Deedo IDDP-PUN-03RYCompletion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 74% of its units are booked.
Tathwade, Pune 411057 · Property rates in Tathwade · by Prithvi Buildcon
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2027
- This projectRegistered 27 Jun 2023, completion promised 26 Dec 2026, revised to 26 Apr 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- A10 floors · 40 units83% booked
- B11 floors · 44 units82% booked
- Commercial11 floors · 21 units43% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100051588
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100051588 | 27 Jun 2023 | 26 Dec 2026 | 26 Apr 2027 | Prithvi Buildcon | Project page |
Documents180
1 document held by Deedo, 179 filings listed on MahaRERA's project page
Finance
- PAN CardPAN.pdf · uploaded 29 May 2023Source
Legal
Migrated
- 1 PAN CardPAN.pdf · uploaded 29 May 2023Source
- 1 Copy of the legal title reportSearch Report_compressed.pdf · uploaded 29 May 2023Source
- 1 Copy of Layout Approval (in case of layout)Layput Plan_compressed.pdf · uploaded 29 May 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentHPSCANNER4404_compressed.pdf · uploaded 29 May 2023Source
Show all 180 documentsShow fewer documents
Migrated
- 2 Building Plan Approval / NA Order for plotted developmentHPSCANNER4406_compressed.pdf · uploaded 29 May 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentHPSCANNER4407_compressed.pdf · uploaded 29 May 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentHPSCANNER4408_compressed.pdf · uploaded 29 May 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentsanction plan 1_compressed.pdf · uploaded 29 May 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentsanction plan 2_compressed.pdf · uploaded 29 May 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentHPSCANNER4409.pdf · uploaded 29 May 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentComencement Certificate_compressed.pdf · uploaded 29 May 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentN A Order.pdf · uploaded 29 May 2023Source
- 1 Declaration about Commencement CertificateComencement Declaration.pdf · uploaded 29 May 2023Source
- 1 Declaration in FORM BForm B Dilip Hadap.pdf · uploaded 29 May 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect certificate_compressed.pdf · uploaded 29 May 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate.pdf · uploaded 29 May 2023Source
- 1 Disclosure of sold/ booked inventorySold unsold.pdf · uploaded 29 May 2023Source
- 1 CERSAI detailsCERSAI_Search_Report_200269886859_For_Asset_Based_Search_28_05_2023_12_24_24_117.pdf · uploaded 29 May 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsOther Real estate disclosure -Dilip Hadap.pdf · uploaded 29 May 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsOther Real estate disclosure -Vijaya Londge.pdf · uploaded 29 May 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsOther Real estate disclosure -Sarman Agarwal.pdf · uploaded 29 May 2023Source
- 1 Proforma of Agreement for saleNEW DRAFT - Pruthvi Paradise - Londhe - Shete - Tathwade - DRAFT AGREEMENT - 28-04-2023.pdf · uploaded 29 May 2023Source
- 1 Proforma of Allotment letterdraft Allotment letter.pdf · uploaded 29 May 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration - Separate Bank Account.pdf · uploaded 29 May 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation - Allotment Letter.pdf · uploaded 29 May 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation - Agreement to sale.pdf · uploaded 29 May 2023Source
- 1 a Details of encumbrances concerned to FinanceEncumbrance - Legal.pdf · uploaded 30 May 2023Source
- 2 a Details of encumbrances concerned to FinanceEncumbrance - Finance.pdf · uploaded 30 May 2023Source
- 1 b Details of encumbrances concerned to LegalEncumbrance - Legal.pdf · uploaded 30 May 2023Source
- 2 b Details of encumbrances concerned to LegalEncumbrance - Finance.pdf · uploaded 30 May 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate.pdf · uploaded 30 May 2023Source
- 8 Building Plan Approval / NA Order for plotted development1 Copy of Layout Approval (in case of layout) (1).pdf · uploaded 8 Jun 2023Source
- 9 Building Plan Approval / NA Order for plotted development0scan (2)_compressed.pdf · uploaded 4 Jul 2023Source
- 10 Building Plan Approval / NA Order for plotted development0scan (3)_compressed.pdf · uploaded 4 Jul 2023Source
- 11 Building Plan Approval / NA Order for plotted development0scan (4)_compressed.pdf · uploaded 4 Jul 2023Source
- 12 Building Plan Approval / NA Order for plotted development0scan (5)_compressed.pdf · uploaded 4 Jul 2023Source
- 13 Building Plan Approval / NA Order for plotted development0scan (6)_compressed.pdf · uploaded 4 Jul 2023Source
- 14 Building Plan Approval / NA Order for plotted development0scan (7)_compressed.pdf · uploaded 4 Jul 2023Source
- 3 Commencement Certificates / NA Order for plotted development0scan (1)_compressed.pdf · uploaded 4 Jul 2023Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeparate Bank account.pdf · uploaded 28 Sep 2023Source
- 2 Copy of Layout Approval (in case of layout)scan 033_compressed.pdf · uploaded 19 Oct 2023Source
- 15 Building Plan Approval / NA Order for plotted developmentscan 034_compressed.pdf · uploaded 19 Oct 2023Source
- 16 Building Plan Approval / NA Order for plotted developmentscan 035_compressed.pdf · uploaded 19 Oct 2023Source
- 17 Building Plan Approval / NA Order for plotted developmentscan 036_compressed.pdf · uploaded 19 Oct 2023Source
- 18 Building Plan Approval / NA Order for plotted developmentscan 037_compressed.pdf · uploaded 19 Oct 2023Source
- 19 Building Plan Approval / NA Order for plotted developmentscan 038_compressed.pdf · uploaded 19 Oct 2023Source
- 20 Building Plan Approval / NA Order for plotted developmentscan 039_compressed.pdf · uploaded 19 Oct 2023Source
- 21 Building Plan Approval / NA Order for plotted developmentscan 040_compressed.pdf · uploaded 19 Oct 2023Source
- 22 Building Plan Approval / NA Order for plotted developmentscan 041_compressed.pdf · uploaded 19 Oct 2023Source
- 4 Commencement Certificates / NA Order for plotted developmentSKMBT_C28023101407250_compressed.pdf · uploaded 19 Oct 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 (sept 23).pdf · uploaded 1 Dec 2023Source
- 3 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the samenull-6.pdf · uploaded 1 Dec 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 (30092023).pdf · uploaded 20 Dec 2023Source
- 4 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDocScanner Dec 22, 2023 12-08 PM.pdf · uploaded 22 Dec 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 (092023).pdf · uploaded 5 Jan 2024Source
- 5 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same4 Separate Bank Account (1).pdf · uploaded 5 Jan 2024Source
- 6 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same4 Separate Bank Account (2).pdf · uploaded 5 Jan 2024Source
- 3 Copy of Layout Approval (in case of layout)HPSC0036.pdf · uploaded 15 Apr 2024Source
- 23 Building Plan Approval / NA Order for plotted developmentHPSC0037.pdf · uploaded 15 Apr 2024Source
- 24 Building Plan Approval / NA Order for plotted developmentHPSC0038.pdf · uploaded 15 Apr 2024Source
- 25 Building Plan Approval / NA Order for plotted developmentHPSC0039.pdf · uploaded 15 Apr 2024Source
- 26 Building Plan Approval / NA Order for plotted developmentHPSC0040.pdf · uploaded 15 Apr 2024Source
- 27 Building Plan Approval / NA Order for plotted developmentHPSC0041.pdf · uploaded 15 Apr 2024Source
- 28 Building Plan Approval / NA Order for plotted developmentHPSC0042.pdf · uploaded 15 Apr 2024Source
- 29 Building Plan Approval / NA Order for plotted developmentHPSC0042.pdf · uploaded 15 Apr 2024Source
- 30 Building Plan Approval / NA Order for plotted developmentHPSC0044.pdf · uploaded 15 Apr 2024Source
- 31 Building Plan Approval / NA Order for plotted developmentHPSC0045.pdf · uploaded 15 Apr 2024Source
- 32 Building Plan Approval / NA Order for plotted developmentHPSC0046.pdf · uploaded 15 Apr 2024Source
- 5 Commencement Certificates / NA Order for plotted development20240411003233.pdf · uploaded 15 Apr 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 (March'24) Final.pdf · uploaded 7 May 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 (March'24) Final.pdf · uploaded 7 May 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 (March'24) Final.pdf · uploaded 7 May 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)AR.pdf · uploaded 20 Jul 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)ER.pdf · uploaded 20 Jul 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA - converted.pdf · uploaded 20 Jul 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Prithvi Buildcon - Form 3.pdf · uploaded 1 Aug 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Sep 24.pdf · uploaded 7 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Sep 24.pdf · uploaded 7 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Sep 24.pdf · uploaded 7 Jan 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Dec 24.pdf · uploaded 20 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Dec 24.pdf · uploaded 20 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Dec 24.pdf · uploaded 24 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Prithvi Buildcon - From-1 - Architect Certificate.pdf · uploaded 22 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Prithvi Buildcon - From-3 - CA Certificate compressed.pdf · uploaded 22 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Prithvi Buildcon - From-2 - Engineer's Certificate.pdf · uploaded 22 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryPrithvi Buildcon_compressed.pdf · uploaded 22 Apr 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 20 Jul 2025Source
- Withdrawal Update Form 1Form-1 - Architect Certificate (Prithvi Buildcon).pdf · uploaded 27 Oct 2025Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 27 Oct 2025Source
- Withdrawal Update Form 3Form-3 - CA Certificate (Prithvi Buildcon).pdf · uploaded 27 Oct 2025Source
- Form 5 (FY 2024-2025)PRITHVI BUILDCON(FORM 5).pdf · uploaded 27 Oct 2025Source
- Withdrawal Update Form 1Form-1 - Architect Certificate (Prithvi Buildcon).pdf · uploaded 26 Dec 2025Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 26 Dec 2025Source
- Withdrawal Update Form 3From 3 september 25.pdf · uploaded 26 Dec 2025Source
- Form 2A (FY 2023-2024)FORM 2A MARCH 24.pdf · uploaded 26 Dec 2025Source
- Form 2A (FY 2024-2025)FORM 2A MARCH 25.pdf · uploaded 26 Dec 2025Source
- Form 5 (FY 2023-2024)VCAN and ASSOCIATES LLP.pdf · uploaded 9 Jan 2026Source
- Withdrawal Update Form 1FM1.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 2Form-2 - Engineering Certificate Q3 (Buildcon).pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 3Form-3 - CA Certificate Q3 Buildcon.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 1Form-1 - Prithvi Buildcon.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 2Form-2 - Prithvi Buildcon.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 3Form_3.pdf · uploaded 29 Apr 2026Source
