Deedo IDDP-PUN-EFWTCompletion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record; 82% of its units are booked.
Shewalewadi, Pune 412307 · Property rates in Shewalewadi · by Joyville Shapoorji Housing Private Limited · 69% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2028
- P52100026452Registered 24 Sep 2020, completion promised 30 May 2025.
- P52100026451Registered 24 Sep 2020, completion promised 31 Jan 2025.
- P52100026480Registered 25 Sep 2020, completion promised 31 Jan 2025.
- P52100026478Registered 25 Sep 2020, completion promised 30 May 2025.
- P52100026479Registered 25 Sep 2020, completion promised 31 Jan 2025.
- P52100026800Registered 25 Oct 2020, completion promised 30 Jun 2025, and still not shown completed today.
Show 13 more registrations
- P52100026785Registered 25 Oct 2020, completion promised 30 Sep 2025, and still not shown completed today.
- P52100026797Registered 25 Oct 2020, completion promised 30 Jun 2025.
- P52100026795Registered 25 Oct 2020, completion promised 30 Jun 2025.
- P52100026779Registered 25 Oct 2020, completion promised 30 Sep 2025.
- P52100028311Registered 18 Feb 2021, completion promised 31 Jan 2026, and still not shown completed today.
- P52100028308Registered 18 Feb 2021, completion promised 31 Jan 2026, and still not shown completed today.
- P52100031391Registered 23 Oct 2021, completion promised 31 Dec 2025, and still not shown completed today.
- P52100031515Registered 25 Oct 2021, completion promised 31 Dec 2025.
- P52100034911Registered 28 Apr 2022, completion promised 30 Jun 2026, and still not shown completed today.
- P52100048314Registered 26 Dec 2022, completion promised 31 Dec 2026, revised to 30 Apr 2027.
- P52100048377Registered 27 Dec 2022, completion promised 31 Dec 2026, revised to 30 Apr 2027.
- P52100049970Registered 6 Mar 2023, completion promised 31 Dec 2026, revised to 30 Apr 2027.
- P52100054174Registered 1 Jan 2024, completion promised 31 Dec 2027, revised to 30 Apr 2028.
No extension certificate on record.
19 registrations · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Rental · Oct 2026 (probable)
- Primary sale · Oct 2026
- Primary sale · Oct 2026 (probable)
- Other · Oct 2026 (probable)
- Mortgage · Oct 2026 (probable)No amount
- Rental · Oct 2026 (probable)
- Rental · Oct 2026 (probable)
- Rental · Oct 2026 (probable)
- Rental · Oct 2026 (probable)
- Mortgage · Oct 2026 (probable)No amount
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2026 | Tower 18 · 301 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Unit 0205 | Primary sale | 933 sq ft | View Primary sale, Oct 2026 | |
| Oct 2026 | Unit 1303 | Primary sale | 560 sq ft | View Primary sale, Oct 2026 | |
| Oct 2026 | Unit 501 | Other | 371 sq ft | View Other, Oct 2026 | |
| Oct 2026 | Unit 496 | Mortgage | — | View Mortgage, Oct 2026 | |
| Oct 2026 | Unit T18 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Tower 1 · 102 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Unit 1805 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Tower 19 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Not on record | Mortgage | — | View Mortgage, Oct 2026 |
34 buildings
Open a building to see every flat, floor by floor.
- Building 1121 floors · 126 units0% booked
- Building 1321 floors · 126 units98% booked
- Building 1421 floors · 126 units79% booked
- Building 921 floors · 126 units37% booked
- Building (P52100026451)Size not on record99% booked
- Building (P52100026452)Size not on record98% booked
- Building (P52100026478)Size not on record98% booked
- Building (P52100026479)Size not on record99% booked
- Building (P52100026480)Size not on record98% booked
- Building (P52100026779)Size not on record95% booked
- Building (P52100026795)Size not on record100% booked
- Building (P52100026797)Size not on record99% booked
Show all 34 buildingsShow fewer buildings
- Main buildingSize not on record
- Tower 124 floors
- Tower 1021 floors · 126 units59% booked
- Tower 1220 floors · 60 units67% booked
- Tower 1522 floors · 132 units97% booked
- Tower 1622 floors · 132 units97% booked
- Tower 1725 floors · 132 units99% booked
- Tower 1825 floors · 132 units100% booked
- Tower 1924 floors
- Tower 224 floors
- Tower 2024 floors
- Tower 2124 floors · 132 units98% booked
- Tower 325 floors
- Tower 425 floors · 132 units100% booked
- Tower 522 floors · 132 units94% booked
- Tower 622 floors · 132 units94% booked
- Tower 722 floors · 132 units92% booked
- Tower 822 floors · 132 units93% booked
- Wing 502Size not on record
- Wing ASize not on record
- Wing BOSize not on record
- Wing JSize not on record
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrations19
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100026452 | 24 Sep 2020 | 30 May 2025 | 30 May 2025 | Joyville Shapoorji Housing Private Limited | Project page |
| P52100026451 | 24 Sep 2020 | 31 Jan 2025 | 31 Jan 2025 | Joyville Shapoorji Housing Private Limited | Project page |
| P52100026480 | 25 Sep 2020 | 31 Jan 2025 | 31 Jan 2025 | Joyville Shapoorji Housing Private Limited | Project page |
| P52100026478 | 25 Sep 2020 | 30 May 2025 | 30 May 2025 | Joyville Shapoorji Housing Private Limited | Project page |
| P52100026479 | 25 Sep 2020 | 31 Jan 2025 | 31 Jan 2025 | Joyville Shapoorji Housing Private Limited | Project page |
| P52100026800 | 25 Oct 2020 | 30 Jun 2025 | 30 Jun 2025 | Joyville Shapoorji Housing Private Limited | Project page |
| P52100026785 | 25 Oct 2020 | 30 Sep 2025 | 30 Sep 2025 | Joyville Shapoorji Housing Private Limited | Project page |
| P52100026797 | 25 Oct 2020 | 30 Jun 2025 | 30 Jun 2025 | Joyville Shapoorji Housing Private Limited | Project page |
Show all 19 registrationsShow fewer registrations
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100026795 | 25 Oct 2020 | 30 Jun 2025 | 30 Jun 2025 | Joyville Shapoorji Housing Private Limited | Project page |
| P52100026779 | 25 Oct 2020 | 30 Sep 2025 | 30 Sep 2025 | Joyville Shapoorji Housing Private Limited | Project page |
| P52100028311 | 18 Feb 2021 | 31 Jan 2026 | 31 Jan 2026 | Joyville Shapoorji Housing Private Limited | Project page |
| P52100028308 | 18 Feb 2021 | 31 Jan 2026 | 31 Jan 2026 | Joyville Shapoorji Housing Private Limited | Project page |
| P52100031391 | 23 Oct 2021 | 31 Dec 2025 | 31 Dec 2025 | Joyville Shapoorji Housing Private Limited | Project page |
| P52100031515 | 25 Oct 2021 | 31 Dec 2025 | 31 Dec 2025 | Joyville Shapoorji Housing Private Limited | Project page |
| P52100034911 | 28 Apr 2022 | 30 Jun 2026 | 30 Jun 2026 | Joyville Shapoorji Housing Private Limited | Project page |
| P52100048314 | 26 Dec 2022 | 31 Dec 2026 | 30 Apr 2027 | Joyville Shapoorji Housing Private Limited | Project page |
| P52100048377 | 27 Dec 2022 | 31 Dec 2026 | 30 Apr 2027 | Joyville Shapoorji Housing Private Limited | Project page |
| P52100049970 | 6 Mar 2023 | 31 Dec 2026 | 30 Apr 2027 | Joyville Shapoorji Housing Private Limited | Project page |
| P52100054174 | 1 Jan 2024 | 31 Dec 2027 | 30 Apr 2028 | Joyville Shapoorji Housing Private Limited | Project page |
Documents2,665
27 documents held by Deedo, 2,638 filings listed on MahaRERA's project page
Registration certificate (19)
- Registration certificateP52100026479 · 8 Sep 2021ViewSource
- Registration certificateP52100026480 · 8 Sep 2021ViewSource
- Registration certificateP52100026478 · 8 Sep 2021ViewSource
- Registration certificateP52100026452 · 8 Sep 2021ViewSource
- Registration certificateP52100026451 · 8 Sep 2021ViewSource
- Registration certificateP52100026785 · 8 Sep 2021ViewSource
- Registration certificateP52100026797 · 8 Sep 2021ViewSource
- Registration certificateP52100026795 · 8 Sep 2021ViewSource
Show all 2665 documentsShow fewer documents
Registration certificate (19)
- Registration certificateP52100026779 · 8 Sep 2021ViewSource
- Registration certificateP52100026800 · 8 Sep 2021ViewSource
- Registration certificateP52100028311 · 8 Sep 2021ViewSource
- Registration certificateP52100031391 · 23 Oct 2021ViewSource
- Registration certificateP52100031515 · 25 Oct 2021ViewSource
- Registration certificateP52100048314 · 12 Aug 2026ViewSource
- Registration certificateP52100028308 · 13 Aug 2026ViewSource
- Registration certificateP52100048377 · 13 Aug 2026ViewSource
- Registration certificateP52100049970 · 13 Aug 2026ViewSource
- Registration certificateP52100054174 · 13 Aug 2026ViewSource
- Registration certificateP52100034911 · 19 Aug 2026ViewSource
Other (8)
- OtherP52100026451 · Date not statedView
- OtherP52100026452 · Date not statedView
- OtherP52100026478 · Date not statedView
- OtherP52100026479 · Date not statedView
- OtherP52100026480 · Date not statedView
- OtherP52100026779 · Date not statedView
- OtherP52100026795 · Date not statedView
- OtherP52100026797 · Date not statedView
Finance
- PAN CardP52100026478 · PAN-Joyville_compressed.pdf · uploaded 23 Sep 2020Source
- PAN CardP52100026479 · PAN-Joyville_compressed.pdf · uploaded 23 Sep 2020Source
- PAN CardP52100026480 · PAN-Joyville_compressed.pdf · uploaded 23 Sep 2020Source
- PAN CardP52100026785 · PAN-Joyville_compressed.pdf · uploaded 21 Oct 2020Source
- PAN CardP52100026795 · PAN-Joyville_compressed.pdf · uploaded 21 Oct 2020Source
- PAN CardP52100026797 · PAN-Joyville_compressed.pdf · uploaded 21 Oct 2020Source
- PAN CardP52100026800 · PAN-Joyville_compressed.pdf · uploaded 21 Oct 2020Source
- PAN CardP52100026779 · PAN-Joyville_compressed.pdf · uploaded 21 Oct 2020Source
- PAN CardP52100028308 · PAN-Joyville_compressed.pdf · uploaded 10 Feb 2021Source
- PAN CardP52100028311 · PAN-Joyville_compressed.pdf · uploaded 10 Feb 2021Source
- PAN CardP52100034911 · Joyville PAN.pdf · uploaded 21 Apr 2022Source
- PAN CardP52100026451 · Joyville PAN.pdf · uploaded 20 Jul 2022Source
- PAN CardP52100048377 · Joyville PAN.pdf · uploaded 18 Oct 2022Source
- PAN CardP52100048314 · Joyville PAN.pdf · uploaded 28 Nov 2022Source
- PAN CardP52100049970 · Joyville PAN.pdf · uploaded 31 Jan 2023Source
- PAN CardP52100054174 · 1 PAN Card.pdf · uploaded 5 Dec 2023Source
- OthersP52100034911 · Annexure A_Joyville Hadapsar Annexe Phase 15.pdf · uploaded 1 Aug 2025Source
- OthersP52100034911 · Self Declartion cum Application_Joyville Hadapsar Annexe Phase 15.pdf · uploaded 1 Aug 2025Source
- OthersP52100048377 · Self Declartion cum Application_Joyville Hadapsar Annexe Phase 20.pdf · uploaded 13 Aug 2025Source
- OthersP52100048314 · Annexure A_Joyville Hadapsar Annexe Phase 18.pdf · uploaded 13 Aug 2025Source
- OthersP52100048314 · Self Declartion cum Application_Joyville Hadapsar Annexe Phase 18.pdf · uploaded 13 Aug 2025Source
- OthersP52100054174 · JSHPLMAHA.pdf · uploaded 11 Sep 2025Source
- OthersP52100054174 · JSHPLMAHA.pdf · uploaded 11 Sep 2025Source
- OthersP52100048377 · Annexure A_Joyville Hadapsar Annexe Phase 20.pdf · uploaded 11 Sep 2025Source
- OthersP52100049970 · JSHPLMAHA.pdf · uploaded 16 Sep 2025Source
- OthersP52100049970 · JSHPLMAHA.pdf · uploaded 16 Sep 2025Source
- OthersP52100028308 · Annexure A_Joyville Hadapsar Annexe Phase 12.pdf · uploaded 16 Sep 2025Source
- OthersP52100028308 · Self Declartion cum Application_Joyville Hadapsar Annexe Phase 12 new.pdf · uploaded 16 Sep 2025Source
Legal
- Legal Title reportP52100026478 · Title Certificate.pdf · uploaded 22 Sep 2020Source
- Declaration Form BP52100026478 · Form B phase 4 JSHPL.pdf · uploaded 22 Sep 2020Source
- Legal Title reportP52100026479 · Title Certificate.pdf · uploaded 22 Sep 2020Source
- Declaration Form BP52100026479 · Form B phase 2 JSHPL.pdf · uploaded 22 Sep 2020Source
- Legal Title reportP52100026480 · Title Certificate.pdf · uploaded 22 Sep 2020Source
- Declaration Form BP52100026480 · Form B phase 3 JSHPL.pdf · uploaded 22 Sep 2020Source
- Legal Title reportP52100026451 · RERA Title Certificate (Joyville - Manjri)_13 March 2020 for RERA Upload_V2_compressed (2).pdf · uploaded 22 Sep 2020Source
- Declaration Form BP52100026451 · Form B phase 1 JSHPL.pdf · uploaded 22 Sep 2020Source
- Legal Title reportP52100026452 · Title Certificate.pdf · uploaded 22 Sep 2020Source
- Declaration Form BP52100026452 · Form B phase 5 JSHPL.pdf · uploaded 22 Sep 2020Source
- Legal Title reportP52100026785 · Title Certificate.pdf · uploaded 21 Oct 2020Source
- Declaration Form BP52100026785 · FORM B jshpl PHASE 8-compressed.pdf · uploaded 21 Oct 2020Source
- Legal Title reportP52100026795 · Title Certificate.pdf · uploaded 21 Oct 2020Source
- Declaration Form BP52100026795 · FORM B jshpl PHASE 10-compressed.pdf · uploaded 21 Oct 2020Source
- Legal Title reportP52100026797 · Title Certificate.pdf · uploaded 21 Oct 2020Source
- Declaration Form BP52100026797 · FORM B jshpl PHASE 9-compressed.pdf · uploaded 21 Oct 2020Source
- Legal Title reportP52100026800 · Title Certificate.pdf · uploaded 21 Oct 2020Source
- Declaration Form BP52100026800 · FORM B jshpl PHASE 7-compressed.pdf · uploaded 21 Oct 2020Source
- Legal Title reportP52100026779 · Title Certificate.pdf · uploaded 21 Oct 2020Source
- Declaration Form BP52100026779 · FORM B jshpl PHASE 6-compressed.pdf · uploaded 21 Oct 2020Source
- Legal Title reportP52100028308 · Title Certificate.pdf · uploaded 10 Feb 2021Source
- Legal Title reportP52100028311 · Title Certificate.pdf · uploaded 10 Feb 2021Source
- Declaration Form BP52100028308 · Form B Phase 11 JSHPL_compressed.pdf · uploaded 11 Feb 2021Source
- Declaration Form BP52100028311 · Form B Phase 11 JSHPL_compressed.pdf · uploaded 11 Feb 2021Source
- Declaration Form BP52100031515 · Formb B - JSHPL - Ph 14-compressed.pdf · uploaded 7 Oct 2021Source
- Declaration Form BP52100031391 · Formb B - JSHPL - Ph 13-compressed.pdf · uploaded 7 Oct 2021Source
- Legal Title reportP52100031515 · RERA Title_Manjri-compressed_compressed.pdf · uploaded 18 Oct 2021Source
- Legal Title reportP52100031391 · RERA Title_Manjri-compressed_compressed.pdf · uploaded 18 Oct 2021Source
- Declaration Form BP52100034911 · Joyville Hadapsar Annexe_Affidavit cum decln (Form B)_For JSHPL(LO)_Phase 15-compressed.pdf · uploaded 12 Apr 2022Source
- OtherP52100034911 · Decleration.pdf · uploaded 21 Apr 2022Source
- Legal Title reportP52100034911 · 1 Copy of the legal title report (3).pdf · uploaded 21 Apr 2022Source
- Legal Title reportP52100048377 · LegalTitile_Plot1.pdf · uploaded 18 Oct 2022Source
- Declaration Form BP52100048377 · FormB_Phase20.pdf · uploaded 25 Oct 2022Source
- Other – LegalP52100048377 · LegalEncumbrance_New.pdf · uploaded 16 Nov 2022Source
- Legal Title reportP52100048314 · LegalTitile_Plot1.pdf · uploaded 28 Nov 2022Source
- Declaration Form BP52100048314 · FormB_Phase18.pdf · uploaded 28 Nov 2022Source
- Legal Title reportP52100049970 · Final-Title Sahil 27-09-2022.pdf · uploaded 2 Feb 2023Source
- Declaration Form BP52100049970 · Joyville_FormB.pdf · uploaded 2 Feb 2023Source
- Other – LegalP52100049970 · ilovepdf_merged (13) (1) (1)-1.pdf · uploaded 7 Feb 2023Source
- Other – LegalP52100049970 · ilovepdf_merged (13) (1) (1)-2.pdf · uploaded 7 Feb 2023Source
- Other – LegalP52100049970 · ilovepdf_merged (13) (1) (1)-3.pdf · uploaded 7 Feb 2023Source
- Declaration Form BP52100054174 · Form B_B9 B11_Joyville.pdf · uploaded 11 Dec 2023Source
- Legal Title reportP52100054174 · RERA Title report Hadapsar Plot 1 (Sahil Shah) dt 12-12-2023_compressed-1-9.pdf · uploaded 13 Dec 2023Source
- Legal Title reportP52100054174 · RERA Title report Hadapsar Plot 1 (Sahil Shah) dt 12-12-2023_compressed-10-18.pdf · uploaded 13 Dec 2023Source
- Legal Title reportP52100054174 · Survye nos declaration.pdf · uploaded 13 Dec 2023Source
- Declaration Form BP52100034911 · Signed Title Report-Hadapsar Phase I_Pg 1-13.pdf · uploaded 26 Sep 2025Source
- Declaration Form BP52100034911 · Signed Title Report-Hadapsar Phase I_Pg 14-26.pdf · uploaded 26 Sep 2025Source
Migrated
- 1 Copy of the legal title reportP52100026478 · Title Certificate.pdf · uploaded 22 Sep 2020Source
- 1 Details of encumbrancesP52100026478 · Non encumbrance certificate ph 4.pdf · uploaded 22 Sep 2020Source
- 1 Copy of Layout Approval (in case of layout)P52100026478 · Layout.pdf · uploaded 22 Sep 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100026478 · CC.pdf · uploaded 22 Sep 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100026478 · CC.pdf · uploaded 22 Sep 2020Source
- 1 Declaration in FORM BP52100026478 · Form B phase 4 JSHPL.pdf · uploaded 22 Sep 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · Architect's Certificate Hadapsar Annex_Phase_4_T1.pdf · uploaded 22 Sep 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase 4_ Tower 1 -10-09-2020.pdf · uploaded 22 Sep 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026478 · CA certificate_Phase 4_Tower 1_compressed.pdf · uploaded 22 Sep 2020Source
- 1 Proforma of Allotment letterP52100026478 · AFS.pdf · uploaded 22 Sep 2020Source
- 1 Copy of the legal title reportP52100026479 · Title Certificate.pdf · uploaded 22 Sep 2020Source
- 1 Details of encumbrancesP52100026479 · Non encumbrance certificate ph 2.pdf · uploaded 22 Sep 2020Source
- 1 Copy of Layout Approval (in case of layout)P52100026479 · Layout.pdf · uploaded 22 Sep 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100026479 · CC.pdf · uploaded 22 Sep 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100026479 · CC.pdf · uploaded 22 Sep 2020Source
- 1 Declaration in FORM BP52100026479 · Form B phase 2 JSHPL.pdf · uploaded 22 Sep 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Hadapsar Annex_Phase_2_T20.pdf · uploaded 22 Sep 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Engineer's Certificate_Hadapsar Annex_Phase 2_ Tower 20 -10-09-2020.pdf · uploaded 22 Sep 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026479 · CA certificate_Phase 2_Tower 20_compressed.pdf · uploaded 22 Sep 2020Source
- 1 Proforma of Allotment letterP52100026479 · AFS.pdf · uploaded 22 Sep 2020Source
- 1 Copy of the legal title reportP52100026480 · Title Certificate.pdf · uploaded 22 Sep 2020Source
- 1 Details of encumbrancesP52100026480 · Non encumbrance certificate ph 3.pdf · uploaded 22 Sep 2020Source
- 1 Copy of Layout Approval (in case of layout)P52100026480 · Layout.pdf · uploaded 22 Sep 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100026480 · CC.pdf · uploaded 22 Sep 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100026480 · CC.pdf · uploaded 22 Sep 2020Source
- 1 Declaration in FORM BP52100026480 · Form B phase 3 JSHPL.pdf · uploaded 22 Sep 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Architect's Certificate Hadapsar Annex_Phase_3_T19.pdf · uploaded 22 Sep 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026480 · Engineer's Certificate_Hadapsar Annex_Phase 3_ Tower 19 -10-09-2020.pdf · uploaded 22 Sep 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026480 · CA certificate_Phase 3_Tower 19_compressed.pdf · uploaded 22 Sep 2020Source
- 1 Proforma of Allotment letterP52100026480 · AFS.pdf · uploaded 22 Sep 2020Source
- 1 Copy of the legal title reportP52100026451 · RERA Title Certificate (Joyville - Manjri)_13 March 2020 for RERA Upload_V2_compressed (2).pdf · uploaded 22 Sep 2020Source
- 1 Details of encumbrancesP52100026451 · Non encumbrance certificate ph 1.pdf · uploaded 22 Sep 2020Source
- 1 Copy of Layout Approval (in case of layout)P52100026451 · Layout.pdf · uploaded 22 Sep 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100026451 · PMRDA Order_Scan Copy_1.pdf · uploaded 22 Sep 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100026451 · PMRDA Order_Scan Copy_1.pdf · uploaded 22 Sep 2020Source
- 1 Declaration in FORM BP52100026451 · Form B phase 1 JSHPL.pdf · uploaded 22 Sep 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21_compressed.pdf · uploaded 22 Sep 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase 1_ Tower 21 -10-09-2020.pdf · uploaded 22 Sep 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · CA certificate_Phase 1_Tower 21_compressed.pdf · uploaded 22 Sep 2020Source
- 1 Proforma of Allotment letterP52100026451 · AFS.pdf · uploaded 22 Sep 2020Source
- 1 Copy of the legal title reportP52100026452 · Title Certificate.pdf · uploaded 22 Sep 2020Source
- 1 Details of encumbrancesP52100026452 · Non encumbrance certificate ph 5.pdf · uploaded 22 Sep 2020Source
- 1 Copy of Layout Approval (in case of layout)P52100026452 · Layout.pdf · uploaded 22 Sep 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100026452 · CC.pdf · uploaded 22 Sep 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100026452 · CC.pdf · uploaded 22 Sep 2020Source
- 1 Declaration in FORM BP52100026452 · Form B phase 5 JSHPL.pdf · uploaded 22 Sep 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026452 · Architect's Certificate Hadapsar Annex_Phase_5_T2.pdf · uploaded 22 Sep 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026452 · Engineer's Certificate_Hadapsar Annex_Phase 5_ Tower 2 -10-09-2020.pdf · uploaded 22 Sep 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026452 · CA certificate_Phase 5_Tower 2_compressed.pdf · uploaded 22 Sep 2020Source
- 1 Proforma of Allotment letterP52100026452 · AFS.pdf · uploaded 22 Sep 2020Source
- 1 PAN CardP52100026478 · PAN-Joyville_compressed.pdf · uploaded 23 Sep 2020Source
- 2 Proforma of Allotment letterP52100026478 · Manjri Proforma of Allotment Letter.pdf · uploaded 23 Sep 2020Source
- 1 PAN CardP52100026479 · PAN-Joyville_compressed.pdf · uploaded 23 Sep 2020Source
- 2 Proforma of Allotment letterP52100026479 · Manjri Proforma of Allotment Letter.pdf · uploaded 23 Sep 2020Source
- 1 PAN CardP52100026480 · PAN-Joyville_compressed.pdf · uploaded 23 Sep 2020Source
- 2 Proforma of Allotment letterP52100026480 · Manjri Proforma of Allotment Letter.pdf · uploaded 23 Sep 2020Source
- 1 PAN CardP52100026785 · PAN-Joyville_compressed.pdf · uploaded 21 Oct 2020Source
- 1 Copy of the legal title reportP52100026785 · Title Certificate.pdf · uploaded 21 Oct 2020Source
- 1 Details of encumbrancesP52100026785 · non EC phase 8 .pdf · uploaded 21 Oct 2020Source
- 1 Copy of Layout Approval (in case of layout)P52100026785 · Layout.pdf · uploaded 21 Oct 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100026785 · CC.pdf · uploaded 21 Oct 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100026785 · CC.pdf · uploaded 21 Oct 2020Source
- 1 Declaration in FORM BP52100026785 · FORM B jshpl PHASE 8-compressed.pdf · uploaded 21 Oct 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5.pdf · uploaded 21 Oct 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase 8_ Tower 5 -13-10-2020.pdf · uploaded 21 Oct 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202009 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 21 Oct 2020Source
- 1 Proforma of Allotment letterP52100026785 · Manjri Proforma of Allotment Letter.pdf · uploaded 21 Oct 2020Source
- 2 Proforma of Allotment letterP52100026785 · AFS.pdf · uploaded 21 Oct 2020Source
- 3 Proforma of Allotment letterP52100026478 · AFS.pdf · uploaded 21 Oct 2020Source
- 3 Proforma of Allotment letterP52100026479 · AFS.pdf · uploaded 21 Oct 2020Source
- 3 Proforma of Allotment letterP52100026480 · AFS.pdf · uploaded 21 Oct 2020Source
- 1 PAN CardP52100026795 · PAN-Joyville_compressed.pdf · uploaded 21 Oct 2020Source
- 1 Copy of the legal title reportP52100026795 · Title Certificate.pdf · uploaded 21 Oct 2020Source
- 1 Details of encumbrancesP52100026795 · non EC phase10.pdf · uploaded 21 Oct 2020Source
- 1 Copy of Layout Approval (in case of layout)P52100026795 · Layout.pdf · uploaded 21 Oct 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100026795 · CC.pdf · uploaded 21 Oct 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100026795 · CC.pdf · uploaded 21 Oct 2020Source
- 1 Declaration in FORM BP52100026795 · FORM B jshpl PHASE 10-compressed.pdf · uploaded 21 Oct 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18.pdf · uploaded 21 Oct 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_14-10-20.pdf · uploaded 21 Oct 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202009 RERA Certificate Ph 10 Tower 18 - RERA.pdf · uploaded 21 Oct 2020Source
- 1 Proforma of Allotment letterP52100026795 · Manjri Proforma of Allotment Letter.pdf · uploaded 21 Oct 2020Source
- 2 Proforma of Allotment letterP52100026795 · AFS.pdf · uploaded 21 Oct 2020Source
- 1 PAN CardP52100026797 · PAN-Joyville_compressed.pdf · uploaded 21 Oct 2020Source
- 1 Copy of the legal title reportP52100026797 · Title Certificate.pdf · uploaded 21 Oct 2020Source
- 1 Details of encumbrancesP52100026797 · nonEC phase 9.pdf · uploaded 21 Oct 2020Source
- 1 Copy of Layout Approval (in case of layout)P52100026797 · Layout.pdf · uploaded 21 Oct 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100026797 · CC.pdf · uploaded 21 Oct 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100026797 · CC.pdf · uploaded 21 Oct 2020Source
- 1 Declaration in FORM BP52100026797 · FORM B jshpl PHASE 9-compressed.pdf · uploaded 21 Oct 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17.pdf · uploaded 21 Oct 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_14-10-20.pdf · uploaded 21 Oct 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202009 RERA Certificate Ph 9 Tower 17 - RERA.pdf · uploaded 21 Oct 2020Source
- 1 Proforma of Allotment letterP52100026797 · Manjri Proforma of Allotment Letter.pdf · uploaded 21 Oct 2020Source
- 2 Proforma of Allotment letterP52100026797 · AFS.pdf · uploaded 21 Oct 2020Source
- 1 PAN CardP52100026800 · PAN-Joyville_compressed.pdf · uploaded 21 Oct 2020Source
- 1 Copy of the legal title reportP52100026800 · Title Certificate.pdf · uploaded 21 Oct 2020Source
- 1 Details of encumbrancesP52100026800 · non EC phase 7.pdf · uploaded 21 Oct 2020Source
- 1 Copy of Layout Approval (in case of layout)P52100026800 · Layout.pdf · uploaded 21 Oct 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100026800 · CC.pdf · uploaded 21 Oct 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100026800 · CC.pdf · uploaded 21 Oct 2020Source
- 1 Declaration in FORM BP52100026800 · FORM B jshpl PHASE 7-compressed.pdf · uploaded 21 Oct 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_7_T4.pdf · uploaded 21 Oct 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase 7_ Tower 4 -9-10-2020.pdf · uploaded 21 Oct 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202009 RERA Certificate Ph 7 Tower 04 - RERA.pdf · uploaded 21 Oct 2020Source
- 1 Proforma of Allotment letterP52100026800 · Manjri Proforma of Allotment Letter.pdf · uploaded 21 Oct 2020Source
- 2 Proforma of Allotment letterP52100026800 · AFS.pdf · uploaded 21 Oct 2020Source
- 2 Proforma of Allotment letterP52100026451 · AFS.pdf · uploaded 21 Oct 2020Source
- 1 PAN CardP52100026779 · PAN-Joyville_compressed.pdf · uploaded 21 Oct 2020Source
- 1 Copy of the legal title reportP52100026779 · Title Certificate.pdf · uploaded 21 Oct 2020Source
- 1 Details of encumbrancesP52100026779 · non EC phase 6.pdf · uploaded 21 Oct 2020Source
- 1 Copy of Layout Approval (in case of layout)P52100026779 · Layout.pdf · uploaded 21 Oct 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100026779 · CC.pdf · uploaded 21 Oct 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100026779 · CC.pdf · uploaded 21 Oct 2020Source
- 1 Declaration in FORM BP52100026779 · FORM B jshpl PHASE 6-compressed.pdf · uploaded 21 Oct 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026779 · Architect's Certificate Hadapsar Annex_Phase_6_T3.pdf · uploaded 21 Oct 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Engineer's Certificate_Hadapsar Annex_Phase 6_ Tower 3 -9-10-2020.pdf · uploaded 21 Oct 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026779 · 202009 RERA Certificate Ph 6 Tower 03 - RERA.pdf · uploaded 21 Oct 2020Source
- 1 Proforma of Allotment letterP52100026779 · Manjri Proforma of Allotment Letter.pdf · uploaded 21 Oct 2020Source
- 2 Proforma of Allotment letterP52100026779 · AFS.pdf · uploaded 21 Oct 2020Source
- 2 Proforma of Allotment letterP52100026452 · AFS.pdf · uploaded 21 Oct 2020Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · Architect's Certificate Hadapsar Annex_Phase_4_T1.pdf · uploaded 6 Jan 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · Architect's Certificate Hadapsar Annex_Phase_4_T1.pdf · uploaded 6 Jan 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase 4_ Tower 1 -30-09-2020.pdf · uploaded 6 Jan 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase_4_T1.pdf · uploaded 6 Jan 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Hadapsar Annex_Phase_2_T20.pdf · uploaded 6 Jan 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Hadapsar Annex_Phase_2_T20.pdf · uploaded 6 Jan 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Engineer's Certificate_Hadapsar Annex_Phase 2_ Tower 20 -30-09-2020.pdf · uploaded 6 Jan 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Engineer's Certificate_Hadapsar Annex_Phase_2_T20.pdf · uploaded 6 Jan 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Architect's Certificate Hadapsar Annex_Phase_3_T19.pdf · uploaded 6 Jan 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Architect's Certificate Hadapsar Annex_Phase_3_T19.pdf · uploaded 6 Jan 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026480 · Engineer's Certificate_Hadapsar Annex_Phase 3_ Tower 19 -30-09-2020.pdf · uploaded 6 Jan 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026480 · Engineer's Certificate_Hadapsar Annex_Phase_3_T19.pdf · uploaded 6 Jan 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18.pdf · uploaded 6 Jan 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18.pdf · uploaded 6 Jan 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17.pdf · uploaded 6 Jan 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17.pdf · uploaded 6 Jan 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21.pdf · uploaded 6 Jan 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21.pdf · uploaded 6 Jan 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase 1_ Tower 21 -30-09-2020.pdf · uploaded 6 Jan 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase_1_T21.pdf · uploaded 6 Jan 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026452 · Architect's Certificate Hadapsar Annex_Phase_5_T2.pdf · uploaded 6 Jan 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026452 · Architect's Certificate Hadapsar Annex_Phase_5_T2.pdf · uploaded 6 Jan 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026452 · Engineer's Certificate_Hadapsar Annex_Phase 5_ Tower 2 -30-09-2020.pdf · uploaded 6 Jan 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026452 · Engineer's Certificate_Hadapsar Annex_Phase_5_T2.pdf · uploaded 6 Jan 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026478 · 202009 RERA Certificate Ph 4 Tower 01 - RERA.pdf · uploaded 25 Jan 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026479 · 202009 RERA Certificate Ph 2 Tower 20 - RERA.pdf · uploaded 25 Jan 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026480 · 202009 RERA Certificate Ph 3 Tower 19 - RERA.pdf · uploaded 25 Jan 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202009 RERA Certificate Ph 10 Tower 18 - RERA.pdf · uploaded 25 Jan 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202009 RERA Certificate Ph 9 Tower 17 - RERA.pdf · uploaded 25 Jan 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · 202009 RERA Certificate Ph 1 Tower 21 - RERA.pdf · uploaded 25 Jan 2021Source
- 1 PAN CardP52100028308 · PAN-Joyville_compressed.pdf · uploaded 10 Feb 2021Source
- 1 Copy of the legal title reportP52100028308 · Title Certificate.pdf · uploaded 10 Feb 2021Source
- 1 Copy of Layout Approval (in case of layout)P52100028308 · Layout.pdf · uploaded 10 Feb 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100028308 · Layout.pdf · uploaded 10 Feb 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100028308 · CC.pdf · uploaded 10 Feb 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · Joyville Phase 12_compressed.pdf · uploaded 10 Feb 2021Source
- 1 Proforma of Allotment letterP52100028308 · AFS.pdf · uploaded 10 Feb 2021Source
- 2 Proforma of Allotment letterP52100028308 · Manjri Proforma of Allotment Letter.pdf · uploaded 10 Feb 2021Source
- 1 PAN CardP52100028311 · PAN-Joyville_compressed.pdf · uploaded 10 Feb 2021Source
- 1 Copy of the legal title reportP52100028311 · Title Certificate.pdf · uploaded 10 Feb 2021Source
- 1 Copy of Layout Approval (in case of layout)P52100028311 · Layout.pdf · uploaded 10 Feb 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100028311 · Layout.pdf · uploaded 10 Feb 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100028311 · CC.pdf · uploaded 10 Feb 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · Joyville Phase 11_compressed.pdf · uploaded 10 Feb 2021Source
- 1 Proforma of Allotment letterP52100028311 · AFS.pdf · uploaded 10 Feb 2021Source
- 2 Proforma of Allotment letterP52100028311 · Manjri Proforma of Allotment Letter.pdf · uploaded 10 Feb 2021Source
- 1 Details of encumbrancesP52100028308 · No Encumbrance Phase 12.pdf · uploaded 11 Feb 2021Source
- 1 Declaration in FORM BP52100028308 · Form B Phase 11 JSHPL_compressed.pdf · uploaded 11 Feb 2021Source
- 1 Details of encumbrancesP52100028311 · No Encumbrance Phase 11.pdf · uploaded 11 Feb 2021Source
- 1 Declaration in FORM BP52100028311 · Form B Phase 11 JSHPL_compressed.pdf · uploaded 11 Feb 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · Architect's Certificate Hadapsar Annex_Phase_4_T1.pdf · uploaded 14 Apr 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase_4_T1_March 21.pdf · uploaded 14 Apr 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026478 · QA-Tower-1.pdf · uploaded 14 Apr 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Hadapsar Annex_Phase_2_T20.pdf · uploaded 14 Apr 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Engineer's Certificate_Hadapsar Annex_Phase_2_T20_March 21.pdf · uploaded 14 Apr 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026479 · QA-Tower-20.pdf · uploaded 14 Apr 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Architect's Certificate Hadapsar Annex_Phase_3_T19.pdf · uploaded 14 Apr 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026480 · Engineer's Certificate_Hadapsar Annex_Phase_3_T19_March 21.pdf · uploaded 14 Apr 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026480 · QA-Tower-19.pdf · uploaded 14 Apr 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18.pdf · uploaded 14 Apr 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_March 21.pdf · uploaded 14 Apr 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026795 · QA-Tower-18.pdf · uploaded 14 Apr 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17.pdf · uploaded 14 Apr 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_March 21.pdf · uploaded 14 Apr 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026797 · QA-Tower-17.pdf · uploaded 14 Apr 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21.pdf · uploaded 14 Apr 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase_1_T21_March 21.pdf · uploaded 14 Apr 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026451 · QA-Tower-21.pdf · uploaded 14 Apr 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026452 · Architect's Certificate Hadapsar Annex_Phase_5_T2.pdf · uploaded 14 Apr 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026452 · Engineer's Certificate_Hadapsar Annex_Phase_5_T2_March 21.pdf · uploaded 14 Apr 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026452 · QA-Tower-2.pdf · uploaded 14 Apr 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Architect's Certificate Hadapsar Annex_Phase_12_T8.pdf · uploaded 21 Apr 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Architect's Certificate Hadapsar Annex_Phase_12_T8.pdf · uploaded 21 Apr 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026478 · hadapsarphase4-compressed (1).pdf · uploaded 26 Apr 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026479 · hadapsarphase2-compressed.pdf · uploaded 26 Apr 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026480 · hadapsarphase3-compressed.pdf · uploaded 26 Apr 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · hadapsarphase10-compressed.pdf · uploaded 26 Apr 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · phase9hadapsar-compressed.pdf · uploaded 26 Apr 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · hadapsarphase1-compressed.pdf · uploaded 26 Apr 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026452 · hadapsarphase5-compressed.pdf · uploaded 26 Apr 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5.pdf · uploaded 1 Jul 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_March 21.pdf · uploaded 1 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026785 · Quality Cer_8th Phase-compressed.pdf · uploaded 1 Jul 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · phase8hadapsar8-compressed.pdf · uploaded 1 Jul 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · joyvillephase12.pdf · uploaded 1 Jul 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Architect's Certificate Hadapsar Annex_Phase_11_T6.pdf · uploaded 1 Jul 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_March 2021.pdf · uploaded 1 Jul 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · joyvillehadapsarphase11.pdf · uploaded 1 Jul 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_7_T4.pdf · uploaded 1 Jul 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_March 21.pdf · uploaded 1 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026800 · Quality Cer_7th Phase-compressed.pdf · uploaded 1 Jul 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · hadapsarphase7-compressed.pdf · uploaded 1 Jul 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026779 · Architect's Certificate Hadapsar Annex_Phase_6_T3.pdf · uploaded 1 Jul 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Engineer's Certificate_Hadapsar Annex_Phase_6_T3_March 21.pdf · uploaded 1 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026779 · Quality Cer_6th Phase-compressed.pdf · uploaded 1 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026779 · Quality Cer_6th Phase-compressed.pdf · uploaded 1 Jul 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026779 · hadapsarphase6-compressed (1).pdf · uploaded 1 Jul 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5.pdf · uploaded 14 Jul 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_June 21.pdf · uploaded 14 Jul 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Architect's Certificate Hadapsar Annex_Phase_12_T8.pdf · uploaded 14 Jul 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_June 2021.pdf · uploaded 14 Jul 2021Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · Architect's Certificate Hadapsar Annex_Phase_4_T1.pdf · uploaded 14 Jul 2021Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase_4_T1_June 21.pdf · uploaded 14 Jul 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Architect's Certificate Hadapsar Annex_Phase_11_T6.pdf · uploaded 14 Jul 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_June 2021.pdf · uploaded 14 Jul 2021Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Hadapsar Annex_Phase_2_T20.pdf · uploaded 14 Jul 2021Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Engineer's Certificate_Hadapsar Annex_Phase_2_T20_June 21.pdf · uploaded 14 Jul 2021Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Architect's Certificate Hadapsar Annex_Phase_3_T19.pdf · uploaded 14 Jul 2021Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026480 · Engineer's Certificate_Hadapsar Annex_Phase_3_T19_June 21.pdf · uploaded 14 Jul 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18.pdf · uploaded 14 Jul 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_June 21.pdf · uploaded 14 Jul 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17.pdf · uploaded 14 Jul 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_June 21.pdf · uploaded 14 Jul 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_7_T4.pdf · uploaded 14 Jul 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_June 21.pdf · uploaded 14 Jul 2021Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21.pdf · uploaded 14 Jul 2021Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase_1_T21_June 21.pdf · uploaded 14 Jul 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026779 · Architect's Certificate Hadapsar Annex_Phase_6_T3.pdf · uploaded 14 Jul 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Engineer's Certificate_Hadapsar Annex_Phase_6_T3_June 21.pdf · uploaded 14 Jul 2021Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026452 · Architect's Certificate Hadapsar Annex_Phase_5_T2.pdf · uploaded 14 Jul 2021Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026452 · Engineer's Certificate_Hadapsar Annex_Phase_5_T2_June 21.pdf · uploaded 14 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026785 · Phase 8.pdf · uploaded 15 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100028308 · Phase 12.pdf · uploaded 15 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026478 · Phase 4.pdf · uploaded 15 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100028311 · Phase 11.pdf · uploaded 15 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026479 · Phase 2.pdf · uploaded 15 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026480 · Phase 3.pdf · uploaded 15 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026795 · Phase 10.pdf · uploaded 15 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026797 · Phase 9.pdf · uploaded 15 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026800 · Phase 7.pdf · uploaded 15 Jul 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026451 · Phase 1.pdf · uploaded 15 Jul 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026779 · Phase 6.pdf · uploaded 15 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026452 · Phase 5.pdf · uploaded 15 Jul 2021Source
- 1 Disclosure of sold/ booked inventoryP52100026785 · Phase 8_Merged.pdf · uploaded 29 Jul 2021Source
- 1 Disclosure of sold/ booked inventoryP52100028308 · Phase 12_Merged.pdf · uploaded 29 Jul 2021Source
- 1 Disclosure of sold/ booked inventoryP52100026478 · Phase - 4_Merged.pdf · uploaded 29 Jul 2021View
- 1 Disclosure of sold/ booked inventoryP52100028311 · Phase 11_Merged.pdf · uploaded 29 Jul 2021Source
- 1 Disclosure of sold/ booked inventoryP52100026479 · Phase - 2_Merged.pdf · uploaded 29 Jul 2021View
- 1 Disclosure of sold/ booked inventoryP52100026480 · Phase 3_Merged.pdf · uploaded 29 Jul 2021View
- 1 Disclosure of sold/ booked inventoryP52100026795 · Phase 10_Merged.pdf · uploaded 29 Jul 2021View
- 1 Disclosure of sold/ booked inventoryP52100026797 · Phase 9_Merged.pdf · uploaded 29 Jul 2021View
- 1 Disclosure of sold/ booked inventoryP52100026451 · Phase - 1 (2)_Merged.pdf · uploaded 29 Jul 2021View
- 1 Disclosure of sold/ booked inventoryP52100026779 · Phase 6_merged.pdf · uploaded 29 Jul 2021View
- 1 Disclosure of sold/ booked inventoryP52100026452 · Phase 5_Merged.pdf · uploaded 29 Jul 2021View
- 2 Disclosure of sold/ booked inventoryP52100026785 · Hadapsar Annex Phase 8.pdf · uploaded 7 Aug 2021Source
- 2 Disclosure of sold/ booked inventoryP52100028308 · Hadapsar Annex Phase 12.pdf · uploaded 7 Aug 2021Source
- 2 Disclosure of sold/ booked inventoryP52100026478 · Hadapsar Annex Phase 4.pdf · uploaded 7 Aug 2021Source
- 2 Disclosure of sold/ booked inventoryP52100028311 · Hadapsar Annex Phase 11.pdf · uploaded 7 Aug 2021Source
- 2 Disclosure of sold/ booked inventoryP52100026479 · Hadapsar Annex Phase 2.pdf · uploaded 7 Aug 2021Source
- 2 Disclosure of sold/ booked inventoryP52100026480 · Hadapsar Annex Phase 3.pdf · uploaded 7 Aug 2021Source
- 2 Disclosure of sold/ booked inventoryP52100026795 · Hadapsar Annex Phase 10.pdf · uploaded 7 Aug 2021Source
- 2 Disclosure of sold/ booked inventoryP52100026797 · Hadapsar Annex Phase 9.pdf · uploaded 7 Aug 2021Source
- 1 Disclosure of sold/ booked inventoryP52100026800 · Hadapsar Annex Phase 7.pdf · uploaded 7 Aug 2021Source
- 2 Disclosure of sold/ booked inventoryP52100026451 · Hadapsar Annex Phase 1.pdf · uploaded 7 Aug 2021Source
- 2 Disclosure of sold/ booked inventoryP52100026779 · Hadapsar Annex Phase 6.pdf · uploaded 7 Aug 2021Source
- 2 Disclosure of sold/ booked inventoryP52100026452 · Hadapsar Annex Phase 5.pdf · uploaded 7 Aug 2021Source
- 2 Disclosure of sold/ booked inventoryP52100026800 · Hadapsar Annex Phase 7.pdf · uploaded 5 Sep 2021Source
- 3 Disclosure of sold/ booked inventoryP52100026785 · Hadapsar Annex-Phase 8.pdf · uploaded 9 Sep 2021Source
- 4 Disclosure of sold/ booked inventoryP52100026785 · Hadapsar Annex Phase 8.pdf · uploaded 9 Sep 2021Source
- 3 Disclosure of sold/ booked inventoryP52100028308 · Hadapsar Annex-Phase 12.pdf · uploaded 9 Sep 2021Source
- 4 Disclosure of sold/ booked inventoryP52100028308 · Hadapsar Annex Phase 12.pdf · uploaded 9 Sep 2021Source
- 3 Disclosure of sold/ booked inventoryP52100026478 · Hadapsar Annex-Phase 4.pdf · uploaded 9 Sep 2021Source
- 4 Disclosure of sold/ booked inventoryP52100026478 · Hadapsar Annex Phase 4.pdf · uploaded 9 Sep 2021Source
- 3 Disclosure of sold/ booked inventoryP52100028311 · Hadapsar Annex-Phase 11.pdf · uploaded 9 Sep 2021Source
- 4 Disclosure of sold/ booked inventoryP52100028311 · Hadapsar Annex Phase 11.pdf · uploaded 9 Sep 2021Source
- 3 Disclosure of sold/ booked inventoryP52100026479 · Hadapsar Annex-Phase 2.pdf · uploaded 9 Sep 2021Source
- 4 Disclosure of sold/ booked inventoryP52100026479 · Hadapsar Annex Phase 2.pdf · uploaded 9 Sep 2021Source
- 3 Disclosure of sold/ booked inventoryP52100026480 · Hadapsar Annex-Phase 3.pdf · uploaded 9 Sep 2021Source
- 4 Disclosure of sold/ booked inventoryP52100026480 · Hadapsar Annex Phase 3.pdf · uploaded 9 Sep 2021Source
- 3 Disclosure of sold/ booked inventoryP52100026795 · Hadapsar Annex-Phase 10.pdf · uploaded 9 Sep 2021Source
- 4 Disclosure of sold/ booked inventoryP52100026795 · Hadapsar Annex Phase 10.pdf · uploaded 9 Sep 2021Source
- 3 Disclosure of sold/ booked inventoryP52100026797 · Hadapsar Annex-Phase 9.pdf · uploaded 9 Sep 2021Source
- 4 Disclosure of sold/ booked inventoryP52100026797 · Hadapsar Annex Phase 9.pdf · uploaded 9 Sep 2021Source
- 3 Disclosure of sold/ booked inventoryP52100026800 · Hadapsar Annex-Phase 7.pdf · uploaded 9 Sep 2021Source
- 4 Disclosure of sold/ booked inventoryP52100026800 · Hadapsar Annex Phase 7.pdf · uploaded 9 Sep 2021Source
- 3 Disclosure of sold/ booked inventoryP52100026451 · Hadapsar Annex-Phase 1.pdf · uploaded 9 Sep 2021Source
- 4 Disclosure of sold/ booked inventoryP52100026451 · Hadapsar Annex Phase 1.pdf · uploaded 9 Sep 2021Source
- 3 Disclosure of sold/ booked inventoryP52100026779 · Hadapsar Annex-Phase 6.pdf · uploaded 9 Sep 2021Source
- 4 Disclosure of sold/ booked inventoryP52100026779 · Hadapsar Annex Phase 6.pdf · uploaded 9 Sep 2021Source
- 3 Disclosure of sold/ booked inventoryP52100026452 · Hadapsar Annex-Phase 5.pdf · uploaded 9 Sep 2021Source
- 4 Disclosure of sold/ booked inventoryP52100026452 · Hadapsar Annex Phase 5.pdf · uploaded 9 Sep 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · phase8.pdf · uploaded 11 Sep 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · phase12.pdf · uploaded 11 Sep 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026478 · phase4.pdf · uploaded 11 Sep 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · phase11.pdf · uploaded 11 Sep 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026479 · phase2.pdf · uploaded 11 Sep 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026480 · phase3.pdf · uploaded 11 Sep 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · phase11.pdf · uploaded 11 Sep 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · phase9.pdf · uploaded 11 Sep 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · phase7.pdf · uploaded 11 Sep 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · phase1hadapsar.pdf · uploaded 11 Sep 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026779 · phase6.pdf · uploaded 11 Sep 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026452 · phase5.pdf · uploaded 11 Sep 2021Source
- 1 Copy of Layout Approval (in case of layout)P52100031515 · Layout Approval.pdf · uploaded 6 Oct 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100031515 · Building Plan and CC.pdf · uploaded 6 Oct 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100031515 · Building Plan and CC.pdf · uploaded 6 Oct 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Architect's Certificate Hadapsar Annex_Phase_14_T16-compressed.pdf · uploaded 6 Oct 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_September 21.pdf · uploaded 6 Oct 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · CA Certificate Phase 14-compressed.pdf · uploaded 6 Oct 2021Source
- 1 Proforma of Allotment letterP52100031515 · Manjri Proforma of Allotment Letter.pdf · uploaded 6 Oct 2021Source
- 1 Copy of Layout Approval (in case of layout)P52100031391 · Layout Approval.pdf · uploaded 6 Oct 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100031391 · Building Plan and CC.pdf · uploaded 6 Oct 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100031391 · Building Plan and CC.pdf · uploaded 6 Oct 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Architect's Certificate Hadapsar Annex_Phase_13_T7-compressed.pdf · uploaded 6 Oct 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_September 21.pdf · uploaded 6 Oct 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · CA Certificate Phase 13-compressed.pdf · uploaded 6 Oct 2021Source
- 1 Proforma of Allotment letterP52100031391 · Manjri Proforma of Allotment Letter.pdf · uploaded 6 Oct 2021Source
- 1 Declaration in FORM BP52100031515 · Formb B - JSHPL - Ph 14-compressed.pdf · uploaded 7 Oct 2021Source
- 2 Proforma of Allotment letterP52100031515 · AFS-Oct 2021.pdf · uploaded 7 Oct 2021Source
- 1 Declaration in FORM BP52100031391 · Formb B - JSHPL - Ph 13-compressed.pdf · uploaded 7 Oct 2021Source
- 2 Proforma of Allotment letterP52100031391 · AFS-Oct 2021.pdf · uploaded 7 Oct 2021Source
- 1 Copy of the legal title reportP52100031515 · RERA Title_Manjri-compressed_compressed.pdf · uploaded 18 Oct 2021Source
- 1 Details of encumbrancesP52100031515 · No Encumbrance Ph 14_1.pdf · uploaded 18 Oct 2021Source
- 1 Declaration about Commencement CertificateP52100031515 · Form D-CC_Declearation -Building - 16.pdf · uploaded 18 Oct 2021Source
- 1 Copy of the legal title reportP52100031391 · RERA Title_Manjri-compressed_compressed.pdf · uploaded 18 Oct 2021Source
- 1 Details of encumbrancesP52100031391 · No Encumbrance Ph 13.pdf · uploaded 18 Oct 2021Source
- 1 Declaration about Commencement CertificateP52100031391 · Form D-CC_Declearation -Building - 7.pdf · uploaded 18 Oct 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5_compressed.pdf · uploaded 19 Oct 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_September 21_compressed.pdf · uploaded 19 Oct 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202109 RERA Certificate Ph 8 Tower 05 - RERA Final.pdf · uploaded 19 Oct 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Architect's Certificate Hadapsar Annex_Phase_12_T8_compressed.pdf · uploaded 19 Oct 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_September 21_compressed.pdf · uploaded 19 Oct 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202109 RERA Certificate Ph 12 Tower 08 - RERA Final.pdf · uploaded 19 Oct 2021Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · Architect's Certificate Hadapsar Annex_Phase_4_T1_compressed.pdf · uploaded 19 Oct 2021Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase_4_T1_September 21_compressed.pdf · uploaded 19 Oct 2021Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026478 · 202109 RERA Certificate Ph 4 Tower 01 - RERA Final.pdf · uploaded 19 Oct 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Architect's Certificate Hadapsar Annex_Phase_11_T6_compressed.pdf · uploaded 19 Oct 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_September 21_compressed.pdf · uploaded 19 Oct 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202109 RERA Certificate Ph 11 Tower 06 - RERA Final.pdf · uploaded 19 Oct 2021Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Hadapsar Annex_Phase_2_T20_compressed.pdf · uploaded 19 Oct 2021Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Engineer's Certificate_Hadapsar Annex_Phase_2_T20_September 21_compressed.pdf · uploaded 19 Oct 2021Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026479 · 202109 RERA Certificate Ph 2 Tower 20 - RERAFinal.pdf · uploaded 19 Oct 2021Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Architect's Certificate Hadapsar Annex_Phase_3_T19_compressed.pdf · uploaded 19 Oct 2021Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026480 · Engineer's Certificate_Hadapsar Annex_Phase_3_T19_September 21_compressed.pdf · uploaded 19 Oct 2021Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026480 · 202109 RERA Certificate Ph 3 Tower 19 - RERAFinal.pdf · uploaded 19 Oct 2021Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18_compressed.pdf · uploaded 19 Oct 2021Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_September 21_compressed.pdf · uploaded 19 Oct 2021Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202109 RERA Certificate Ph 10 Tower 18 - RERA Final.pdf · uploaded 19 Oct 2021Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17_compressed.pdf · uploaded 19 Oct 2021Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_September 21_compressed.pdf · uploaded 19 Oct 2021Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202109 RERA Certificate Ph 9 Tower 17 - RERA FInal.pdf · uploaded 19 Oct 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_7_T4_compressed.pdf · uploaded 19 Oct 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_September 21_compressed.pdf · uploaded 19 Oct 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202109 RERA Certificate Ph 7 Tower 04 - RERA FInal.pdf · uploaded 19 Oct 2021Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21_compressed.pdf · uploaded 19 Oct 2021Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase_1_T21_September 21_compressed.pdf · uploaded 19 Oct 2021Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · 202109 RERA Certificate Ph 1 Tower 21 - RERAFInal.pdf · uploaded 19 Oct 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Architect's Certificate Hadapsar Annex_Phase_6_T3_compressed.pdf · uploaded 19 Oct 2021Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Engineer's Certificate_Hadapsar Annex_Phase_6_T3_September 21_compressed.pdf · uploaded 19 Oct 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026779 · 202109 RERA Certificate Ph 6 Tower 03 - RERA Final.pdf · uploaded 19 Oct 2021Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026452 · Architect's Certificate Hadapsar Annex_Phase_5_T2_compressed.pdf · uploaded 19 Oct 2021Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026452 · Engineer's Certificate_Hadapsar Annex_Phase_5_T2_September 21_compressed.pdf · uploaded 19 Oct 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026452 · 202109 RERA Certificate Ph 5 Tower 02 - RERA Final.pdf · uploaded 19 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026785 · Manjiri Phase 8 Annual Certi and cover letter.pdf · uploaded 30 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100028308 · Manjiri Phase 12 Annual Certi and cover letter.pdf · uploaded 30 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026478 · Manjiri Phase 4 Annual Certi and cover letter.pdf · uploaded 30 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100028311 · Manjiri Phase 11 Annual Certi and cover letter.pdf · uploaded 30 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026479 · Manjiri Phase 2 Annual Certi and cover letter.pdf · uploaded 30 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026480 · Manjiri Phase 3 Annual Certi and cover letter.pdf · uploaded 30 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026795 · Manjiri Phase 10 Annual Certi and cover letter.pdf · uploaded 30 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026797 · Manjiri Phase 9 Annual Certi and cover letter.pdf · uploaded 30 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026800 · Manjiri Phase 7 Annual Certi and cover letter.pdf · uploaded 30 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026451 · Manjiri Phase 1 Annual Certi and cover letter.pdf · uploaded 30 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026779 · Manjiri Phase 6 Annual Certi and cover letter.pdf · uploaded 30 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026452 · Manjiri Phase 5 Annual Certi and cover letter.pdf · uploaded 30 Oct 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026785 · Quality Ph-8.pdf · uploaded 27 Nov 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100028308 · Quality Ph-12.pdf · uploaded 27 Nov 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026478 · Quality Ph-4.pdf · uploaded 27 Nov 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100028311 · Quality Ph-11.pdf · uploaded 27 Nov 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026479 · Quality Ph-2.pdf · uploaded 27 Nov 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026480 · Quality Ph-3.pdf · uploaded 27 Nov 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026795 · Quality Ph-10.pdf · uploaded 27 Nov 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026797 · Quality Ph-9.pdf · uploaded 27 Nov 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026800 · Quality Ph-7.pdf · uploaded 27 Nov 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026451 · Quality Ph-1.pdf · uploaded 27 Nov 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026779 · Quality Ph-6.pdf · uploaded 27 Nov 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026452 · Quality Ph-5.pdf · uploaded 27 Nov 2021Source
- 5 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 29 Nov 2021Source
- 6 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 29 Nov 2021Source
- 7 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 29 Nov 2021Source
- 8 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 29 Nov 2021Source
- 5 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 29 Nov 2021Source
- 6 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 29 Nov 2021Source
- 7 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 29 Nov 2021Source
- 8 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 29 Nov 2021Source
- 5 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 29 Nov 2021View
- 6 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 29 Nov 2021View
- 7 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 29 Nov 2021View
- 8 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 29 Nov 2021View
- 5 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 29 Nov 2021Source
- 6 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 29 Nov 2021Source
- 7 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 29 Nov 2021Source
- 8 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 29 Nov 2021Source
- 5 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 29 Nov 2021View
- 6 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 29 Nov 2021View
- 7 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 29 Nov 2021View
- 8 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 29 Nov 2021View
- 5 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 29 Nov 2021View
- 6 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 29 Nov 2021View
- 7 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 29 Nov 2021View
- 8 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 29 Nov 2021View
- 5 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 29 Nov 2021View
- 6 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 29 Nov 2021View
- 7 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 29 Nov 2021View
- 8 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 29 Nov 2021View
- 5 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 29 Nov 2021View
- 6 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 29 Nov 2021View
- 7 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 29 Nov 2021View
- 8 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 29 Nov 2021View
- 5 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 29 Nov 2021Source
- 6 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 29 Nov 2021Source
- 7 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 29 Nov 2021Source
- 8 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 29 Nov 2021Source
- 5 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21_Sign.pdf · uploaded 29 Nov 2021Source
- 6 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 29 Nov 2021View
- 7 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 29 Nov 2021View
- 8 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 29 Nov 2021View
- 5 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 29 Nov 2021View
- 6 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 29 Nov 2021View
- 7 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 29 Nov 2021View
- 8 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 29 Nov 2021View
- 5 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 29 Nov 2021View
- 6 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 29 Nov 2021View
- 7 Disclosure of sold/ booked inventoryP52100026452 · Joyville Virar Phase 5 - Palm Meadows - 1.pdf · uploaded 29 Nov 2021Source
- 8 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 29 Nov 2021View
- 9 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 29 Nov 2021View
- 9 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 30 Nov 2021Source
- 9 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 30 Nov 2021Source
- 9 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 30 Nov 2021View
- 9 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 30 Nov 2021Source
- 9 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 30 Nov 2021View
- 9 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 30 Nov 2021View
- 9 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 30 Nov 2021View
- 9 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 30 Nov 2021View
- 9 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 30 Nov 2021Source
- 9 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 30 Nov 2021View
- 9 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 30 Nov 2021View
- 10 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 30 Nov 2021View
- 10 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 1 Dec 2021Source
- 10 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 1 Dec 2021Source
- 10 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 1 Dec 2021View
- 10 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 1 Dec 2021Source
- 10 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 1 Dec 2021View
- 10 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 1 Dec 2021View
- 10 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 1 Dec 2021View
- 10 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 1 Dec 2021View
- 10 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 1 Dec 2021Source
- 10 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 1 Dec 2021View
- 10 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 1 Dec 2021View
- 11 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 1 Dec 2021View
- 11 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 15 Dec 2021Source
- 11 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 15 Dec 2021Source
- 11 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 15 Dec 2021View
- 11 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 15 Dec 2021Source
- 11 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 15 Dec 2021View
- 11 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 15 Dec 2021View
- 11 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 15 Dec 2021View
- 11 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 15 Dec 2021View
- 11 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 15 Dec 2021Source
- 11 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 15 Dec 2021View
- 12 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 15 Dec 2021View
- 12 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 23 Dec 2021Source
- 12 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 23 Dec 2021Source
- 12 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 23 Dec 2021View
- 12 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 23 Dec 2021Source
- 12 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 23 Dec 2021View
- 12 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 23 Dec 2021View
- 12 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 23 Dec 2021View
- 12 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 23 Dec 2021View
- 12 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 23 Dec 2021Source
- 11 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 23 Dec 2021View
- 12 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 23 Dec 2021View
- 13 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 23 Dec 2021View
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100026785 · REGISTRATION CERTIFICATE PHASE 8.pdf · uploaded 1 Jan 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100026478 · REGISTRATION CERTIFICATE PHASE 4.pdf · uploaded 1 Jan 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100028311 · REGISTRATION CERTIFICATE PHASE 11.pdf · uploaded 1 Jan 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100026479 · REGISTRATION CERTIFICATE PHASE 2.pdf · uploaded 1 Jan 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100026480 · REGISTRATION CERTIFICATE PHASE 3.pdf · uploaded 1 Jan 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100026795 · REGISTRATION CERTIFICATE PHASE 10.pdf · uploaded 1 Jan 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100026797 · REGISTRATION CERTIFICATE PHASE 9.pdf · uploaded 1 Jan 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100026800 · REGISTRATION CERTIFICATE PHASE 7.pdf · uploaded 1 Jan 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100026451 · REGISTRATION CERTIFICATE PHASE 1.pdf · uploaded 1 Jan 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100026779 · REGISTRATION CERTIFICATE PHASE 6.pdf · uploaded 1 Jan 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100026452 · REGISTRATION CERTIFICATE PHASE 5.pdf · uploaded 1 Jan 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5.pdf · uploaded 3 Jan 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_December 21.pdf · uploaded 3 Jan 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Architect's Certificate Hadapsar Annex_Phase_12_T8.pdf · uploaded 3 Jan 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_December 21.pdf · uploaded 3 Jan 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · Architect's Certificate Hadapsar Annex_Phase_4_T1.pdf · uploaded 3 Jan 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase_4_T1_December 21.pdf · uploaded 3 Jan 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Architect's Certificate Hadapsar Annex_Phase_11_T6.pdf · uploaded 3 Jan 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_December 21.pdf · uploaded 3 Jan 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Hadapsar Annex_Phase_2_T20.pdf · uploaded 3 Jan 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Engineer's Certificate_Hadapsar Annex_Phase_2_T20_December 21.pdf · uploaded 3 Jan 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Architect's Certificate Hadapsar Annex_Phase_3_T19.pdf · uploaded 3 Jan 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026480 · Engineer's Certificate_Hadapsar Annex_Phase_3_T19_December 21.pdf · uploaded 3 Jan 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18.pdf · uploaded 3 Jan 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_December 21.pdf · uploaded 3 Jan 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17.pdf · uploaded 3 Jan 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_December 21.pdf · uploaded 3 Jan 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_7_T4.pdf · uploaded 3 Jan 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_December 21.pdf · uploaded 3 Jan 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21.pdf · uploaded 3 Jan 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase_1_T21_December 21.pdf · uploaded 3 Jan 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026779 · Architect's Certificate Hadapsar Annex_Phase_6_T3.pdf · uploaded 3 Jan 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Engineer's Certificate_Hadapsar Annex_Phase_6_T3_December 21.pdf · uploaded 3 Jan 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026452 · Architect's Certificate Hadapsar Annex_Phase_5_T2.pdf · uploaded 3 Jan 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026452 · Engineer's Certificate_Hadapsar Annex_Phase_5_T2_December 21.pdf · uploaded 3 Jan 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5.pdf · uploaded 10 Jan 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_December 21.pdf · uploaded 10 Jan 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Architect's Certificate Hadapsar Annex_Phase_12_T8.pdf · uploaded 10 Jan 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_December 21.pdf · uploaded 10 Jan 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · Architect's Certificate Hadapsar Annex_Phase_4_T1.pdf · uploaded 10 Jan 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase_4_T1_December 21.pdf · uploaded 10 Jan 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Architect's Certificate Hadapsar Annex_Phase_11_T6.pdf · uploaded 10 Jan 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_December 21.pdf · uploaded 10 Jan 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Hadapsar Annex_Phase_2_T20.pdf · uploaded 10 Jan 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Engineer's Certificate_Hadapsar Annex_Phase_2_T20_December 21.pdf · uploaded 10 Jan 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Architect's Certificate Hadapsar Annex_Phase_13_T7.pdf · uploaded 10 Jan 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_December 21.pdf · uploaded 10 Jan 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Architect's Certificate Hadapsar Annex_Phase_3_T19.pdf · uploaded 10 Jan 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026480 · Engineer's Certificate_Hadapsar Annex_Phase_3_T19_December 21.pdf · uploaded 10 Jan 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18.pdf · uploaded 10 Jan 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_December 21.pdf · uploaded 10 Jan 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17.pdf · uploaded 10 Jan 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_December 21.pdf · uploaded 10 Jan 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_7_T4.pdf · uploaded 10 Jan 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_December 21.pdf · uploaded 10 Jan 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21.pdf · uploaded 10 Jan 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase_1_T21_December 21.pdf · uploaded 10 Jan 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Engineer's Certificate_Hadapsar Annex_Phase_6_T3_December 21.pdf · uploaded 10 Jan 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Architect's Certificate Hadapsar Annex_Phase_6_T3.pdf · uploaded 10 Jan 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026452 · Architect's Certificate Hadapsar Annex_Phase_5_T2.pdf · uploaded 10 Jan 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026452 · Engineer's Certificate_Hadapsar Annex_Phase_5_T2_December 21.pdf · uploaded 10 Jan 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026785 · Form 2A - Manjri - Phase-8-Tower-5.pdf · uploaded 14 Jan 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100028308 · Form 2A - Manjri - Phase-12-Tower-8.pdf · uploaded 14 Jan 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026478 · Form 2A - Manjri - Phase-4-Tower-1.pdf · uploaded 14 Jan 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100028311 · Form 2A - Manjri - Phase-11-Tower-6.pdf · uploaded 14 Jan 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026479 · Form 2A - Manjri - Phase-2-Tower-20.pdf · uploaded 14 Jan 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100031391 · Form 2A - Manjri - Phase-13-Tower-7.pdf · uploaded 14 Jan 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026480 · Form 2A - Manjri - Phase-3-Tower-19.pdf · uploaded 14 Jan 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026795 · Form 2A - Manjri - Phase-10-Tower-18.pdf · uploaded 14 Jan 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026797 · Form 2A - Manjri - Phase-9-Tower-17.pdf · uploaded 14 Jan 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026800 · Form 2A - Manjri - Phase-7-Tower-4.pdf · uploaded 14 Jan 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026451 · Form 2A - Manjri - Phase-1-Tower-21.pdf · uploaded 14 Jan 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026779 · Form 2A - Manjri - Phase-6-Tower-3.pdf · uploaded 14 Jan 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026452 · Form 2A - Manjri - Phase-5-Tower-2.pdf · uploaded 14 Jan 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202112 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 15 Jan 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202112 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 15 Jan 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Architect's Certificate Hadapsar Annex_Phase_14_T16.pdf · uploaded 15 Jan 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_December 21.pdf · uploaded 15 Jan 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100031515 · Form 2A - Manjri - Phase-14-Tower-16.pdf · uploaded 15 Jan 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · 202112 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 15 Jan 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026478 · 202112 RERA Certificate Ph 4 Tower 01 - RERA.pdf · uploaded 15 Jan 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202112 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 15 Jan 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026479 · 202112 RERA Certificate Ph 2 Tower 20 - RERA.pdf · uploaded 15 Jan 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202112 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 15 Jan 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026480 · 202112 RERA Certificate Ph 3 Tower 19 - RERA.pdf · uploaded 15 Jan 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202112 RERA Certificate Ph 10 Tower 18 - RERA.pdf · uploaded 15 Jan 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202112 RERA Certificate Ph 9 Tower 17 - RERA.pdf · uploaded 15 Jan 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202112 RERA Certificate Ph 7 Tower 04 - RERA.pdf · uploaded 15 Jan 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · 202112 RERA Certificate Ph 1 Tower 21 - RERA (003).pdf · uploaded 15 Jan 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026779 · 202112 RERA Certificate Ph 6 Tower 03 - RERA.pdf · uploaded 15 Jan 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026452 · 202112 RERA Certificate Ph 5 Tower 02 - RERA.pdf · uploaded 15 Jan 2022Source
