Others · 7 buildings · 406 unitsRERA P52100001396

Ganga Acropolis

Deedo IDDP-PUN-SD96

Completion was pushed back 1 year and 10 months to Apr 2025, and that date has passed too; no MahaRERA orders on record; 100% of its units are booked.

Sus, Pune 411021 · Property rates in Sus · by Ganraj Homes Llp

Delivery3 yrs 5 mo latePromised Jun 2023 · revised Apr 2025 · that date has passed tooRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales100% booked404 of 406 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 1 year and 10 months to Apr 2025, and that date has passed too

  • This projectRegistered 27 Jul 2017, completion promised 30 Jun 2023, revised to 10 Apr 2025, and still not shown completed today.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

7 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100001396
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210000139627 Jul 201730 Jun 202310 Apr 2025Ganraj Homes LLPProject page
Documents107

3 documents held by Deedo, 104 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Other

  • OtherDate not statedView

Finance

  • PAN CardPAN-GHLLP.PDF · uploaded 24 Jul 2017Source

Legal

  • Legal Title reportTitle 1MB GHLLP.pdf · uploaded 24 Jul 2017Source
  • Declaration Form BFORM B GHLLP.pdf · uploaded 24 Jul 2017Source
  • OtherCompletion Certificate Acropolis.pdf · uploaded 21 Jun 2021Source
  • Declaration Form BForm B _ RERA.pdf · uploaded 10 Dec 2024Source
Show all 107 documentsShow fewer documents

