withdrawal Update Form 3CA Cert 30 06 2025 Revised.pdf · uploaded 23 Aug 2025Source
  • Withdrawal Update Form 1ARCH Cert 30-09-2025.pdf · uploaded 29 Nov 2025Source
  • Withdrawal Update Form 2V1 Next Ph 1 30-09-2025_11zon.pdf · uploaded 29 Nov 2025Source
  • Withdrawal Update Form 3Ca Cert 30-09-2025_compressed.pdf · uploaded 29 Nov 2025Source
  • Form 5 (FY 2024-2025)FORM 5 Signed.pdf · uploaded 23 Dec 2025Source
  • Withdrawal Update Form 1ARCH CERT 31 12 2025.pdf · uploaded 19 Feb 2026Source
  • Withdrawal Update Form 2FORM 2 31 12 2025.pdf · uploaded 19 Feb 2026Source
  • Withdrawal Update Form 3final form 3.pdf · uploaded 19 Feb 2026Source
  • Withdrawal Update Form 1ARCH CERT 31 03 2026.pdf · uploaded 6 May 2026Source
  • Withdrawal Update Form 2V1 Next Ph 1 31 03 2026.pdf · uploaded 6 May 2026Source
  • Withdrawal Update Form 3SS VENTURE AOP RERA CA CERT FINAL SIGNED.pdf · uploaded 6 May 2026Source
  • Form 5 (FY 2025-2026)Form 5 SIgned.pdf · uploaded 21 Sep 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 1 Oct 2026Source
  • Withdrawal Update Form 2V1 Next Ph 1 30 06 2026.pdf · uploaded 1 Oct 2026Source
  • Withdrawal Update Form 3CA Cert 30 06 2026.pdf · uploaded 1 Oct 2026Source

Technical

  • Document1-16_reduce.pdf · uploaded 2 Oct 2019Source
  • DocumentHPSCANNER3453.pdf · uploaded 3 Oct 2019Source

Technical (Architect)

  • DocumentS S VENTURES AOP ( C ) ARCHITECHS 30-09-2024.pdf · uploaded 7 Nov 2024Source
  • DocumentVision One next ph1 Form 1 Dec 24.pdf · uploaded 17 Apr 2025Source
  • DocumentForm 1.pdf · uploaded 30 Aug 2026Source

Technical (Engineer)

  • DocumentS S VENTURES AOP (C) ENGINEERS CERTIFICATE 30-09-2024.pdf · uploaded 7 Nov 2024Source
  • DocumentVision one next ph 1 Form 2 Dec 24.pdf · uploaded 17 Apr 2025Source
  • DocumentV1 Next Ph 1 30 06 2026.pdf · uploaded 30 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvals

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Unit types
Office space, Shop89 units in all
Address
S. NO. 56, HISSA NO. 3/16, 56/3/16(p) & 56(4)p, TATHWADEPIN 411003
Village
Tathwade, Mulshi taluka
Land area for this project
3,438 sq m (37,009 sq ft)
Permissible built-up area
6,403 sq m (68,920 sq ft)
Sanctioned built-up area
6,403 sq m (68,920 sq ft)
Recreational open space
344 sq m (3,701 sq ft)
Designated bank account
109
Developed in phases
No

Land as published on MahaRERA's project page

S. NO. 56, HISSA NO. 3/16

Boundaries

North
Land Hold By Mr Salunke
South
Land Hold By Varma Sakla And Sancheti
East
Land Hold By Balaji College
West
41 Aar Land Out Of S No 56-3-16

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking89 units

0 of 89 units booked (0%), as the promoter reported to MahaRERA

Office space · 80 unitsShop · 9 units
TypeCarpet areaUnitsBooked
Office space14.96 sq m · 161 sq ft10
Office space20.16 sq m · 217 sq ft10
Office space20.62 sq m · 222 sq ft60
Office space21.65 sq m · 233 sq ft140
Office space24.15 sq m · 260 sq ft10
Office space24.53 sq m · 264 sq ft130
Office space27.03 sq m · 291 sq ft20
Office space27.41 sq m · 295 sq ft10
Show all 32 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Office space27.68 sq m · 298 sq ft10
Office space28.34 sq m · 305 sq ft10
Office space28.71 sq m · 309 sq ft10
Office space29.17 sq m · 314 sq ft20
Office space30.47 sq m · 328 sq ft10
Office space30.56 sq m · 329 sq ft20
Office space30.94 sq m · 333 sq ft10
Office space31.31 sq m · 337 sq ft10
Office space32.05 sq m · 345 sq ft30
Office space32.61 sq m · 351 sq ft10
Office space32.79 sq m · 353 sq ft10
Office space33.54 sq m · 361 sq ft10
Office space34.19 sq m · 368 sq ft80
Office space37.07 sq m · 399 sq ft110
Office space38.18 sq m · 411 sq ft10
Office space46.92 sq m · 505 sq ft10
Office space53.6 sq m · 577 sq ft10
Office space59.55 sq m · 641 sq ft10
Office space102.75 sq m · 1,106 sq ft20
Shop160.64 sq m · 1,729 sq ft10
Shop168.83 sq m · 1,817 sq ft50
Shop341.65 sq m · 3,677 sq ft10
Shop1,110.58 sq m · 11,954 sq ft10
Shop1,110.58 sq m · 11,954 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals15

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectHrisikesh Kulkarni—
Chartered accountantCa Anuj Sushil Kumar Agrawal—
Chartered accountantCa Preeti Gandhi—
Chartered accountantDipali Shelar—
Chartered accountantRahul Sarawgi—
EngineerAjinkya Kalbhor—
EngineerAjinkya Tanaji Kalbhor—
EngineerDattatray Dondkar—
Show all 15 professionalsShow fewer professionals
RoleNameRegistration no.
OtherDpi Daylighting Private Limited—
OtherNavnirmitee Electricals (Abhijit Bagmar)—
OtherOm Sai Fire System (Chetan Kunjir)—
OtherRk Painters (Navnath Wagh)—
OtherSairaj Fabrication (Sambhaji Buchute)—
OtherSs venture—
OtherSwastik Suyog Venture (Kalpesh Patel)—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Tathwade

All 171 projects in Tathwade · Compare Vision One Next Phase 1 with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology