Teerth Avila
Deedo IDDP-PUN-7RCBMahaRERA shows it completed; no MahaRERA orders on record; 38% of its units are booked.
Sus, Pune 411021 · Property rates in Sus · by Vijay Tukaram Raundal
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 20 Apr 2022, completion promised 31 Dec 2024.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
9 buildings
Open a building to see every flat, floor by floor.
- 20jSize not on record0% booked
- 2uSize not on record0% booked
- 3uSize not on record0% booked
- B9Size not on record0% booked
- Building A21 floors · 148 units44% booked
- Building B21 floors · 142 units39% booked
- Building (P52100034662)Size not on record35% booked
- Wing C116 floors · 92 units34% booked
- Wing C216 floors · 124 units33% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100034662
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100034662 | 20 Apr 2022 | 31 Dec 2024 | 31 Dec 2024 | Vijay Tukaram Raundal | Project page |
Documents63
2 documents held by Deedo, 61 filings listed on MahaRERA's project page
Other
- OtherDate not statedView
Finance
- PAN Card1 Pan Card Vijay Raundal.pdf · uploaded 1 Apr 2022Source
Legal
- Declaration Form BForm B Affidavit - Teerth Avila.pdf · uploaded 2 Apr 2022Source
- Legal Title reportFORMAT A FINAL UPLOAD.pdf · uploaded 4 Apr 2022Source
- Legal Title reportsearch and title report -1-15 compressed.pdf · uploaded 4 Apr 2022Source
- Legal Title reportsearch and title report -16-32 compressed.pdf · uploaded 4 Apr 2022Source
- Legal Title reportsearch and title report -33-50 compressed.pdf · uploaded 4 Apr 2022Source
Show all 63 documentsShow fewer documents
Legal
- Legal Title reportsearch and title report -51-59 compressed.pdf · uploaded 4 Apr 2022Source
Migrated
- 1 PAN Card1 Pan Card Vijay Raundal.pdf · uploaded 1 Apr 2022Source
- 1 Details of encumbrances3 Self declaration Encumbrance.pdf · uploaded 1 Apr 2022Source
- 1 Commencement Certificates / NA Order for plotted development6 Commencement.pdf · uploaded 1 Apr 2022Source
- 1 Declaration about Commencement Certificate7 Format-D.pdf · uploaded 1 Apr 2022Source
- 1 Copy of Layout Approval (in case of layout)1-21.pdf · uploaded 2 Apr 2022Source
- 2 Copy of Layout Approval (in case of layout)2-21.pdf · uploaded 2 Apr 2022Source
- 3 Copy of Layout Approval (in case of layout)3-21.pdf · uploaded 2 Apr 2022Source
- 1 Building Plan Approval / NA Order for plotted development1-4 Compressed.pdf · uploaded 2 Apr 2022Source
- 2 Building Plan Approval / NA Order for plotted development5-8 Compressed.pdf · uploaded 2 Apr 2022Source
- 3 Building Plan Approval / NA Order for plotted development9-12 Compressed.pdf · uploaded 2 Apr 2022Source
- 4 Building Plan Approval / NA Order for plotted development13-16 Compressed.pdf · uploaded 2 Apr 2022Source
- 5 Building Plan Approval / NA Order for plotted development17-21 Compressed.pdf · uploaded 2 Apr 2022Source
- 1 Declaration in FORM BForm B Affidavit - Teerth Avila.pdf · uploaded 2 Apr 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect certificate.pdf · uploaded 2 Apr 2022Source
- 1 Proforma of Allotment letterDraft Allotment letter and Agreement Upload.pdf · uploaded 2 Apr 2022Source
- 1 Copy of the legal title reportFORMAT A FINAL UPLOAD.pdf · uploaded 4 Apr 2022Source
- 2 Copy of the legal title reportsearch and title report -1-15 compressed.pdf · uploaded 4 Apr 2022Source
- 3 Copy of the legal title reportsearch and title report -16-32 compressed.pdf · uploaded 4 Apr 2022Source
- 4 Copy of the legal title reportsearch and title report -33-50 compressed.pdf · uploaded 4 Apr 2022Source
- 5 Copy of the legal title reportsearch and title report -51-59 compressed.pdf · uploaded 4 Apr 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)10 Form-2.pdf · uploaded 4 Apr 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Upload FINAL.pdf · uploaded 6 Apr 2022Source
- 1 CERSAI detailsRepsonse Doc to Query 11042022.pdf · uploaded 12 Apr 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Avila.pdf · uploaded 5 Dec 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Avila.pdf · uploaded 5 Dec 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 1 Mar 2023Source
- 1 Disclosure of sold/ booked inventoryDraft Inventory Declaration.pdf · uploaded 25 Mar 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Teerth Avila.pdf · uploaded 24 Apr 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT.pdf · uploaded 26 Apr 2023Source
- 2 Declaration about Commencement CertificateDeclaration about Commencemnet Certificate Teerth avila 26042023.pdf · uploaded 26 Apr 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)AVILA RERA FORM 1.pdf · uploaded 10 Jun 2023Source
- 2 Disclosure of sold/ booked inventoryInventory details of Teerth Avila organized.pdf · uploaded 10 Jun 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA FORM 3 compressed.pdf · uploaded 10 Jun 2023Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC dated 21st Sept 23.pdf · uploaded 22 Sep 2023Source
- 1 Architect’s Certificate on Completion of Project (Form 4)Form 4 Avila Project.pdf · uploaded 25 Sep 2023Source
- 1 Proforma of Agreement for saleAvila Draft of Agreement_06-07-2023 (2).pdf · uploaded 29 Sep 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 11 Oct 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Chartered Accountant Certificate 30092023 Signed.pdf · uploaded 18 Oct 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Avila upload.pdf · uploaded 18 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Avila 3.pdf · uploaded 21 Oct 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2_TEERTH AVILA.pdf · uploaded 26 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Teerth Avila_Form 2A.pdf · uploaded 26 Oct 2023Source
- 3 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY TEERTH AVILA.pdf · uploaded 26 Oct 2023View
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFinal OC Dt 30102023.pdf · uploaded 6 Nov 2023Source
Technical
- Document1-21.pdf · uploaded 2 Apr 2022Source
- Document2-21.pdf · uploaded 2 Apr 2022Source
- Document3-21.pdf · uploaded 2 Apr 2022Source
- Document1-4 Compressed.pdf · uploaded 2 Apr 2022Source
- Document5-8 Compressed.pdf · uploaded 2 Apr 2022Source
- Document9-12 Compressed.pdf · uploaded 2 Apr 2022Source
- Document13-16 Compressed.pdf · uploaded 2 Apr 2022Source
- Document17-21 Compressed.pdf · uploaded 2 Apr 2022Source
Technical (Architect)
- Documentform 1.pdf · uploaded 11 Oct 2023Source
Technical (Engineer)
- DocumentFROM 2_TEERTH AVILA.pdf · uploaded 26 Oct 2023Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 2 Part/A/2, 2 Part/A/3
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 3BHK, Flat, Shop, 2BHK, flat506 units in all
- Address
- S. No. 127/1 & 2 Part/A/3, S No 127/1 & 2 Part/A/2, S No 127/1 & 2 Part/A/4, S No 87 Part/128 Part/A/1 Village Sus Taluka Mulshi 411021 at Sus, Mulshi, Pune 411021., Sus Road, Parkhe VastiPIN 411021
- Village
- Sus, Mulshi taluka
- Location
- 18.55119, 73.75177
- Land area for this project
- 22,926 sq m (2,46,773 sq ft)
- Permissible built-up area
- 31,731 sq m (3,41,550 sq ft)
- Sanctioned built-up area
- 31,731 sq m (3,41,550 sq ft)
- Recreational open space
- 1,986 sq m (21,378 sq ft)
- Designated bank account
- 220
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S. No. 127/1 & 2 Part/A/3, S No 127/1 & 2 Part/A/2, S No 127/1 & 2 Part/A/4, S No 87 Part/128 Part/A/1 Village Sus Taluka Mulshi 411021 at Sus, Mulshi, Pune 411021.