Migrated

  • 1 PAN CardPAN-GHLLP.PDF · uploaded 24 Jul 2017Source
  • 1 Copy of the legal title reportTitle 1MB GHLLP.pdf · uploaded 24 Jul 2017Source
  • 1 Details of encumbrancesIndex Mortgage Deed GHLLP.pdf · uploaded 24 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)Sanction Layout GHLLP.pdf · uploaded 24 Jul 2017Source
  • 1 Building Plan Approval (IOD)GHLLP IOD.pdf · uploaded 24 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentFinal CC GHLLP 1MB.pdf · uploaded 24 Jul 2017Source
  • 1 Declaration in FORM BFORM B GHLLP.pdf · uploaded 24 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect letter - GHLLP 1MB.pdf · uploaded 24 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer certificate GHLLP 1MB.pdf · uploaded 24 Jul 2017Source
  • 1 Certificates of CA (Form 3)CA Cert GHLLP Final 1MB.pdf · uploaded 24 Jul 2017Source
  • 1 Proforma of Allotment letterGHLLP Draft Allottment Letter.pdf · uploaded 24 Jul 2017Source
  • 2 Proforma of Allotment letterGHLLP Draft Agreement.pdf · uploaded 24 Jul 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE Acropolis 311217 (1).pdf · uploaded 19 Feb 2018Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ER Certificate Acro 311217-1 (2).pdf · uploaded 19 Feb 2018Source
  • 2 Certificates of CA (Form 3)CA cert Acro 311217-1 (1).pdf · uploaded 19 Feb 2018Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Acropolis A,B,C,D,E (1).pdf · uploaded 28 Apr 2018Source
  • 3 Proforma of Allotment letterACROPOLIS-REVISED-AGREEMENT-FOR-FLATS-OTHER-THAN -PENT-HOUSES-20-07-2018.pdf · uploaded 27 Jul 2018Source
  • 1 Certificates of CA (Form 5)Self Declaration - Form 5 Acro.pdf · uploaded 20 Nov 2018Source
  • 2 Copy of Layout Approval (in case of layout)Sus 41 Laout Copy 26-07-2019 (1) (1).pdf · uploaded 10 Dec 2019Source
  • 2 Commencement Certificates / NA Order for plotted developmentSus 41 CC Layout- 26-07-2019.pdf · uploaded 10 Dec 2019Source
  • 4 Proforma of Allotment letterACROPOLIS-UNIT-AGREEMENT-20-11-2019.pdf · uploaded 17 Dec 2019Source
  • 5 Proforma of Allotment letterACROPOLIS-UNIT-AGREEMENT-20-11-2019 Revised.pdf · uploaded 18 Dec 2019Source
  • 6 Proforma of Allotment letterGanga Acropolis RERA Draft Agreement_compressed.pdf · uploaded 18 Dec 2019Source
  • 1 OtherCompletion Certificate Acropolis.pdf · uploaded 21 Jun 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Ganga Acropolis 2018 to 2019.pdf · uploaded 6 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Ganga Acropolis 2019 to 2020.pdf · uploaded 6 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Ganga Acropolis 2020 to 2021.pdf · uploaded 6 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Ganga Acropolis 2021 to 2022.pdf · uploaded 6 Feb 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A_ghllp_Ganga Acropolis_2019.pdf · uploaded 13 Mar 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A_ghllp_Ganga Acropolis_2020.pdf · uploaded 13 Mar 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A Ganga Utopia Commercial_2021.pdf · uploaded 13 Mar 2023Source
  • 1 Declaration in FORM BForm B _ RERA.pdf · uploaded 10 Dec 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)0 Form 2A Dt 16 04 2018 Quality Certificate Original Filed in RERA File.pdf · uploaded 9 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)3 Form 2A Dt 20 04 2021 Quality Certificate Original Filed in RERA File.pdf · uploaded 9 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)5 Form 2A Dt 25 04 2023 Quality Certificate Original Filed in RERA File.pdf · uploaded 9 Apr 2025Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)5 Form 2A Dt 25 04 2023 Quality Certificate Original Filed in RERA File.pdf · uploaded 9 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)6 Form 2A Dt 18 04 2024 Quality Certificate Original Filed in RERA File.pdf · uploaded 9 Apr 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)00 Form 1 Arch Cert Ganga Acro Mar 23.pdf · uploaded 29 May 2025Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)00 Form 1 Arch Cert Ganga Acro Jun 23.pdf · uploaded 29 May 2025Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)00 Form 1 Arch Cert Ganga Acro Sep 23.pdf · uploaded 29 May 2025Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ganga acropolis form 3 dec 2023.pdf · uploaded 29 May 2025Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)27 Form 3 Arch Cert Ganga Acro Mar 24 (2).pdf · uploaded 29 May 2025Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)june 2024.pdf · uploaded 29 May 2025Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)sep 2024.pdf · uploaded 29 May 2025Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)dec 2024.pdf · uploaded 29 May 2025Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)march 2025.pdf · uploaded 29 May 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)march 2023.pdf · uploaded 30 May 2025Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)24 Form 2 Er Certificate Ganga Acro Jun 23.pdf · uploaded 30 May 2025Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)25 Form 2 Er Certificate Ganga Acro Sep 23.pdf · uploaded 30 May 2025Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)26 Form 2 Er Certificate Ganga Acro Dec 23 (1).pdf · uploaded 30 May 2025Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 march 2024.pdf · uploaded 30 May 2025Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 june 2024.pdf · uploaded 30 May 2025Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form 2 sep 2024.pdf · uploaded 30 May 2025Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form 2 dec 2024.pdf · uploaded 30 May 2025Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 march 2025.pdf · uploaded 30 May 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)5 Form 2A Er QA Certificate Ganga Acro 2022.pdf · uploaded 30 May 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 2022-23.pdf · uploaded 30 May 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 2023-2024.pdf · uploaded 30 May 2025Source
  • 2 Certificates of CA (Form 3)24 Form 3 CA Cert Ganga Acro Jun 23-2.pdf · uploaded 28 Jun 2025Source
  • 3 Certificates of CA (Form 3)25 Form 3 CA Cert Ganga Acro Sep 23-3.pdf · uploaded 28 Jun 2025Source
  • 4 Certificates of CA (Form 3)26 Form 3 CA Cert Ganga Acro Dec 23-2.pdf · uploaded 28 Jun 2025Source
  • 5 Certificates of CA (Form 3)27 Form 3 CA Cert Ganga Acro Mar 24-3.pdf · uploaded 28 Jun 2025Source
  • 6 Certificates of CA (Form 3)28 Form 3 CA Cert Ganga Acro Jun 24-2.pdf · uploaded 28 Jun 2025Source
  • 7 Certificates of CA (Form 3)29 Form 3 CA Cert Ganga Acro Sep 24-2.pdf · uploaded 28 Jun 2025Source
  • 8 Certificates of CA (Form 3)30 Form 3 CA Cert Ganga Acro Dec 24-2.pdf · uploaded 28 Jun 2025Source
  • 9 Certificates of CA (Form 3)31 Form 3 CA Cert Ganga Acro Mar 25-2.pdf · uploaded 28 Jun 2025Source
  • 1 Certificates of CA (Form 3)23 Form 3 CA Cert Ganga Acro Mar 23-3.pdf · uploaded 28 Jun 2025Source
  • 9 Disclosure of sold/ booked inventoryMarch 2025 sold.pdf · uploaded 28 Jun 2025View
  • 8 Disclosure of sold/ booked inventoryDecember 2024 sold.pdf · uploaded 28 Jun 2025Source
  • 7 Disclosure of sold/ booked inventorySeptember 2024 sold.pdf · uploaded 28 Jun 2025Source
  • 6 Disclosure of sold/ booked inventoryJune 2024 sold.pdf · uploaded 28 Jun 2025Source
  • 5 Disclosure of sold/ booked inventorymarch 2024 sold.pdf · uploaded 28 Jun 2025Source
  • 4 Disclosure of sold/ booked inventoryDec 2023 sold.pdf · uploaded 28 Jun 2025Source
  • 3 Disclosure of sold/ booked inventorysep 2023 sold.pdf · uploaded 28 Jun 2025Source
  • 2 Disclosure of sold/ booked inventoryJune 2023 sold.pdf · uploaded 28 Jun 2025Source
  • 1 Disclosure of sold/ booked inventoryMarch 2023 sold.pdf · uploaded 28 Jun 2025Source

Technical

  • DocumentSanction Layout GHLLP.pdf · uploaded 24 Jul 2017Source
  • DocumentGHLLP IOD.pdf · uploaded 24 Jul 2017Source
  • DocumentSus 41 Laout Copy 26-07-2019 (1) (1).pdf · uploaded 10 Dec 2019Source

Technical (Architect)

  • DocumentAcropolis A,B,C,D,E (1).pdf · uploaded 28 Apr 2018Source
  • Document00 Form 1 Arch Cert Ganga Acro Mar 23.pdf · uploaded 29 May 2025Source
  • Document00 Form 1 Arch Cert Ganga Acro Jun 23.pdf · uploaded 29 May 2025Source
  • Document00 Form 1 Arch Cert Ganga Acro Sep 23.pdf · uploaded 29 May 2025Source
  • Documentganga acropolis form 3 dec 2023.pdf · uploaded 29 May 2025Source
  • Document27 Form 3 Arch Cert Ganga Acro Mar 24 (2).pdf · uploaded 29 May 2025Source
  • Documentjune 2024.pdf · uploaded 29 May 2025Source
  • Documentsep 2024.pdf · uploaded 29 May 2025Source
  • Documentdec 2024.pdf · uploaded 29 May 2025Source
  • Documentmarch 2025.pdf · uploaded 29 May 2025Source

Technical (Engineer)

  • DocumentER Certificate Acro 311217-1 (2).pdf · uploaded 19 Feb 2018Source
  • Documentmarch 2023.pdf · uploaded 30 May 2025Source
  • Document24 Form 2 Er Certificate Ganga Acro Jun 23.pdf · uploaded 30 May 2025Source
  • Document25 Form 2 Er Certificate Ganga Acro Sep 23.pdf · uploaded 30 May 2025Source
  • Document26 Form 2 Er Certificate Ganga Acro Dec 23 (1).pdf · uploaded 30 May 2025Source
  • DocumentForm 2 march 2024.pdf · uploaded 30 May 2025Source
  • DocumentForm 2 june 2024.pdf · uploaded 30 May 2025Source
  • Documentform 2 sep 2024.pdf · uploaded 30 May 2025Source
  • Documentform 2 dec 2024.pdf · uploaded 30 May 2025Source
  • DocumentForm 2 march 2025.pdf · uploaded 30 May 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 41/1, 41/2/1

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
3BHK, 4BHK, 2 BHK, 2BHK, 3 BHK, Shop406 units in all
Address
41/1, 41/2/14, 41/2/1, Maharashtra, MulashiPIN 411021
Village
Sus, Mulshi taluka
Land area for this project
26,354 sq m (2,83,672 sq ft)
Permissible built-up area
31,251 sq m (3,36,384 sq ft)
Sanctioned built-up area
27,624 sq m (2,97,340 sq ft)
Recreational open space
2,418 sq m (26,024 sq ft)
Designated bank account
220
Developed in phases
Yes

Survey, CTS, gat or plot numbers

41/141/2/141/2/14

Land as published on MahaRERA's project page

41/1,41/2/14,41/2/1

Boundaries

North
S No 39 And 40
South
S No 41p And 9 M W Existing Road
East
24 M Rp Road
West
Nala

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking406 units

404 of 406 units booked (100%), as the promoter reported to MahaRERA

3BHK · 79 units4BHK · 14 units2 BHK · 17 units2BHK · 281 units3 BHK · 4 unitsShop · 11 units
BuildingTypeCarpet areaUnitsBooked
A3BHK120.08 sq m · 1,293 sq ft11
A3BHK120.09 sq m · 1,293 sq ft33
A3BHK120.17 sq m · 1,293 sq ft33
A3BHK122.91 sq m · 1,323 sq ft33
A3BHK123.04 sq m · 1,324 sq ft44
B4BHK123.14 sq m · 1,325 sq ft22
B4BHK123.23 sq m · 1,326 sq ft66
B4BHK123.26 sq m · 1,327 sq ft66
Show all 60 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
C2 BHK62.3 sq m · 671 sq ft1717
C2BHK54.37 sq m · 585 sq ft22
C2BHK54.38 sq m · 585 sq ft1616
C2BHK54.52 sq m · 587 sq ft1818
C2BHK60.21 sq m · 648 sq ft22
C2BHK60.32 sq m · 649 sq ft11
C2BHK62.16 sq m · 669 sq ft1616
D2BHK37.28 sq m · 401 sq ft33
D2BHK51.93 sq m · 559 sq ft66
D2BHK52.28 sq m · 563 sq ft3939
D2BHK52.44 sq m · 564 sq ft1515
D2BHK52.61 sq m · 566 sq ft4545
E2BHK72.8 sq m · 784 sq ft22
E2BHK73.16 sq m · 787 sq ft11
E3 BHK83.17 sq m · 895 sq ft22
E3 BHK84.75 sq m · 912 sq ft22
E3BHK82.92 sq m · 893 sq ft22
E3BHK83.81 sq m · 902 sq ft22
E3BHK83.89 sq m · 903 sq ft22
E3BHK84.49 sq m · 909 sq ft22
E3BHK85.15 sq m · 917 sq ft22
E3BHK85.4 sq m · 919 sq ft22
E3BHK97.51 sq m · 1,050 sq ft77
E3BHK97.6 sq m · 1,051 sq ft77
E3BHK97.8 sq m · 1,053 sq ft11
E3BHK97.82 sq m · 1,053 sq ft66
E3BHK97.86 sq m · 1,053 sq ft66
E3BHK97.9 sq m · 1,054 sq ft77
E3BHK97.93 sq m · 1,054 sq ft77
E3BHK98.1 sq m · 1,056 sq ft55
E3BHK98.17 sq m · 1,057 sq ft77
F2BHK60.61 sq m · 652 sq ft99
F2BHK60.81 sq m · 655 sq ft99
F2BHK61.12 sq m · 658 sq ft3939
F2BHK61.15 sq m · 658 sq ft99
F2BHK61.28 sq m · 660 sq ft1010
F2BHK61.58 sq m · 663 sq ft22
F2BHK61.6 sq m · 663 sq ft1010
F2BHK61.7 sq m · 664 sq ft11
F2BHK62.15 sq m · 669 sq ft99
F2BHK62.2 sq m · 670 sq ft11
F2BHK62.24 sq m · 670 sq ft33
F2BHK62.25 sq m · 670 sq ft11
F2BHK62.38 sq m · 671 sq ft11
F2BHK62.66 sq m · 674 sq ft11
F2BHK62.78 sq m · 676 sq ft11
F2BHK63.47 sq m · 683 sq ft10
F2BHK63.48 sq m · 683 sq ft88
FShop42.9 sq m · 462 sq ft66
FShop50.61 sq m · 545 sq ft11
FShop82.2 sq m · 885 sq ft33
FShop86.5 sq m · 931 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals24

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMalvadkar Architects—
EngineerDesign Workzs Engineering Pvt Ltd—
OtherChandrashekhar Tendulkar—
Registered real estate agent360 Realtors LLP—
Registered real estate agentAmanco Realtors Pvt Ltd—
Registered real estate agentAsset Housing And Realtors Pvt Ltd—
Registered real estate agentAtul Ramchandra Mazire—
Registered real estate agentCorazon Homes And Securities—
Show all 24 professionalsShow fewer professionals
RoleNameRegistration no.
Registered real estate agentKey2home Property Advisors—
Registered real estate agentKprbsk Realtors Private Limited—
Registered real estate agentMayank Barholia—
Registered real estate agentMonika Dave—
Registered real estate agentNitesh Roop Narayan Khare—
Registered real estate agentPearlquest Associates Pvt Ltd—
Registered real estate agentPradnesh Ashok Nawsagaray—
Registered real estate agentPropengine Realtech LLP—
Registered real estate agentRanjeet Singh Yadav—
Registered real estate agentR-Constellation Pvt. Ltd.—
Registered real estate agentRuchika Prajwal Rajkondawar—
Registered real estate agentSpaceindia Nest LLP—
Registered real estate agentSuggested Property Private Limited—
Registered real estate agentSwati Jain—
Registered real estate agentTsdn Realtors LLP—
Registered real estate agentWisteria Real Vision Pvt Ltd—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Sus

All 88 projects in Sus · Compare Ganga Acropolis with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology