33 Central Avenue

Deedo IDDP-PUN-W09X

Completion was pushed back 4 months, to Apr 2030; no MahaRERA orders on record; 18% of its units are booked.

Tathwade, Pune 411033 · Property rates in Tathwade · by Eisha Properties Unit 5

DeliveryExtended 4 moPromised Dec 2029 · now due Apr 2030RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales18% booked86 of 474 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2030

  • P52100056399Registered 31 May 2024, completion promised 31 Dec 2028, revised to 30 Apr 2029.
  • PR1261012502172Registered 23 Jan 2026, completion promised 31 Dec 2029, revised to 30 Apr 2030.

No extension certificate on record.

2 registrations · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrations2
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210005639931 May 202431 Dec 202830 Apr 2029Eisha Properties Unit 5Project page
PR126101250217223 Jan 202631 Dec 202930 Apr 2030Eisha Properties Unit 5Project page
Documents205

2 documents held by Deedo, 203 filings listed on MahaRERA's project page

Registration certificate (2)

  • Registration certificateP52100056399 · 14 Aug 2026ViewSource
  • Registration certificatePR1261012502172 · 7 Oct 2026ViewSource

Finance

  • PAN CardP52100056399 · EISHA Properties PAN Card.PDF · uploaded 8 May 2024Source
  • Other – FinanceP52100056399 · Area Share Declaration.pdf · uploaded 13 May 2024Source
  • Other – FinanceP52100056399 · One Rera Declaration.pdf · uploaded 14 May 2024Source
  • PAN CardPR1261012502172 · EISHA Properties PAN Card.PDF · uploaded 17 Dec 2025Source
  • OthersPR1261012502172 · Format D - DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf · uploaded 9 Jan 2026Source
  • OthersPR1261012502172 · Declaration for landowner Consideration.pdf · uploaded 21 Jan 2026Source
Show all 205 documentsShow fewer documents

Legal

  • Legal Title reportP52100056399 · Search Report.pdf · uploaded 8 May 2024Source
  • Other – LegalP52100056399 · Area Share Declaration.pdf · uploaded 11 May 2024Source
  • Declaration Form BP52100056399 · Form B Promoter.PDF · uploaded 11 May 2024Source
  • OthersP52100056399 · Form B by Promoter.PDF · uploaded 30 Sep 2024Source
  • OthersP52100056399 · Encumbrances Declaration Legal.PDF · uploaded 30 Sep 2024Source
  • Declaration Form BP52100056399 · Form B by Promoter.PDF · uploaded 21 Oct 2024Source
  • Declaration Form BPR1261012502172 · Eisha Power of Attorney.pdf · uploaded 16 Dec 2025Source
  • OthersPR1261012502172 · EISHA PROPERTIES PARTNERSHIP DEED.pdf · uploaded 5 Jan 2026Source
  • Declaration Form BPR1261012502172 · FORM B Promoter - Declaration.pdf · uploaded 5 Jan 2026Source
  • Declaration Form BPR1261012502172 · Development Agreement 5270-08.pdf · uploaded 5 Jan 2026Source
  • OthersPR1261012502172 · Annexure A - MR KISHOR SHANKAR GARVE.pdf · uploaded 7 Jan 2026Source
  • OthersPR1261012502172 · Annexure A - MR VINAYAK KISHOR GARVE.pdf · uploaded 7 Jan 2026Source
  • OthersPR1261012502172 · ANNEXURE A - BHARAT NAGORI.pdf · uploaded 7 Jan 2026Source
  • OthersPR1261012502172 · LLP Agreement of EPU 5.pdf · uploaded 7 Jan 2026Source
  • OthersPR1261012502172 · Annexure A - MR VIRAL BHARAT NAGORI.pdf · uploaded 7 Jan 2026Source
  • OthersPR1261012502172 · ANNEXURE A - BHAVEN NANAWATI.pdf · uploaded 7 Jan 2026Source
  • OthersPR1261012502172 · ANNEXURE A - MALAV SHAH.pdf · uploaded 7 Jan 2026Source
  • OthersPR1261012502172 · We Home Properties LLP Reconstitusion Deed 23-08-2024.pdf · uploaded 17 Jan 2026Source
  • OthersPR1261012502172 · Vrishali Deshpande- Annexure A.pdf · uploaded 17 Jan 2026Source
  • OthersPR1261012502172 · Vishal Deshpande- Annexure A.pdf · uploaded 17 Jan 2026Source
  • Declaration Form BPR1261012502172 · Revised - Search Title Report.pdf · uploaded 17 Jan 2026Source
  • OthersPR1261012502172 · General POA (6699-2024)-1.pdf · uploaded 20 Jan 2026Source
  • OthersPR1261012502172 · General POA (6699-2024)-2.pdf · uploaded 20 Jan 2026Source

Migrated

  • 1 PAN CardP52100056399 · EISHA Properties PAN Card.PDF · uploaded 8 May 2024Source
  • 1 Copy of the legal title reportP52100056399 · Search Report.pdf · uploaded 8 May 2024Source
  • 1 Copy of Layout Approval (in case of layout)P52100056399 · Layout Plan.pdf · uploaded 8 May 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100056399 · Floor Plan F3.pdf · uploaded 8 May 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100056399 · Floor Plan F3 Refuge.pdf · uploaded 8 May 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100056399 · Commcement Certificate.pdf · uploaded 8 May 2024Source
  • 1 Proforma of Allotment letterP52100056399 · Allotment Letter.pdf · uploaded 8 May 2024Source
  • 1 a Details of encumbrances concerned to FinanceP52100056399 · Encumbrances Declaration Finance.PDF · uploaded 11 May 2024Source
  • 2 a Details of encumbrances concerned to FinanceP52100056399 · Encumbrances Declaration Legal.PDF · uploaded 11 May 2024Source
  • 1 b Details of encumbrances concerned to LegalP52100056399 · Encumbrances Declaration Finance.PDF · uploaded 11 May 2024Source
  • 2 b Details of encumbrances concerned to LegalP52100056399 · Encumbrances Declaration Legal.PDF · uploaded 11 May 2024Source
  • 1 Declaration about Commencement CertificateP52100056399 · Declaration Commencement Certificate.PDF · uploaded 11 May 2024Source
  • 1 Declaration in FORM BP52100056399 · Form B Promoter.PDF · uploaded 11 May 2024Source
  • 1 CERSAI detailsP52100056399 · CERSAI Declaration.PDF · uploaded 11 May 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP52100056399 · Disclosure of Other RERA Kishor G.PDF · uploaded 11 May 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsP52100056399 · Disclosure of Other RERA Vinayak G.PDF · uploaded 11 May 2024Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsP52100056399 · Disclosure of Other RERA Nagori.PDF · uploaded 11 May 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100056399 · Seperate Bank Accout Declaration.PDF · uploaded 11 May 2024Source
  • 1 Deviation Report with respect to Allotment letterP52100056399 · Declaration Allotment Letter Deviation.PDF · uploaded 11 May 2024Source
  • 1 Other – LegalP52100056399 · Area Share Declaration.pdf · uploaded 11 May 2024Source
  • 1 Other – TechnicalP52100056399 · Area Share Declaration.pdf · uploaded 11 May 2024Source
  • 1 Other – FinanceP52100056399 · Area Share Declaration.pdf · uploaded 13 May 2024Source
  • 2 Other – FinanceP52100056399 · One Rera Declaration.pdf · uploaded 14 May 2024Source
  • 2 Other – TechnicalP52100056399 · One Rera Declaration.pdf · uploaded 14 May 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100056399 · CA Form 3 Eisha.pdf · uploaded 23 May 2024Source
  • 1 Proforma of Agreement for saleP52100056399 · Agreement to Sale Draft Eisha New.pdf · uploaded 23 May 2024Source
  • 1 Deviation Report with respect to model copy of AgreementP52100056399 · Deviation Report Agreement to Sale.pdf · uploaded 24 May 2024Source
  • 1 Copy of Layout Approval (in case of layout)P52100056399 · Layout.pdf · uploaded 7 Oct 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100056399 · Commencement Certificate.pdf · uploaded 7 Oct 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100056399 · Floor Plan.pdf · uploaded 7 Oct 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100056399 · Floor Plan and Refuge.pdf · uploaded 7 Oct 2024Source
  • 1 a Details of encumbrances concerned to FinanceP52100056399 · Encumbrances Declaration Legal.PDF · uploaded 21 Oct 2024Source
  • 1 Declaration in FORM BP52100056399 · Form B by Promoter.PDF · uploaded 21 Oct 2024Source
  • 1 b Details of encumbrances concerned to LegalP52100056399 · Encumbrances Declaration Legal.PDF · uploaded 21 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100056399 · Form 1 Architect Certificate Jun 2024.pdf · uploaded 22 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100056399 · Form 2 Engineer Certificate Mar 2024.pdf · uploaded 22 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100056399 · Form 2 Engineer Certificate Jun 2024.pdf · uploaded 22 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100056399 · Form 2 Engineer Certificate Sept 2024.pdf · uploaded 22 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryP52100056399 · Sold Unsold Inventory.pdf · uploaded 25 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100056399 · CA Form 3 June 2024.pdf · uploaded 26 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100056399 · FORM 3 EISHA Sept 24.pdf · uploaded 8 Mar 2025Source
  • 1 Copy of Layout Approval (in case of layout)P52100056399 · Layout F3.pdf · uploaded 20 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100056399 · Form 1 Architect Certificate Mar 25.pdf · uploaded 20 Mar 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100056399 · CA Form 3 Mar 25.pdf · uploaded 20 Mar 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100056399 · Basement Parking Plan F3.pdf · uploaded 20 Mar 2025Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52100056399 · Commencement Certificate.pdf · uploaded 20 Mar 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100056399 · Ground and Podium Parking.pdf · uploaded 20 Mar 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100056399 · Building F3 Floor Plan.pdf · uploaded 20 Mar 2025Source
  • 3 Building Plan Approval / NA Order for plotted developmentP52100056399 · Building F3 Floor Plan 6,11,16,21.pdf · uploaded 20 Mar 2025Source
  • 4 Building Plan Approval / NA Order for plotted developmentP52100056399 · Building F3 Floor Plan 26.pdf · uploaded 20 Mar 2025Source
  • 1 Disclosure of sold/ booked inventoryP52100056399 · Sold Inventory Mar 25.pdf · uploaded 20 Mar 2025Source
  • Withdrawal Update Form 1P52100056399 · Form 1 Architect Certificate Mar 25.pdf · uploaded 11 Sep 2025Source
  • Withdrawal Update Form 2P52100056399 · Form 2 Engineer Certificate Mar 25.PDF · uploaded 11 Sep 2025Source
  • Withdrawal Update Form 3P52100056399 · CA Form 3 Mar 25.pdf · uploaded 11 Sep 2025Source
  • Form 2A (FY 2024-2025)P52100056399 · Form 2A Quality Assurance 24-25.PDF · uploaded 11 Sep 2025Source
  • Form 1P52100056399 · Form 1 Architect Certificate Dec 24.pdf · uploaded 20 Sep 2025Source
  • Form 1P52100056399 · Form 1 Architect Certificate Mar 25.pdf · uploaded 20 Sep 2025Source
  • Form 1P52100056399 · Form 1 Architect Certificate Jun 2024.pdf · uploaded 20 Sep 2025Source
  • Form 2P52100056399 · Form 2 Engineer Certificate Dec 24.pdf · uploaded 20 Sep 2025Source
  • Form 2P52100056399 · Form 2 Engineer Certificate Mar 25.pdf · uploaded 20 Sep 2025Source
  • Form 2P52100056399 · Form 2 Engineer Certificate Jun 2024.pdf · uploaded 20 Sep 2025Source
  • Form 3P52100056399 · Form 3 CA Certificate Dec 24.pdf · uploaded 20 Sep 2025Source
  • Form 3P52100056399 · Form 3 CA Certificate Mar 25.pdf · uploaded 20 Sep 2025Source
  • Form 3P52100056399 · Form 3 CA Certificate June 2024.pdf · uploaded 20 Sep 2025Source
  • Disclosure of Sold and Booked InventoryP52100056399 · Sold Inventory Dec 24.pdf · uploaded 20 Sep 2025Source
