Townscapes
Deedo IDDP-PUN-H1V0Completion was pushed back 2 years, to Dec 2026; no MahaRERA orders on record; 75% of its units are booked.
Shivajinagar Bhamburda, Pune 411005 · by Gruha Navnirman Housing
Buying a flat here?
See every deed registered on it.
Completion was pushed back 2 years, to Dec 2026
- This projectRegistered 10 Aug 2022, completion promised 31 Dec 2024, revised to 31 Dec 2026.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100046527
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100046527 | 10 Aug 2022 | 31 Dec 2024 | 31 Dec 2026 | Gruha Navnirman Housing | Project page |
Documents153
3 documents held by Deedo, 150 filings listed on MahaRERA's project page
Other
- OtherDate not statedView
Finance
- PAN Cardpan card.pdf · uploaded 30 Jun 2022Source
Legal
Migrated
- 1 PAN Cardpan card.pdf · uploaded 30 Jun 2022Source
Show all 153 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reporttitle search r_compressed.pdf · uploaded 30 Jun 2022Source
- 1 a Details of encumbrances concerned to FinanceTownscapes - Self Declarations about Non Encumbrances.pdf · uploaded 30 Jun 2022Source
- 1 b Details of encumbrances concerned to LegalTownscapes - Self Declarations about Non Encumbrances.pdf · uploaded 30 Jun 2022Source
- 1 Copy of Layout Approval (in case of layout)1_compressed (1).pdf · uploaded 30 Jun 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentcc.pdf · uploaded 30 Jun 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentcc.pdf · uploaded 30 Jun 2022Source
- 1 Declaration about Commencement CertificateTownscapes - Declaration about Commencement Certificate.pdf · uploaded 30 Jun 2022Source
- 1 Declaration in FORM Bform b pro_compressed.pdf · uploaded 30 Jun 2022Source
- 1 CERSAI detailscersai report.pdf · uploaded 30 Jun 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSelf-Declaration about Separate Bank Ac.pdf · uploaded 30 Jun 2022Source
- 1 Deviation Report with respect to Allotment letterSelf-Declaration No Deviation in otment Letter Format.pdf · uploaded 30 Jun 2022Source
- 1 Deviation Report with respect to model copy of AgreementSelf-Declaration No Deviation in Agreement to Sale Format.pdf · uploaded 30 Jun 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Townscapes Form 3compressed.pdf · uploaded 6 Jul 2022Source
- 1 Proforma of Allotment letterAgreement to Sale new.pdf · uploaded 19 Jul 2022Source
- 2 Proforma of Allotment letterAllotment Letter new_compressed.pdf · uploaded 19 Jul 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Oct Dec 2022.pdf · uploaded 14 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Jan March 2023.pdf · uploaded 14 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 April June 2023.pdf · uploaded 14 Feb 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 July Sept 2023.pdf · uploaded 14 Feb 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Oct Dec 2023.pdf · uploaded 14 Feb 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Jan-March 2024.pdf · uploaded 14 Feb 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 April June 2024.pdf · uploaded 14 Feb 2025Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 July Sept 2024.pdf · uploaded 14 Feb 2025Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Oct Dec 2024.pdf · uploaded 14 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 July Sept 2022.pdf · uploaded 14 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Jan March 2023.pdf · uploaded 14 Feb 2025Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Oct Dec 2024.pdf · uploaded 14 Feb 2025Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 April June 2024.pdf · uploaded 14 Feb 2025Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Jan March 2024.pdf · uploaded 14 Feb 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Oct Dec 2023.pdf · uploaded 14 Feb 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 July Sept 2023.pdf · uploaded 14 Feb 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 July Sept 2024.pdf · uploaded 14 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 April June 2023.pdf · uploaded 14 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Oct Dec 2022.pdf · uploaded 14 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Fom 3 July Sept 2022.pdf · uploaded 14 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Oct-Dec 2022.pdf · uploaded 14 Feb 2025Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Oct Dec 2024.pdf · uploaded 14 Feb 2025Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 July Sept 2024.pdf · uploaded 14 Feb 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 April June 2024.pdf · uploaded 14 Feb 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Jan March 2024.pdf · uploaded 14 Feb 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 July Sept 2023.pdf · uploaded 14 Feb 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 April June 2023.pdf · uploaded 14 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Jan March 2023.pdf · uploaded 14 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 July Sept 2022.pdf · uploaded 14 Feb 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Oct Dec 2023.pdf · uploaded 14 Feb 2025Source
- 5 Disclosure of sold/ booked inventoryInventory July Sept 2023.pdf · uploaded 14 Feb 2025Source
- 9 Disclosure of sold/ booked inventoryInventory Oct Dec 2024.pdf · uploaded 14 Feb 2025Source
- 8 Disclosure of sold/ booked inventoryInventory July Sept 2024.pdf · uploaded 14 Feb 2025Source
- 7 Disclosure of sold/ booked inventoryInventory Jan March 2024.pdf · uploaded 14 Feb 2025Source
- 6 Disclosure of sold/ booked inventoryInventory Oct Dec 2023.pdf · uploaded 14 Feb 2025Source
- 4 Disclosure of sold/ booked inventoryInventory April June 2023.pdf · uploaded 14 Feb 2025Source
- 3 Disclosure of sold/ booked inventoryInventory Jan March 2023.pdf · uploaded 14 Feb 2025Source
- 2 Disclosure of sold/ booked inventoryInventory Oct Dec 2022.pdf · uploaded 14 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryInventory July Sept 2022.pdf · uploaded 14 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)From 2A 22-23.pdf · uploaded 14 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Inventory Jan March 2024.pdf · uploaded 14 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5.pdf · uploaded 20 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.pdf · uploaded 20 Feb 2025Source
- 1 Declaration in FORM BAffidavit cum declaration.pdf · uploaded 19 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate.pdf · uploaded 21 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2 Engineers Certificate.pdf · uploaded 21 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2 Engineers Certificate.pdf · uploaded 21 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySold Unsold Inventory.pdf · uploaded 21 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form -2A Engineers Certificate.pdf · uploaded 21 Apr 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form -2A Engineers Certificate.pdf · uploaded 21 Apr 2025Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Engineers Certificate.pdf · uploaded 21 Apr 2025Source
- Form 1Form 1 Architect Certificate.pdf · uploaded 25 Jul 2025Source
- Form 2Form 2 Engineers Certificate.pdf · uploaded 25 Jul 2025Source
- Form 3Form 3 CA Certificate.pdf · uploaded 25 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold inventory.pdf · uploaded 25 Jul 2025View
- Form 11 Form 1 Architects Certificate.pdf · uploaded 25 Jul 2025Source
- Form 22 Engineers Certificate.pdf · uploaded 25 Jul 2025Source
- Form 33 Form 3 CA Certificate.pdf · uploaded 25 Jul 2025Source
- Disclosure of Sold and Booked InventoryTotal Inventory Sold Unsold format.pdf · uploaded 25 Jul 2025View
- Form 11 Form 1 Architects Certificate.pdf · uploaded 25 Jul 2025Source
- Form 22 Engineers Certificate.pdf · uploaded 25 Jul 2025Source
- Form 33 Form 3 CA Certificate.pdf · uploaded 25 Jul 2025Source
- Disclosure of Sold and Booked InventoryTotal Inventory Sold Unsold format.pdf · uploaded 25 Jul 2025View
- Form 11 Form 1 Architects Certificate.pdf · uploaded 25 Jul 2025Source
- Form 22 Form 2 Engineers Certificate.pdf · uploaded 25 Jul 2025Source
- Form 34 Form 3 CA Certificate.pdf · uploaded 25 Jul 2025Source
- Disclosure of Sold and Booked InventoryTotal Inventory Sold Unsold format.pdf · uploaded 25 Jul 2025View
- Form 11 Form 1 Architects Certificate.pdf · uploaded 25 Jul 2025Source
- Form 22 Form 2 Engineers Certificate.pdf · uploaded 25 Jul 2025Source
- Form 33 Form 3 CA Certificate.pdf · uploaded 25 Jul 2025Source
- Disclosure of Sold and Booked InventoryTotal Inventory Sold Unsold format.pdf · uploaded 25 Jul 2025View
- Form 11 Form 1 Architects Certificate.pdf · uploaded 25 Jul 2025Source
- Form 22 Form 2 Engineers Certificate.pdf · uploaded 25 Jul 2025Source
- Form 33 Form 3 CA Certificate.pdf · uploaded 25 Jul 2025Source
- Disclosure of Sold and Booked InventoryTotal Inventory Sold Unsold format.pdf · uploaded 25 Jul 2025View
- Form 11 Form 1 Architects Certificate.pdf · uploaded 25 Jul 2025Source
- Form 22 Form 2 Engineers Certificate.pdf · uploaded 25 Jul 2025Source
- Form 33 Form 3 CA Certificate.pdf · uploaded 25 Jul 2025Source
- Disclosure of Sold and Booked InventoryTotal Inventory Sold Unsold format.pdf · uploaded 25 Jul 2025View
- Form 11 Form 1 Architects Certificate.pdf · uploaded 25 Jul 2025Source
- Form 22 Form 2 Engineers Certificate.pdf · uploaded 25 Jul 2025Source
- Form 33 Form 3 CA Certificate.pdf · uploaded 25 Jul 2025Source
- Disclosure of Sold and Booked InventoryTotal Inventory Sold Unsold format.pdf · uploaded 25 Jul 2025View
- Form 11 Form 1 Architects Certificate.pdf · uploaded 25 Jul 2025Source
- Form 22 Form 2 Engineers Certificate.pdf · uploaded 25 Jul 2025Source
- Form 33 Form 3 CA Certificate.pdf · uploaded 25 Jul 2025Source
- Disclosure of Sold and Booked InventoryTotal Inventory Sold Unsold format.pdf · uploaded 25 Jul 2025View
- Form 11 Form 1 Architects Certificate.pdf · uploaded 25 Jul 2025Source
- Form 22 Form 2 Engineers Certificate.pdf · uploaded 25 Jul 2025Source
- Form 33 Form 3 CA Certificate.pdf · uploaded 25 Jul 2025Source
- Disclosure of Sold and Booked InventoryTotal Inventory Sold Unsold format.pdf · uploaded 25 Jul 2025View
- Form 11 Form 1 Architects Certificate.pdf · uploaded 25 Jul 2025Source
- Form 22 Form 2 Engineers Certificate.pdf · uploaded 25 Jul 2025Source
- Form 33 Form 3 CA Certificate.pdf · uploaded 25 Jul 2025Source
- Disclosure of Sold and Booked InventoryTotal Inventory Sold Unsold format.pdf · uploaded 25 Jul 2025View
- Form 1Form 1 Architect Certificate.pdf · uploaded 25 Jul 2025Source
- Form 2Form 2 Engineers Certificate.pdf · uploaded 25 Jul 2025Source
- Form 3Form 3 CA Certificate.pdf · uploaded 25 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold Inventory.pdf · uploaded 25 Jul 2025View
- Form 5 (FY 2022-2023)Form 5.pdf · uploaded 26 Jul 2025Source
- Form 5 (FY 2023-2024)Form 5.pdf · uploaded 26 Jul 2025Source
- Form 1Form 1 Architect Certificate.pdf · uploaded 11 Nov 2025Source
- Form 2Form 2 Engineers Certificate.pdf · uploaded 11 Nov 2025Source
- Form 3Form 3 C A Certificate.pdf · uploaded 11 Nov 2025Source
- Disclosure of Sold and Booked InventorySold-Unsold inventory.pdf · uploaded 11 Nov 2025View
Technical
Technical (Architect)
- DocumentForm 1 July Sept 2022.pdf · uploaded 14 Feb 2025Source
- DocumentForm 1 Oct Dec 2022.pdf · uploaded 14 Feb 2025Source
- DocumentForm 1 Jan March 2023.pdf · uploaded 14 Feb 2025Source
- DocumentForm 1 April June 2023.pdf · uploaded 14 Feb 2025Source
- DocumentForm 1 July Sept 2023.pdf · uploaded 14 Feb 2025Source
- DocumentForm 1 Oct Dec 2023.pdf · uploaded 14 Feb 2025Source
- DocumentForm 1 Jan-March 2024.pdf · uploaded 14 Feb 2025Source
- DocumentForm 1 April June 2024.pdf · uploaded 14 Feb 2025Source
- DocumentForm 1 July Sept 2024.pdf · uploaded 14 Feb 2025Source
- DocumentForm 1 Oct Dec 2024.pdf · uploaded 14 Feb 2025Source
- DocumentForm 1 Architect Certificate.pdf · uploaded 21 Apr 2025Source
Technical (Engineer)
- DocumentForm 2 July Sept 2022.pdf · uploaded 14 Feb 2025Source
- DocumentForm 2 Oct-Dec 2022.pdf · uploaded 14 Feb 2025Source
- DocumentForm 2 Jan March 2023.pdf · uploaded 14 Feb 2025Source
- DocumentForm 2 April June 2023.pdf · uploaded 14 Feb 2025Source
- DocumentForm 2 July Sept 2023.pdf · uploaded 14 Feb 2025Source
- DocumentForm 2 Oct Dec 2023.pdf · uploaded 14 Feb 2025Source
- DocumentForm 2 Jan March 2024.pdf · uploaded 14 Feb 2025Source
- DocumentForm 2 April June 2024.pdf · uploaded 14 Feb 2025Source
- DocumentForm 2 July Sept 2024.pdf · uploaded 14 Feb 2025Source
- DocumentForm 2 Oct Dec 2024.pdf · uploaded 14 Feb 2025Source
- DocumentForm -2 Engineers Certificate.pdf · uploaded 21 Apr 2025Source
- DocumentForm -2 Engineers Certificate.pdf · uploaded 21 Apr 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 135 1+2B
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Address
- 135 1+2b, Cts No 3060, P No 32, , Shivajinagar BhamburdaPIN 411005
- Village
- Pune (M Corp.), Pune City taluka
- Location
- 18.55899, 73.94333
- Land area for this project
- 515 sq m (5,543 sq ft)
- Permissible built-up area
- 905 sq m (9,741 sq ft)
- Sanctioned built-up area
- 566 sq m (6,088 sq ft)
- Designated bank account
- 76
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
135 1+2B
Boundaries
- North
- Cts No 2708
- South
- 12 Mtr Road
- East
- Cts No 3059
- West
- Cts No 3061
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals2
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Mangesh Gotal | — |
| Engineer | Prashant Chandurkar | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Shivajinagar Bhamburda
- SnehbandhRERA PR1260002602431
- SudarshanRERA PR1260002602270
- Preetkunj B CHSLRERA PR1260002601144
- NeelratnaRERA PR1260002600173
- Raghav EmpireRERA PM1260002600022
- Preet CRERA PR1260002502943
- SumukhRERA PR1260002502924
- The City ScapeRERA PM1260002502694
All 32 projects in Shivajinagar Bhamburda · Compare Townscapes with another project