- Form 2A (FY 2025-2026)Form 2A FY-2025-2026 - Prithvi Paradise.pdf · uploaded 22 Jun 2026Source
- Withdrawal Update Form 1Form 1 (Architects Certificate).PDF · uploaded 24 Jul 2026Source
- Withdrawal Update Form 2Form-2 - Prithvi Buildcon.pdf · uploaded 24 Jul 2026Source
- Withdrawal Update Form 3Form-3 - Prithvi Buildcon.pdf · uploaded 24 Jul 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 4 Aug 2026Source
Technical
- DocumentLayput Plan_compressed.pdf · uploaded 29 May 2023Source
- DocumentHPSCANNER4404_compressed.pdf · uploaded 29 May 2023Source
- DocumentHPSCANNER4406_compressed.pdf · uploaded 29 May 2023Source
- DocumentHPSCANNER4407_compressed.pdf · uploaded 29 May 2023Source
- DocumentHPSCANNER4408_compressed.pdf · uploaded 29 May 2023Source
- Documentsanction plan 1_compressed.pdf · uploaded 29 May 2023Source
- Documentsanction plan 2_compressed.pdf · uploaded 29 May 2023Source
- DocumentHPSCANNER4409.pdf · uploaded 29 May 2023Source
- Document1 Copy of Layout Approval (in case of layout) (1).pdf · uploaded 8 Jun 2023Source
- Document0scan (2)_compressed.pdf · uploaded 4 Jul 2023Source
- Document0scan (3)_compressed.pdf · uploaded 4 Jul 2023Source
- Document0scan (4)_compressed.pdf · uploaded 4 Jul 2023Source
- Document0scan (5)_compressed.pdf · uploaded 4 Jul 2023Source
- Document0scan (6)_compressed.pdf · uploaded 4 Jul 2023Source
- Document0scan (7)_compressed.pdf · uploaded 4 Jul 2023Source
- Documentscan 033_compressed.pdf · uploaded 19 Oct 2023Source
- Documentscan 034_compressed.pdf · uploaded 19 Oct 2023Source
- Documentscan 035_compressed.pdf · uploaded 19 Oct 2023Source
- Documentscan 036_compressed.pdf · uploaded 19 Oct 2023Source
- Documentscan 037_compressed.pdf · uploaded 19 Oct 2023Source
- Documentscan 038_compressed.pdf · uploaded 19 Oct 2023Source
- Documentscan 039_compressed.pdf · uploaded 19 Oct 2023Source
- Documentscan 040_compressed.pdf · uploaded 19 Oct 2023Source
- Documentscan 041_compressed.pdf · uploaded 19 Oct 2023Source
- DocumentHPSC0036.pdf · uploaded 15 Apr 2024Source
- DocumentHPSC0037.pdf · uploaded 15 Apr 2024Source
- DocumentHPSC0038.pdf · uploaded 15 Apr 2024Source
- DocumentHPSC0039.pdf · uploaded 15 Apr 2024Source
- DocumentHPSC0040.pdf · uploaded 15 Apr 2024Source
- DocumentHPSC0041.pdf · uploaded 15 Apr 2024Source
- DocumentHPSC0042.pdf · uploaded 15 Apr 2024Source
- DocumentHPSC0042.pdf · uploaded 15 Apr 2024Source
- DocumentHPSC0044.pdf · uploaded 15 Apr 2024Source
- DocumentHPSC0045.pdf · uploaded 15 Apr 2024Source
- DocumentHPSC0046.pdf · uploaded 15 Apr 2024Source
- DocumentPlan - 18-06-2025.pdf · uploaded 21 Jul 2025Source
- DocumentPlan Wing A - 18-06-2025 - 1.pdf · uploaded 21 Jul 2025Source
- DocumentPlan Wing A - 18-06-2025.pdf · uploaded 21 Jul 2025Source
- DocumentPlan Wing A - Sec and Ele 18-06-2025.pdf · uploaded 21 Jul 2025Source
- DocumentPlan Wing B -18-06-2025 - 1.pdf · uploaded 21 Jul 2025Source
- DocumentPlan Wing B - 18-06-2025.pdf · uploaded 21 Jul 2025Source
- DocumentPlan Wing B - Sec and Ele 18-06-2025.pdf · uploaded 21 Jul 2025Source
- DocumentPlan Comm Bldg -18-06-2025 - 1.pdf · uploaded 21 Jul 2025Source
- DocumentPlan Comm Bldg -18-06-2025.pdf · uploaded 21 Jul 2025Source
- DocumentParking - 18-06-2025.pdf · uploaded 21 Jul 2025Source
- Documentscan 1128.pdf · uploaded 17 Feb 2026Source
- Documentscan 1128.pdf · uploaded 17 Feb 2026Source
- Documentscan 1129.pdf · uploaded 17 Feb 2026Source
- Documentscan 1130.pdf · uploaded 17 Feb 2026Source
- Documentscan 1131.pdf · uploaded 17 Feb 2026Source
- Documentscan 1132.pdf · uploaded 17 Feb 2026Source
- Documentscan 1133.pdf · uploaded 17 Feb 2026Source
- Documentscan 1134.pdf · uploaded 17 Feb 2026Source
- Documentscan 1135.pdf · uploaded 17 Feb 2026Source
- Documentscan 1136.pdf · uploaded 17 Feb 2026Source
- Documentscan 1137.pdf · uploaded 17 Feb 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel Hissa No.2, S No 130
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK Developer Share, 2BHK Landowner Share, Off Developer Share, Off Landowner Share, Shop Landowner Share105 units in all
- Address
- S No 130, Hissa No.2, NH4 Service Road, Near Jai Malhar HotelPIN 411057
- Village
- Tathwade, Mulshi taluka
- Location
- 18.61528, 73.77215
- Land area for this project
- 2,500 sq m (26,910 sq ft)
- Permissible built-up area
- 11,586 sq m (1,24,707 sq ft)
- Sanctioned built-up area
- 11,584 sq m (1,24,689 sq ft)
- Designated bank account
- 203
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S No 130, Hissa No.2
Boundaries
- North
- S No 130-1
- South
- S No 134-2
- East
- S No 134-1
- West
- S No 131
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking105 units
78 of 105 units booked (74%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A | 2BHK Developer Share | 67.26 sq m · 724 sq ft | 2 | 2 |
| A | 2BHK Developer Share | 69.86 sq m · 752 sq ft | 3 | 3 |
| A | 2BHK Developer Share | 71.07 sq m · 765 sq ft | 29 | 28 |
| A | 2BHK Landowner Share | 67.26 sq m · 724 sq ft | 2 | 0 |
| A | 2BHK Landowner Share | 69.86 sq m · 752 sq ft | 1 | 0 |
| A | 2BHK Landowner Share | 71.07 sq m · 765 sq ft | 3 | 0 |
| B | 2BHK Developer Share | 60.02 sq m · 646 sq ft | 4 | 4 |
| B | 2BHK Developer Share | 66.15 sq m · 712 sq ft | 4 | 4 |
Show all 22 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| B | 2BHK Developer Share | 71.07 sq m · 765 sq ft | 28 | 28 |
| B | 2BHK Landowner Share | 69.86 sq m · 752 sq ft | 4 | 0 |
| B | 2BHK Landowner Share | 71.07 sq m · 765 sq ft | 4 | 0 |
| Commercial | Off Developer Share | 47.38 sq m · 510 sq ft | 3 | 2 |
| Commercial | Off Developer Share | 47.66 sq m · 513 sq ft | 1 | 0 |
| Commercial | Off Developer Share | 48.31 sq m · 520 sq ft | 3 | 1 |
| Commercial | Off Developer Share | 49.15 sq m · 529 sq ft | 4 | 2 |
| Commercial | Off Developer Share | 58.06 sq m · 625 sq ft | 2 | 2 |
| Commercial | Off Developer Share | 63.17 sq m · 680 sq ft | 3 | 2 |
| Commercial | Off Landowner Share | 47.66 sq m · 513 sq ft | 1 | 0 |
| Commercial | Off Landowner Share | 49.15 sq m · 529 sq ft | 1 | 0 |
| Commercial | Off Landowner Share | 58.06 sq m · 625 sq ft | 1 | 0 |
| Commercial | Shop Landowner Share | 126.53 sq m · 1,362 sq ft | 1 | 0 |
| Commercial | Shop Landowner Share | 173.63 sq m · 1,869 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals10
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Yogesh Manakshe | — |
| Architect | Yogesh Shankarlal Manakshe | — |
| Chartered accountant | CA GaneshTapdiya | — |
| Chartered accountant | Mahesh Omprakash Chandak | — |
| Chartered accountant | Sachin K Mishra | — |
| Engineer | Amol Prabhakar Jambhale | — |
| Engineer | Nagesh Shantilal Raut | — |
| Engineer | Nitin Patil | — |
| Engineer | Santosh Mule | — |
| Registered real estate agent | Tarun Suresh Agarwal | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Tathwade
- Bhagawati ChambersRERA PC1260002601422
- SiennaRERA PC1260002601395
- Avenue 7RERA PM1260002601199
- The PrivveRERA PM1260002600993
- Oriana WorldRERA PR1261012600520
- Alpine 21RERA PR1260002600172
- 6 BoulevardRERA PR1261012600142
- NeopolisRERA PR1260002600009
All 171 projects in Tathwade · Compare Prithvi Paradise with another project