  • Disclosure of Sold and Booked InventoryP52100056399 · Sold Inventory Mar 25.pdf · uploaded 20 Sep 2025Source
  • Disclosure of Sold and Booked InventoryP52100056399 · Sold Unsold Inventory.pdf · uploaded 20 Sep 2025Source
  • Withdrawal Update Form 1P52100056399 · Form 1 Architect Certificate June 25.pdf · uploaded 20 Sep 2025Source
  • Withdrawal Update Form 2P52100056399 · Form 2 Engineer Certificate Jun 25.pdf · uploaded 20 Sep 2025Source
  • Withdrawal Update Form 3P52100056399 · Form 3 CA Certificate June 25.pdf · uploaded 20 Sep 2025Source
  • Form 5 (FY 2024-2025)P52100056399 · Form 5 CA Certificate 24-25.pdf · uploaded 20 Sep 2025Source
  • Withdrawal Update Form 1P52100056399 · Form 1.pdf · uploaded 29 Nov 2025Source
  • Withdrawal Update Form 2P52100056399 · Form 2.pdf · uploaded 29 Nov 2025Source
  • Withdrawal Update Form 3P52100056399 · Form 3.pdf · uploaded 29 Nov 2025Source
  • Form 2A (FY 2025-2026)PR1261012502172 · Form 2A.pdf · uploaded 2 Apr 2026Source
  • Withdrawal Update Form 1P52100056399 · FORM 1 EISHA F3 Mar 26.pdf · uploaded 8 Aug 2026Source
  • Withdrawal Update Form 2P52100056399 · FORM 2 ESHA F3 Mar 26.pdf · uploaded 8 Aug 2026Source
  • Withdrawal Update Form 3P52100056399 · FORM-3 EISHA F3 MARCH 2026.pdf · uploaded 8 Aug 2026Source
  • Withdrawal Update Form 1PR1261012502172 · FORM 1 EISHA F1 Mar 26.pdf · uploaded 8 Aug 2026Source
  • Withdrawal Update Form 2PR1261012502172 · FORM 2 ESHA F1 Mar 26.pdf · uploaded 8 Aug 2026Source
  • Withdrawal Update Form 3PR1261012502172 · FORM-3 EISHA F1 MARCH 2026.pdf · uploaded 8 Aug 2026Source
  • Withdrawal Update Form 1P52100056399 · FORM 1 EISHA F3 June 26.pdf · uploaded 11 Aug 2026Source
  • Withdrawal Update Form 2P52100056399 · FORM 2 ESHA F3 June 26.pdf · uploaded 11 Aug 2026Source
  • Withdrawal Update Form 3P52100056399 · FORM-3 EISHA F3 JUNE 2026.pdf · uploaded 11 Aug 2026Source
  • Withdrawal Update Form 1PR1261012502172 · FORM 1 EISHA F1 June 26.pdf · uploaded 11 Aug 2026Source
  • Withdrawal Update Form 2PR1261012502172 · FORM 2 ESHA F1 June 26.pdf · uploaded 11 Aug 2026Source
  • Withdrawal Update Form 3PR1261012502172 · FORM-3 EISHA F1 JUNE 2026.pdf · uploaded 11 Aug 2026Source
  • Withdrawal Update Form 1P52100056399 · FORM 1 EISHA F3 Dec 25.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 1P52100056399 · FORM 1 EISHA F3 Dec 25.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 2P52100056399 · FORM 2 ESHA F3 Dec 25.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 2P52100056399 · FORM 2 ESHA F3 Dec 25.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 3P52100056399 · FORM 2 ESHA F3 Dec 25.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 3P52100056399 · FORM-3 EISHA F3 Dec 2025.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 1PR1261012502172 · FORM 1 EISHA F1 June 26.pdf · uploaded 20 Aug 2026Source
  • Withdrawal Update Form 1PR1261012502172 · FORM 1 EISHA F1 June 26.pdf · uploaded 20 Aug 2026Source
  • Withdrawal Update Form 2PR1261012502172 · FORM 2 ESHA F1 June 26.pdf · uploaded 20 Aug 2026Source
  • Withdrawal Update Form 2PR1261012502172 · FORM 2 ESHA F1 June 26.pdf · uploaded 20 Aug 2026Source
  • Withdrawal Update Form 3PR1261012502172 · FORM-3 EISHA F1 JUNE 2026.pdf · uploaded 20 Aug 2026Source
  • Withdrawal Update Form 3PR1261012502172 · FORM-3 EISHA F1 JUNE 2026.pdf · uploaded 20 Aug 2026Source
  • Form 5 (FY 2025-2026)P52100056399 · EISHA F3 FORM-5 2025 - 2026.pdf · uploaded 19 Sep 2026Source

Technical

  • DocumentP52100056399 · Layout Plan.pdf · uploaded 8 May 2024Source
  • DocumentP52100056399 · Floor Plan F3.pdf · uploaded 8 May 2024Source
  • DocumentP52100056399 · Floor Plan F3 Refuge.pdf · uploaded 8 May 2024Source
  • Other – TechnicalP52100056399 · Area Share Declaration.pdf · uploaded 11 May 2024Source
  • Other – TechnicalP52100056399 · One Rera Declaration.pdf · uploaded 14 May 2024Source
  • DocumentP52100056399 · New Layout Eisha.pdf · uploaded 30 Sep 2024Source
  • DocumentP52100056399 · Floor Plan F3.pdf · uploaded 30 Sep 2024Source
  • DocumentP52100056399 · Floor Plan F3 Refuge.pdf · uploaded 30 Sep 2024Source
  • DocumentP52100056399 · Commcement Certificate.pdf · uploaded 30 Sep 2024Source
  • OthersP52100056399 · Layout.pdf · uploaded 4 Oct 2024Source
  • OthersP52100056399 · Floor Plan.pdf · uploaded 4 Oct 2024Source
  • OthersP52100056399 · Floor Plan and Refuge.pdf · uploaded 4 Oct 2024Source
  • DocumentP52100056399 · Layout.pdf · uploaded 7 Oct 2024Source
  • DocumentP52100056399 · Floor Plan.pdf · uploaded 7 Oct 2024Source
  • DocumentP52100056399 · Floor Plan and Refuge.pdf · uploaded 7 Oct 2024Source
  • DocumentP52100056399 · Layout F3.pdf · uploaded 20 Mar 2025Source
  • DocumentP52100056399 · Ground and Podium Parking.pdf · uploaded 20 Mar 2025Source
  • DocumentP52100056399 · Building F3 Floor Plan.pdf · uploaded 20 Mar 2025Source
  • DocumentP52100056399 · Building F3 Floor Plan 6,11,16,21.pdf · uploaded 20 Mar 2025Source
  • DocumentP52100056399 · Building F3 Floor Plan 26.pdf · uploaded 20 Mar 2025Source
  • DocumentP52100056399 · Layout.pdf · uploaded 17 Oct 2025Source
  • DocumentP52100056399 · Basement Floor Parking.pdf · uploaded 17 Oct 2025Source
  • DocumentP52100056399 · Ground and Podium Parking.pdf · uploaded 17 Oct 2025Source
  • DocumentP52100056399 · F3 Floor Plan.pdf · uploaded 17 Oct 2025Source
  • DocumentP52100056399 · F3 Refuge Floor Plan.pdf · uploaded 17 Oct 2025Source
  • DocumentP52100056399 · F3 Elevation and Section Floor.pdf · uploaded 17 Oct 2025Source
  • DocumentP52100056399 · Layout.pdf · uploaded 10 Dec 2025Source
  • DocumentP52100056399 · Basement Floor Parking.pdf · uploaded 10 Dec 2025Source
  • DocumentP52100056399 · Ground and Podium Parking.pdf · uploaded 10 Dec 2025Source
  • DocumentP52100056399 · F3 Floor Plan.pdf · uploaded 10 Dec 2025Source
  • DocumentP52100056399 · F3 Refuge Floor Plan.pdf · uploaded 10 Dec 2025Source
  • DocumentPR1261012502172 · Basement Floor Parking.pdf · uploaded 19 Dec 2025Source
  • DocumentPR1261012502172 · Ground and Podium Parking.pdf · uploaded 19 Dec 2025Source
  • DocumentPR1261012502172 · F1 Floor Plan.pdf · uploaded 19 Dec 2025Source