Boundaries
- North
- S No 128 P
- South
- Hissa No 4 and Hissa No 5 and 127-1 P
- East
- 127-2 P
- West
- Lagu S No 126
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking506 units
193 of 506 units booked (38%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building A | 3BHK | 52.23 sq m · 562 sq ft | 1 | 0 |
| Building A | 3BHK | 52.7 sq m · 567 sq ft | 2 | 1 |
| Building A | 3BHK | 53.9 sq m · 580 sq ft | 8 | 3 |
| Building A | 3BHK | 54.15 sq m · 583 sq ft | 7 | 1 |
| Building A | 3BHK | 54.38 sq m · 585 sq ft | 8 | 1 |
| Building A | 3BHK | 54.41 sq m · 586 sq ft | 8 | 2 |
| Building A | 3BHK | 54.55 sq m · 587 sq ft | 1 | 0 |
| Building A | 3BHK | 54.63 sq m · 588 sq ft | 6 | 5 |
Show all 109 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building A | 3BHK | 54.71 sq m · 589 sq ft | 8 | 2 |
| Building A | 3BHK | 55.19 sq m · 594 sq ft | 1 | 0 |
| Building A | 3BHK | 55.27 sq m · 595 sq ft | 1 | 1 |
| Building A | 3BHK | 56.28 sq m · 606 sq ft | 29 | 15 |
| Building A | 3BHK | 56.29 sq m · 606 sq ft | 2 | 0 |
| Building A | 3BHK | 56.76 sq m · 611 sq ft | 30 | 16 |
| Building A | 3BHK | 57.02 sq m · 614 sq ft | 4 | 2 |
| Building A | 3BHK | 59.24 sq m · 638 sq ft | 1 | 1 |
| Building A | 3BHK | 59.42 sq m · 640 sq ft | 6 | 2 |
| Building A | 3BHK | 59.53 sq m · 641 sq ft | 10 | 2 |
| Building A | Flat | 17.2 sq m · 185 sq ft | 3 | 0 |
| Building A | Shop | 12.06 sq m · 130 sq ft | 1 | 1 |
| Building A | Shop | 13.23 sq m · 142 sq ft | 1 | 1 |
| Building A | Shop | 14.72 sq m · 158 sq ft | 1 | 1 |
| Building A | Shop | 14.74 sq m · 159 sq ft | 2 | 2 |
| Building A | Shop | 14.74 sq m · 159 sq ft | 1 | 1 |
| Building A | Shop | 16.31 sq m · 176 sq ft | 1 | 1 |
| Building A | Shop | 16.83 sq m · 181 sq ft | 1 | 1 |
| Building A | Shop | 20.2 sq m · 217 sq ft | 3 | 2 |
| Building A | Shop | 20.26 sq m · 218 sq ft | 1 | 1 |
| Building B | 2BHK | 57.02 sq m · 614 sq ft | 4 | 2 |
| Building B | 3BHK | 52.23 sq m · 562 sq ft | 1 | 0 |
| Building B | 3BHK | 52.7 sq m · 567 sq ft | 2 | 0 |
| Building B | 3BHK | 53.9 sq m · 580 sq ft | 8 | 5 |
| Building B | 3BHK | 54.15 sq m · 583 sq ft | 7 | 0 |
| Building B | 3BHK | 54.38 sq m · 585 sq ft | 8 | 6 |
| Building B | 3BHK | 54.41 sq m · 586 sq ft | 8 | 4 |
| Building B | 3BHK | 54.63 sq m · 588 sq ft | 6 | 6 |
| Building B | 3BHK | 54.71 sq m · 589 sq ft | 8 | 4 |
| Building B | 3BHK | 54.95 sq m · 591 sq ft | 1 | 0 |
| Building B | 3BHK | 55.19 sq m · 594 sq ft | 1 | 0 |
| Building B | 3BHK | 55.27 sq m · 595 sq ft | 1 | 0 |
| Building B | 3BHK | 56.28 sq m · 606 sq ft | 29 | 9 |
| Building B | 3BHK | 56.29 sq m · 606 sq ft | 2 | 0 |
| Building B | 3BHK | 56.76 sq m · 611 sq ft | 30 | 14 |
| Building B | 3BHK | 59.24 sq m · 638 sq ft | 1 | 0 |
| Building B | 3BHK | 59.42 sq m · 640 sq ft | 6 | 0 |
| Building B | 3BHK | 59.53 sq m · 641 sq ft | 10 | 0 |
| Building B | flat | 17.2 sq m · 185 sq ft | 3 | 0 |
| Building B | Shop | 14.74 sq m · 159 sq ft | 1 | 1 |
| Building B | Shop | 18.24 sq m · 196 sq ft | 1 | 1 |
| Building B | Shop | 18.63 sq m · 201 sq ft | 2 | 2 |
| Building B | Shop | 20.87 sq m · 225 sq ft | 1 | 1 |
| Building B | Shop | 21.4 sq m · 230 sq ft | 1 | 1 |
| Wing C1 | 3BHK | 52.25 sq m · 562 sq ft | 2 | 0 |
| Wing C1 | 3BHK | 53.63 sq m · 577 sq ft | 7 | 1 |
| Wing C1 | 3BHK | 53.71 sq m · 578 sq ft | 7 | 0 |
| Wing C1 | 3BHK | 53.91 sq m · 580 sq ft | 1 | 0 |
| Wing C1 | 3BHK | 54.09 sq m · 582 sq ft | 6 | 4 |
| Wing C1 | 3BHK | 54.15 sq m · 583 sq ft | 4 | 3 |
| Wing C1 | 3BHK | 54.7 sq m · 589 sq ft | 1 | 1 |
| Wing C1 | 3BHK | 55.56 sq m · 598 sq ft | 7 | 1 |
| Wing C1 | 3BHK | 55.86 sq m · 601 sq ft | 7 | 3 |
| Wing C1 | 3BHK | 56.3 sq m · 606 sq ft | 2 | 0 |
| Wing C1 | 3BHK | 56.32 sq m · 606 sq ft | 8 | 4 |
| Wing C1 | 3BHK | 56.58 sq m · 609 sq ft | 1 | 1 |
| Wing C1 | 3BHK | 56.73 sq m · 611 sq ft | 1 | 1 |
| Wing C1 | 3BHK | 57.93 sq m · 624 sq ft | 14 | 0 |
| Wing C1 | 3BHK | 58.17 sq m · 626 sq ft | 12 | 2 |
| Wing C1 | 3BHK | 58.75 sq m · 632 sq ft | 1 | 1 |
| Wing C1 | 3BHK | 58.96 sq m · 635 sq ft | 1 | 1 |
| Wing C1 | flat | 17.2 sq m · 185 sq ft | 2 | 0 |
| Wing C1 | Shop | 12.27 sq m · 132 sq ft | 1 | 1 |
| Wing C1 | Shop | 13.38 sq m · 144 sq ft | 1 | 1 |
| Wing C1 | Shop | 14.55 sq m · 157 sq ft | 1 | 1 |
| Wing C1 | Shop | 14.94 sq m · 161 sq ft | 1 | 1 |
| Wing C1 | Shop | 16.92 sq m · 182 sq ft | 1 | 1 |
| Wing C1 | Shop | 20.46 sq m · 220 sq ft | 1 | 1 |
| Wing C1 | Shop | 20.48 sq m · 220 sq ft | 1 | 1 |
| Wing C1 | Shop | 20.48 sq m · 220 sq ft | 1 | 1 |
| Wing C2 | 3BHK | 53.46 sq m · 575 sq ft | 14 | 2 |
| Wing C2 | 3BHK | 53.91 sq m · 580 sq ft | 6 | 1 |
| Wing C2 | 3BHK | 53.91 sq m · 580 sq ft | 4 | 3 |
| Wing C2 | 3BHK | 53.97 sq m · 581 sq ft | 2 | 0 |
| Wing C2 | 3BHK | 54.52 sq m · 587 sq ft | 1 | 0 |
| Wing C2 | 3BHK | 54.52 sq m · 587 sq ft | 1 | 1 |
| Wing C2 | 3BHK | 56.01 sq m · 603 sq ft | 14 | 9 |
| Wing C2 | 3BHK | 56.47 sq m · 608 sq ft | 12 | 9 |
| Wing C2 | 3BHK | 56.73 sq m · 611 sq ft | 2 | 1 |
| Wing C2 | 3BHK | 57.63 sq m · 620 sq ft | 14 | 0 |
| Wing C2 | 3BHK | 58.03 sq m · 625 sq ft | 10 | 0 |
| Wing C2 | 3BHK | 58.61 sq m · 631 sq ft | 1 | 0 |
| Wing C2 | 3BHK | 58.85 sq m · 633 sq ft | 1 | 0 |
| Wing C2 | 3BHK | 59.19 sq m · 637 sq ft | 1 | 1 |
| Wing C2 | 3BHK | 59.48 sq m · 640 sq ft | 6 | 1 |
| Wing C2 | 3BHK | 59.48 sq m · 640 sq ft | 6 | 5 |
| Wing C2 | 3BHK | 59.5 sq m · 640 sq ft | 1 | 0 |
| Wing C2 | 3BHK | 59.52 sq m · 641 sq ft | 14 | 0 |
| Wing C2 | flat | 17.2 sq m · 185 sq ft | 2 | 0 |
| Wing C2 | Shop | 12.93 sq m · 139 sq ft | 1 | 0 |
| Wing C2 | Shop | 13.86 sq m · 149 sq ft | 1 | 1 |
| Wing C2 | Shop | 14.49 sq m · 156 sq ft | 1 | 0 |
| Wing C2 | Shop | 14.54 sq m · 157 sq ft | 1 | 1 |
| Wing C2 | Shop | 14.56 sq m · 157 sq ft | 1 | 1 |
| Wing C2 | Shop | 16.84 sq m · 181 sq ft | 1 | 1 |
| Wing C2 | Shop | 17.76 sq m · 191 sq ft | 1 | 1 |
| Wing C2 | Shop | 18.33 sq m · 197 sq ft | 1 | 0 |
| Wing C2 | Shop | 19.82 sq m · 213 sq ft | 1 | 0 |
| Wing C2 | Shop | 20.1 sq m · 216 sq ft | 1 | 1 |
| Wing C2 | Shop | 20.47 sq m · 220 sq ft | 1 | 1 |
| Wing C2 | Shop | 20.48 sq m · 220 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Other projects in Sus
- 66 HillsideRERA PR1260002602586
- Vtp Skylights MHADARERA PR1260002601869
- Mantra Mistara Phase IRERA PR1261012600816
- A.A. AuroraRERA PR1261012600523
- SahajeevanRERA PR1260002600468
- Kiran SoraRERA PM1260002502713
- Amber Wing CRERA PM1260002500167
- VrindavanRERA P52100080651
All 88 projects in Sus · Compare Teerth Avila with another project