  • DocumentPR1261012502172 · F1 6 and 9 Floor Plan.pdf · uploaded 19 Dec 2025Source
  • DocumentPR1261012502172 · F1 Elevation and Section.pdf · uploaded 19 Dec 2025Source
  • DocumentPR1261012502172 · Layout.pdf · uploaded 31 Dec 2025Source
  • OthersPR1261012502172 · Format D - DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf · uploaded 5 Jan 2026Source
  • DocumentPR1261012502172 · Layout - Highlighted.pdf · uploaded 9 Jan 2026Source
  • DocumentPR1261012502172 · Annexure A.pdf · uploaded 9 Jan 2026Source
  • OthersPR1261012502172 · CC Verification.pdf · uploaded 17 Jan 2026Source
  • OthersPR1261012502172 · EISHA F1 Parking Statement_260117_102359.pdf · uploaded 17 Jan 2026Source
  • OthersPR1261012502172 · Highlighted Basement Floor plan_.pdf · uploaded 17 Jan 2026Source
  • OthersPR1261012502172 · Highlighted Ground and Podium Floor parking plan.pdf · uploaded 17 Jan 2026Source
  • DocumentPR1261012502172 · Wing F1 F2 F3 Basement Floor Plan.pdf · uploaded 18 Mar 2026Source
  • DocumentPR1261012502172 · Wing F1 F2 F3 Ground and Podium Floor Plan.pdf · uploaded 18 Mar 2026Source
  • DocumentPR1261012502172 · Wing F1 Typical Floor Plan.pdf · uploaded 18 Mar 2026Source
  • DocumentPR1261012502172 · Wing F1 Refuge Floor Plan.pdf · uploaded 18 Mar 2026Source
  • DocumentPR1261012502172 · Wing F1 Elevation Plan.pdf · uploaded 18 Mar 2026Source
  • DocumentPR1261012502172 · Wing F1 Section Plan.pdf · uploaded 18 Mar 2026Source
  • DocumentPR1261012502172 · Sanction Plan_compressed.pdf · uploaded 20 Mar 2026Source
  • DocumentPR1261012502172 · SANCTION PLAN 1.pdf · uploaded 20 Aug 2026Source
  • DocumentPR1261012502172 · SANCTION PLAN 2.pdf · uploaded 20 Aug 2026Source
  • DocumentPR1261012502172 · SANCTION PLAN 3.pdf · uploaded 20 Aug 2026Source
  • DocumentPR1261012502172 · SANCTION PLAN 4.pdf · uploaded 20 Aug 2026Source
  • DocumentPR1261012502172 · SANCTION PLAN 5.pdf · uploaded 20 Aug 2026Source
  • DocumentPR1261012502172 · SANCTION PLAN 6.pdf · uploaded 20 Aug 2026Source
  • DocumentPR1261012502172 · SANCTION PLAN 7.pdf · uploaded 20 Aug 2026Source
  • DocumentPR1261012502172 · SANCTION PLAN 8.pdf · uploaded 20 Aug 2026Source
  • DocumentPR1261012502172 · SANCTION PLAN 9.pdf · uploaded 20 Aug 2026Source
  • DocumentPR1261012502172 · SANCTION PLAN 10.pdf · uploaded 20 Aug 2026Source
  • DocumentPR1261012502172 · SANCTION PLAN 12.pdf · uploaded 20 Aug 2026Source
  • DocumentPR1261012502172 · SANCTION PLAN 13.pdf · uploaded 20 Aug 2026Source
  • DocumentPR1261012502172 · SANCTION PLAN 14.pdf · uploaded 20 Aug 2026Source
  • DocumentPR1261012502172 · SANCTION PLAN 11.pdf · uploaded 21 Aug 2026Source

Technical (Architect)

  • DocumentP52100056399 · Form 1 Architect Certificate Jun 2024.pdf · uploaded 22 Oct 2024Source
  • DocumentP52100056399 · Form 1 Architect Certificate Mar 25.pdf · uploaded 20 Mar 2025Source
  • DocumentPR1261012502172 · FORM 1 EISHA F1 June 26.pdf · uploaded 11 Aug 2026Source
  • DocumentP52100056399 · FORM 1 EISHA F3 Dec 25.pdf · uploaded 12 Aug 2026Source

Technical (Engineer)

  • DocumentP52100056399 · Form 2 Engineer Certificate Mar 2024.pdf · uploaded 22 Oct 2024Source
  • DocumentP52100056399 · Form 2 Engineer Certificate Jun 2024.pdf · uploaded 22 Oct 2024Source
  • DocumentP52100056399 · Form 2 Engineer Certificate Sept 2024.pdf · uploaded 22 Oct 2024Source
  • DocumentPR1261012502172 · FORM 2 ESHA F1 June 26.pdf · uploaded 11 Aug 2026Source
  • DocumentP52100056399 · FORM 2 ESHA F3 Dec 25.pdf · uploaded 12 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 95/2, 95/3

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Phases
2
Unit types
—, 2BHK, 3BHK474 units in all
Address
95/2 & 95/3, Tathwade, TathwadePIN 411033
Village
Tathwade, Mulshi taluka
Land area for this project
2,255 sq m (24,276 sq ft)
Permissible built-up area
28,766 sq m (3,09,631 sq ft)
Sanctioned built-up area
25,251 sq m (2,71,796 sq ft)
Recreational open space
225 sq m (2,422 sq ft)
Designated bank account
76
Developed in phases
No
Also registered as
33 Central Avenue Wing F-3, 33 Central Avenue Wing F-1

Survey, CTS, gat or plot numbers

95/295/3Survey No 95/2

Land as published on MahaRERA's project page

95/2 & 95/3

Boundaries

North
Internal Road
South
Internal Road
East
Building F1
West
Internal Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking474 units

86 of 474 units booked (18%), as the promoter reported to MahaRERA

— · 247 units2BHK · 176 units3BHK · 51 units
RERABuildingTypeCarpet areaUnitsBooked
PR1261012502172Building F1——247—
P52100056399Wing F-32BHK60.44 sq m · 651 sq ft2613
P52100056399Wing F-32BHK61.61 sq m · 663 sq ft5229
P52100056399Wing F-32BHK62.71 sq m · 675 sq ft2614
P52100056399Wing F-32BHK64.13 sq m · 690 sq ft211
P52100056399Wing F-32BHK65.02 sq m · 700 sq ft5119
P52100056399Wing F-33BHK85.96 sq m · 925 sq ft5110

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals9

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectMilind Patil—PR1261012502172
ArchitectMilind Patil—P52100056399
Chartered accountantJsg & Co—PR1261012502172
Chartered accountantJsg & Co—P52100056399
EngineerMilind Bhagwat Pokharkar—P52100056399
EngineerPrathamesh Sugate—P52100056399
EngineerVenkangouda Jadiyappagoudar—PR1261012502172
EngineerVenkangouda V Jadiyappagoudar—PR1261012502172
EngineerVenkangouda V Jadiyappagoudar—P52100056399

Source: MahaRERA project page. Contact details are not shown.