- 13 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5-converted.pdf · uploaded 17 Jan 2022Source
- 13 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8-converted.pdf · uploaded 17 Jan 2022Source
- 1 Disclosure of sold/ booked inventoryP52100031515 · Joyville Hadapsar Annexe Phase 14 - Tower 16-converted.pdf · uploaded 17 Jan 2022Source
- 13 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1-converted.pdf · uploaded 17 Jan 2022Source
- 13 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6-converted.pdf · uploaded 17 Jan 2022Source
- 13 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20-converted.pdf · uploaded 17 Jan 2022Source
- 1 Disclosure of sold/ booked inventoryP52100031391 · Joyville Hadapsar Annexe Phase 13 - Tower 7-converted.pdf · uploaded 17 Jan 2022Source
- 13 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19-converted.pdf · uploaded 17 Jan 2022Source
- 13 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18-converted.pdf · uploaded 17 Jan 2022Source
- 13 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17-converted.pdf · uploaded 17 Jan 2022Source
- 13 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4-converted.pdf · uploaded 17 Jan 2022Source
- 12 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21-converted.pdf · uploaded 17 Jan 2022Source
- 13 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3-converted.pdf · uploaded 17 Jan 2022Source
- 14 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2-converted.pdf · uploaded 17 Jan 2022Source
- 14 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 31 Jan 2022Source
- 14 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 31 Jan 2022Source
- 2 Disclosure of sold/ booked inventoryP52100031515 · Joyville Hadapsar Annexe Phase 14 - Tower 16.pdf · uploaded 31 Jan 2022Source
- 14 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 31 Jan 2022View
- 14 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 31 Jan 2022Source
- 14 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 31 Jan 2022View
- 2 Disclosure of sold/ booked inventoryP52100031391 · Joyville Hadapsar Annexe Phase 13 - Tower 7.pdf · uploaded 31 Jan 2022Source
- 14 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 31 Jan 2022View
- 14 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 31 Jan 2022View
- 14 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 31 Jan 2022View
- 14 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 31 Jan 2022Source
- 13 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 31 Jan 2022View
- 14 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 31 Jan 2022View
- 15 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 31 Jan 2022View
- 15 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 28 Feb 2022Source
- 15 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 28 Feb 2022Source
- 3 Disclosure of sold/ booked inventoryP52100031515 · Joyville Hadapsar Annexe Phase 14 - Tower 16.pdf · uploaded 28 Feb 2022Source
- 15 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 28 Feb 2022View
- 15 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 28 Feb 2022Source
- 15 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 28 Feb 2022View
- 3 Disclosure of sold/ booked inventoryP52100031391 · Joyville Hadapsar Annexe Phase 13 - Tower 7.pdf · uploaded 28 Feb 2022Source
- 15 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 28 Feb 2022View
- 15 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 28 Feb 2022View
- 15 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 28 Feb 2022View
- 15 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 28 Feb 2022Source
- 14 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 28 Feb 2022View
- 15 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 28 Feb 2022View
- 16 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 28 Feb 2022View
- 16 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 9 Mar 2022Source
- 16 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 9 Mar 2022Source
- 4 Disclosure of sold/ booked inventoryP52100031515 · Joyville Hadapsar Annexe Phase 14 - Tower 16.pdf · uploaded 9 Mar 2022Source
- 16 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 9 Mar 2022View
- 16 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 9 Mar 2022Source
- 16 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 9 Mar 2022View
- 4 Disclosure of sold/ booked inventoryP52100031391 · Joyville Hadapsar Annexe Phase 13 - Tower 7.pdf · uploaded 9 Mar 2022Source
- 16 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 9 Mar 2022View
- 16 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 9 Mar 2022View
- 16 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 9 Mar 2022View
- 16 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 9 Mar 2022Source
- 15 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 9 Mar 2022View
- 16 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 9 Mar 2022View
- 17 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 9 Mar 2022View
- 17 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 10 Mar 2022Source
- 17 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 10 Mar 2022Source
- 5 Disclosure of sold/ booked inventoryP52100031515 · Joyville Hadapsar Annexe Phase 14 - Tower 16.pdf · uploaded 10 Mar 2022Source
- 17 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 10 Mar 2022View
- 17 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 10 Mar 2022Source
- 17 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 10 Mar 2022View
- 5 Disclosure of sold/ booked inventoryP52100031391 · Joyville Hadapsar Annexe Phase 13 - Tower 7.pdf · uploaded 10 Mar 2022Source
- 17 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 10 Mar 2022View
- 17 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 10 Mar 2022View
- 17 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 10 Mar 2022View
- 17 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 10 Mar 2022Source
- 16 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 10 Mar 2022View
- 17 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 10 Mar 2022View
- 18 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 10 Mar 2022View
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · HADAPSARPHASE8TOWER5_compressed.pdf · uploaded 22 Mar 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026478 · HADAPSARPHASE4-compressed.pdf · uploaded 22 Mar 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026479 · HADAPSARPHASE2_compressed.pdf · uploaded 22 Mar 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026480 · HADAPSARPHASE3TOWER19_compressed.pdf · uploaded 22 Mar 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · HADAPSARPHASE10TOWER18_compressed.pdf · uploaded 22 Mar 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · HADAPSARPHASE9TOWER17_compressed.pdf · uploaded 22 Mar 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · HADAPSARPHASE7TOWER4_compressed.pdf · uploaded 22 Mar 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · HADAPSARPHASE1TOWER21_compressed.pdf · uploaded 22 Mar 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026779 · HADAPSARPHASE6_compressed.pdf · uploaded 22 Mar 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026452 · HADAPSARPHASE5-compressed.pdf · uploaded 22 Mar 2022Source
- 18 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 30 Mar 2022Source
- 18 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 30 Mar 2022Source
- 6 Disclosure of sold/ booked inventoryP52100031515 · Joyville Hadapsar Annexe Phase 14 - Tower 16.pdf · uploaded 30 Mar 2022Source
- 18 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 30 Mar 2022View
- 18 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 30 Mar 2022Source
- 18 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 30 Mar 2022View
- 6 Disclosure of sold/ booked inventoryP52100031391 · Joyville Hadapsar Annexe Phase 13 - Tower 7.pdf · uploaded 30 Mar 2022Source
- 18 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 30 Mar 2022View
- 18 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 30 Mar 2022View
- 18 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 30 Mar 2022View
- 18 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 30 Mar 2022Source
- 17 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 30 Mar 2022View
- 18 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 30 Mar 2022View
- 19 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 30 Mar 2022View
- 1 Details of encumbrancesP52100034911 · non encumbrance certificate.pdf · uploaded 12 Apr 2022Source
- 1 Declaration in FORM BP52100034911 · Joyville Hadapsar Annexe_Affidavit cum decln (Form B)_For JSHPL(LO)_Phase 15-compressed.pdf · uploaded 12 Apr 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034911 · CA RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 12 Apr 2022Source
- 1 Proforma of Allotment letterP52100034911 · AFS-Oct 2021.pdf · uploaded 12 Apr 2022Source
- 2 Proforma of Allotment letterP52100034911 · Manjri Proforma of Allotment Letter.pdf · uploaded 12 Apr 2022Source
- 19 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 13 Apr 2022Source
- 19 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 13 Apr 2022Source
- 7 Disclosure of sold/ booked inventoryP52100031515 · Joyville Hadapsar Annexe Phase 14 - Tower 16.pdf · uploaded 13 Apr 2022Source
- 19 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 13 Apr 2022View
- 19 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 13 Apr 2022Source
- 19 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 13 Apr 2022View
- 7 Disclosure of sold/ booked inventoryP52100031391 · Joyville Hadapsar Annexe Phase 13 - Tower 7.pdf · uploaded 13 Apr 2022Source
- 19 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 13 Apr 2022View
- 19 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 13 Apr 2022View
- 19 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 13 Apr 2022View
- 19 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 13 Apr 2022Source
- 18 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 13 Apr 2022View
- 19 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 13 Apr 2022View
- 20 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 13 Apr 2022View
- 1 Commencement Certificates / NA Order for plotted developmentP52100034911 · CC ORDER_1.pdf · uploaded 18 Apr 2022Source
- 1 PAN CardP52100034911 · Joyville PAN.pdf · uploaded 21 Apr 2022Source
- 1 Copy of the legal title reportP52100034911 · 1 Copy of the legal title report (3).pdf · uploaded 21 Apr 2022Source
- 1 Copy of Layout Approval (in case of layout)P52100034911 · PMRDA_Sanction layout.pdf · uploaded 21 Apr 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100034911 · PMRDA_Sanction layout.pdf · uploaded 21 Apr 2022Source
- 1 Declaration about Commencement CertificateP52100034911 · Form-D.pdf · uploaded 21 Apr 2022Source
- 1 CERSAI detailsP52100034911 · CERSAI_Search_Report_200235543691_For_Asset_Based_Search_21_04_2022_14_53_02_148.pdf · uploaded 21 Apr 2022Source
- 1 OtherP52100034911 · Decleration.pdf · uploaded 21 Apr 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5.pdf · uploaded 3 Jun 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5__March 22.pdf · uploaded 3 Jun 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202203 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 3 Jun 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Architect's Certificate Hadapsar Annex_Phase_12_T8.pdf · uploaded 3 Jun 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8__March 22.pdf · uploaded 3 Jun 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202203 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 3 Jun 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Architect's Certificate Hadapsar Annex_Phase_14_T16.pdf · uploaded 3 Jun 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_March 22.pdf · uploaded 3 Jun 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · 202203 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 3 Jun 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · Architect's Certificate Hadapsar Annex_Phase_4_T1.pdf · uploaded 3 Jun 2022Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase_4_T1__March 22.pdf · uploaded 3 Jun 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026478 · 202203 RERA Certificate Ph 4 Tower 01 - RERA.pdf · uploaded 3 Jun 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Architect's Certificate Hadapsar Annex_Phase_11_T6.pdf · uploaded 3 Jun 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6__March 22.pdf · uploaded 3 Jun 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202203 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 3 Jun 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Hadapsar Annex_Phase_2_T20.pdf · uploaded 3 Jun 2022Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Engineer's Certificate_Hadapsar Annex_Phase_2_T20__March 22.pdf · uploaded 3 Jun 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026479 · 202203 RERA Certificate Ph 2 Tower 20 - RERA.pdf · uploaded 3 Jun 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · 202203 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 3 Jun 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Architect's Certificate Hadapsar Annex_Phase_13_T7.pdf · uploaded 3 Jun 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Architect's Certificate Hadapsar Annex_Phase_13_T7.pdf · uploaded 3 Jun 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7__March 22.pdf · uploaded 3 Jun 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202203 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 3 Jun 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Architect's Certificate Hadapsar Annex_Phase_3_T19.pdf · uploaded 3 Jun 2022Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026480 · Engineer's Certificate_Hadapsar Annex_Phase_3_T19__March 22.pdf · uploaded 3 Jun 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026480 · 202203 RERA Certificate Ph 3 Tower 19 - RERA.pdf · uploaded 3 Jun 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18.pdf · uploaded 3 Jun 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18__March 22.pdf · uploaded 3 Jun 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202203 RERA Certificate Ph 10 Tower 18 - RERA.pdf · uploaded 3 Jun 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17.pdf · uploaded 3 Jun 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17__March 22.pdf · uploaded 3 Jun 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202203 RERA Certificate Ph 9 Tower 17 - RERA.pdf · uploaded 3 Jun 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_7_T4.pdf · uploaded 3 Jun 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4__March 22.pdf · uploaded 3 Jun 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202203 RERA Certificate Ph 7 Tower 04 - RERA.pdf · uploaded 3 Jun 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21.pdf · uploaded 3 Jun 2022Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase_1_T21_March 22.pdf · uploaded 3 Jun 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · 202203 RERA Certificate Ph 1 Tower 21 - RERA.pdf · uploaded 3 Jun 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026779 · Architect's Certificate Hadapsar Annex_Phase_6_T3.pdf · uploaded 3 Jun 2022Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Engineer's Certificate_Hadapsar Annex_Phase_6_T3__March 22.pdf · uploaded 3 Jun 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026779 · 202203 RERA Certificate Ph 6 Tower 03 - RERA.pdf · uploaded 3 Jun 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026452 · Architect's Certificate Hadapsar Annex_Phase_5_T2.pdf · uploaded 3 Jun 2022Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026452 · Engineer's Certificate_Hadapsar Annex_Phase_5_T2__March 22.pdf · uploaded 3 Jun 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026452 · 202203 RERA Certificate Ph 5 Tower 02 - RERA.pdf · uploaded 3 Jun 2022Source
- 19 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Phase 1.pdf · uploaded 27 Jun 2022Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · Architect's Certificate Hadapsar Annex_Phase_4_T1.pdf · uploaded 18 Jul 2022Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase_4_T1__June 22.pdf · uploaded 18 Jul 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026478 · Form 2A - Manjri - Phase-4-Tower-1.pdf · uploaded 18 Jul 2022Source
- 20 Disclosure of sold/ booked inventoryP52100026478 · Joyville Manjri Phase 4.pdf · uploaded 18 Jul 2022Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026478 · 202206 RERA Certificate Ph 4 Tower 01 - RERA.pdf · uploaded 18 Jul 2022Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Hadapsar Annex_Phase_2_T20.pdf · uploaded 18 Jul 2022Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Engineer's Certificate_Hadapsar Annex_Phase_2_T20__June 22.pdf · uploaded 18 Jul 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026479 · Form 2A - Manjri - Phase-2-Tower-20.pdf · uploaded 18 Jul 2022Source
- 20 Disclosure of sold/ booked inventoryP52100026479 · Joyville Manjri Phase 2.pdf · uploaded 18 Jul 2022Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026479 · 202206 RERA Certificate Ph 2 Tower 20 - RERA.pdf · uploaded 18 Jul 2022Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Architect's Certificate Hadapsar Annex_Phase_3_T19.pdf · uploaded 18 Jul 2022Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026480 · Engineer's Certificate_Hadapsar Annex_Phase_3_T19__June 22.pdf · uploaded 18 Jul 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026480 · Form 2A - Manjri - Phase-3-Tower-19.pdf · uploaded 18 Jul 2022Source
- 20 Disclosure of sold/ booked inventoryP52100026480 · Joyville Manjri Phase 3.pdf · uploaded 18 Jul 2022Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026480 · 202206 RERA Certificate Ph 3 Tower 19 - RERA.pdf · uploaded 18 Jul 2022Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21.pdf · uploaded 18 Jul 2022Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase_1_T21_June 22.pdf · uploaded 18 Jul 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026451 · Form 2A - Manjri - Phase-1-Tower-21.pdf · uploaded 18 Jul 2022Source
- 20 Disclosure of sold/ booked inventoryP52100026451 · Joyville Manjri Phase 1.pdf · uploaded 18 Jul 2022Source
- 21 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Phase 1.pdf · uploaded 18 Jul 2022Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · 202206 RERA Certificate Ph 1 Tower 21 - RERA.pdf · uploaded 18 Jul 2022Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026452 · Architect's Certificate Hadapsar Annex_Phase_5_T2.pdf · uploaded 18 Jul 2022Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026452 · Engineer's Certificate_Hadapsar Annex_Phase_5_T2__June 22.pdf · uploaded 18 Jul 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026452 · Form 2A - Manjri - Phase-5-Tower-2.pdf · uploaded 18 Jul 2022Source
- 21 Disclosure of sold/ booked inventoryP52100026452 · Joyville Manjri Phase 5.pdf · uploaded 18 Jul 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5.pdf · uploaded 19 Jul 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5__June 22.pdf · uploaded 19 Jul 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026785 · Form 2A - Manjri - Phase-8-Tower-5.pdf · uploaded 19 Jul 2022Source
- 20 Disclosure of sold/ booked inventoryP52100026785 · Joyville Manjri Phase 8.pdf · uploaded 19 Jul 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202206 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 19 Jul 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Architect's Certificate Hadapsar Annex_Phase_12_T8.pdf · uploaded 19 Jul 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8__June 22.pdf · uploaded 19 Jul 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100028308 · Form 2A - Manjri - Phase-12-Tower-8.pdf · uploaded 19 Jul 2022Source
- 20 Disclosure of sold/ booked inventoryP52100028308 · Joyville Manjri Phase 12.pdf · uploaded 19 Jul 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202206 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 19 Jul 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Architect's Certificate Hadapsar Annex_Phase_14_T16.pdf · uploaded 19 Jul 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_June 22.pdf · uploaded 19 Jul 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100031515 · Form 2A - Manjri - Phase-14-Tower-16.pdf · uploaded 19 Jul 2022Source
- 8 Disclosure of sold/ booked inventoryP52100031515 · Joyville Manjri Phase 14.pdf · uploaded 19 Jul 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Architect's Certificate Hadapsar Annex_Phase_11_T6.pdf · uploaded 19 Jul 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6__June 22.pdf · uploaded 19 Jul 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100028311 · Form 2A - Manjri - Phase-11-Tower-6.pdf · uploaded 19 Jul 2022Source
- 20 Disclosure of sold/ booked inventoryP52100028311 · 202206 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 19 Jul 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202206 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 19 Jul 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Architect's Certificate Hadapsar Annex_Phase_13_T7.pdf · uploaded 19 Jul 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7__June 22.pdf · uploaded 19 Jul 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100031391 · Form 2A - Manjri - Phase-13-Tower-7.pdf · uploaded 19 Jul 2022Source
- 8 Disclosure of sold/ booked inventoryP52100031391 · Joyville Manjri Phase 13.pdf · uploaded 19 Jul 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202206 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 19 Jul 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034911 · Architect's Certificate Hadapsar Annex_Phase_15_T15.pdf · uploaded 19 Jul 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T16_June 22 .pdf · uploaded 19 Jul 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100034911 · From 2A - Manjri - Phase - T15 - Tower - 15.pdf · uploaded 19 Jul 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100034911 · 202206 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 19 Jul 2022Source
- 1 Disclosure of sold/ booked inventoryP52100034911 · Joyville Manjri Phase 15.pdf · uploaded 19 Jul 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18.pdf · uploaded 19 Jul 2022Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18__June 22.pdf · uploaded 19 Jul 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026795 · Form 2A - Manjri - Phase-10-Tower-18.pdf · uploaded 19 Jul 2022Source
- 20 Disclosure of sold/ booked inventoryP52100026795 · Joyville Manjri Phase 10.pdf · uploaded 19 Jul 2022Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202206 RERA Certificate Ph 10 Tower 18 - RERA.pdf · uploaded 19 Jul 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17.pdf · uploaded 19 Jul 2022Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17__June 22.pdf · uploaded 19 Jul 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026797 · Form 2A - Manjri - Phase-9-Tower-17.pdf · uploaded 19 Jul 2022Source
- 20 Disclosure of sold/ booked inventoryP52100026797 · Joyville Manjri Phase 9.pdf · uploaded 19 Jul 2022Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202206 RERA Certificate Ph 9 Tower 17 - RERA.pdf · uploaded 19 Jul 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_7_T4.pdf · uploaded 19 Jul 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4__June 22.pdf · uploaded 19 Jul 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026800 · Form 2A - Manjri - Phase-7-Tower-4.pdf · uploaded 19 Jul 2022Source
- 20 Disclosure of sold/ booked inventoryP52100026800 · Joyville Manjri Phase 7.pdf · uploaded 19 Jul 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202206 RERA Certificate Ph 7 Tower 04 - RERA.pdf · uploaded 19 Jul 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026779 · Architect's Certificate Hadapsar Annex_Phase_6_T3.pdf · uploaded 19 Jul 2022Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Engineer's Certificate_Hadapsar Annex_Phase_6_T3__June 22.pdf · uploaded 19 Jul 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026779 · Form 2A - Manjri - Phase-6-Tower-3.pdf · uploaded 19 Jul 2022Source
- 20 Disclosure of sold/ booked inventoryP52100026779 · Joyville Manjri Phase 6.pdf · uploaded 19 Jul 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026779 · 202206 RERA Certificate Ph 6 Tower 03 - RERA.pdf · uploaded 19 Jul 2022Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026478 · Phase-4 - T 1 - CA Certificate March-22 (1).pdf · uploaded 20 Jul 2022Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026480 · Phase 3 - T 19 - CA Certificate March-22 (1).pdf · uploaded 20 Jul 2022Source
- 1 PAN CardP52100026451 · Joyville PAN.pdf · uploaded 20 Jul 2022Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21.pdf · uploaded 20 Jul 2022Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase_1_T21_March 22.pdf · uploaded 20 Jul 2022Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · Phase 1 - T 21 - CA Certificate March-22.pdf · uploaded 20 Jul 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026452 · Phase-5 - T 2 - CA Certificate March-22.pdf · uploaded 20 Jul 2022Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026452 · 202206 RERA Certificate Ph 5 Tower 02 - RERA.pdf · uploaded 20 Jul 2022Source
- 21 Disclosure of sold/ booked inventoryP52100026785 · Phase 8.pdf · uploaded 30 Jul 2022Source
- 21 Disclosure of sold/ booked inventoryP52100028308 · Phase 12.pdf · uploaded 30 Jul 2022Source
- 9 Disclosure of sold/ booked inventoryP52100031515 · Phase 14.pdf · uploaded 30 Jul 2022Source
- 21 Disclosure of sold/ booked inventoryP52100026478 · Phase 4.pdf · uploaded 30 Jul 2022Source
- 21 Disclosure of sold/ booked inventoryP52100028311 · Phase 11.pdf · uploaded 30 Jul 2022Source
- 21 Disclosure of sold/ booked inventoryP52100026479 · Phase 2.pdf · uploaded 30 Jul 2022Source
- 9 Disclosure of sold/ booked inventoryP52100031391 · Phase 13.pdf · uploaded 30 Jul 2022Source
- 21 Disclosure of sold/ booked inventoryP52100026480 · Phase 3.pdf · uploaded 30 Jul 2022Source
- 2 Disclosure of sold/ booked inventoryP52100034911 · Phase 15.pdf · uploaded 30 Jul 2022Source
- 21 Disclosure of sold/ booked inventoryP52100026795 · Phase 10.pdf · uploaded 30 Jul 2022Source
- 21 Disclosure of sold/ booked inventoryP52100026797 · Phase 9.pdf · uploaded 30 Jul 2022Source
- 21 Disclosure of sold/ booked inventoryP52100026800 · Phase 7.pdf · uploaded 30 Jul 2022Source
- 22 Disclosure of sold/ booked inventoryP52100026451 · Joyville Manjri Phase 1.pdf · uploaded 30 Jul 2022Source
- 23 Disclosure of sold/ booked inventoryP52100026451 · Phase 1.pdf · uploaded 30 Jul 2022Source
- 21 Disclosure of sold/ booked inventoryP52100026779 · Phase 6.pdf · uploaded 30 Jul 2022Source
- 22 Disclosure of sold/ booked inventoryP52100026452 · Phase 5.pdf · uploaded 30 Jul 2022Source
- 22 Disclosure of sold/ booked inventoryP52100026785 · Phase 8.pdf · uploaded 17 Aug 2022Source
- 22 Disclosure of sold/ booked inventoryP52100028308 · Phase 12.pdf · uploaded 17 Aug 2022Source
- 10 Disclosure of sold/ booked inventoryP52100031515 · Phase 14.pdf · uploaded 17 Aug 2022Source
- 22 Disclosure of sold/ booked inventoryP52100026478 · Phase 4.pdf · uploaded 17 Aug 2022Source
- 22 Disclosure of sold/ booked inventoryP52100028311 · Phase 11.pdf · uploaded 17 Aug 2022Source
- 22 Disclosure of sold/ booked inventoryP52100026479 · Phase 2.pdf · uploaded 17 Aug 2022Source
- 10 Disclosure of sold/ booked inventoryP52100031391 · Phase 13.pdf · uploaded 17 Aug 2022Source
- 22 Disclosure of sold/ booked inventoryP52100026480 · Phase 3.pdf · uploaded 17 Aug 2022Source
- 3 Disclosure of sold/ booked inventoryP52100034911 · Phase 15.pdf · uploaded 17 Aug 2022Source
- 22 Disclosure of sold/ booked inventoryP52100026795 · Phase 10.pdf · uploaded 17 Aug 2022Source
- 22 Disclosure of sold/ booked inventoryP52100026797 · Phase 9.pdf · uploaded 17 Aug 2022Source
- 22 Disclosure of sold/ booked inventoryP52100026800 · Phase 7.pdf · uploaded 17 Aug 2022Source
- 24 Disclosure of sold/ booked inventoryP52100026451 · Phase 1.pdf · uploaded 17 Aug 2022Source
- 22 Disclosure of sold/ booked inventoryP52100026779 · Phase 6.pdf · uploaded 17 Aug 2022Source
- 23 Disclosure of sold/ booked inventoryP52100026452 · Phase 5.pdf · uploaded 17 Aug 2022Source
- 23 Disclosure of sold/ booked inventoryP52100026785 · Phase 8.pdf · uploaded 25 Aug 2022Source
- 23 Disclosure of sold/ booked inventoryP52100028308 · Phase 12.pdf · uploaded 25 Aug 2022Source
- 11 Disclosure of sold/ booked inventoryP52100031515 · Phase 14.pdf · uploaded 25 Aug 2022Source
- 23 Disclosure of sold/ booked inventoryP52100026478 · Phase 4.pdf · uploaded 25 Aug 2022Source
- 23 Disclosure of sold/ booked inventoryP52100028311 · Phase 11.pdf · uploaded 25 Aug 2022Source
- 23 Disclosure of sold/ booked inventoryP52100026479 · Phase 2.pdf · uploaded 25 Aug 2022Source
- 11 Disclosure of sold/ booked inventoryP52100031391 · Phase 13.pdf · uploaded 25 Aug 2022Source
- 23 Disclosure of sold/ booked inventoryP52100026480 · Phase 3.pdf · uploaded 25 Aug 2022Source
- 4 Disclosure of sold/ booked inventoryP52100034911 · Phase 15.pdf · uploaded 25 Aug 2022Source
- 23 Disclosure of sold/ booked inventoryP52100026795 · Phase 10.pdf · uploaded 25 Aug 2022Source
- 23 Disclosure of sold/ booked inventoryP52100026797 · Phase 9.pdf · uploaded 25 Aug 2022Source
- 23 Disclosure of sold/ booked inventoryP52100026800 · Phase 7.pdf · uploaded 25 Aug 2022Source
- 25 Disclosure of sold/ booked inventoryP52100026451 · Phase 1.pdf · uploaded 25 Aug 2022Source
- 23 Disclosure of sold/ booked inventoryP52100026779 · Phase 6.pdf · uploaded 25 Aug 2022Source
- 24 Disclosure of sold/ booked inventoryP52100026452 · Phase 5.pdf · uploaded 25 Aug 2022Source
- 24 Disclosure of sold/ booked inventoryP52100026785 · Joyville hadapsar Phase 8.pdf · uploaded 14 Sep 2022Source
- 24 Disclosure of sold/ booked inventoryP52100028308 · Joyville hadapsar Phase 12.pdf · uploaded 14 Sep 2022Source
- 12 Disclosure of sold/ booked inventoryP52100031515 · Joyville hadapsar Phase 14.pdf · uploaded 14 Sep 2022Source
- 24 Disclosure of sold/ booked inventoryP52100026478 · Joyville hadapsar Phase 4.pdf · uploaded 14 Sep 2022Source
- 24 Disclosure of sold/ booked inventoryP52100028311 · Joyville hadapsar Phase 11.pdf · uploaded 14 Sep 2022Source
- 24 Disclosure of sold/ booked inventoryP52100026479 · Joyville hadapsar Phase 2.pdf · uploaded 14 Sep 2022Source
- 12 Disclosure of sold/ booked inventoryP52100031391 · Joyville hadapsar Phase 13.pdf · uploaded 14 Sep 2022Source
- 24 Disclosure of sold/ booked inventoryP52100026480 · Joyville hadapsar Phase 3.pdf · uploaded 14 Sep 2022Source
- 5 Disclosure of sold/ booked inventoryP52100034911 · Joyville hadapsar Phase 15.pdf · uploaded 14 Sep 2022Source
- 24 Disclosure of sold/ booked inventoryP52100026795 · Joyville hadapsar Phase 10.pdf · uploaded 14 Sep 2022Source
- 24 Disclosure of sold/ booked inventoryP52100026797 · Joyville hadapsar Phase 9.pdf · uploaded 14 Sep 2022Source
- 24 Disclosure of sold/ booked inventoryP52100026800 · Joyville hadapsar Phase 7.pdf · uploaded 14 Sep 2022Source
- 26 Disclosure of sold/ booked inventoryP52100026451 · Joyville hadapsar Phase 1.pdf · uploaded 14 Sep 2022Source
- 24 Disclosure of sold/ booked inventoryP52100026779 · Joyville hadapsar Phase 6.pdf · uploaded 14 Sep 2022Source
- 25 Disclosure of sold/ booked inventoryP52100026452 · Joyville hadapsar Phase 5.pdf · uploaded 14 Sep 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026785 · Phase 8 Certificate Signed.pdf · uploaded 29 Sep 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100028308 · Final Manjri Phase 12 Signed.pdf · uploaded 29 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100031515 · Final Manjri Phase 14 Signed.pdf · uploaded 29 Sep 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026478 · Phase 4 Certificate Signed.pdf · uploaded 29 Sep 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100028311 · Final Manjri Phase 11 Signed.pdf · uploaded 29 Sep 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026479 · Manjiri Phase 2 Certificate Signed.pdf · uploaded 29 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100031391 · Final Manjri Phase 13 Signed.pdf · uploaded 29 Sep 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026480 · Manjiri Phase 3 Certificate Signed.pdf · uploaded 29 Sep 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026795 · Phase 10 Certificate Signed.pdf · uploaded 29 Sep 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026797 · Phase 9 Certificate Signed.pdf · uploaded 29 Sep 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026800 · Manjiri Phase 7 Certificate Signed.pdf · uploaded 29 Sep 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026451 · Manjiri Phase 1 Certificate Signed.pdf · uploaded 29 Sep 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026779 · Manjiri Phase 6 Certificate Signed.pdf · uploaded 29 Sep 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026452 · Manjiri Phase 5 Certificate Signed.pdf · uploaded 29 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100026785 · Phase 8 Certificate Signed.pdf · uploaded 30 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100028308 · Final Manjri Phase 12 Signed.pdf · uploaded 30 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100031515 · Final Manjri Phase 14 Signed.pdf · uploaded 30 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100026478 · Phase 4 Certificate Signed.pdf · uploaded 30 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100028311 · Final Manjri Phase 11 Signed.pdf · uploaded 30 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100026479 · Manjiri Phase 2 Certificate Signed.pdf · uploaded 30 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100031391 · Final Manjri Phase 13 Signed.pdf · uploaded 30 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100026480 · Manjiri Phase 3 Certificate Signed.pdf · uploaded 30 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100026795 · Phase 10 Certificate Signed.pdf · uploaded 30 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100026797 · Phase 9 Certificate Signed.pdf · uploaded 30 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100026800 · Manjiri Phase 7 Certificate Signed.pdf · uploaded 30 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100026451 · Manjiri Phase 1 Certificate Signed.pdf · uploaded 30 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100026779 · Manjiri Phase 6 Certificate Signed.pdf · uploaded 30 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100026452 · Manjiri Phase 5 Certificate Signed.pdf · uploaded 30 Sep 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5.pdf · uploaded 4 Oct 2022Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5__September 22.pdf · uploaded 4 Oct 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026785 · Form 2A - Manjri - Phase-8-Tower-5.pdf · uploaded 4 Oct 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Architect's Certificate Hadapsar Annex_Phase_12_T8.pdf · uploaded 4 Oct 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8__September 22.pdf · uploaded 4 Oct 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100028308 · Form 2A - Manjri - Phase-12-Tower-8.pdf · uploaded 4 Oct 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Architect's Certificate Hadapsar Annex_Phase_14_T16.pdf · uploaded 4 Oct 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_September 22.pdf · uploaded 4 Oct 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100031515 · Form 2A - Manjri - Phase-14-Tower-16.pdf · uploaded 4 Oct 2022Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · Architect's Certificate Hadapsar Annex_Phase_4_T1.pdf · uploaded 4 Oct 2022Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase_4_T1__September 22.pdf · uploaded 4 Oct 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026478 · Form 2A - Manjri - Phase-4-Tower-1.pdf · uploaded 4 Oct 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Architect's Certificate Hadapsar Annex_Phase_11_T6.pdf · uploaded 4 Oct 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6__September 22.pdf · uploaded 4 Oct 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100028311 · Form 2A - Manjri - Phase-11-Tower-6.pdf · uploaded 4 Oct 2022Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Hadapsar Annex_Phase_2_T20.pdf · uploaded 4 Oct 2022Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Engineer's Certificate_Hadapsar Annex_Phase_2_T20__September 22.pdf · uploaded 4 Oct 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026479 · Form 2A - Manjri - Phase-2-Tower-20.pdf · uploaded 4 Oct 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Architect's Certificate Hadapsar Annex_Phase_13_T7.pdf · uploaded 4 Oct 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7__September 22.pdf · uploaded 4 Oct 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100031391 · Form 2A - Manjri - Phase-13-Tower-7.pdf · uploaded 4 Oct 2022Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026480 · Engineer's Certificate_Hadapsar Annex_Phase_3_T19__September 22.pdf · uploaded 4 Oct 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026480 · Form 2A - Manjri - Phase-3-Tower-19.pdf · uploaded 4 Oct 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034911 · Architect's Certificate Hadapsar Annex_Phase_15_T15.pdf · uploaded 4 Oct 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T16_September 22.pdf · uploaded 4 Oct 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100034911 · Form 2A - Manjri - Phase-15-Tower-15.pdf · uploaded 4 Oct 2022Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18.pdf · uploaded 4 Oct 2022Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18__September 22.pdf · uploaded 4 Oct 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026795 · Form 2A - Manjri - Phase-10-Tower-18.pdf · uploaded 4 Oct 2022Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17.pdf · uploaded 4 Oct 2022Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17__September 22.pdf · uploaded 4 Oct 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026797 · Form 2A - Manjri - Phase-9-Tower-17.pdf · uploaded 4 Oct 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_7_T4.pdf · uploaded 4 Oct 2022Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4__September 22.pdf · uploaded 4 Oct 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026800 · Form 2A - Manjri - Phase-7-Tower-4.pdf · uploaded 4 Oct 2022Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21.pdf · uploaded 4 Oct 2022Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase_1_T21_September 22.pdf · uploaded 4 Oct 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026451 · Form 2A - Manjri - Phase-1-Tower-21.pdf · uploaded 4 Oct 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026779 · Architect's Certificate Hadapsar Annex_Phase_6_T3.pdf · uploaded 4 Oct 2022Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Engineer's Certificate_Hadapsar Annex_Phase_6_T3__September 22.pdf · uploaded 4 Oct 2022Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026779 · Form 2A - Manjri - Phase-6-Tower-3.pdf · uploaded 4 Oct 2022Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026452 · Architect's Certificate Hadapsar Annex_Phase_5_T2.pdf · uploaded 4 Oct 2022Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026452 · Engineer's Certificate_Hadapsar Annex_Phase_5_T2__September 22.pdf · uploaded 4 Oct 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100026452 · Form 2A - Manjri - Phase-5-Tower-2.pdf · uploaded 4 Oct 2022Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5__September 22_R1.pdf · uploaded 10 Oct 2022Source
- 25 Disclosure of sold/ booked inventoryP52100026785 · Phase 8.pdf · uploaded 15 Oct 2022Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202209 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 15 Oct 2022Source
- 25 Disclosure of sold/ booked inventoryP52100028308 · Phase 12.pdf · uploaded 15 Oct 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202209 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 15 Oct 2022Source
- 13 Disclosure of sold/ booked inventoryP52100031515 · Phase 14.pdf · uploaded 15 Oct 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · 202209 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 15 Oct 2022Source
- 25 Disclosure of sold/ booked inventoryP52100026478 · Phase 4.pdf · uploaded 15 Oct 2022Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026478 · 202209 RERA Certificate Ph 4 Tower 01 - RERA.pdf · uploaded 15 Oct 2022Source
- 25 Disclosure of sold/ booked inventoryP52100028311 · Phase 11.pdf · uploaded 15 Oct 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202209 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 15 Oct 2022Source
- 25 Disclosure of sold/ booked inventoryP52100026479 · Phase 2.pdf · uploaded 15 Oct 2022Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026479 · 202209 RERA Certificate Ph 2 Tower 20 - RERA.pdf · uploaded 15 Oct 2022Source
- 13 Disclosure of sold/ booked inventoryP52100031391 · Phase 13.pdf · uploaded 15 Oct 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202209 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 15 Oct 2022Source
- 25 Disclosure of sold/ booked inventoryP52100026480 · Phase 3.pdf · uploaded 15 Oct 2022Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026480 · 202209 RERA Certificate Ph 3 Tower 19 - RERA.pdf · uploaded 15 Oct 2022Source
- 6 Disclosure of sold/ booked inventoryP52100034911 · Phase 15.pdf · uploaded 15 Oct 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034911 · 202209 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 15 Oct 2022Source
- 25 Disclosure of sold/ booked inventoryP52100026795 · Phase 10.pdf · uploaded 15 Oct 2022Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202209 RERA Certificate Ph 10 Tower 18 - RERA.pdf · uploaded 15 Oct 2022Source
- 25 Disclosure of sold/ booked inventoryP52100026797 · Phase 9.pdf · uploaded 15 Oct 2022Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202209 RERA Certificate Ph 9 Tower 17 - RERA.pdf · uploaded 15 Oct 2022Source
- 25 Disclosure of sold/ booked inventoryP52100026800 · Phase 7.pdf · uploaded 15 Oct 2022Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202209 RERA Certificate Ph 7 Tower 04 - RERA.pdf · uploaded 15 Oct 2022Source
- 27 Disclosure of sold/ booked inventoryP52100026451 · Phase 1.pdf · uploaded 15 Oct 2022Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · 202209 RERA Certificate Ph 1 Tower 21 - RERA.pdf · uploaded 15 Oct 2022Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · 202209 RERA Certificate Ph 1 Tower 21 - RERA.pdf · uploaded 15 Oct 2022Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · 202209 RERA Certificate Ph 1 Tower 21 - RERA.pdf · uploaded 15 Oct 2022Source
- 25 Disclosure of sold/ booked inventoryP52100026779 · Phase 6.pdf · uploaded 15 Oct 2022Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026779 · 202209 RERA Certificate Ph 6 Tower 03 - RERA.pdf · uploaded 15 Oct 2022Source
- 26 Disclosure of sold/ booked inventoryP52100026452 · Phase 5.pdf · uploaded 15 Oct 2022Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026452 · 202209 RERA Certificate Ph 5 Tower 02 - RERA.pdf · uploaded 15 Oct 2022Source
- 26 Disclosure of sold/ booked inventoryP52100026785 · Phase 8.pdf · uploaded 17 Oct 2022Source
- 26 Disclosure of sold/ booked inventoryP52100028308 · Phase 12.pdf · uploaded 17 Oct 2022Source
- 14 Disclosure of sold/ booked inventoryP52100031515 · Phase 14.pdf · uploaded 17 Oct 2022Source
- 26 Disclosure of sold/ booked inventoryP52100026478 · Phase 4.pdf · uploaded 17 Oct 2022Source
- 26 Disclosure of sold/ booked inventoryP52100028311 · Phase 11.pdf · uploaded 17 Oct 2022Source
- 26 Disclosure of sold/ booked inventoryP52100026479 · Phase 2.pdf · uploaded 17 Oct 2022Source
- 14 Disclosure of sold/ booked inventoryP52100031391 · Phase 13.pdf · uploaded 17 Oct 2022Source
- 26 Disclosure of sold/ booked inventoryP52100026480 · Phase 3.pdf · uploaded 17 Oct 2022Source
- 7 Disclosure of sold/ booked inventoryP52100034911 · Phase 15.pdf · uploaded 17 Oct 2022Source
- 26 Disclosure of sold/ booked inventoryP52100026795 · Phase 10.pdf · uploaded 17 Oct 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048377 · Architect's Certificate Hadapsar Annex_Phase_20_T10.pdf · uploaded 17 Oct 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_October 22.pdf · uploaded 17 Oct 2022Source
- 26 Disclosure of sold/ booked inventoryP52100026797 · Phase 9.pdf · uploaded 17 Oct 2022Source
- 26 Disclosure of sold/ booked inventoryP52100026800 · Phase 7.pdf · uploaded 17 Oct 2022Source
- 28 Disclosure of sold/ booked inventoryP52100026451 · Phase 1.pdf · uploaded 17 Oct 2022Source
- 26 Disclosure of sold/ booked inventoryP52100026779 · Phase 6.pdf · uploaded 17 Oct 2022Source
- 27 Disclosure of sold/ booked inventoryP52100026452 · Phase 5.pdf · uploaded 17 Oct 2022Source
- 1 PAN CardP52100048377 · Joyville PAN.pdf · uploaded 18 Oct 2022Source
- 1 Copy of the legal title reportP52100048377 · LegalTitile_Plot1.pdf · uploaded 18 Oct 2022Source
- 1 a Details of encumbrances concerned to FinanceP52100048377 · Encumbrance Certificate_Phase20.pdf · uploaded 20 Oct 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100048377 · Account declaration Phase 20.pdf · uploaded 20 Oct 2022Source
- 1 b Details of encumbrances concerned to LegalP52100048377 · Legal Encumbrance Phase 20.pdf · uploaded 25 Oct 2022Source
- 1 Copy of Layout Approval (in case of layout)P52100048377 · LayoutFinal.pdf · uploaded 25 Oct 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100048377 · LayoutFinal.pdf · uploaded 25 Oct 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100048377 · 01_Commencement Certificate.pdf · uploaded 25 Oct 2022Source
- 1 Declaration about Commencement CertificateP52100048377 · Final Form D.pdf · uploaded 25 Oct 2022Source
- 1 Declaration in FORM BP52100048377 · FormB_Phase20.pdf · uploaded 25 Oct 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048377 · RERA Certificate Ph 20 Tower 10 - Signed Revised.pdf · uploaded 5 Nov 2022Source
- 1 Proforma of Allotment letterP52100048377 · Allotment Letter upload.pdf · uploaded 15 Nov 2022Source
- 1 Deviation Report with respect to Allotment letterP52100048377 · UpdatedDeviationReport_Allotment.pdf · uploaded 15 Nov 2022Source
- 1 Other – LegalP52100048377 · LegalEncumbrance_New.pdf · uploaded 16 Nov 2022Source
- 1 Proforma of Agreement for saleP52100048377 · AFS.pdf · uploaded 22 Nov 2022Source
- 1 Deviation Report with respect to model copy of AgreementP52100048377 · Deviation Report.pdf · uploaded 22 Nov 2022Source
- 1 PAN CardP52100048314 · Joyville PAN.pdf · uploaded 28 Nov 2022Source
- 1 Copy of the legal title reportP52100048314 · LegalTitile_Plot1.pdf · uploaded 28 Nov 2022Source
- 1 a Details of encumbrances concerned to FinanceP52100048314 · Phase18Encumbrance.pdf · uploaded 28 Nov 2022Source
- 1 b Details of encumbrances concerned to LegalP52100048314 · Phase18Encumbrance.pdf · uploaded 28 Nov 2022Source
- 1 Copy of Layout Approval (in case of layout)P52100048314 · LayoutFinal (2).pdf · uploaded 28 Nov 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100048314 · LayoutFinal (2).pdf · uploaded 28 Nov 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100048314 · 01_Commencement Certificate.pdf · uploaded 28 Nov 2022Source
- 1 Declaration about Commencement CertificateP52100048314 · CC Declaration.pdf · uploaded 28 Nov 2022Source
- 1 Declaration in FORM BP52100048314 · FormB_Phase18.pdf · uploaded 28 Nov 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048314 · Architect's Certificate Hadapsar Annex_Phase_18_T12.pdf · uploaded 28 Nov 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_October 22.pdf · uploaded 28 Nov 2022Source
- 1 CERSAI detailsP52100048314 · CERSAI_Search_Report_200254490158_For_Asset_Based_Search_12_12_2022_11_59_37_747.pdf · uploaded 28 Nov 2022Source
- 1 Proforma of Agreement for saleP52100048314 · AFS.pdf · uploaded 28 Nov 2022Source
- 1 Proforma of Allotment letterP52100048314 · Updated_Allotment Letter plot 1.pdf · uploaded 28 Nov 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100048314 · Account Declaration Phase 18.pdf · uploaded 28 Nov 2022Source
- 1 Deviation Report with respect to Allotment letterP52100048314 · UpdatedDeviationReport_Allotment.pdf · uploaded 28 Nov 2022Source
- 1 Deviation Report with respect to model copy of AgreementP52100048314 · DeviationReport.pdf · uploaded 28 Nov 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048314 · CACertLatest_compressed.pdf · uploaded 30 Nov 2022Source
- 1 CERSAI detailsP52100048377 · CERSAI_Search_Report_200254490158_For_Asset_Based_Search_12_12_2022_11_59_37_747.pdf · uploaded 12 Dec 2022Source
- 2 a Details of encumbrances concerned to FinanceP52100048314 · FinEncum_LegEncum_merged.pdf · uploaded 14 Dec 2022Source
- 2 b Details of encumbrances concerned to LegalP52100048314 · FinEncum_LegEncum_merged.pdf · uploaded 14 Dec 2022Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5.pdf · uploaded 7 Jan 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5__December 22.pdf · uploaded 7 Jan 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Architect's Certificate Hadapsar Annex_Phase_12_T8.pdf · uploaded 7 Jan 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8__December 22.pdf · uploaded 7 Jan 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Architect's Certificate Hadapsar Annex_Phase_14_T16.pdf · uploaded 7 Jan 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_December 22.pdf · uploaded 7 Jan 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · Architect's Certificate Hadapsar Annex_Phase_4_T1.pdf · uploaded 7 Jan 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase_4_T1__December 22.pdf · uploaded 7 Jan 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Architect's Certificate Hadapsar Annex_Phase_11_T6.pdf · uploaded 7 Jan 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6__December 22.pdf · uploaded 7 Jan 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Hadapsar Annex_Phase_2_T20.pdf · uploaded 7 Jan 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Engineer's Certificate_Hadapsar Annex_Phase_2_T20__December 22.pdf · uploaded 7 Jan 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Architect's Certificate Hadapsar Annex_Phase_13_T7.pdf · uploaded 7 Jan 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7__December 22.pdf · uploaded 7 Jan 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Architect's Certificate Hadapsar Annex_Phase_3_T19.pdf · uploaded 7 Jan 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026480 · Engineer's Certificate_Hadapsar Annex_Phase_3_T19__December 22.pdf · uploaded 7 Jan 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034911 · Architect's Certificate Hadapsar Annex_Phase_15_T15.pdf · uploaded 7 Jan 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T16_December 22.pdf · uploaded 7 Jan 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18__December 22.pdf · uploaded 7 Jan 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18.pdf · uploaded 7 Jan 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18__December 22.pdf · uploaded 7 Jan 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048377 · Architect's Certificate Hadapsar Annex_Phase_20_T10.pdf · uploaded 7 Jan 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_December 22.pdf · uploaded 7 Jan 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17.pdf · uploaded 7 Jan 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17__December 22.pdf · uploaded 7 Jan 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_7_T4.pdf · uploaded 7 Jan 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4__December 22.pdf · uploaded 7 Jan 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21.pdf · uploaded 7 Jan 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase_1_T21_December 22.pdf · uploaded 7 Jan 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026779 · Architect's Certificate Hadapsar Annex_Phase_6_T3.pdf · uploaded 7 Jan 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Engineer's Certificate_Hadapsar Annex_Phase_6_T3__December 22.pdf · uploaded 7 Jan 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026452 · Architect's Certificate Hadapsar Annex_Phase_5_T2.pdf · uploaded 7 Jan 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026452 · Engineer's Certificate_Hadapsar Annex_Phase_5_T2__December 22.pdf · uploaded 7 Jan 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048314 · Architect's Certificate Hadapsar Annex_Phase_18_T12.pdf · uploaded 7 Jan 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048314 · Architect's Certificate Hadapsar Annex_Phase_20_T10.pdf · uploaded 7 Jan 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_December 22.pdf · uploaded 7 Jan 2023Source
- 27 Disclosure of sold/ booked inventoryP52100026785 · Hadapsar Phase 8.pdf · uploaded 14 Jan 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202212 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 14 Jan 2023Source
- 27 Disclosure of sold/ booked inventoryP52100028308 · Hadapsar Phase 12.pdf · uploaded 14 Jan 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202212 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 14 Jan 2023Source
- 15 Disclosure of sold/ booked inventoryP52100031515 · Hadapsar Phase 14.pdf · uploaded 14 Jan 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · 202212 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 14 Jan 2023Source
- 27 Disclosure of sold/ booked inventoryP52100026478 · Hadapsar Phase 4.pdf · uploaded 14 Jan 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026478 · 202212 RERA Certificate Ph 4 Tower 01 - RERA.pdf · uploaded 14 Jan 2023Source
- 27 Disclosure of sold/ booked inventoryP52100028311 · Hadapsar Phase 11.pdf · uploaded 14 Jan 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202212 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 14 Jan 2023Source
- 27 Disclosure of sold/ booked inventoryP52100026479 · Hadapsar Phase 2.pdf · uploaded 14 Jan 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026479 · 202212 RERA Certificate Ph 2 Tower 20 - RERA.pdf · uploaded 14 Jan 2023Source
- 15 Disclosure of sold/ booked inventoryP52100031391 · Hadapsar Phase 13.pdf · uploaded 14 Jan 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202212 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 14 Jan 2023Source
- 27 Disclosure of sold/ booked inventoryP52100026480 · Hadapsar Phase 3.pdf · uploaded 14 Jan 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026480 · 202212 RERA Certificate Ph 3 Tower 19 - RERA.pdf · uploaded 14 Jan 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_December 22.pdf · uploaded 14 Jan 2023Source
- 8 Disclosure of sold/ booked inventoryP52100034911 · Hadapsar Phase 15.pdf · uploaded 14 Jan 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034911 · 202212 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 14 Jan 2023Source
- 27 Disclosure of sold/ booked inventoryP52100026795 · Hadapsar Phase 10.pdf · uploaded 14 Jan 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202212 RERA Certificate Ph 10 Tower 18 - RERA.pdf · uploaded 14 Jan 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048377 · 202212 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 14 Jan 2023Source
- 27 Disclosure of sold/ booked inventoryP52100026797 · Hadapsar Phase 9.pdf · uploaded 14 Jan 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202212 RERA Certificate Ph 9 Tower 17 - RERA.pdf · uploaded 14 Jan 2023Source
- 27 Disclosure of sold/ booked inventoryP52100026800 · Hadapsar Phase 7.pdf · uploaded 14 Jan 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202212 RERA Certificate Ph 7 Tower 04 - RERA.pdf · uploaded 14 Jan 2023Source
- 29 Disclosure of sold/ booked inventoryP52100026451 · Hadapsar Phase 1.pdf · uploaded 14 Jan 2023Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · 202212 RERA Certificate Ph 1 Tower 21 - RERA.pdf · uploaded 14 Jan 2023Source
- 27 Disclosure of sold/ booked inventoryP52100026779 · Hadapsar Phase 6.pdf · uploaded 14 Jan 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026779 · 202212 RERA Certificate Ph 6 Tower 03 - RERA.pdf · uploaded 14 Jan 2023Source
- 28 Disclosure of sold/ booked inventoryP52100026452 · Hadapsar Phase 5.pdf · uploaded 14 Jan 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026452 · 202212 RERA Certificate Ph 5 Tower 02 - RERA.pdf · uploaded 14 Jan 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048314 · 202212 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 14 Jan 2023Source
- 1 Disclosure of sold/ booked inventoryP52100048377 · Hadapsar Phase 20.pdf · uploaded 15 Jan 2023Source
- 1 Disclosure of sold/ booked inventoryP52100048314 · Hadapsar Phase 18.pdf · uploaded 15 Jan 2023Source
- 1 PAN CardP52100049970 · Joyville PAN.pdf · uploaded 31 Jan 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100049970 · LayoutFinal (2) (1).pdf · uploaded 31 Jan 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100049970 · ilovepdf_merged (12) (1).pdf · uploaded 31 Jan 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100049970 · 01_Commencement Certificate.pdf · uploaded 31 Jan 2023Source
- 1 CERSAI detailsP52100049970 · CERSAI_Acknowledgemnt_Report_200246784932_For_Registration_Of_Security_Interest_09_09_2022_15_05_10_868.pdf · uploaded 31 Jan 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100049970 · Seperate account declaration.pdf · uploaded 31 Jan 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049970 · Architect's Certificate Hadapsar Annex_Phase_16_T13 and 14.pdf · uploaded 1 Feb 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049970 · Engineer's Certificate_Hadapsar Annex_Phase_16_T13 and 14_January 23.pdf · uploaded 1 Feb 2023Source
- 1 Copy of the legal title reportP52100049970 · Final-Title Sahil 27-09-2022.pdf · uploaded 2 Feb 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100049970 · Encumbrance Certificate Final.pdf · uploaded 2 Feb 2023Source
- 1 b Details of encumbrances concerned to LegalP52100049970 · Encumbrance Certificate Final.pdf · uploaded 2 Feb 2023Source
- 1 Declaration in FORM BP52100049970 · Joyville_FormB.pdf · uploaded 2 Feb 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100049970 · Director Declaration Combined_compressed.pdf · uploaded 2 Feb 2023Source
- 1 Proforma of Agreement for saleP52100049970 · AFS_Phase16.pdf · uploaded 2 Feb 2023Source
- 1 Proforma of Allotment letterP52100049970 · AllotmentLetter_Phase16.pdf · uploaded 2 Feb 2023Source
- 1 Deviation Report with respect to Allotment letterP52100049970 · DeviationReport Allotment Letter.pdf · uploaded 2 Feb 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100049970 · AFS Remaining_merged.pdf · uploaded 2 Feb 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049970 · Cacertificate.pdf · uploaded 6 Feb 2023Source
- 1 Other – LegalP52100049970 · ilovepdf_merged (13) (1) (1)-1.pdf · uploaded 7 Feb 2023Source
- 2 Other – LegalP52100049970 · ilovepdf_merged (13) (1) (1)-2.pdf · uploaded 7 Feb 2023Source
- 3 Other – LegalP52100049970 · ilovepdf_merged (13) (1) (1)-3.pdf · uploaded 7 Feb 2023Source
- 1 Declaration about Commencement CertificateP52100049970 · CC Declaration.pdf · uploaded 23 Feb 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100049970 · Legal Encumbrance2.pdf · uploaded 27 Feb 2023Source
- 2 b Details of encumbrances concerned to LegalP52100049970 · Legal Encumbrance2.pdf · uploaded 27 Feb 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049970 · Architect's Certificate Hadapsar Annex_Phase_16_T13 14.pdf · uploaded 17 Apr 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049970 · Engineer's Certificate_Hadapsar Annex_Phase_16_T13 14_March 23.pdf · uploaded 17 Apr 2023Source
- 1 Disclosure of sold/ booked inventoryP52100049970 · Phase16.pdf · uploaded 17 Apr 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049970 · 202303 RERA Certificate Ph 16 Tower 13_14 - RERA.pdf · uploaded 17 Apr 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5.pdf · uploaded 17 Apr 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5.pdf · uploaded 17 Apr 2023Source
- 28 Disclosure of sold/ booked inventoryP52100026785 · Phase8.pdf · uploaded 17 Apr 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202303 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 17 Apr 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Architect's Certificate Hadapsar Annex_Phase_12_T8.pdf · uploaded 17 Apr 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8__March 23.pdf · uploaded 17 Apr 2023Source
- 28 Disclosure of sold/ booked inventoryP52100028308 · Phase12.pdf · uploaded 17 Apr 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202303 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 17 Apr 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Architect's Certificate Hadapsar Annex_Phase_14_T16.pdf · uploaded 17 Apr 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_March 23.pdf · uploaded 17 Apr 2023Source
- 16 Disclosure of sold/ booked inventoryP52100031515 · Phase14.pdf · uploaded 17 Apr 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · 202303 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 17 Apr 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · Architect's Certificate Hadapsar Annex_Phase_4_T1.pdf · uploaded 17 Apr 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase_4_T1__March 23.pdf · uploaded 17 Apr 2023Source
- 28 Disclosure of sold/ booked inventoryP52100026478 · Phase4.pdf · uploaded 17 Apr 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026478 · 202303 RERA Certificate Ph 4 Tower 01 - RERA.pdf · uploaded 17 Apr 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Architect's Certificate Hadapsar Annex_Phase_11_T6.pdf · uploaded 17 Apr 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6__March 23.pdf · uploaded 17 Apr 2023Source
- 28 Disclosure of sold/ booked inventoryP52100028311 · Phase11.pdf · uploaded 17 Apr 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202303 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 17 Apr 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Hadapsar Annex_Phase_2_T20.pdf · uploaded 17 Apr 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Engineer's Certificate_Hadapsar Annex_Phase_2_T20__March 23.pdf · uploaded 17 Apr 2023Source
- 28 Disclosure of sold/ booked inventoryP52100026479 · Phase2.pdf · uploaded 17 Apr 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026479 · 202303 RERA Certificate Ph 2 Tower 20 - RERA.pdf · uploaded 17 Apr 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Architect's Certificate Hadapsar Annex_Phase_13_T7.pdf · uploaded 17 Apr 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7__March 23.pdf · uploaded 17 Apr 2023Source
- 16 Disclosure of sold/ booked inventoryP52100031391 · Phase13.pdf · uploaded 17 Apr 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202303 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 17 Apr 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Architect's Certificate Hadapsar Annex_Phase_3_T19.pdf · uploaded 17 Apr 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026480 · Engineer's Certificate_Hadapsar Annex_Phase_3_T19__March 23.pdf · uploaded 17 Apr 2023Source
- 28 Disclosure of sold/ booked inventoryP52100026480 · Phase3.pdf · uploaded 17 Apr 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026480 · 202303 RERA Certificate Ph 3 Tower 19 - RERA.pdf · uploaded 17 Apr 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034911 · Architect's Certificate Hadapsar Annex_Phase_15_T15.pdf · uploaded 17 Apr 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T16_March 23.pdf · uploaded 17 Apr 2023Source
- 9 Disclosure of sold/ booked inventoryP52100034911 · Phase15.pdf · uploaded 17 Apr 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034911 · 202303 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 17 Apr 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18.pdf · uploaded 17 Apr 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18__March 23.pdf · uploaded 17 Apr 2023Source
- 28 Disclosure of sold/ booked inventoryP52100026795 · Phase10.pdf · uploaded 17 Apr 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202303 RERA Certificate Ph 10 Tower 18 - RERA.pdf · uploaded 17 Apr 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048377 · Architect's Certificate Hadapsar Annex_Phase_20_T10.pdf · uploaded 17 Apr 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_March 23.pdf · uploaded 17 Apr 2023Source
- 2 Disclosure of sold/ booked inventoryP52100048377 · Phase20.pdf · uploaded 17 Apr 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048377 · 202303 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 17 Apr 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17.pdf · uploaded 17 Apr 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17__March 23.pdf · uploaded 17 Apr 2023Source
- 28 Disclosure of sold/ booked inventoryP52100026797 · Phase9.pdf · uploaded 17 Apr 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202303 RERA Certificate Ph 9 Tower 17 - RERA.pdf · uploaded 17 Apr 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_7_T4.pdf · uploaded 17 Apr 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4__March 23.pdf · uploaded 17 Apr 2023Source
- 28 Disclosure of sold/ booked inventoryP52100026800 · Phase7.pdf · uploaded 17 Apr 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202303 RERA Certificate Ph 7 Tower 04 - RERA.pdf · uploaded 17 Apr 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21.pdf · uploaded 17 Apr 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase_1_T21_March 23.pdf · uploaded 17 Apr 2023Source
- 30 Disclosure of sold/ booked inventoryP52100026451 · Phase1.pdf · uploaded 17 Apr 2023Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · 202303 RERA Certificate Ph 1 Tower 21 - RERA.pdf · uploaded 17 Apr 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026779 · Architect's Certificate Hadapsar Annex_Phase_6_T3.pdf · uploaded 17 Apr 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Engineer's Certificate_Hadapsar Annex_Phase_6_T3__March 23.pdf · uploaded 17 Apr 2023Source
- 28 Disclosure of sold/ booked inventoryP52100026779 · Phase6.pdf · uploaded 17 Apr 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026779 · 202303 RERA Certificate Ph 6 Tower 03 - RERA.pdf · uploaded 17 Apr 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026452 · Architect's Certificate Hadapsar Annex_Phase_5_T2.pdf · uploaded 17 Apr 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026452 · Engineer's Certificate_Hadapsar Annex_Phase_5_T2__March 23.pdf · uploaded 17 Apr 2023Source
- 29 Disclosure of sold/ booked inventoryP52100026452 · Phase5.pdf · uploaded 17 Apr 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026452 · 202303 RERA Certificate Ph 5 Tower 02 - RERA.pdf · uploaded 17 Apr 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048314 · Architect's Certificate Hadapsar Annex_Phase_18_T12.pdf · uploaded 17 Apr 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_March 23.pdf · uploaded 17 Apr 2023Source
- 2 Disclosure of sold/ booked inventoryP52100048314 · Phase18.pdf · uploaded 17 Apr 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048314 · 202303 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 17 Apr 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202303 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 19 Apr 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100049970 · Form 2A - Manjri - Phase-16-Tower-13 14.pdf · uploaded 16 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100026785 · Form 2A - Manjri - Phase-8-Tower-5.pdf · uploaded 16 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100028308 · Form 2A - Manjri - Phase-12-Tower-8.pdf · uploaded 16 May 2023Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100028308 · JOYVILLE HADAPSAR T-8.pdf · uploaded 16 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100031515 · Form 2A - Manjri - Phase-14-Tower-16.pdf · uploaded 16 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100026478 · Form 2A - Manjri - Phase-4-Tower-1.pdf · uploaded 16 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100028311 · Form 2A - Manjri - Phase-11-Tower-6.pdf · uploaded 16 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100026479 · Form 2A - Manjri - Phase-2-Tower-20.pdf · uploaded 16 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100031391 · Form 2A - Manjri - Phase-13-Tower-7.pdf · uploaded 16 May 2023Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100031391 · JOYVILLE HADAPSAR T-7.pdf · uploaded 16 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100026480 · Form 2A - Manjri - Phase-3-Tower-19.pdf · uploaded 16 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100034911 · Form 2A - Manjri - Phase-15-Tower-15.pdf · uploaded 16 May 2023Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100034911 · JOYVILLE HADAPSAR T-15.pdf · uploaded 16 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100026795 · Form 2A - Manjri - Phase-10-Tower-18.pdf · uploaded 16 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100048377 · Form 2A - Manjri - Phase-20-Tower-10.pdf · uploaded 16 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100026797 · Form 2A - Manjri - Phase-9-Tower-17.pdf · uploaded 16 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100026800 · Form 2A - Manjri - Phase-7-Tower-4.pdf · uploaded 16 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100026451 · Form 2A - Manjri - Phase-1-Tower-21.pdf · uploaded 16 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100026779 · Form 2A - Manjri - Phase-6-Tower-3.pdf · uploaded 16 May 2023Source
- 3 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026452 · Form 2A - Manjri - Phase-5-Tower-2.pdf · uploaded 16 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100048314 · Form 2A - Manjri - Phase-18-Tower-12.pdf · uploaded 16 May 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049970 · Architect's Certificate Hadapsar Annex_Phase_16_T1314 (002).pdf · uploaded 19 Jul 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049970 · Engineer's Certificate_Hadapsar Annex_Phase_16_T1314_June 23 (002).pdf · uploaded 19 Jul 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049970 · 202306 RERA Certificate Ph 16 Tower 13_14 - RERA.pdf · uploaded 19 Jul 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5.pdf · uploaded 19 Jul 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_June 23.pdf · uploaded 19 Jul 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202306 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 19 Jul 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Architect's Certificate Hadapsar Annex_Phase_12_T8.pdf · uploaded 19 Jul 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_June 23.pdf · uploaded 19 Jul 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202306 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 19 Jul 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Architect's Certificate Hadapsar Annex_Phase_14_T16.pdf · uploaded 19 Jul 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_June 23.pdf · uploaded 19 Jul 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · 202306 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 19 Jul 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · 202306 RERA Certificate Ph 4 Tower 01 - RERA.pdf · uploaded 19 Jul 2023Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · Architect's Certificate Hadapsar Annex_Phase_4_T1.pdf · uploaded 19 Jul 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase_4_T1_June 23.pdf · uploaded 19 Jul 2023Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026478 · 202306 RERA Certificate Ph 4 Tower 01 - RERA.pdf · uploaded 19 Jul 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Architect's Certificate Hadapsar Annex_Phase_11_T6.pdf · uploaded 19 Jul 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_June 23.pdf · uploaded 19 Jul 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202306 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 19 Jul 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Hadapsar Annex_Phase_2_T20.pdf · uploaded 19 Jul 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Engineer's Certificate_Hadapsar Annex_Phase_2_T20_June 23.pdf · uploaded 19 Jul 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026479 · 202303 RERA Certificate Ph 2 Tower 20 - RERA.pdf · uploaded 19 Jul 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Architect's Certificate Hadapsar Annex_Phase_13_T7.pdf · uploaded 19 Jul 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_June 23.pdf · uploaded 19 Jul 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202306 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 19 Jul 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Architect's Certificate Hadapsar Annex_Phase_3_T19.pdf · uploaded 19 Jul 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026480 · Engineer's Certificate_Hadapsar Annex_Phase_3_T19_June 23.pdf · uploaded 19 Jul 2023Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026480 · 202306 RERA Certificate Ph 3 Tower 19 - RERA.pdf · uploaded 19 Jul 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034911 · Architect's Certificate Hadapsar Annex_Phase_15_T15.pdf · uploaded 19 Jul 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_June 23.pdf · uploaded 19 Jul 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034911 · 202306 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 19 Jul 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18.pdf · uploaded 19 Jul 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_June 23.pdf · uploaded 19 Jul 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202306 RERA Certificate Ph 10 Tower 18 - RERA.pdf · uploaded 19 Jul 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048377 · Architect's Certificate Hadapsar Annex_Phase_20_T10.pdf · uploaded 19 Jul 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_June 23.pdf · uploaded 19 Jul 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048377 · 202306 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 19 Jul 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17.pdf · uploaded 19 Jul 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_June 23.pdf · uploaded 19 Jul 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202306 RERA Certificate Ph 9 Tower 17 - RERA.pdf · uploaded 19 Jul 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_7_T4.pdf · uploaded 19 Jul 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_June 23.pdf · uploaded 19 Jul 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202306 RERA Certificate Ph 7 Tower 04 - RERA.pdf · uploaded 19 Jul 2023Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21.pdf · uploaded 19 Jul 2023Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase_1_T21_June 23.pdf · uploaded 19 Jul 2023Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · 202303 RERA Certificate Ph 1 Tower 21 - RERA.pdf · uploaded 19 Jul 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026779 · Architect's Certificate Hadapsar Annex_Phase_6_T3.pdf · uploaded 19 Jul 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Engineer's Certificate_Hadapsar Annex_Phase_6_T3_June 23.pdf · uploaded 19 Jul 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026779 · 202306 RERA Certificate Ph 6 Tower 03 - RERA.pdf · uploaded 19 Jul 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026452 · Architect's Certificate Hadapsar Annex_Phase_5_T2.pdf · uploaded 19 Jul 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026452 · Engineer's Certificate_Hadapsar Annex_Phase_5_T2_June 23.pdf · uploaded 19 Jul 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026452 · 202306 RERA Certificate Ph 5 Tower 02 - RERA.pdf · uploaded 19 Jul 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048314 · Architect's Certificate Hadapsar Annex_Phase_18_T12.pdf · uploaded 19 Jul 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_June 23.pdf · uploaded 19 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100026451 · Manjri Phase 1 M23.pdf · uploaded 28 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100049970 · Manjri Phase 16.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100026785 · Manjri Phase 8.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100028308 · Manjri Phase 12.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100031515 · Manjri Phase 14.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100026478 · Manjri Phase 4.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100028311 · Manjri Phase 11.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100026479 · Manjri Phase 2.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100031391 · Manjri Phase 13.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100026480 · Manjri Phase 3.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100034911 · Manjri Phase 15.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100026795 · Manjri Phase 10.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100048377 · Manjri Phase 20.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100026797 · Manjri Phase 9.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100026800 · Manjri Phase 7.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100026779 · Manjri Phase 6.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100026452 · Manjri Phase 5.pdf · uploaded 29 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100048314 · Manjri Phase 18.pdf · uploaded 29 Sep 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5.pdf · uploaded 17 Oct 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_Sept 23.pdf · uploaded 17 Oct 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202309 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 17 Oct 2023Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Hadapsar Annex_Phase_2_T20.pdf · uploaded 17 Oct 2023Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Engineer's Certificate_Hadapsar Annex_Phase_2_T20_Sept 23.pdf · uploaded 17 Oct 2023Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026479 · 202309 RERA Certificate Ph 2 Tower 20 - RERA.pdf · uploaded 17 Oct 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Architect's Certificate Hadapsar Annex_Phase_3_T19.pdf · uploaded 17 Oct 2023Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026480 · Engineer's Certificate_Hadapsar Annex_Phase_3_T19_Sept 23.pdf · uploaded 17 Oct 2023Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026480 · 202309 RERA Certificate Ph 3 Tower 19 - RERA.pdf · uploaded 17 Oct 2023Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18.pdf · uploaded 17 Oct 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_Sept 23.pdf · uploaded 17 Oct 2023Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202309 RERA Certificate Ph 10 Tower 18 - RERA.pdf · uploaded 17 Oct 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17.pdf · uploaded 17 Oct 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_Sept 23.pdf · uploaded 17 Oct 2023Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202309 RERA Certificate Ph 9 Tower 17 - RERA.pdf · uploaded 17 Oct 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_6_T3.pdf · uploaded 17 Oct 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_7_T4.pdf · uploaded 17 Oct 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_6_T3_Sept 23.pdf · uploaded 17 Oct 2023Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_Sept 23.pdf · uploaded 17 Oct 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202309 RERA Certificate Ph 6 Tower 03 - RERA.pdf · uploaded 17 Oct 2023Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202309 RERA Certificate Ph 7 Tower 04 - RERA.pdf · uploaded 17 Oct 2023Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21.pdf · uploaded 17 Oct 2023Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase_1_T21_Sept 23.pdf · uploaded 17 Oct 2023Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · 202309 RERA Certificate Ph 1 Tower 21 - RERA.pdf · uploaded 17 Oct 2023Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026452 · Architect's Certificate Hadapsar Annex_Phase_5_T2.pdf · uploaded 17 Oct 2023Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026452 · Engineer's Certificate_Hadapsar Annex_Phase_5_T2_Sept 23.pdf · uploaded 17 Oct 2023Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026452 · 202309 RERA Certificate Ph 5 Tower 02 - RERA.pdf · uploaded 17 Oct 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049970 · Architect's Certificate Hadapsar Annex_Phase_16_T13_14.pdf · uploaded 18 Oct 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049970 · Engineer's Certificate_Hadapsar Annex_Phase_16_T13_14_Sept 23.pdf · uploaded 18 Oct 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049970 · 202309 RERA Certificate Ph 16 Tower 13_14 - RERA.pdf · uploaded 18 Oct 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Architect's Certificate Hadapsar Annex_Phase_12_T8.pdf · uploaded 18 Oct 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_Sept 23.pdf · uploaded 18 Oct 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202309 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 18 Oct 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Architect's Certificate Hadapsar Annex_Phase_14_T16.pdf · uploaded 18 Oct 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_Sept 23.pdf · uploaded 18 Oct 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · 202309 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 18 Oct 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Architect's Certificate Hadapsar Annex_Phase_11_T6.pdf · uploaded 18 Oct 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_Sept 23.pdf · uploaded 18 Oct 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202309 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 18 Oct 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Architect's Certificate Hadapsar Annex_Phase_13_T7.pdf · uploaded 18 Oct 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_Sept 23.pdf · uploaded 18 Oct 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202309 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 18 Oct 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034911 · Architect's Certificate Hadapsar Annex_Phase_15_T15.pdf · uploaded 18 Oct 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_Sept 23.pdf · uploaded 18 Oct 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034911 · 202309 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 18 Oct 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048377 · Architect's Certificate Hadapsar Annex_Phase_20_T10.pdf · uploaded 18 Oct 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_Sept 23.pdf · uploaded 18 Oct 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048377 · 202309 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 18 Oct 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048314 · Architect's Certificate Hadapsar Annex_Phase_18_T12.pdf · uploaded 18 Oct 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_Sept 23.pdf · uploaded 18 Oct 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048314 · 202309 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 18 Oct 2023Source
- 2 Disclosure of sold/ booked inventoryP52100049970 · Phase 16_merged.pdf · uploaded 19 Oct 2023Source
- 29 Disclosure of sold/ booked inventoryP52100026785 · Phase 8.pdf · uploaded 19 Oct 2023Source
- 29 Disclosure of sold/ booked inventoryP52100028308 · Phase 12.pdf · uploaded 19 Oct 2023Source
- 17 Disclosure of sold/ booked inventoryP52100031515 · Phase 14.pdf · uploaded 19 Oct 2023Source
- 29 Disclosure of sold/ booked inventoryP52100026478 · Phase 4.pdf · uploaded 19 Oct 2023Source
- 29 Disclosure of sold/ booked inventoryP52100028311 · Phase 11.pdf · uploaded 19 Oct 2023Source
- 29 Disclosure of sold/ booked inventoryP52100026479 · Phase 2.pdf · uploaded 19 Oct 2023Source
- 17 Disclosure of sold/ booked inventoryP52100031391 · Phase 13.pdf · uploaded 19 Oct 2023Source
- 29 Disclosure of sold/ booked inventoryP52100026480 · Phase 3.pdf · uploaded 19 Oct 2023Source
- 10 Disclosure of sold/ booked inventoryP52100034911 · Phase 15.pdf · uploaded 19 Oct 2023Source
- 29 Disclosure of sold/ booked inventoryP52100026795 · Phase 10.pdf · uploaded 19 Oct 2023Source
- 3 Disclosure of sold/ booked inventoryP52100048377 · Phase 20.pdf · uploaded 19 Oct 2023Source
- 29 Disclosure of sold/ booked inventoryP52100026797 · Phase 9.pdf · uploaded 19 Oct 2023Source
- 29 Disclosure of sold/ booked inventoryP52100026800 · Phase 7.pdf · uploaded 19 Oct 2023Source
- 31 Disclosure of sold/ booked inventoryP52100026451 · Phase 1.pdf · uploaded 19 Oct 2023Source
- 29 Disclosure of sold/ booked inventoryP52100026779 · Phase 6.pdf · uploaded 19 Oct 2023Source
- 30 Disclosure of sold/ booked inventoryP52100026452 · Phase 5.pdf · uploaded 19 Oct 2023Source
- 3 Disclosure of sold/ booked inventoryP52100048314 · Phase 18.pdf · uploaded 19 Oct 2023Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · Architect's Certificate Hadapsar Annex_Phase_4_T1.pdf · uploaded 20 Oct 2023Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase_4_T1_Sept 23.pdf · uploaded 20 Oct 2023Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026478 · 202309 RERA Certificate Ph 4 Tower 01 - RERA.pdf · uploaded 20 Oct 2023Source
- 1 PAN CardP52100054174 · 1 PAN Card.pdf · uploaded 5 Dec 2023Source
- 1 Deviation Report with respect to Allotment letterP52100054174 · Deviation Report Letter of Allotment T9 RERA 24-11-2023.pdf · uploaded 5 Dec 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100054174 · Deviation AFS T9 RERA 24-11-2023.pdf · uploaded 5 Dec 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100054174 · Encrumbance_legal_financial_B9 B11.pdf · uploaded 6 Dec 2023Source
- 1 b Details of encumbrances concerned to LegalP52100054174 · Encrumbance_legal_financial_B9 B11.pdf · uploaded 6 Dec 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100054174 · Sanctioned layout_11 9 23_ 0612.pdf · uploaded 6 Dec 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054174 · CA Cert B9 B11_6 12.pdf · uploaded 6 Dec 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100054174 · Discloser of interest.pdf · uploaded 6 Dec 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054174 · Architect's Certificate Hadapsar Annex_Phase_17_T09 and 11.pdf · uploaded 7 Dec 2023Source
- 1 CERSAI detailsP52100054174 · Cersai undertaking_B9 B11.pdf · uploaded 7 Dec 2023Source
- 1 Proforma of Agreement for saleP52100054174 · AFS T9 (Manjri Plot 1) 24-11-2023.pdf · uploaded 7 Dec 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100054174 · Sheet-17.pdf · uploaded 8 Dec 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100054174 · Sheet-18.pdf · uploaded 8 Dec 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054174 · Engineer Certificate_B9 B11_Nov 23.pdf · uploaded 8 Dec 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100054174 · CC_110923.pdf · uploaded 11 Dec 2023Source
- 1 Declaration about Commencement CertificateP52100054174 · CC declaration_B9 B11.pdf · uploaded 11 Dec 2023Source
- 1 Declaration in FORM BP52100054174 · Form B_B9 B11_Joyville.pdf · uploaded 11 Dec 2023Source
- 1 Proforma of Allotment letterP52100054174 · Allotment letter (Manjri Plot 1) T9 24-11-2023.pdf · uploaded 11 Dec 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100054174 · Separate Account declaration.pdf · uploaded 12 Dec 2023Source
- 1 Copy of the legal title reportP52100054174 · RERA Title report Hadapsar Plot 1 (Sahil Shah) dt 12-12-2023_compressed-1-9.pdf · uploaded 13 Dec 2023Source
- 2 Copy of the legal title reportP52100054174 · RERA Title report Hadapsar Plot 1 (Sahil Shah) dt 12-12-2023_compressed-10-18.pdf · uploaded 13 Dec 2023Source
- 3 Copy of the legal title reportP52100054174 · Survye nos declaration.pdf · uploaded 13 Dec 2023Source
- 2 Declaration about Commencement CertificateP52100054174 · RG declaration_ B9 B11.pdf · uploaded 14 Dec 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100054174 · Encrumbance_legal_financial_B9 B11.pdf · uploaded 27 Dec 2023Source
- 2 b Details of encumbrances concerned to LegalP52100054174 · Encrumbance_legal_financial_B9 B11.pdf · uploaded 27 Dec 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049970 · Architect's Certificate Hadapsar Annex_Phase_16_T13_14.pdf · uploaded 15 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049970 · Engineer's Certificate_Hadapsar Annex_Phase_16_T13_14_Dec 23.pdf · uploaded 15 Jan 2024Source
- 3 Disclosure of sold/ booked inventoryP52100049970 · Phase16.pdf · uploaded 15 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049970 · 202312 RERA Certificate Ph 16 Tower 13_14 - RERA.pdf · uploaded 15 Jan 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5.pdf · uploaded 15 Jan 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_Dec 23.pdf · uploaded 15 Jan 2024Source
- 30 Disclosure of sold/ booked inventoryP52100026785 · Phase8.pdf · uploaded 15 Jan 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Architect's Certificate Hadapsar Annex_Phase_12_T8.pdf · uploaded 15 Jan 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_Dec 23.pdf · uploaded 15 Jan 2024Source
- 30 Disclosure of sold/ booked inventoryP52100028308 · Phase12.pdf · uploaded 15 Jan 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202312 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 15 Jan 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Architect's Certificate Hadapsar Annex_Phase_14_T16.pdf · uploaded 15 Jan 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_Dec 23.pdf · uploaded 15 Jan 2024Source
- 18 Disclosure of sold/ booked inventoryP52100031515 · Phase14.pdf · uploaded 15 Jan 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · 202312 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 15 Jan 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · Architect's Certificate Hadapsar Annex_Phase_4_T1.pdf · uploaded 15 Jan 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase_4_T1_Dec 23.pdf · uploaded 15 Jan 2024Source
- 30 Disclosure of sold/ booked inventoryP52100026478 · Phase4.pdf · uploaded 15 Jan 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026478 · 202312 RERA Certificate Ph 4 Tower 01 - RERA.pdf · uploaded 15 Jan 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Architect's Certificate Hadapsar Annex_Phase_11_T6.pdf · uploaded 15 Jan 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_Dec 23.pdf · uploaded 15 Jan 2024Source
- 30 Disclosure of sold/ booked inventoryP52100028311 · Phase11.pdf · uploaded 15 Jan 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202312 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 15 Jan 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Hadapsar Annex_Phase_2_T20.pdf · uploaded 15 Jan 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Engineer's Certificate_Hadapsar Annex_Phase_2_T20_Dec 23.pdf · uploaded 15 Jan 2024Source
- 30 Disclosure of sold/ booked inventoryP52100026479 · Phase2.pdf · uploaded 15 Jan 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026479 · 202312 RERA Certificate Ph 2 Tower 20 - RERA.pdf · uploaded 15 Jan 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Architect's Certificate Hadapsar Annex_Phase_13_T7.pdf · uploaded 15 Jan 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_Dec 23.pdf · uploaded 15 Jan 2024Source
- 18 Disclosure of sold/ booked inventoryP52100031391 · Phase13.pdf · uploaded 15 Jan 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202312 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 15 Jan 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Architect's Certificate Hadapsar Annex_Phase_3_T19.pdf · uploaded 15 Jan 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026480 · Engineer's Certificate_Hadapsar Annex_Phase_3_T19_Dec 23.pdf · uploaded 15 Jan 2024Source
- 30 Disclosure of sold/ booked inventoryP52100026480 · Phase3.pdf · uploaded 15 Jan 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026480 · 202312 RERA Certificate Ph 3 Tower 19 - RERA.pdf · uploaded 15 Jan 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034911 · Architect's Certificate Hadapsar Annex_Phase_15_T15.pdf · uploaded 15 Jan 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_Dec 23.pdf · uploaded 15 Jan 2024Source
- 11 Disclosure of sold/ booked inventoryP52100034911 · Phase15.pdf · uploaded 15 Jan 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034911 · 202312 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 15 Jan 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18.pdf · uploaded 15 Jan 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_Dec 23.pdf · uploaded 15 Jan 2024Source
- 30 Disclosure of sold/ booked inventoryP52100026795 · Phase10.pdf · uploaded 15 Jan 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202312 RERA Certificate Ph 10 Tower 18 - RERA.pdf · uploaded 15 Jan 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048377 · Architect's Certificate Hadapsar Annex_Phase_20_T10.pdf · uploaded 15 Jan 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_Dec 23.pdf · uploaded 15 Jan 2024Source
- 4 Disclosure of sold/ booked inventoryP52100048377 · Phase20.pdf · uploaded 15 Jan 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048377 · 202312 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 15 Jan 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17.pdf · uploaded 15 Jan 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_Dec 23.pdf · uploaded 15 Jan 2024Source
- 30 Disclosure of sold/ booked inventoryP52100026797 · Phase9.pdf · uploaded 15 Jan 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202312 RERA Certificate Ph 9 Tower 17 - RERA.pdf · uploaded 15 Jan 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_7_T4.pdf · uploaded 15 Jan 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_Dec 23.pdf · uploaded 15 Jan 2024Source
- 30 Disclosure of sold/ booked inventoryP52100026800 · Phase7.pdf · uploaded 15 Jan 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202312 RERA Certificate Ph 7 Tower 04 - RERA.pdf · uploaded 15 Jan 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21.pdf · uploaded 15 Jan 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase_1_T21_Dec 23.pdf · uploaded 15 Jan 2024Source
- 32 Disclosure of sold/ booked inventoryP52100026451 · Phase1.pdf · uploaded 15 Jan 2024Source
- 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · 202312 RERA Certificate Ph 1 Tower 21 - RERA.pdf · uploaded 15 Jan 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026779 · Architect's Certificate Hadapsar Annex_Phase_6_T3.pdf · uploaded 15 Jan 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026779 · Architect's Certificate Hadapsar Annex_Phase_6_T3.pdf · uploaded 15 Jan 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Engineer's Certificate_Hadapsar Annex_Phase_6_T3_Sept 23.pdf · uploaded 15 Jan 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Engineer's Certificate_Hadapsar Annex_Phase_6_T3_Dec 23.pdf · uploaded 15 Jan 2024Source
- 30 Disclosure of sold/ booked inventoryP52100026779 · Phase6.pdf · uploaded 15 Jan 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026779 · 202309 RERA Certificate Ph 6 Tower 03 - RERA.pdf · uploaded 15 Jan 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026779 · 202312 RERA Certificate Ph 6 Tower 03 - RERA.pdf · uploaded 15 Jan 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026452 · Architect's Certificate Hadapsar Annex_Phase_5_T2.pdf · uploaded 15 Jan 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026452 · Engineer's Certificate_Hadapsar Annex_Phase_5_T2_Dec 23.pdf · uploaded 15 Jan 2024Source
- 31 Disclosure of sold/ booked inventoryP52100026452 · Phase5.pdf · uploaded 15 Jan 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026452 · 202312 RERA Certificate Ph 5 Tower 02 - RERA.pdf · uploaded 15 Jan 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048314 · Architect's Certificate Hadapsar Annex_Phase_18_T12.pdf · uploaded 15 Jan 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_Dec 23.pdf · uploaded 15 Jan 2024Source
- 4 Disclosure of sold/ booked inventoryP52100048314 · Phase18.pdf · uploaded 15 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048314 · 202312 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 15 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100049970 · Form 2A - Manjri - Phase-16-Tower-13_14.pdf · uploaded 16 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026785 · Form 2A - Manjri - Phase-8-Tower-5.pdf · uploaded 16 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100028308 · Form 2A - Manjri - Phase-12-Tower-8.pdf · uploaded 16 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100031515 · Form 2A - Manjri - Phase-14-Tower-16.pdf · uploaded 16 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026478 · Form 2A - Manjri - Phase-4-Tower-1.pdf · uploaded 16 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100028311 · Form 2A - Manjri - Phase-11-Tower-6.pdf · uploaded 16 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026479 · Form 2A - Manjri - Phase-2-Tower-20.pdf · uploaded 16 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100031391 · Form 2A - Manjri - Phase-13-Tower-7.pdf · uploaded 16 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026480 · Form 2A - Manjri - Phase-3-Tower-19.pdf · uploaded 16 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100034911 · Form 2A - Manjri - Phase-15-Tower-15.pdf · uploaded 16 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026795 · Form 2A - Manjri - Phase-10-Tower-18.pdf · uploaded 16 Jan 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100048377 · Form 2A - Manjri - Phase-20-Tower-10.pdf · uploaded 16 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026797 · Form 2A - Manjri - Phase-9-Tower-17.pdf · uploaded 16 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026800 · Form 2A - Manjri - Phase-7-Tower-4.pdf · uploaded 16 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026451 · Form 2A - Manjri - Phase-1-Tower-21.pdf · uploaded 16 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026779 · Form 2A - Manjri - Phase-6-Tower-3.pdf · uploaded 16 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026452 · Form 2A - Manjri - Phase-5-Tower-2.pdf · uploaded 16 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100048314 · Form 2A - Manjri - Phase-18-Tower-12.pdf · uploaded 16 Jan 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202312 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 17 Jan 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5_03.pdf · uploaded 19 Feb 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase 8_ Tower 5_03.pdf · uploaded 19 Feb 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Arch Cert Phase 3_Sept 22.pdf · uploaded 19 Feb 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase 8_ Tower 5_03.pdf · uploaded 19 Feb 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_7_T4_02.pdf · uploaded 19 Feb 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase 7_ Tower 4 _02.pdf · uploaded 19 Feb 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026779 · Architect's Certificate Hadapsar Annex_Phase_6_T3_01.pdf · uploaded 19 Feb 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Engineer's Certificate_Hadapsar Annex_Phase 6_ Tower 3_01.pdf · uploaded 19 Feb 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · Joyville Hadapsar Annex, Phase 14-30th June 2022.pdf · uploaded 23 Feb 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034911 · Joyville Hadapsar Annex, Phase 15-30th June 2022.pdf · uploaded 23 Feb 2024Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Hadapsar Annex Phase-12th Phase- 31st March 2021.pdf · uploaded 26 Feb 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048314 · Joyville Hadapsar Annex, Phase 18-30th June 2023.pdf · uploaded 26 Feb 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100048377 · Form 2A - Manjri - Phase-20-Tower-10.pdf · uploaded 27 Feb 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100048314 · Form 2A - Manjri - Phase-18-Tower-12.pdf · uploaded 27 Feb 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Pune Plot 2 Phase 2 Tower E (Prisma) JULY 20.pdf · uploaded 29 Feb 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Eng Prisma March 20.pdf · uploaded 29 Feb 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Architect's Certificate Pune Plot 2 Phase 3 Tower B (Elation) JULY 20.pdf · uploaded 29 Feb 2024Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100026480 · Eng Elation march20.pdf · uploaded 29 Feb 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5__March 23.pdf · uploaded 5 Mar 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026779 · Architect's Certificate Hadapsar Annex_Phase_6_T3.pdf · uploaded 5 Mar 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase_4_T1_December 21.pdf · uploaded 7 Mar 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049970 · Architect's Certificate Hadapsar Annex_Phase_16_T13 14.pdf · uploaded 19 Apr 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049970 · Engineer's Certificate_Hadapsar Annex_Phase_16_T13 14_March 24.pdf · uploaded 19 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100049970 · Form 2A - Manjri - Phase-16-Tower-13 14.pdf · uploaded 19 Apr 2024Source
- 4 Disclosure of sold/ booked inventoryP52100049970 · Phase16.pdf · uploaded 19 Apr 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049970 · 202403 RERA Certificate Ph 16 Tower 13_14 - RERA.pdf · uploaded 19 Apr 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054174 · Architect's Certificate Hadapsar Annex_Phase_17_T09 T11.pdf · uploaded 19 Apr 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054174 · Engineer's Certificate_Hadapsar Annex_Phase_17_T09 and 11_March 24.pdf · uploaded 19 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100054174 · Form 2A - Manjri - Phase-17-Tower-09 11.pdf · uploaded 19 Apr 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054174 · 202403 RERA Certificate Ph 17 Tower 9_11 - RERA.pdf · uploaded 19 Apr 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5.pdf · uploaded 19 Apr 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_March 24.pdf · uploaded 19 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026785 · Form 2A - Manjri - Phase-8-Tower-5.pdf · uploaded 19 Apr 2024Source
- 31 Disclosure of sold/ booked inventoryP52100026785 · Phase8.pdf · uploaded 19 Apr 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202403 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 19 Apr 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Architect's Certificate Hadapsar Annex_Phase_12_T8.pdf · uploaded 19 Apr 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_March 24.pdf · uploaded 19 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100028308 · Form 2A - Manjri - Phase-12-Tower-8.pdf · uploaded 19 Apr 2024Source
- 31 Disclosure of sold/ booked inventoryP52100028308 · Phase12.pdf · uploaded 19 Apr 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202403 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 19 Apr 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Architect's Certificate Hadapsar Annex_Phase_14_T16.pdf · uploaded 19 Apr 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_March 24.pdf · uploaded 19 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100031515 · Form 2A - Manjri - Phase-14-Tower-16.pdf · uploaded 19 Apr 2024Source
- 19 Disclosure of sold/ booked inventoryP52100031515 · Phase14.pdf · uploaded 19 Apr 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · 202403 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 19 Apr 2024Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026478 · Architect's Certificate Hadapsar Annex_Phase_4_T1.pdf · uploaded 19 Apr 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026478 · Engineer's Certificate_Hadapsar Annex_Phase_4_T1_March 24.pdf · uploaded 19 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026478 · Form 2A - Manjri - Phase-4-Tower-1.pdf · uploaded 19 Apr 2024Source
- 31 Disclosure of sold/ booked inventoryP52100026478 · Phase4.pdf · uploaded 19 Apr 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026478 · 202403 RERA Certificate Ph 4 Tower 01 - RERA.pdf · uploaded 19 Apr 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Architect's Certificate Hadapsar Annex_Phase_11_T6.pdf · uploaded 19 Apr 2024Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_March 24.pdf · uploaded 19 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100028311 · Form 2A - Manjri - Phase-11-Tower-6.pdf · uploaded 19 Apr 2024Source
- 31 Disclosure of sold/ booked inventoryP52100028311 · Phase11.pdf · uploaded 19 Apr 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202403 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 19 Apr 2024Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026479 · Architect's Certificate Hadapsar Annex_Phase_2_T20.pdf · uploaded 19 Apr 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026479 · Engineer's Certificate_Hadapsar Annex_Phase_2_T20_March 24.pdf · uploaded 19 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026479 · Form 2A - Manjri - Phase-2-Tower-20.pdf · uploaded 19 Apr 2024Source
- 31 Disclosure of sold/ booked inventoryP52100026479 · Phase2.pdf · uploaded 19 Apr 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026479 · 202403 RERA Certificate Ph 2 Tower 20 - RERA.pdf · uploaded 19 Apr 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Architect's Certificate Hadapsar Annex_Phase_13_T7.pdf · uploaded 19 Apr 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_March 24.pdf · uploaded 19 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100031391 · Form 2A - Manjri - Phase-13-Tower-7.pdf · uploaded 19 Apr 2024Source
- 19 Disclosure of sold/ booked inventoryP52100031391 · Phase13.pdf · uploaded 19 Apr 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202403 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 19 Apr 2024Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026480 · Architect's Certificate Hadapsar Annex_Phase_3_T19.pdf · uploaded 19 Apr 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026480 · Engineer's Certificate_Hadapsar Annex_Phase_3_T19_March 24.pdf · uploaded 19 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026480 · Form 2A - Manjri - Phase-3-Tower-19.pdf · uploaded 19 Apr 2024Source
- 31 Disclosure of sold/ booked inventoryP52100026480 · Phase3.pdf · uploaded 19 Apr 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026480 · 202403 RERA Certificate Ph 6 Tower 03 - RERA.pdf · uploaded 19 Apr 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034911 · Architect's Certificate Hadapsar Annex_Phase_15_T15.pdf · uploaded 19 Apr 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_March 24.pdf · uploaded 19 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100034911 · Form 2A - Manjri - Phase-15-Tower-15.pdf · uploaded 19 Apr 2024Source
- 12 Disclosure of sold/ booked inventoryP52100034911 · Phase15.pdf · uploaded 19 Apr 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034911 · 202403 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 19 Apr 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18.pdf · uploaded 19 Apr 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_March 24.pdf · uploaded 19 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026795 · Form 2A - Manjri - Phase-10-Tower-18.pdf · uploaded 19 Apr 2024Source
- 31 Disclosure of sold/ booked inventoryP52100026795 · Phase10.pdf · uploaded 19 Apr 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202403 RERA Certificate Ph 10 Tower 18 - RERA.pdf · uploaded 19 Apr 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048377 · Architect's Certificate Hadapsar Annex_Phase_20_T10.pdf · uploaded 19 Apr 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_March 24.pdf · uploaded 19 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100048377 · Form 2A - Manjri - Phase-20-Tower-10.pdf · uploaded 19 Apr 2024Source
- 5 Disclosure of sold/ booked inventoryP52100048377 · Phase20.pdf · uploaded 19 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048377 · 202403 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 19 Apr 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17.pdf · uploaded 19 Apr 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_March 24.pdf · uploaded 19 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026797 · Form 2A - Manjri - Phase-9-Tower-17.pdf · uploaded 19 Apr 2024Source
- 31 Disclosure of sold/ booked inventoryP52100026797 · Phase9.pdf · uploaded 19 Apr 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202403 RERA Certificate Ph 9 Tower 17 - RERA.pdf · uploaded 19 Apr 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_7_T4.pdf · uploaded 19 Apr 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_March 24.pdf · uploaded 19 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026800 · Phase7.pdf · uploaded 19 Apr 2024Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026800 · Form 2A - Manjri - Phase-7-Tower-4.pdf · uploaded 19 Apr 2024Source
- 31 Disclosure of sold/ booked inventoryP52100026800 · Phase7.pdf · uploaded 19 Apr 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202403 RERA Certificate Ph 7 Tower 04 - RERA.pdf · uploaded 19 Apr 2024Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026451 · Architect's Certificate Hadapsar Annex_Phase_1_T21.pdf · uploaded 19 Apr 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026451 · Engineer's Certificate_Hadapsar Annex_Phase_1_T21_March 24.pdf · uploaded 19 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026451 · Form 2A - Manjri - Phase-1-Tower-21.pdf · uploaded 19 Apr 2024Source
- 33 Disclosure of sold/ booked inventoryP52100026451 · Phase1.pdf · uploaded 19 Apr 2024Source
- 19 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026451 · 202403 RERA Certificate Ph 1 Tower 21 - RERA.pdf · uploaded 19 Apr 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026779 · Architect's Certificate Hadapsar Annex_Phase_6_T3.pdf · uploaded 19 Apr 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026779 · Engineer's Certificate_Hadapsar Annex_Phase_6_T3_March 24.pdf · uploaded 19 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026779 · Form 2A - Manjri - Phase-6-Tower-3.pdf · uploaded 19 Apr 2024Source
- 31 Disclosure of sold/ booked inventoryP52100026779 · Phase6.pdf · uploaded 19 Apr 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026779 · 202403 RERA Certificate Ph 6 Tower 03 - RERA.pdf · uploaded 19 Apr 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026452 · Architect's Certificate Hadapsar Annex_Phase_5_T2.pdf · uploaded 19 Apr 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026452 · Engineer's Certificate_Hadapsar Annex_Phase_5_T2_March 24.pdf · uploaded 19 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100026452 · Form 2A - Manjri - Phase-5-Tower-2.pdf · uploaded 19 Apr 2024Source
- 32 Disclosure of sold/ booked inventoryP52100026452 · Phase5.pdf · uploaded 19 Apr 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026452 · 202403 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 19 Apr 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048314 · Architect's Certificate Hadapsar Annex_Phase_18_T12.pdf · uploaded 19 Apr 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_March 24.pdf · uploaded 19 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100048314 · Form 2A - Manjri - Phase-18-Tower-12.pdf · uploaded 19 Apr 2024Source
- 5 Disclosure of sold/ booked inventoryP52100048314 · Phase18.pdf · uploaded 19 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048314 · 202403 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 19 Apr 2024Source
- 1 Disclosure of sold/ booked inventoryP52100054174 · Phase17.pdf · uploaded 20 Apr 2024Source
- 1 Architect’s Certificate on Completion of Project (Form 4)P52100026480 · Joyville hadapsar Annexe Phase 3_T19.pdf · uploaded 31 May 2024Source
- 1 Architect’s Certificate on Completion of Project (Form 4)P52100026779 · Joyville hadapsar Annexe Phase 6_T3.pdf · uploaded 31 May 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100026478 · Completion Certificate.pdf · uploaded 3 Jun 2024Source
- 2 Architect’s Certificate on Completion of Project (Form 4)P52100026478 · Joyville hadapsar Annexe Phase 4_T1.pdf · uploaded 3 Jun 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100026479 · Completion Certificate.pdf · uploaded 3 Jun 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100026480 · Completion Certificate.pdf · uploaded 3 Jun 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100026451 · Completion Certificate.pdf · uploaded 3 Jun 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100026779 · Completion Certificate.pdf · uploaded 3 Jun 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100026452 · Completion Certificate.pdf · uploaded 3 Jun 2024Source
- 2 Architect’s Certificate on Completion of Project (Form 4)P52100026452 · Joyville hadapsar Annexe Phase 5_T2.pdf · uploaded 3 Jun 2024Source
- 2 Architect’s Certificate on Completion of Project (Form 4)P52100026479 · Joyville hadapsar Annexe Phase 2_T20.pdf · uploaded 15 Jul 2024Source
- 2 Architect’s Certificate on Completion of Project (Form 4)P52100026451 · Joyville hadapsar Annexe Phase 1_T21.pdf · uploaded 15 Jul 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049970 · Architect's Certificate Hadapsar Annex_Phase_16_T1314.pdf · uploaded 20 Jul 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049970 · Engineer's Certificate_Hadapsar Annex_Phase_16_T1314_Dec 23.pdf · uploaded 20 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100049970 · Form 2A - Manjri - Phase-16-Tower-1314.pdf · uploaded 20 Jul 2024Source
- 5 Disclosure of sold/ booked inventoryP52100049970 · Phase16.pdf · uploaded 20 Jul 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049970 · 202406 RERA Certificate Ph 16 Tower 13_14 - RERA.pdf · uploaded 20 Jul 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054174 · Architect's Certificate Hadapsar Annex_Phase_17_T09 T11.pdf · uploaded 20 Jul 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054174 · Engineer's Certificate_Hadapsar Annex_Phase_17_T09_Dec 23.pdf · uploaded 20 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100054174 · Form 2A - Manjri - Phase-17-Tower-0911.pdf · uploaded 20 Jul 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054174 · 202406 RERA Certificate Ph 17 Tower 9_11 - RERA.pdf · uploaded 20 Jul 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Architect's Certificate Hadapsar Annex_Phase_8_T5.pdf · uploaded 20 Jul 2024Source
- 19 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_Dec 23.pdf · uploaded 20 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100026785 · Form 2A - Manjri - Phase-8-Tower-5.pdf · uploaded 20 Jul 2024Source
- 32 Disclosure of sold/ booked inventoryP52100026785 · Phase8.pdf · uploaded 20 Jul 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202406 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 20 Jul 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Architect's Certificate Hadapsar Annex_Phase_12_T8.pdf · uploaded 20 Jul 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_Dec 23.pdf · uploaded 20 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100028308 · Form 2A - Manjri - Phase-12-Tower-8.pdf · uploaded 20 Jul 2024Source
- 32 Disclosure of sold/ booked inventoryP52100028308 · Phase12.pdf · uploaded 20 Jul 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202406 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 20 Jul 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Architect's Certificate Hadapsar Annex_Phase_14_T16.pdf · uploaded 20 Jul 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_Dec 23.pdf · uploaded 20 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100031515 · Form 2A - Manjri - Phase-14-Tower-16.pdf · uploaded 20 Jul 2024Source
- 20 Disclosure of sold/ booked inventoryP52100031515 · Phase14.pdf · uploaded 20 Jul 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · 202406 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 20 Jul 2024Source
- 32 Disclosure of sold/ booked inventoryP52100026478 · Phase4.pdf · uploaded 20 Jul 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Architect's Certificate Hadapsar Annex_Phase_11_T6.pdf · uploaded 20 Jul 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_Dec 23.pdf · uploaded 20 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100028311 · Form 2A - Manjri - Phase-11-Tower-6.pdf · uploaded 20 Jul 2024Source
- 32 Disclosure of sold/ booked inventoryP52100028311 · Phase11.pdf · uploaded 20 Jul 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202406 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 20 Jul 2024Source
- 32 Disclosure of sold/ booked inventoryP52100026479 · Phase2.pdf · uploaded 20 Jul 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Architect's Certificate Hadapsar Annex_Phase_13_T7.pdf · uploaded 20 Jul 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_Dec 23.pdf · uploaded 20 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100031391 · Form 2A - Manjri - Phase-13-Tower-7.pdf · uploaded 20 Jul 2024Source
- 20 Disclosure of sold/ booked inventoryP52100031391 · Phase13.pdf · uploaded 20 Jul 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202406 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 20 Jul 2024Source
- 32 Disclosure of sold/ booked inventoryP52100026480 · Phase3.pdf · uploaded 20 Jul 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034911 · Architect's Certificate Hadapsar Annex_Phase_15_T15.pdf · uploaded 20 Jul 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_Dec 23.pdf · uploaded 20 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100034911 · Form 2A - Manjri - Phase-15-Tower-15.pdf · uploaded 20 Jul 2024Source
- 13 Disclosure of sold/ booked inventoryP52100034911 · Phase15.pdf · uploaded 20 Jul 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034911 · 202406 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 20 Jul 2024Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18.pdf · uploaded 20 Jul 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_Dec 23.pdf · uploaded 20 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100026795 · Form 2A - Manjri - Phase-10-Tower-18.pdf · uploaded 20 Jul 2024Source
- 32 Disclosure of sold/ booked inventoryP52100026795 · Phase10.pdf · uploaded 20 Jul 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202406 RERA Certificate Ph 10 Tower 18 - RERA.pdf · uploaded 20 Jul 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048377 · Architect's Certificate Hadapsar Annex_Phase_20_T10.pdf · uploaded 20 Jul 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_Dec 23.pdf · uploaded 20 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100048377 · Form 2A - Manjri - Phase-20-Tower-10.pdf · uploaded 20 Jul 2024Source
- 6 Disclosure of sold/ booked inventoryP52100048377 · Phase20.pdf · uploaded 20 Jul 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048377 · 202406 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 20 Jul 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17.pdf · uploaded 20 Jul 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_Dec 23.pdf · uploaded 20 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100026797 · Form 2A - Manjri - Phase-9-Tower-17.pdf · uploaded 20 Jul 2024Source
- 32 Disclosure of sold/ booked inventoryP52100026797 · Phase9.pdf · uploaded 20 Jul 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202406 RERA Certificate Ph 9 Tower 17 - RERA.pdf · uploaded 20 Jul 2024Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Architect's Certificate Hadapsar Annex_Phase_7_T4.pdf · uploaded 20 Jul 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_Dec 23.pdf · uploaded 20 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100026800 · Form 2A - Manjri - Phase-7-Tower-4.pdf · uploaded 20 Jul 2024Source
- 32 Disclosure of sold/ booked inventoryP52100026800 · Phase7.pdf · uploaded 20 Jul 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202406 RERA Certificate Ph 7 Tower 04 - RERA.pdf · uploaded 20 Jul 2024Source
- 34 Disclosure of sold/ booked inventoryP52100026451 · Phase1.pdf · uploaded 20 Jul 2024Source
- 32 Disclosure of sold/ booked inventoryP52100026779 · Phase6.pdf · uploaded 20 Jul 2024Source
- 33 Disclosure of sold/ booked inventoryP52100026452 · Phase5.pdf · uploaded 20 Jul 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048314 · Architect's Certificate Hadapsar Annex_Phase_18_T12.pdf · uploaded 20 Jul 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_Dec 23.pdf · uploaded 20 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100048314 · Form 2A - Manjri - Phase-18-Tower-12.pdf · uploaded 20 Jul 2024Source
- 6 Disclosure of sold/ booked inventoryP52100048314 · Phase18.pdf · uploaded 20 Jul 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048314 · 202406 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 20 Jul 2024Source
- 2 Disclosure of sold/ booked inventoryP52100054174 · Phase17.pdf · uploaded 22 Jul 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054174 · 202406 RERA Certificate Ph 17 Tower 9_11 - RERA.pdf · uploaded 22 Jul 2024Source
- Form 5 (FY 2023-2024)P52100026785 · JHA_Phase_8_Upload.pdf · uploaded 27 Sep 2024Source
- Form 5 (FY 2023-2024)P52100026795 · JHA_Phase_10_Upload.pdf · uploaded 27 Sep 2024Source
- Form 5 (FY 2023-2024)P52100048377 · JHA_Phase_20_Upload.pdf · uploaded 27 Sep 2024Source
- Form 5 (FY 2023-2024)P52100026797 · JHA_Phase_9_Upload.pdf · uploaded 27 Sep 2024Source
- Form 5 (FY 2023-2024)P52100026800 · JHA_Phase_7_Upload.pdf · uploaded 27 Sep 2024Source
- Form 5 (FY 2023-2024)P52100048314 · JHA_Phase_18_Upload.pdf · uploaded 27 Sep 2024Source
- Form 5 (FY 2023-2024)P52100031515 · Hadapsar_Annex_Phase_14_Upload.pdf · uploaded 28 Sep 2024Source
- Form 5 (FY 2023-2024)P52100028311 · Hadapsar_Annex_Phase_11_Upload.pdf · uploaded 28 Sep 2024Source
- Form 5 (FY 2023-2024)P52100031391 · Hadapsar_Annex_Phase_13_Upload.pdf · uploaded 28 Sep 2024Source
- Form 5 (FY 2023-2024)P52100034911 · Hadapsar_Annex_Phase_15_Upload.pdf · uploaded 28 Sep 2024Source
- Form 5 (FY 2023-2024)P52100049970 · Hadapsar_Annex_Phase_16_Upload.pdf · uploaded 30 Sep 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100049970 · Hadapsar_Annexe_Phase_16-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100049970 · Hadapsar_Annexe_Phase_16-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100049970 · Hadapsar_Annexe_Phase_16-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100054174 · Hadapsar_Annexe_Phase_17-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100054174 · Hadapsar_Annexe_Phase_17-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100054174 · Hadapsar_Annexe_Phase_17-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026785 · Hadapsar_Annexe_Phase_8-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026785 · Hadapsar_Annexe_Phase_8-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026785 · Hadapsar_Annexe_Phase_8-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100028308 · Hadapsar_Annexe_Phase_12-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100028308 · Hadapsar_Annexe_Phase_12-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100028308 · Hadapsar_Annexe_Phase_12-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100031515 · Hadapsar_Annexe_Phase_14-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100031515 · Hadapsar_Annexe_Phase_14-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100031515 · Hadapsar_Annexe_Phase_14-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026478 · Hadapsar_Annexe_Phase_4-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100028311 · Hadapsar_Annexe_Phase_11-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100028311 · Hadapsar_Annexe_Phase_11-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100028311 · Hadapsar_Annexe_Phase_11-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100031391 · Hadapsar_Annexe_Phase_13-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100031391 · Hadapsar_Annexe_Phase_13-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100031391 · Hadapsar_Annexe_Phase_13-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100034911 · Hadapsar_Annexe_Phase_15-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100034911 · Hadapsar_Annexe_Phase_15-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100034911 · Hadapsar_Annexe_Phase_15-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026795 · Hadapsar_Annexe_Phase_10-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100048377 · Hadapsar_Annexe_Phase_20-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100048377 · Hadapsar_Annexe_Phase_20-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100048377 · Hadapsar_Annexe_Phase_20-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026797 · Hadapsar_Annexe_Phase_9-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026800 · Hadapsar_Annexe_Phase_7-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026779 · Hadapsar_Annexe_Phase_6-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026779 · Hadapsar_Annexe_Phase_6-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026779 · Hadapsar_Annexe_Phase_6-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026452 · Hadapsar_Annexe_Phase_5-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100048314 · Hadapsar_Annexe_Phase_18-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100048314 · Hadapsar_Annexe_Phase_18-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100048314 · Hadapsar_Annexe_Phase_18-_March_24.pdf · uploaded 6 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026479 · Hadapsar_Annexe_Phase_2-_March_24.pdf · uploaded 7 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026479 · Hadapsar_Annexe_Phase_2-_March_24.pdf · uploaded 7 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026479 · Hadapsar_Annexe_Phase_2-_March_24.pdf · uploaded 7 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026480 · Hadapsar_Annexe_Phase_3-_March_24.pdf · uploaded 7 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026480 · Hadapsar_Annexe_Phase_3-_March_24.pdf · uploaded 7 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026480 · Hadapsar_Annexe_Phase_3-_March_24.pdf · uploaded 7 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026451 · Hadapsar_Annexe_Phase_1-_March_24.pdf · uploaded 7 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026451 · Hadapsar_Annexe_Phase_1-_March_24.pdf · uploaded 7 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026451 · Hadapsar_Annexe_Phase_1-_March_24.pdf · uploaded 7 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049970 · 202409 RERA Certificate Ph 16 Tower 13_14 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100049970 · Joyville Hadapsar Annexe Phase 16 MG.pdf · uploaded 20 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049970 · 202409 RERA Certificate Ph 16 Tower 13_14 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100049970 · Joyville Hadapsar Annexe Phase 16 MG.pdf · uploaded 20 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 20 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049970 · 202409 RERA Certificate Ph 16 Tower 13_14 - RERA.pdf · uploaded 20 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100049970 · Joyville Hadapsar Annexe Phase 16 MG.pdf · uploaded 20 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054174 · Engineer's Certificate_Hadapsar Annex_Phase_17_T9_Oct 24.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054174 · 202409 RERA Certificate Ph 17 Tower 9_11 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100054174 · Joyville Hadapsar Annexe Phase 17 MG.pdf · uploaded 20 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054174 · Engineer's Certificate_Hadapsar Annex_Phase_17_T9_Oct 24.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054174 · 202409 RERA Certificate Ph 17 Tower 9_11 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100054174 · Joyville Hadapsar Annexe Phase 17 MG.pdf · uploaded 20 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 20 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054174 · 202409 RERA Certificate Ph 17 Tower 9_11 - RERA.pdf · uploaded 20 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054174 · Engineer's Certificate_Hadapsar Annex_Phase_17_T9_Oct 24.pdf · uploaded 20 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100054174 · Joyville Hadapsar Annexe Phase 17 MG.pdf · uploaded 20 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Form 1_Joyville Hadapsar Annex_Phase_8.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_Oct 24.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202409 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 20 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Form 1_Joyville Hadapsar Annex_Phase_8.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_Oct 24.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202409 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 20 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Form 1_Joyville Hadapsar Annex_Phase_8.pdf · uploaded 20 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202409 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 20 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_Oct 24.pdf · uploaded 20 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 20 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_Oct 24.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202409 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 20 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_Oct 24.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202409 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 20 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 20 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202409 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 20 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_Oct 24.pdf · uploaded 20 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 20 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Form 1_Joyville Hadapsar Annex_Phase_14.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_Oct 24.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · 202409 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100031515 · Joyville Hadapsar Annexe Phase 14 - Tower 16.pdf · uploaded 20 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Form 1_Joyville Hadapsar Annex_Phase_14.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_Oct 24.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · 202409 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100031515 · Joyville Hadapsar Annexe Phase 14 - Tower 16.pdf · uploaded 20 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Form 1_Joyville Hadapsar Annex_Phase_14.pdf · uploaded 20 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · 202409 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 20 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_Oct 24.pdf · uploaded 20 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100031515 · Joyville Hadapsar Annexe Phase 14 - Tower 16.pdf · uploaded 20 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 20 Oct 2024View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Form 1_Joyville Hadapsar Annex_Phase_11.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_Oct 24.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202409 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 20 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Form 1_Joyville Hadapsar Annex_Phase_11.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_Oct 24.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202409 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 20 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Form 1_Joyville Hadapsar Annex_Phase_11.pdf · uploaded 20 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202409 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 20 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_Oct 24.pdf · uploaded 20 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 20 Oct 2024View
- 1 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 20 Oct 2024View
- 2 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 20 Oct 2024View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Form 1_Joyville Hadapsar Annex_Phase_13.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_Oct 24.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202409 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100031391 · Joyville Hadapsar Annexe Phase 13 - Tower 7.pdf · uploaded 20 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Form 1_Joyville Hadapsar Annex_Phase_13.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_Oct 24.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202409 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100031391 · Joyville Hadapsar Annexe Phase 13 - Tower 7.pdf · uploaded 20 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Form 1_Joyville Hadapsar Annex_Phase_13.pdf · uploaded 20 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202409 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 20 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_Oct 24.pdf · uploaded 20 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100031391 · Joyville Hadapsar Annexe Phase 13 - Tower 7.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 20 Oct 2024View
- 1 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 20 Oct 2024View
- 2 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 20 Oct 2024View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_Oct 24.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034911 · 202409 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_Oct 24.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034911 · 202409 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 20 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 20 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034911 · 202409 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 20 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_Oct 24.pdf · uploaded 20 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Form 1_Joyville Hadapsar Annex_Phase_10.pdf · uploaded 20 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202409 RERA Certificate Ph 10 Tower 18 - RERA.pdf · uploaded 20 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_Oct 24.pdf · uploaded 20 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 20 Oct 2024View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_Oct 24.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048377 · 202409 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100048377 · Joyville Hadapsar Annexe Phase 20 - Tower 10.pdf · uploaded 20 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_Oct 24.pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048377 · 202409 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100048377 · Joyville Hadapsar Annexe Phase 20 - Tower 10.pdf · uploaded 20 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 20 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048377 · 202409 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 20 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_Oct 24.pdf · uploaded 20 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100048377 · Joyville Hadapsar Annexe Phase 20 - Tower 10.pdf · uploaded 20 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Form 1_Joyville Hadapsar Annex_Phase_9.pdf · uploaded 20 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202409 RERA Certificate Ph 9 Tower 17 - RERA.pdf · uploaded 20 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_Oct 24.pdf · uploaded 20 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 20 Oct 2024View
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Form 1_Joyville Hadapsar Annex_Phase_7.pdf · uploaded 20 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202409 RERA Certificate Ph 7 Tower 04 - RERA.pdf · uploaded 20 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_Oct 24.pdf · uploaded 20 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 20 Oct 2024View
- 1 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 20 Oct 2024View
- 2 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 20 Oct 2024View
- 1 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 20 Oct 2024View
- 1 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 20 Oct 2024View
- 2 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 20 Oct 2024View
- 2 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 20 Oct 2024View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_Oct 24 (1).pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048314 · 202409 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100048314 · Joyville Hadapsar Annexe Phase 18 - Tower 12.pdf · uploaded 20 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 20 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_Oct 24 (1).pdf · uploaded 20 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048314 · 202409 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100048314 · Joyville Hadapsar Annexe Phase 18 - Tower 12.pdf · uploaded 20 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 20 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048314 · 202409 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 20 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_Oct 24 (1).pdf · uploaded 20 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100048314 · Joyville Hadapsar Annexe Phase 18 - Tower 12.pdf · uploaded 20 Oct 2024Source
- 1 Architect’s Certificate on Completion of Project (Form 4)P52100026795 · Architect's Certificate Hadapsar Annex_Phase_10_T18.pdf · uploaded 30 Dec 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100026795 · OC Copy Bldg 4 5 17 18.pdf · uploaded 30 Dec 2024Source
- 1 Architect’s Certificate on Completion of Project (Form 4)P52100026797 · Architect's Certificate Hadapsar Annex_Phase_9_T17.pdf · uploaded 30 Dec 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100026797 · OC Copy Bldg 4 5 17 18.pdf · uploaded 30 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049970 · 202412 RERA Certificate Ph 16 Tower 13_14 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049970 · 202412 RERA Certificate Ph 16 Tower 13_14 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049970 · 202412 RERA Certificate Ph 16 Tower 13_14 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054174 · Engineer's Certificate_Hadapsar Annex_Phase_17_T9_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054174 · 202412 RERA Certificate Ph 17 Tower 9_11 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054174 · Engineer's Certificate_Hadapsar Annex_Phase_17_T9_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054174 · 202412 RERA Certificate Ph 17 Tower 9_11 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054174 · 202412 RERA Certificate Ph 17 Tower 9_11 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054174 · Engineer's Certificate_Hadapsar Annex_Phase_17_T9_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Form 1_Joyville Hadapsar Annex_Phase_8.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202412 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Form 1_Joyville Hadapsar Annex_Phase_8.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202412 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026785 · Form 1_Joyville Hadapsar Annex_Phase_8.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026785 · 202412 RERA Certificate Ph 8 Tower 05 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202412 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202412 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202412 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Form 1_Joyville Hadapsar Annex_Phase_14.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · 202412 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Form 1_Joyville Hadapsar Annex_Phase_14.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · 202412 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Form 1_Joyville Hadapsar Annex_Phase_14.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · 202412 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Form 1_Joyville Hadapsar Annex_Phase_11.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202412 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Form 1_Joyville Hadapsar Annex_Phase_11.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202412 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Form 1_Joyville Hadapsar Annex_Phase_11.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202412 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Form 1_Joyville Hadapsar Annex_Phase_13.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202412 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Form 1_Joyville Hadapsar Annex_Phase_13.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202412 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Form 1_Joyville Hadapsar Annex_Phase_13.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202412 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034911 · 202412 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034911 · 202412 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034911 · 202412 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Form 1_Joyville Hadapsar Annex_Phase_10.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202412 RERA Certificate Ph 10 Tower 18 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Form 1_Joyville Hadapsar Annex_Phase_10.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202412 RERA Certificate Ph 10 Tower 18 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026795 · Form 1_Joyville Hadapsar Annex_Phase_10.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026795 · 202412 RERA Certificate Ph 10 Tower 18 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048377 · 202412 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048377 · 202412 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048377 · 202412 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Form 1_Joyville Hadapsar Annex_Phase_7.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202412 RERA Certificate Ph 7 Tower 04 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Form 1_Joyville Hadapsar Annex_Phase_7.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202412 RERA Certificate Ph 7 Tower 04 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026800 · Form 1_Joyville Hadapsar Annex_Phase_7.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026800 · 202412 RERA Certificate Ph 7 Tower 04 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048314 · 202412 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048314 · 202412 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048314 · 202412 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_Dec 24.pdf · uploaded 19 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100049970 · Joyville Hadapsar Annexe Phase 16 - Tower 1314.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100049970 · Joyville Hadapsar Annexe Phase 16 - Tower 1314.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100049970 · Joyville Hadapsar Annexe Phase 16 - Tower 1314.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100054174 · Joyville Hadapsar Annexe Phase 17 - Tower 911.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100054174 · Joyville Hadapsar Annexe Phase 17 - Tower 911.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100054174 · Joyville Hadapsar Annexe Phase 17 - Tower 911.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100026785 · Joyville Hadapsar Annexe Phase 8 - Tower 5.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100031515 · Joyville Hadapsar Annexe Phase 14 - Tower 16.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100031515 · Joyville Hadapsar Annexe Phase 14 - Tower 16.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100031515 · Joyville Hadapsar Annexe Phase 14 - Tower 16.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100026478 · Joyville Hadapsar Annexe Phase 4 - Tower 1.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100026479 · Joyville Hadapsar Annexe Phase 2 - Tower 20.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100031391 · Joyville Hadapsar Annexe Phase 13 - Tower 7.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100031391 · Joyville Hadapsar Annexe Phase 13 - Tower 7.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100031391 · Joyville Hadapsar Annexe Phase 13 - Tower 7.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100026480 · Joyville Hadapsar Annexe Phase 3 - Tower 19.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100034911 · Joyville Hadapsar Annexe Phase 15 - Tower 15.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100034911 · Joyville Hadapsar Annexe Phase 15 - Tower 15.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100034911 · Joyville Hadapsar Annexe Phase 15 - Tower 15.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100026795 · Joyville Hadapsar Annexe Phase 10 - Tower 18.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100048377 · Joyville Hadapsar Annexe Phase 20 - Tower 10.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100048377 · Joyville Hadapsar Annexe Phase 20 - Tower 10.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100048377 · Joyville Hadapsar Annexe Phase 20 - Tower 10.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Form 1_Joyville Hadapsar Annex_Phase_9.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_Dec 24.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202412 RERA Certificate Ph 9 Tower 17 - RERA.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 20 Jan 2025View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Form 1_Joyville Hadapsar Annex_Phase_9.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_Dec 24.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202412 RERA Certificate Ph 9 Tower 17 - RERA.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 20 Jan 2025View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026797 · Form 1_Joyville Hadapsar Annex_Phase_9.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026797 · 202412 RERA Certificate Ph 9 Tower 17 - RERA.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_Dec 24.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100026797 · Joyville Hadapsar Annexe Phase 9 - Tower 17.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100026800 · Joyville Hadapsar Annexe Phase 7 - Tower 4.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100026451 · Joyville Hadapsar Annexe Phase 1 - Tower 21.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100026779 · Joyville Hadapsar Annexe Phase 6 - Tower 3.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100026452 · Joyville Hadapsar Annexe Phase 5 - Tower 2.pdf · uploaded 20 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP52100048314 · Joyville Hadapsar Annexe Phase 18 - Tower 12.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100048314 · Joyville Hadapsar Annexe Phase 18 - Tower 12.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100048314 · Joyville Hadapsar Annexe Phase 18 - Tower 12.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 20 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 20 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054174 · Engineer_s Certificate_Hadapsar Annex_Phase_17_T9_March 25.pdf · uploaded 20 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 20 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028308 · Engineer_s Certificate_Hadapsar Annex_Phase_12_T8_March 25.pdf · uploaded 20 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Form 1_Joyville Hadapsar Annex_Phase_14.pdf · uploaded 20 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031515 · Engineer_s Certificate_Hadapsar Annex_Phase_14_T16_March 25.pdf · uploaded 20 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100028311 · Form 1_Joyville Hadapsar Annex_Phase_11.pdf · uploaded 20 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028311 · 202503 RERA Certificate Joyville Celestia Ph 2 Tower 5 - RERA.pdf · uploaded 20 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100028311 · Engineer_s Certificate_Hadapsar Annex_Phase_11_T6_March 25.pdf · uploaded 20 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031391 · Form 1_Joyville Hadapsar Annex_Phase_13.pdf · uploaded 20 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031391 · Engineer_s Certificate_Hadapsar Annex_Phase_13_T7_March 25.pdf · uploaded 20 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 20 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100034911 · Engineer_s Certificate_Hadapsar Annex_Phase_15_T15_March 25.pdf · uploaded 20 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 20 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048377 · Engineer_s Certificate_Hadapsar Annex_Phase_20_T10_March 25.pdf · uploaded 20 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 20 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100048314 · Engineer_s Certificate_Hadapsar Annex_Phase_18_T12_March 25.pdf · uploaded 20 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049970 · 202503 RERA Certificate Ph 16 Tower 13_14 - RERA.pdf · uploaded 21 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100049970 · MahaRERA Regulations_Form 2A_Phase_16.pdf · uploaded 21 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054174 · 202503 RERA Certificate Ph 17 Tower 9_11 - RERA.pdf · uploaded 21 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100054174 · MahaRERA Regulations_Form 2A_Phase_17.pdf · uploaded 21 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100028308 · 202503 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 21 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100028308 · MahaRERA Regulations_Form 2A_Phase_12.pdf · uploaded 21 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031515 · 202503 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 21 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100031515 · MahaRERA Regulations_Form 2A_Phase_14.pdf · uploaded 21 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100028311 · MahaRERA Regulations_Form 2A_Phase_11.pdf · uploaded 21 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031391 · 202503 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 21 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100031391 · MahaRERA Regulations_Form 2A_Phase_13.pdf · uploaded 21 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100034911 · 202503 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 21 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100034911 · MahaRERA Regulations_Form 2A_Phase_15.pdf · uploaded 21 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048377 · 202503 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 21 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100048377 · MahaRERA Regulations_Form 2A_Phase_20.pdf · uploaded 21 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100048314 · 202503 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 21 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100048314 · MahaRERA Regulations_Form 2A_Phase_18.pdf · uploaded 21 Apr 2025Source
- Occupational CertificateP52100031515 · OC Copy- Bldg 6, 7 & 16.pdf · uploaded 8 Jul 2025Source
- Form 1P52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 17 Jul 2025Source
- Form 2P52100049970 · Engineer_s Certificate_Hadapsar Annex_Phase_16_T13&14_June 25.pdf · uploaded 17 Jul 2025Source
- Form 3P52100049970 · 202506 RERA Certificate Ph 16 Tower 13_14 - RERA.pdf · uploaded 17 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100049970 · Joyville Hadapsar Annexe Phase 16 - Tower 13 & 14.pdf · uploaded 17 Jul 2025Source
- Form 1P52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 17 Jul 2025Source
- Form 2P52100054174 · Engineer_s Certificate_Hadapsar Annex_Phase_17_T9_June 25.pdf · uploaded 17 Jul 2025Source
- Form 3P52100054174 · 202506 RERA Certificate Ph 17 Tower 9_11 - RERA.pdf · uploaded 17 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100054174 · Joyville Hadapsar Annexe Phase 17 - Tower 9 & 11.pdf · uploaded 17 Jul 2025Source
- Form 1P52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 17 Jul 2025Source
- Form 2P52100028308 · Engineer_s Certificate_Hadapsar Annex_Phase_12_T8_June 25.pdf · uploaded 17 Jul 2025Source
- Form 3P52100028308 · 202506 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 17 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100028308 · Joyville Hadapsar Annexe Phase 12 - Tower 8.pdf · uploaded 17 Jul 2025Source
- Form 1P52100031515 · Form 1_Joyville Hadapsar Annex_Phase_14.pdf · uploaded 17 Jul 2025Source
- Form 2P52100031515 · Engineer_s Certificate_Hadapsar Annex_Phase_14_T16_June 25.pdf · uploaded 17 Jul 2025Source
- Form 3P52100031515 · 202506 RERA Certificate Ph 14 Tower 16 - RERA.pdf · uploaded 17 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100031515 · Joyville Hadapsar Annexe Phase 14 - Tower 16.pdf · uploaded 17 Jul 2025Source
- Form 1P52100028311 · Form 1_Joyville Hadapsar Annex_Phase_11.pdf · uploaded 17 Jul 2025Source
- Form 2P52100028311 · Engineer_s Certificate_Hadapsar Annex_Phase_11_T6_June 25.pdf · uploaded 17 Jul 2025Source
- Form 3P52100028311 · 202506 RERA Certificate Ph 11 Tower 06 - RERA.pdf · uploaded 17 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100028311 · Joyville Hadapsar Annexe Phase 11 - Tower 6.pdf · uploaded 17 Jul 2025Source
- Form 1P52100031391 · Form 1_Joyville Hadapsar Annex_Phase_13.pdf · uploaded 17 Jul 2025Source
- Form 2P52100031391 · Engineer_s Certificate_Hadapsar Annex_Phase_13_T7_June 25.pdf · uploaded 17 Jul 2025Source
- Form 3P52100031391 · 202506 RERA Certificate Ph 13 Tower 07 - RERA.pdf · uploaded 17 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100031391 · Joyville Hadapsar Annexe Phase 13 - Tower 7.pdf · uploaded 17 Jul 2025Source
- Form 1P52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 17 Jul 2025Source
- Form 2P52100034911 · Engineer_s Certificate_Hadapsar Annex_Phase_15_T15_June 25.pdf · uploaded 17 Jul 2025Source
- Form 3P52100034911 · 202506 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 17 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100034911 · Joyville Hadapsar Annexe Phase 15 - Tower 15.pdf · uploaded 17 Jul 2025Source
- Form 1P52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 17 Jul 2025Source
- Form 2P52100048377 · Engineer_s Certificate_Hadapsar Annex_Phase_20_T10_June 25.pdf · uploaded 17 Jul 2025Source
- Form 3P52100048377 · 202506 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 17 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100048377 · Joyville Hadapsar Annexe Phase 20 - Tower 10.pdf · uploaded 17 Jul 2025Source
- Form 1P52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 17 Jul 2025Source
- Form 2P52100048314 · Engineer_s Certificate_Hadapsar Annex_Phase_18_T12_June 25.pdf · uploaded 17 Jul 2025Source
- Form 3P52100048314 · 202506 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 17 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100048314 · Joyville Hadapsar Annexe Phase 18 - Tower 12.pdf · uploaded 17 Jul 2025Source
- Withdrawal Update Form 1P52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 1 Aug 2025Source
- Withdrawal Update Form 1P52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 1 Aug 2025Source
- Withdrawal Update Form 2P52100034911 · Engineer_s Certificate_Hadapsar Annex_Phase_15_T15_June 25.pdf · uploaded 1 Aug 2025Source
- Withdrawal Update Form 2P52100034911 · Engineer_s Certificate_Hadapsar Annex_Phase_15_T15_June 25.pdf · uploaded 1 Aug 2025Source
- Withdrawal Update Form 3P52100034911 · 202506 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 1 Aug 2025Source
- Withdrawal Update Form 3P52100034911 · 202506 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 1 Aug 2025Source
- Withdrawal Update Form 1P52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 12 Aug 2025Source
- Withdrawal Update Form 2P52100049970 · Engineer_s Certificate_Hadapsar Annex_Phase_16_T13u002614_June 25.pdf · uploaded 12 Aug 2025Source
- Withdrawal Update Form 3P52100049970 · 202506 RERA Certificate Ph 16 Tower 13_14 - RERA New.pdf · uploaded 12 Aug 2025Source
- Withdrawal Update Form 1P52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 12 Aug 2025Source
- Withdrawal Update Form 2P52100054174 · Engineer_s Certificate_Hadapsar Annex_Phase_17_T9_June 25.pdf · uploaded 12 Aug 2025Source
- Withdrawal Update Form 3P52100054174 · 202506 RERA Certificate Ph 17 Tower 9_11 - RERA.pdf · uploaded 12 Aug 2025Source
- Withdrawal Update Form 1P52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 12 Aug 2025Source
- Withdrawal Update Form 2P52100028308 · Engineer_s Certificate_Hadapsar Annex_Phase_12_T8_June 25.pdf · uploaded 12 Aug 2025Source
- Withdrawal Update Form 3P52100028308 · 202506 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 12 Aug 2025Source
- Withdrawal Update Form 1P52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 12 Aug 2025Source
- Withdrawal Update Form 2P52100048377 · Engineer_s Certificate_Hadapsar Annex_Phase_20_T10_June 25.pdf · uploaded 12 Aug 2025Source
- Withdrawal Update Form 3P52100048377 · 202506 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 12 Aug 2025Source
- Withdrawal Update Form 1P52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 12 Aug 2025Source
- Withdrawal Update Form 2P52100048314 · Engineer_s Certificate_Hadapsar Annex_Phase_18_T12_June 25.pdf · uploaded 12 Aug 2025Source
- Withdrawal Update Form 3P52100048314 · 202506 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 12 Aug 2025Source
- Withdrawal Update Form 1P52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 13 Aug 2025Source
- Withdrawal Update Form 2P52100049970 · Engineer_s Certificate_Hadapsar Annex_Phase_16_T13u002614_June 25.pdf · uploaded 13 Aug 2025Source
- Withdrawal Update Form 3P52100049970 · 202506 RERA Certificate Ph 16 Tower 13_14 - RERA New.pdf · uploaded 13 Aug 2025Source
- Withdrawal Update Form 1P52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 13 Aug 2025Source
- Withdrawal Update Form 2P52100028308 · Engineer_s Certificate_Hadapsar Annex_Phase_12_T8_June 25.pdf · uploaded 13 Aug 2025Source
- Withdrawal Update Form 3P52100028308 · 202506 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 13 Aug 2025Source
- Withdrawal Update Form 1P52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 13 Aug 2025Source
- Withdrawal Update Form 2P52100034911 · Engineer_s Certificate_Hadapsar Annex_Phase_15_T15_June 25.pdf · uploaded 13 Aug 2025Source
- Withdrawal Update Form 3P52100034911 · 202506 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 13 Aug 2025Source
- Withdrawal Update Form 1P52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 13 Aug 2025Source
- Withdrawal Update Form 2P52100048314 · Engineer_s Certificate_Hadapsar Annex_Phase_18_T12_June 25.pdf · uploaded 13 Aug 2025Source
- Withdrawal Update Form 3P52100048314 · 202506 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 13 Aug 2025Source
- Form 5 (FY 2024-2025)P52100049970 · Form 5_Hadapsar Phase 16.pdf · uploaded 28 Sep 2025Source
- Form 5 (FY 2024-2025)P52100054174 · Form 5_Hadapsar Phase 17.pdf · uploaded 28 Sep 2025Source
- Form 5 (FY 2024-2025)P52100026785 · Form 5_Hadapsar Phase 8.pdf · uploaded 28 Sep 2025Source
- Form 5 (FY 2024-2025)P52100028308 · Form 5_Hadapsar Phase 12.pdf · uploaded 28 Sep 2025Source
- Form 5 (FY 2024-2025)P52100031515 · Form 5_Hadapsar Phase 14.pdf · uploaded 28 Sep 2025Source
- Form 5 (FY 2024-2025)P52100028311 · Form 5_Hadapsar Phase 11.pdf · uploaded 28 Sep 2025Source
- Form 5 (FY 2024-2025)P52100031391 · Form 5_Hadapsar Phase 13.pdf · uploaded 28 Sep 2025Source
- Form 5 (FY 2024-2025)P52100034911 · Form 5_Hadapsar Phase 15.pdf · uploaded 28 Sep 2025Source
- Form 5 (FY 2024-2025)P52100048377 · Form 5_Hadapsar Phase 20 NEW.pdf · uploaded 28 Sep 2025Source
- Form 5 (FY 2024-2025)P52100026800 · Form 5_Hadapsar Phase 7.pdf · uploaded 28 Sep 2025Source
- Form 5 (FY 2024-2025)P52100048314 · Form 5_Hadapsar Phase 18.pdf · uploaded 28 Sep 2025Source
- Form 5 (FY 2024-2025)P52100026795 · Form 5_Hadapsar Phase 10.pdf · uploaded 29 Sep 2025Source
- Form 5 (FY 2024-2025)P52100026797 · Form 5_Hadapsar Phase 9.pdf · uploaded 29 Sep 2025Source
- Withdrawal Update Form 1P52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 2P52100028308 · Engineer_s Certificate_Hadapsar Annex_Phase_12_T8_Sept 25.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 3P52100028308 · 202509 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 1P52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 2P52100034911 · Engineer_s Certificate_Hadapsar Annex_Phase_15_T15_Sept 25.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 3P52100034911 · 202509 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 1P52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 21 Oct 2025Source
- Withdrawal Update Form 2P52100048377 · Engineer_s Certificate_Hadapsar Annex_Phase_20_T10_Sept 25.pdf · uploaded 21 Oct 2025Source
- Withdrawal Update Form 3P52100048377 · 202509 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 21 Oct 2025Source
- Withdrawal Update Form 1P52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 21 Oct 2025Source
- Withdrawal Update Form 2P52100048314 · Engineer_s Certificate_Hadapsar Annex_Phase_18_T12_Sept 25.pdf · uploaded 21 Oct 2025Source
- Withdrawal Update Form 3P52100048314 · 202509 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 21 Oct 2025Source
- Withdrawal Update Form 1P52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 22 Oct 2025Source
- Withdrawal Update Form 2P52100049970 · Engineer_s Certificate_Hadapsar Annex_Phase_16_T13u002614_Sept 25.pdf · uploaded 22 Oct 2025Source
- Withdrawal Update Form 3P52100049970 · 202509 RERA Certificate Ph 16 Tower 13_14 - RERA.pdf · uploaded 22 Oct 2025Source
- Withdrawal Update Form 1P52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 22 Oct 2025Source
- Withdrawal Update Form 2P52100054174 · Engineer_s Certificate_Hadapsar Annex_Phase_17_T9_Sept 25.pdf · uploaded 22 Oct 2025Source
- Withdrawal Update Form 3P52100054174 · 202509 RERA Certificate Ph 17 Tower 9_11 - RERA.pdf · uploaded 22 Oct 2025Source
- Occupational CertificateP52100031515 · RERA E-mail for OC Verification.pdf · uploaded 30 Dec 2025Source
- Withdrawal Update Form 1P52100028308 · FORM 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2P52100028308 · FORM 2_Hadapsar Annex_Phase_12_T8_December 25.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3P52100028308 · FORM 3_CA Certificate Ph 12 Tower 08 - RERA_page-0001.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1P52100049970 · FORM 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 24 Jan 2026Source
- Withdrawal Update Form 2P52100049970 · FORM 2_Hadapsar Annex_Phase_16_T13 14_December 25.pdf · uploaded 24 Jan 2026Source
- Withdrawal Update Form 3P52100049970 · FORM 3_CA Certificate Ph 16 Tower 13_14 - RERA_page-0001.pdf · uploaded 24 Jan 2026Source
- Withdrawal Update Form 1P52100034911 · FORM 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 24 Jan 2026Source
- Withdrawal Update Form 2P52100034911 · FORM 2_Hadapsar Annex_Phase_15_T15_December 25.pdf · uploaded 24 Jan 2026Source
- Withdrawal Update Form 3P52100034911 · FORM 3_CA Certificate Ph 15 Tower 15 - RERA_page-0001.pdf · uploaded 24 Jan 2026Source
- Withdrawal Update Form 1P52100048377 · FORM 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 24 Jan 2026Source
- Withdrawal Update Form 2P52100048377 · FORM 2_Hadapsar Annex_Phase_20_T10_December 25.pdf · uploaded 24 Jan 2026Source
- Withdrawal Update Form 3P52100048377 · FORM 3_CA Certificate Ph 20 Tower 10 - RERA_page-0001.pdf · uploaded 24 Jan 2026Source
- Withdrawal Update Form 1P52100048314 · FORM 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 24 Jan 2026Source
- Withdrawal Update Form 2P52100048314 · FORM 2_Hadapsar Annex_Phase_18_T12_December 25.pdf · uploaded 24 Jan 2026Source
- Withdrawal Update Form 3P52100048314 · FORM 3_CA Certificate Ph 18 Tower 12 - RERA_page-0001.pdf · uploaded 24 Jan 2026Source
- Form 2A (FY 2024-2025)P52100034911 · 2a.pdf · uploaded 21 Mar 2026Source
- Withdrawal Update Form 1P52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100049970 · Form 2_Hadapsar Annex_Phase_16_T13 14_March 26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100049970 · Form 2_Hadapsar Annex_Phase_16_T13 14_March 26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100049970 · FORM 3_CA Certificate Ph 16 Tower 13_14 - RERA_page-0001.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100049970 · 202603 RERA Certificate Ph 16 Tower 13_14 - RERA.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P52100054174 · FORM 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100054174 · FORM 2_Hadapsar Annex_Phase_17_T9_December 25.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100054174 · Form 2_Hadapsar Annex_Phase_17_T9_March 26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100054174 · Form 2_Hadapsar Annex_Phase_17_T9_March 26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100054174 · FORM 3_CA Certificate Ph 17 Tower 9_11 - RERA.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100054174 · 202603 RERA Certificate Ph 17 Tower 9_11 - RERA.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100054174 · 202603 RERA Certificate Ph 17 Tower 9_11 - RERA.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100028308 · Form 2_Hadapsar Annex_Phase_12_T8_March 26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100028308 · 202603 RERA Certificate Ph 12 Tower 08 - RERA.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100034911 · Form 2_Hadapsar Annex_Phase_15_T15_March 26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100034911 · 202603 RERA Certificate Ph 15 Tower 15 - RERA.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100048377 · Form 2_Hadapsar Annex_Phase_20_T10_March 26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100048377 · 202603 RERA Certificate Ph 20 Tower 10 - RERA.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100048314 · Form 2_Hadapsar Annex_Phase_18_T12_March 26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100048314 · Form 2_Hadapsar Annex_Phase_18_T12_March 26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100048314 · 202603 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100048314 · 202603 RERA Certificate Ph 18 Tower 12 - RERA.pdf · uploaded 20 Apr 2026Source
- Form 2A (FY 2025-2026)P52100049970 · Form 2A_Hadapsar_Phase_16.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 1P52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17_Updated.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2P52100054174 · Engineer_s Certificate_Hadapsar Annex_Phase_17_T9_July 26_Updated.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3P52100054174 · CA RERA Certificate Ph 17.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 1P52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15_Updated.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2P52100034911 · Engineer_s Certificate_Hadapsar Annex_Phase_15_T15_July 26_Updated.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3P52100034911 · CA RERA Certificate Ph 15 - updated.pdf · uploaded 20 Jul 2026Source
- Form 2A (FY 2025-2026)P52100034911 · Form 2A_Hadapsar_Phase_15.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 1P52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20_Updated.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2P52100048377 · Engineer_s Certificate_Hadapsar Annex_Phase_20_T10_July 26_Updated.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3P52100048377 · CA RERA Certificate Ph 20.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 1P52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18_Updated.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2P52100048314 · Engineer_s Certificate_Hadapsar Annex_Phase_18_T12_July 26_Updated.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3P52100048314 · CA RERA Certificate Ph 18.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 1P52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16_Updated.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 2P52100049970 · Engineer_s Certificate_Hadapsar Annex_Phase_16_T13 14_July 26_Updated.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 3P52100049970 · CA RERA Certificate Ph 16.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 1P52100031391 · f1.pdf · uploaded 13 Aug 2026Source
- Withdrawal Update Form 1P52100031391 · f1.pdf · uploaded 13 Aug 2026Source
- Withdrawal Update Form 2P52100031391 · f2.pdf · uploaded 13 Aug 2026Source
- Withdrawal Update Form 2P52100031391 · f2.pdf · uploaded 13 Aug 2026Source
- Withdrawal Update Form 3P52100031391 · f3.pdf · uploaded 13 Aug 2026Source
- Withdrawal Update Form 3P52100031391 · f3.pdf · uploaded 13 Aug 2026Source
- Form 2A (FY 2023-2024)P52100031391 · FORM 2A 25.pdf · uploaded 13 Aug 2026Source
- Form 2A (FY 2024-2025)P52100031391 · FORM 2A 25.pdf · uploaded 13 Aug 2026Source
- Form 2A (FY 2024-2025)P52100049970 · from 2a joyvilla.pdf · uploaded 14 Aug 2026Source
- Form 5 (FY 2025-2026)P52100049970 · FORM 5 JOYVILLA 13.pdf · uploaded 14 Aug 2026Source
- Form 1P52100026785 · f1.pdf · uploaded 14 Aug 2026Source
- Form 2P52100026785 · f2.pdf · uploaded 14 Aug 2026Source
- Form 3P52100026785 · f3.pdf · uploaded 14 Aug 2026Source
- Disclosure of Sold and Booked InventoryP52100026785 · sold.pdf · uploaded 14 Aug 2026Source
- Form 1P52100026785 · f1.pdf · uploaded 14 Aug 2026Source
- Form 2P52100026785 · f2.pdf · uploaded 14 Aug 2026Source
- Form 3P52100026785 · f3.pdf · uploaded 14 Aug 2026Source
- Disclosure of Sold and Booked InventoryP52100026785 · sold.pdf · uploaded 14 Aug 2026Source
- Form 2A (FY 2025-2026)P52100026785 · 2a.pdf · uploaded 14 Aug 2026Source
- Form 5 (FY 2025-2026)P52100026785 · f5 2..pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 1P52100028311 · FORM1 JOYVILLA.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 1P52100028311 · FORM1 JOYVILLA.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 1P52100028311 · FORM1 JOYVILLA.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 2P52100028311 · FORM 2 JOYVILLA.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 2P52100028311 · FORM 2 JOYVILLA.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 2P52100028311 · FORM 2 JOYVILLA.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 3P52100028311 · FORM 3 JOYVILLA.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 3P52100028311 · FORM 3 JOYVILLA.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 3P52100028311 · FORM 3 JOYVILLA.pdf · uploaded 14 Aug 2026Source
- Form 2A (FY 2024-2025)P52100028311 · joyvilla form 2a 11.pdf · uploaded 14 Aug 2026Source
- Form 2A (FY 2025-2026)P52100028311 · joyvilla form 2a 11.pdf · uploaded 14 Aug 2026Source
- Form 5 (FY 2025-2026)P52100028311 · form 5 joyvilla 11.pdf · uploaded 14 Aug 2026Source
- Form 1P52100026800 · f1.pdf · uploaded 17 Aug 2026Source
- Form 2P52100026800 · f2.pdf · uploaded 17 Aug 2026Source
- Form 3P52100026800 · f3.pdf · uploaded 17 Aug 2026Source
- Disclosure of Sold and Booked InventoryP52100026800 · sold.pdf · uploaded 17 Aug 2026Source
- Form 2A (FY 2025-2026)P52100026800 · f2a.pdf · uploaded 17 Aug 2026Source
- Form 5 (FY 2025-2026)P52100026800 · f5.pdf · uploaded 17 Aug 2026Source
- Form 2A (FY 2025-2026)P52100031391 · form 2A 13.pdf · uploaded 18 Aug 2026Source
- Form 5 (FY 2025-2026)P52100031391 · FORM 5 13.pdf · uploaded 18 Aug 2026Source
- Form 5 (FY 2025-2026)P52100054174 · Joyville Manjri 1 Phase 17_Annexure I Form 5_2026.pdf · uploaded 29 Sep 2026Source
- Form 5 (FY 2025-2026)P52100048377 · Joyville M1_ Phase 20_Annexure I Form 5_2026.pdf · uploaded 29 Sep 2026Source
- Form 5 (FY 2025-2026)P52100048314 · Form 5 Manjri-1 Phase 18.pdf · uploaded 29 Sep 2026Source
- Form 5 (FY 2025-2026)P52100028308 · Joyville M1_ Phase 12_Annexure I Form 5_2026.pdf · uploaded 30 Sep 2026Source
- Form 5 (FY 2025-2026)P52100031515 · Joyville M1_ Phase 14_Annexure I Form 5_2026.pdf · uploaded 30 Sep 2026Source
- Form 5 (FY 2025-2026)P52100034911 · Joyville MJ1_Phase 15_RERA_Form 5_2026.pdf · uploaded 30 Sep 2026Source
Technical
- DocumentP52100026478 · Layout.pdf · uploaded 22 Sep 2020Source
- DocumentP52100026478 · CC.pdf · uploaded 22 Sep 2020Source
- DocumentP52100026479 · Layout.pdf · uploaded 22 Sep 2020Source
- DocumentP52100026479 · CC.pdf · uploaded 22 Sep 2020Source
- DocumentP52100026480 · Layout.pdf · uploaded 22 Sep 2020Source
- DocumentP52100026480 · CC.pdf · uploaded 22 Sep 2020Source
- DocumentP52100026451 · Layout.pdf · uploaded 22 Sep 2020Source
- DocumentP52100026451 · PMRDA Order_Scan Copy_1.pdf · uploaded 22 Sep 2020Source
- DocumentP52100026452 · Layout.pdf · uploaded 22 Sep 2020Source
- DocumentP52100026452 · CC.pdf · uploaded 22 Sep 2020Source
- DocumentP52100026785 · Layout.pdf · uploaded 21 Oct 2020Source
- DocumentP52100026785 · CC.pdf · uploaded 21 Oct 2020Source
- DocumentP52100026795 · Layout.pdf · uploaded 21 Oct 2020Source
- DocumentP52100026795 · CC.pdf · uploaded 21 Oct 2020Source
- DocumentP52100026797 · Layout.pdf · uploaded 21 Oct 2020Source
- DocumentP52100026797 · CC.pdf · uploaded 21 Oct 2020Source
- DocumentP52100026800 · Layout.pdf · uploaded 21 Oct 2020Source
- DocumentP52100026800 · CC.pdf · uploaded 21 Oct 2020Source
- DocumentP52100026779 · Layout.pdf · uploaded 21 Oct 2020Source
- DocumentP52100026779 · CC.pdf · uploaded 21 Oct 2020Source
- DocumentP52100028308 · Layout.pdf · uploaded 10 Feb 2021Source
- DocumentP52100028311 · Layout.pdf · uploaded 10 Feb 2021Source
- DocumentP52100028311 · Layout.pdf · uploaded 10 Feb 2021Source
- DocumentP52100031515 · Layout Approval.pdf · uploaded 6 Oct 2021Source
- DocumentP52100031515 · Building Plan and CC.pdf · uploaded 6 Oct 2021Source
- DocumentP52100031391 · Layout Approval.pdf · uploaded 6 Oct 2021Source
- DocumentP52100031391 · Building Plan and CC.pdf · uploaded 6 Oct 2021Source
- DocumentP52100034911 · PMRDA_Sanction layout.pdf · uploaded 21 Apr 2022Source
- DocumentP52100034911 · PMRDA_Sanction layout.pdf · uploaded 21 Apr 2022Source
- DocumentP52100048377 · LayoutFinal.pdf · uploaded 25 Oct 2022Source
- DocumentP52100048377 · LayoutFinal.pdf · uploaded 25 Oct 2022Source
- DocumentP52100048314 · LayoutFinal (2).pdf · uploaded 28 Nov 2022Source
- DocumentP52100048314 · LayoutFinal (2).pdf · uploaded 28 Nov 2022Source
- DocumentP52100049970 · LayoutFinal (2) (1).pdf · uploaded 31 Jan 2023Source
- DocumentP52100049970 · ilovepdf_merged (12) (1).pdf · uploaded 31 Jan 2023Source
- DocumentP52100054174 · Sanctioned layout_11 9 23_ 0612.pdf · uploaded 6 Dec 2023Source
- DocumentP52100054174 · Sheet-17.pdf · uploaded 8 Dec 2023Source
- DocumentP52100054174 · Sheet-18.pdf · uploaded 8 Dec 2023Source
- DocumentP52100028308 · Building 8_Floor Plans.pdf · uploaded 16 Sep 2025Source
- OthersP52100028311 · Sanctioned Plan-Bldg 6.pdf · uploaded 1 Dec 2025Source
- OthersP52100028311 · OC-Bldg 6, 7, 16.pdf · uploaded 1 Dec 2025Source
- OthersP52100028311 · Gmail - मौजे- शेवाळवाडी, ता हवेली, जि पुणे येथील स नं 6_7_9_10_1 व इतर या मिळकतीवरील भागश_ भोगवटा प्रमाणपत्र.pdf · uploaded 1 Dec 2025Source
- DocumentP52100034911 · 6 Sanctioned Layout_031024.pdf · uploaded 20 Jul 2026Source
Technical (Architect)
- DocumentP52100026785 · JHA phase8.pdf · uploaded 25 Sep 2024Source
- DocumentP52100031515 · JHA phase14.pdf · uploaded 25 Sep 2024Source
- DocumentP52100026478 · JHA phase 4.pdf · uploaded 25 Sep 2024Source
- DocumentP52100026479 · JHA Phase2.pdf · uploaded 25 Sep 2024Source
- DocumentP52100026480 · JHA phase 3.pdf · uploaded 25 Sep 2024Source
- DocumentP52100026795 · JHA phase10.pdf · uploaded 25 Sep 2024Source
- DocumentP52100026797 · JHA phase9.pdf · uploaded 25 Sep 2024Source
- DocumentP52100026800 · JHA phase 7.pdf · uploaded 25 Sep 2024Source
- DocumentP52100026451 · JHA phase 1.pdf · uploaded 25 Sep 2024Source
- DocumentP52100026779 · JHA phase 6.pdf · uploaded 25 Sep 2024Source
- DocumentP52100026452 · JHA phase 5.pdf · uploaded 25 Sep 2024Source
- DocumentP52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 20 Oct 2024Source
- DocumentP52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 20 Oct 2024Source
- DocumentP52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 20 Oct 2024Source
- DocumentP52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 20 Oct 2024Source
- DocumentP52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 20 Oct 2024Source
- DocumentP52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 20 Oct 2024Source
- DocumentP52100026785 · Form 1_Joyville Hadapsar Annex_Phase_8.pdf · uploaded 20 Oct 2024Source
- DocumentP52100026785 · Form 1_Joyville Hadapsar Annex_Phase_8.pdf · uploaded 20 Oct 2024Source
- DocumentP52100026785 · Form 1_Joyville Hadapsar Annex_Phase_8.pdf · uploaded 20 Oct 2024Source
- DocumentP52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 20 Oct 2024Source
- DocumentP52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 20 Oct 2024Source
- DocumentP52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 20 Oct 2024Source
- DocumentP52100031515 · Form 1_Joyville Hadapsar Annex_Phase_14.pdf · uploaded 20 Oct 2024Source
- DocumentP52100031515 · Form 1_Joyville Hadapsar Annex_Phase_14.pdf · uploaded 20 Oct 2024Source
- DocumentP52100031515 · Form 1_Joyville Hadapsar Annex_Phase_14.pdf · uploaded 20 Oct 2024Source
- DocumentP52100028311 · Form 1_Joyville Hadapsar Annex_Phase_11.pdf · uploaded 20 Oct 2024Source
- DocumentP52100028311 · Form 1_Joyville Hadapsar Annex_Phase_11.pdf · uploaded 20 Oct 2024Source
- DocumentP52100028311 · Form 1_Joyville Hadapsar Annex_Phase_11.pdf · uploaded 20 Oct 2024Source
- DocumentP52100031391 · Form 1_Joyville Hadapsar Annex_Phase_13.pdf · uploaded 20 Oct 2024Source
- DocumentP52100031391 · Form 1_Joyville Hadapsar Annex_Phase_13.pdf · uploaded 20 Oct 2024Source
- DocumentP52100031391 · Form 1_Joyville Hadapsar Annex_Phase_13.pdf · uploaded 20 Oct 2024Source
- DocumentP52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 20 Oct 2024Source
- DocumentP52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 20 Oct 2024Source
- DocumentP52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 20 Oct 2024Source
- DocumentP52100026795 · Form 1_Joyville Hadapsar Annex_Phase_10.pdf · uploaded 20 Oct 2024Source
- DocumentP52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 20 Oct 2024Source
- DocumentP52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 20 Oct 2024Source
- DocumentP52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 20 Oct 2024Source
- DocumentP52100026797 · Form 1_Joyville Hadapsar Annex_Phase_9.pdf · uploaded 20 Oct 2024Source
- DocumentP52100026800 · Form 1_Joyville Hadapsar Annex_Phase_7.pdf · uploaded 20 Oct 2024Source
- DocumentP52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 20 Oct 2024Source
- DocumentP52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 20 Oct 2024Source
- DocumentP52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 20 Oct 2024Source
- DocumentP52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 19 Jan 2025Source
- DocumentP52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 19 Jan 2025Source
- DocumentP52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 19 Jan 2025Source
- DocumentP52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 19 Jan 2025Source
- DocumentP52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 19 Jan 2025Source
- DocumentP52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026785 · Form 1_Joyville Hadapsar Annex_Phase_8.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026785 · Form 1_Joyville Hadapsar Annex_Phase_8.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026785 · Form 1_Joyville Hadapsar Annex_Phase_8.pdf · uploaded 19 Jan 2025Source
- DocumentP52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 19 Jan 2025Source
- DocumentP52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 19 Jan 2025Source
- DocumentP52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 19 Jan 2025Source
- DocumentP52100031515 · Form 1_Joyville Hadapsar Annex_Phase_14.pdf · uploaded 19 Jan 2025Source
- DocumentP52100031515 · Form 1_Joyville Hadapsar Annex_Phase_14.pdf · uploaded 19 Jan 2025Source
- DocumentP52100031515 · Form 1_Joyville Hadapsar Annex_Phase_14.pdf · uploaded 19 Jan 2025Source
- DocumentP52100028311 · Form 1_Joyville Hadapsar Annex_Phase_11.pdf · uploaded 19 Jan 2025Source
- DocumentP52100028311 · Form 1_Joyville Hadapsar Annex_Phase_11.pdf · uploaded 19 Jan 2025Source
- DocumentP52100028311 · Form 1_Joyville Hadapsar Annex_Phase_11.pdf · uploaded 19 Jan 2025Source
- DocumentP52100031391 · Form 1_Joyville Hadapsar Annex_Phase_13.pdf · uploaded 19 Jan 2025Source
- DocumentP52100031391 · Form 1_Joyville Hadapsar Annex_Phase_13.pdf · uploaded 19 Jan 2025Source
- DocumentP52100031391 · Form 1_Joyville Hadapsar Annex_Phase_13.pdf · uploaded 19 Jan 2025Source
- DocumentP52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 19 Jan 2025Source
- DocumentP52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 19 Jan 2025Source
- DocumentP52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026795 · Form 1_Joyville Hadapsar Annex_Phase_10.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026795 · Form 1_Joyville Hadapsar Annex_Phase_10.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026795 · Form 1_Joyville Hadapsar Annex_Phase_10.pdf · uploaded 19 Jan 2025Source
- DocumentP52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 19 Jan 2025Source
- DocumentP52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 19 Jan 2025Source
- DocumentP52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026800 · Form 1_Joyville Hadapsar Annex_Phase_7.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026800 · Form 1_Joyville Hadapsar Annex_Phase_7.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026800 · Form 1_Joyville Hadapsar Annex_Phase_7.pdf · uploaded 19 Jan 2025Source
- DocumentP52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 19 Jan 2025Source
- DocumentP52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 19 Jan 2025Source
- DocumentP52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026797 · Form 1_Joyville Hadapsar Annex_Phase_9.pdf · uploaded 20 Jan 2025Source
- DocumentP52100026797 · Form 1_Joyville Hadapsar Annex_Phase_9.pdf · uploaded 20 Jan 2025Source
- DocumentP52100026797 · Form 1_Joyville Hadapsar Annex_Phase_9.pdf · uploaded 20 Jan 2025Source
- DocumentP52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16.pdf · uploaded 20 Apr 2025Source
- DocumentP52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17.pdf · uploaded 20 Apr 2025Source
- DocumentP52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 20 Apr 2025Source
- DocumentP52100031515 · Form 1_Joyville Hadapsar Annex_Phase_14.pdf · uploaded 20 Apr 2025Source
- DocumentP52100031515 · Engineer_s Certificate_Hadapsar Annex_Phase_14_T16_March 25.pdf · uploaded 20 Apr 2025Source
- DocumentP52100028311 · Form 1_Joyville Hadapsar Annex_Phase_11.pdf · uploaded 20 Apr 2025Source
- DocumentP52100031391 · Form 1_Joyville Hadapsar Annex_Phase_13.pdf · uploaded 20 Apr 2025Source
- DocumentP52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15.pdf · uploaded 20 Apr 2025Source
- DocumentP52100034911 · Engineer_s Certificate_Hadapsar Annex_Phase_15_T15_March 25.pdf · uploaded 20 Apr 2025Source
- DocumentP52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20.pdf · uploaded 20 Apr 2025Source
- DocumentP52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18.pdf · uploaded 20 Apr 2025Source
- DocumentP52100028308 · Form 1_Joyville Hadapsar Annex_Phase_12.pdf · uploaded 20 Apr 2026Source
- DocumentP52100054174 · Form 1_Joyville Hadapsar Annex_Phase_17_Updated.pdf · uploaded 16 Jul 2026Source
- DocumentP52100048377 · Form 1_Joyville Hadapsar Annex_Phase_20_Updated.pdf · uploaded 17 Jul 2026Source
- DocumentP52100048314 · Form 1_Joyville Hadapsar Annex_Phase_18_Updated.pdf · uploaded 17 Jul 2026Source
- DocumentP52100049970 · Form 1_Joyville Hadapsar Annex_Phase_16_Updated.pdf · uploaded 20 Jul 2026Source
- DocumentP52100034911 · Form 1_Joyville Hadapsar Annex_Phase_15_Updated.pdf · uploaded 20 Jul 2026Source
- DocumentP52100031391 · f1.pdf · uploaded 13 Aug 2026Source
- DocumentP52100028311 · FORM1 JOYVILLA.pdf · uploaded 14 Aug 2026Source
Technical (Engineer)
- DocumentP52100026785 · JHA Phase 8.pdf · uploaded 26 Sep 2024Source
- DocumentP52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_September 2024.pdf · uploaded 26 Sep 2024Source
- DocumentP52100026478 · Engineer's Certificate_Hadapsar Annex_Phase_4_T1_September 2024.pdf · uploaded 26 Sep 2024Source
- DocumentP52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_September 2024.pdf · uploaded 26 Sep 2024Source
- DocumentP52100026479 · Engineer's Certificate_Hadapsar Annex_Phase_2_T20_September 2024.pdf · uploaded 26 Sep 2024Source
- DocumentP52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_September 2024.pdf · uploaded 26 Sep 2024Source
- DocumentP52100026480 · Engineer's Certificate_Hadapsar Annex_Phase_3_T19_September 2024.pdf · uploaded 26 Sep 2024Source
- DocumentP52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_September 2024.pdf · uploaded 26 Sep 2024Source
- DocumentP52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_September 2024.pdf · uploaded 26 Sep 2024Source
- DocumentP52100026451 · Engineer's Certificate_Hadapsar Annex_Phase_1_T21_September 2024.pdf · uploaded 26 Sep 2024Source
- DocumentP52100026779 · Engineer's Certificate_Hadapsar Annex_Phase_6_T3_September 2024.pdf · uploaded 26 Sep 2024Source
- DocumentP52100026452 · Engineer's Certificate_Hadapsar Annex_Phase_5_T2_September 2024.pdf · uploaded 26 Sep 2024Source
- DocumentP52100031515 · JHA Phase 16.pdf · uploaded 27 Sep 2024Source
- DocumentP52100026800 · JHA Phase 7.pdf · uploaded 27 Sep 2024Source
- DocumentP52100054174 · Engineer's Certificate_Hadapsar Annex_Phase_17_T9_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100054174 · Engineer's Certificate_Hadapsar Annex_Phase_17_T9_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100054174 · Engineer's Certificate_Hadapsar Annex_Phase_17_T9_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_Oct 24.pdf · uploaded 20 Oct 2024Source
- DocumentP52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_Oct 24 (1).pdf · uploaded 20 Oct 2024Source
- DocumentP52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_Oct 24 (1).pdf · uploaded 20 Oct 2024Source
- DocumentP52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_Oct 24 (1).pdf · uploaded 20 Oct 2024Source
- DocumentP52100054174 · Engineer's Certificate_Hadapsar Annex_Phase_17_T9_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100054174 · Engineer's Certificate_Hadapsar Annex_Phase_17_T9_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100054174 · Engineer's Certificate_Hadapsar Annex_Phase_17_T9_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026785 · Engineer's Certificate_Hadapsar Annex_Phase_8_T5_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100028308 · Engineer's Certificate_Hadapsar Annex_Phase_12_T8_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100031515 · Engineer's Certificate_Hadapsar Annex_Phase_14_T16_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100028311 · Engineer's Certificate_Hadapsar Annex_Phase_11_T6_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100031391 · Engineer's Certificate_Hadapsar Annex_Phase_13_T7_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100034911 · Engineer's Certificate_Hadapsar Annex_Phase_15_T15_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026795 · Engineer's Certificate_Hadapsar Annex_Phase_10_T18_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100048377 · Engineer's Certificate_Hadapsar Annex_Phase_20_T10_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026800 · Engineer's Certificate_Hadapsar Annex_Phase_7_T4_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100048314 · Engineer's Certificate_Hadapsar Annex_Phase_18_T12_Dec 24.pdf · uploaded 19 Jan 2025Source
- DocumentP52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_Dec 24.pdf · uploaded 20 Jan 2025Source
- DocumentP52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_Dec 24.pdf · uploaded 20 Jan 2025Source
- DocumentP52100026797 · Engineer's Certificate_Hadapsar Annex_Phase_9_T17_Dec 24.pdf · uploaded 20 Jan 2025Source
- DocumentP52100054174 · Engineer_s Certificate_Hadapsar Annex_Phase_17_T9_March 25.pdf · uploaded 20 Apr 2025Source
- DocumentP52100028308 · Engineer_s Certificate_Hadapsar Annex_Phase_12_T8_March 25.pdf · uploaded 20 Apr 2025Source
- DocumentP52100028311 · Engineer_s Certificate_Hadapsar Annex_Phase_11_T6_March 25.pdf · uploaded 20 Apr 2025Source
- DocumentP52100031391 · Engineer_s Certificate_Hadapsar Annex_Phase_13_T7_March 25.pdf · uploaded 20 Apr 2025Source
- DocumentP52100048377 · Engineer_s Certificate_Hadapsar Annex_Phase_20_T10_March 25.pdf · uploaded 20 Apr 2025Source
- DocumentP52100048314 · Engineer_s Certificate_Hadapsar Annex_Phase_18_T12_March 25.pdf · uploaded 20 Apr 2025Source
- DocumentP52100028308 · Form 2_Hadapsar Annex_Phase_12_T8_March 26.pdf · uploaded 20 Apr 2026Source
- DocumentP52100049970 · Engineer_s Certificate_Hadapsar Annex_Phase_16_T13 14_July 26_Updated.pdf · uploaded 16 Jul 2026Source
- DocumentP52100054174 · Engineer_s Certificate_Hadapsar Annex_Phase_17_T9_July 26_Updated.pdf · uploaded 16 Jul 2026Source
- DocumentP52100048377 · Engineer_s Certificate_Hadapsar Annex_Phase_20_T10_July 26_Updated.pdf · uploaded 17 Jul 2026Source
- DocumentP52100048314 · Engineer_s Certificate_Hadapsar Annex_Phase_18_T12_July 26_Updated.pdf · uploaded 17 Jul 2026Source
- DocumentP52100034911 · Engineer_s Certificate_Hadapsar Annex_Phase_15_T15_July 26_Updated.pdf · uploaded 20 Jul 2026Source
- DocumentP52100031391 · f2.pdf · uploaded 13 Aug 2026Source
- DocumentP52100028311 · FORM 2 JOYVILLA.pdf · uploaded 14 Aug 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 10/10 to 10/16, 10/1 to 10/18
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Phases
- 19
- Unit types
- 1BHK, 2BHK, 3BHK, Duplex Unit2,010 units in all
- Address
- Parts and portion of : 6 1 part, 9 1, 9 2, 9 5 to 9 20, 9 23 to 9 41, 10 1 to 10 8, 10 10 to 10 16, Off Pune Solapur Highway, ShewalewadiPIN 412307
- Village
- Shewalewadi, Haveli taluka
- Location
- 18.48447, 73.96658
- Land area for this project
- 709 sq m (7,630 sq ft)
- Permissible built-up area
- 6,343 sq m (68,272 sq ft)
- Sanctioned built-up area
- 6,343 sq m (68,272 sq ft)
- Recreational open space
- 270 sq m (2,906 sq ft)
- Designated bank account
- 171
- Developed in phases
- No
- Also registered as
- Joyville Hadapsar Annexe Phase 2, Joyville Hadapsar Annexe Phase 3, Joyville Hadapsar Annexe Phase 4, Joyville Hadapsar Annexe Phase 5, Joyville Hadapsar Annexe Phase 1, Joyville Hadapsar Annexe Phase 8, Joyville Hadapsar Annexe Phase 9, Joyville Hadapsar Annexe Phase 10, Joyville Hadapsar Annexe Phase 6, Joyville Hadapsar Annexe Phase 7, Joyville Hadapsar Annexe Phase 11, Joyville Hadapsar Annexe Phase 12, Joyville Hadapsar Annexe Phase 14, Joyville Hadapsar Annexe Phase 13, Joyville Hadapsar Annexe Phase 15, Joyville Hadapsar Annexe Phase 20, Joyville Hadapsar Annexe Phase 18, Joyville Hadapsar Annexe Phase 16, Joyville Hadapsar Annexe Phase 17, Road:-
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Parts and portion of : 6 1 part,9 1,9 2,9 5 to 9 20,9 23 to 9 41,10 1 to 10 8,10 10 to 10 16
Boundaries
- North
- 10-1 to 10-8 10-10 to 10-16
- South
- Building No 20
- East
- 10-1 to 10-8 10-10 to 10-16
- West
- 10-1 to 10-8 10-10 to 10-16
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking2,010 units
1,658 of 2,010 units booked (82%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100054174 | Building 11 | 1BHK | 42.92 sq m · 462 sq ft | 3 | 0 |
| P52100054174 | Building 11 | 2BHK | 56.49 sq m · 608 sq ft | 81 | 0 |
| P52100054174 | Building 11 | 3BHK | 69.36 sq m · 747 sq ft | 42 | 0 |
| P52100049970 | Building 13 | 1BHK | 32.29 sq m · 348 sq ft | 41 | 41 |
| P52100049970 | Building 13 | 1BHK | 32.43 sq m · 349 sq ft | 1 | 1 |
| P52100049970 | Building 13 | 1BHK | 38.9 sq m · 419 sq ft | 3 | 2 |
| P52100049970 | Building 13 | 2BHK | 49.94 sq m · 538 sq ft | 80 | 78 |
| P52100049970 | Building 13 | 2BHK | 49.99 sq m · 538 sq ft | 1 | 1 |
Show all 56 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100049970 | Building 14 | 1BHK | 42.92 sq m · 462 sq ft | 3 | 1 |
| P52100049970 | Building 14 | 1BHK | 49.7 sq m · 535 sq ft | 1 | 0 |
| P52100049970 | Building 14 | 2BHK | 56.49 sq m · 608 sq ft | 80 | 64 |
| P52100049970 | Building 14 | 3BHK | 69.36 sq m · 747 sq ft | 42 | 35 |
| P52100054174 | Building 9 | 1BHK | 42.92 sq m · 462 sq ft | 3 | 0 |
| P52100054174 | Building 9 | 2BHK | 56.49 sq m · 608 sq ft | 81 | 31 |
| P52100054174 | Building 9 | 3BHK | 69.36 sq m · 747 sq ft | 42 | 16 |
| P52100048377 | Tower 10 | 2BHK | 72.03 sq m · 775 sq ft | 3 | 3 |
| P52100048377 | Tower 10 | 3BHK | 96.86 sq m · 1,043 sq ft | 81 | 42 |
| P52100048377 | Tower 10 | 3BHK | 97.04 sq m · 1,045 sq ft | 42 | 29 |
| P52100048314 | Tower 12 | Duplex Unit | 93.38 sq m · 1,005 sq ft | 59 | 39 |
| P52100048314 | Tower 12 | Duplex Unit | 94.52 sq m · 1,017 sq ft | 1 | 1 |
| P52100034911 | Tower 15 | 1BHK | 34.43 sq m · 371 sq ft | 88 | 88 |
| P52100034911 | Tower 15 | 1BHK | 39.51 sq m · 425 sq ft | 3 | 3 |
| P52100034911 | Tower 15 | 2BHK | 52.06 sq m · 560 sq ft | 41 | 37 |
| P52100031515 | Tower 16 | 1BHK | 34.43 sq m · 371 sq ft | 88 | 88 |
| P52100031515 | Tower 16 | 1BHK | 39.51 sq m · 425 sq ft | 3 | 3 |
| P52100031515 | Tower 16 | 1BHK | 45.39 sq m · 489 sq ft | 1 | 0 |
| P52100031515 | Tower 16 | 2BHK | 52.06 sq m · 560 sq ft | 40 | 37 |
| P52100026797 | Tower 17 | 1BHK | 34.43 sq m · 371 sq ft | 88 | 88 |
| P52100026797 | Tower 17 | 1BHK | 39.51 sq m · 425 sq ft | 3 | 3 |
| P52100026797 | Tower 17 | 1BHK | 45.39 sq m · 489 sq ft | 1 | 0 |
| P52100026797 | Tower 17 | 2BHK | 52.06 sq m · 560 sq ft | 40 | 40 |
| P52100026795 | Tower 18 | 1BHK | 34.43 sq m · 371 sq ft | 88 | 88 |
| P52100026795 | Tower 18 | 1BHK | 39.51 sq m · 425 sq ft | 3 | 3 |
| P52100026795 | Tower 18 | 2BHK | 52.06 sq m · 560 sq ft | 41 | 41 |
| P52100026451 | Tower 21 | 1BHK | 34.43 sq m · 371 sq ft | 88 | 88 |
| P52100026451 | Tower 21 | 1BHK | 39.51 sq m · 425 sq ft | 3 | 1 |
| P52100026451 | Tower 21 | 2BHK | 52.06 sq m · 560 sq ft | 41 | 41 |
| P52100026800 | Tower 4 | 1BHK | 39.51 sq m · 425 sq ft | 3 | 3 |
| P52100026800 | Tower 4 | 2BHK | 52.06 sq m · 560 sq ft | 85 | 85 |
| P52100026800 | Tower 4 | 2BHK | 60.46 sq m · 651 sq ft | 44 | 44 |
| P52100026785 | Tower 5 | 1BHK | 44.24 sq m · 476 sq ft | 3 | 0 |
| P52100026785 | Tower 5 | 1BHK | 51.29 sq m · 552 sq ft | 1 | 0 |
| P52100026785 | Tower 5 | 2BHK | 60.46 sq m · 651 sq ft | 84 | 82 |
| P52100026785 | Tower 5 | 3BHK | 76.19 sq m · 820 sq ft | 44 | 42 |
| P52100028311 | Tower 6 | 1BHK | 39.51 sq m · 425 sq ft | 3 | 2 |
| P52100028311 | Tower 6 | 1BHK | 45.47 sq m · 489 sq ft | 1 | 0 |
| P52100028311 | Tower 6 | 2BHK | 52.06 sq m · 560 sq ft | 84 | 81 |
| P52100028311 | Tower 6 | 2BHK | 60.46 sq m · 651 sq ft | 44 | 41 |
| P52100031391 | Tower 7 | 1BHK | 44.24 sq m · 476 sq ft | 3 | 0 |
| P52100031391 | Tower 7 | 1BHK | 51.29 sq m · 552 sq ft | 1 | 0 |
| P52100031391 | Tower 7 | 2BHK | 60.46 sq m · 651 sq ft | 84 | 82 |
| P52100031391 | Tower 7 | 3BHK | 76.19 sq m · 820 sq ft | 44 | 40 |
| P52100028308 | Tower 8 | 1BHK | 39.51 sq m · 425 sq ft | 3 | 2 |
| P52100028308 | Tower 8 | 1BHK | 45.47 sq m · 489 sq ft | 1 | 0 |
| P52100028308 | Tower 8 | 2BHK | 52.06 sq m · 560 sq ft | 84 | 81 |
| P52100028308 | Tower 8 | 2BHK | 60.46 sq m · 651 sq ft | 44 | 40 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals574
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | MSK Arch and Associates | — | P52100026800 |
| Architect | MSK Arch and Associates | — | P52100026785 |
| Architect | MSK ARCH and Associates | — | P52100026452 |
| Architect | MSK ARCH And ASSOCIATES | — | P52100026478 |
| Architect | MSK Arch & Associates | — | P52100026779 |
| Architect | MSK Architect And Associates | — | P52100026480 |
| Architect | MSK Architects and associates | — | P52100048377 |
| Architect | MSK Architects and Associates | — | P52100026795 |
Show all 574 professionalsShow fewer professionals
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | MSK Architects and Associates | — | P52100031515 |
| Architect | MSK Architects and Associates | — | P52100028308 |
| Architect | MSK Architects and Associates | — | P52100028311 |
| Architect | MSK Architects and Associates | — | P52100031391 |
| Architect | MSK Architects and Associates | — | P52100048314 |
| Architect | MSK Architects and Associates | — | P52100026797 |
| Architect | MSK Architectsand Associates | — | P52100034911 |
| Architect | MSK Architects And Associates | — | P52100049970 |
| Architect | MSK ARCHITECTS and associates | — | P52100026479 |
| Architect | MSK Architects & Associates | — | P52100031515 |
| Architect | MSK Architects & Associates | — | P52100028311 |
| Architect | MSK Architects & Associates | — | P52100054174 |
| Architect | MSK Architects & Associates | — | P52100031391 |
| Architect | MSK Architects & Associates | — | P52100026451 |
| Chartered accountant | Bhavesh Nagda | — | P52100034911 |
| Chartered accountant | Bhavesh Nagda | — | P52100048377 |
| Chartered accountant | B R Nagda & Co | — | P52100028308 |
| Chartered accountant | B R Nagda & Co | — | P52100026478 |
| Chartered accountant | B R Nagda & Co | — | P52100028311 |
| Chartered accountant | B R Nagda & Co | — | P52100026785 |
| Chartered accountant | B R Nagda & Co | — | P52100054174 |
| Chartered accountant | B R Nagda & Co | — | P52100026779 |
| Chartered accountant | B R Nagda & Co | — | P52100026795 |
| Chartered accountant | B R Nagda & Co | — | P52100026800 |
| Chartered accountant | B R Nagda & Co | — | P52100026480 |
| Chartered accountant | B R Nagda & Co | — | P52100031515 |
| Chartered accountant | B R Nagda & Co | — | P52100026451 |
| Chartered accountant | B R Nagda & Co | — | P52100026797 |
| Chartered accountant | B R Nagda & Co | — | P52100026452 |
| Chartered accountant | B R Nagda & Co | — | P52100026479 |
| Chartered accountant | B R Nagda & Co | — | P52100031391 |
| Chartered accountant | CA Bhavesh Nagda | — | P52100049970 |
| Chartered accountant | CA Bhavesh Nagda | — | P52100048314 |
| Chartered accountant | Harshad Doshi | — | P52100026800 |
| Chartered accountant | Harshad Doshi | — | P52100028308 |
| Chartered accountant | Harshad Doshi | — | P52100026785 |
| Chartered accountant | Harshad Doshi | — | P52100026452 |
| Chartered accountant | Harshad Doshi | — | P52100026797 |
| Chartered accountant | Harshad Doshi | — | P52100026795 |
| Chartered accountant | Harshad Doshi | — | P52100026779 |
| Chartered accountant | Harshad Doshi | — | P52100026451 |
| Chartered accountant | Harshad Doshi | — | P52100026480 |
| Chartered accountant | Harshad Doshi | — | P52100028311 |
| Chartered accountant | Harshad Doshi | — | P52100026478 |
| Chartered accountant | Harshad Doshi | — | P52100031391 |
| Chartered accountant | Harshad Doshi | — | P52100031515 |
| Chartered accountant | HArshad Doshi | — | P52100026479 |
| Chartered accountant | Pooja Rajendrakumar Boob | — | P52100028308 |
| Chartered accountant | Pooja Rajendrakumar Boob | — | P52100031515 |
| Chartered accountant | Pooja Rajendrakumar Boob | — | P52100054174 |
| Chartered accountant | Pooja Rajendrakumar Boob | — | P52100031391 |
| Chartered accountant | Pooja Rajendrakumar Boob | — | P52100034911 |
| Engineer | Akshay Lalit kasar | — | P52100048377 |
| Engineer | Akshay Lalit Kasar | — | P52100031391 |
| Engineer | Akshay Lalit Kasar | — | P52100026797 |
| Engineer | Akshay Lalit Kasar | — | P52100034911 |
| Engineer | Akshay Lalit Kasar | — | P52100026795 |
| Engineer | Akshay Lalit Kasar | — | P52100028311 |
| Engineer | Akshay Lalit Kasar | — | P52100048314 |
| Engineer | Akshay Lalit Kasar | — | P52100028308 |
| Engineer | Akshay Lalit Kasar | — | P52100026779 |
| Engineer | Akshay Lalit Kasar | — | P52100026451 |
| Engineer | Akshay Lalit Kasar | — | P52100054174 |
| Engineer | Akshay Lalit Kasar | — | P52100031515 |
| Engineer | Akshay Lalit Kasar Kasar | — | P52100026785 |
| Engineer | Akshay Lalit Kasar Kasar | — | P52100026800 |
| Engineer | G A Bhilare Bhilare | — | P52100034911 |
| Engineer | G A Bhilare Bhilare | — | P52100049970 |
| Engineer | Mr Akshay Kasar | — | P52100026480 |
| Engineer | Mr Akshay Kasar | — | P52100026452 |
| Engineer | Mr Akshay Kasar | — | P52100026479 |
| Engineer | Mr Akshay Lalit Kasar | — | P52100026478 |
| Engineer | Mr Akshay Lalit Kasar | — | P52100049970 |
| Registered real estate agent | Abhay Jaysing Chaudhar | — | P52100026795 |
| Registered real estate agent | Abhay Jaysing Chaudhar | — | P52100026452 |
| Registered real estate agent | Abhay Jaysing Chaudhar | — | P52100026779 |
| Registered real estate agent | Abhay Jaysing Chaudhar | — | P52100026797 |
| Registered real estate agent | Abhay Jaysing Chaudhar | — | P52100026480 |
| Registered real estate agent | Abhay Jaysing Chaudhar | — | P52100026479 |
| Registered real estate agent | Abhay Jaysing Chaudhar | — | P52100026800 |
| Registered real estate agent | Abhay Jaysing Chaudhar | — | P52100026451 |
| Registered real estate agent | Abhay Jaysing Chaudhar | — | P52100026478 |
| Registered real estate agent | Abhay Jaysing Chaudhar | — | P52100026785 |
| Registered real estate agent | Abhishek Murarrao Sagare | — | P52100026480 |
| Registered real estate agent | Abhishek Murarrao Sagare | — | P52100026800 |
| Registered real estate agent | Abhishek Murarrao Sagare | — | P52100026479 |
| Registered real estate agent | Abhishek Murarrao Sagare | — | P52100026478 |
| Registered real estate agent | Abhishek Murarrao Sagare | — | P52100026797 |
| Registered real estate agent | Abhishek Murarrao Sagare | — | P52100026779 |
| Registered real estate agent | Abhishek Murarrao Sagare | — | P52100026795 |
| Registered real estate agent | Abhishek Murarrao Sagare | — | P52100026452 |
| Registered real estate agent | Abhishek Murarrao Sagare | — | P52100026451 |
| Registered real estate agent | Abhishek Murarrao Sagare | — | P52100026785 |
| Registered real estate agent | Amardeep Uttreshwar Dhas | — | P52100049970 |
| Registered real estate agent | Amol Venkatrao Biradar | — | P52100026800 |
| Registered real estate agent | Amol Venkatrao Biradar | — | P52100026785 |
| Registered real estate agent | Amol Venkatrao Biradar | — | P52100026797 |
| Registered real estate agent | Amol Venkatrao Biradar | — | P52100026480 |
| Registered real estate agent | Amol Venkatrao Biradar | — | P52100026479 |
| Registered real estate agent | Amol Venkatrao Biradar | — | P52100026451 |
| Registered real estate agent | Amol Venkatrao Biradar | — | P52100026779 |
| Registered real estate agent | Amol Venkatrao Biradar | — | P52100026478 |
| Registered real estate agent | Amol Venkatrao Biradar | — | P52100026795 |
| Registered real estate agent | Amol Venkatrao Biradar | — | P52100026452 |
| Registered real estate agent | Amruta Kishor Birajdar | — | P52100049970 |
| Registered real estate agent | Amruta Sagar Parakh | — | P52100026785 |
| Registered real estate agent | Ankush Zadoo | — | P52100049970 |
| Registered real estate agent | Apm Realty Private Limited | — | P52100028308 |
| Registered real estate agent | Apna Ghar Lifespaces LLP | — | P52100026451 |
| Registered real estate agent | Apna Ghar Lifespaces LLP | — | P52100026479 |
| Registered real estate agent | Apna Ghar Lifespaces LLP | — | P52100026452 |
| Registered real estate agent | Apna Ghar Lifespaces LLP | — | P52100026478 |
| Registered real estate agent | Apna Ghar Lifespaces LLP | — | P52100026480 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100031391 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100026478 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100034911 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100026452 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100048314 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100026451 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100048377 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100026479 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100026800 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100028308 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100026785 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100049970 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100026779 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100026797 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100026795 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100028311 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100026480 |
| Registered real estate agent | Ashish Sumatilal Solanki | — | P52100031515 |
| Registered real estate agent | Chasing Spaces Private Limited | — | P52100048314 |
| Registered real estate agent | Corazon Homes Private Limited | — | P52100028308 |
| Registered real estate agent | Corazon Homes Private Limited | — | P52100031391 |
| Registered real estate agent | Dhanaji Uttam Pawar | — | P52100049970 |
| Registered real estate agent | Dhanaji Uttam Pawar | — | P52100026479 |
| Registered real estate agent | Dhanaji Uttam Pawar | — | P52100026452 |
| Registered real estate agent | Dhanaji Uttam Pawar | — | P52100026779 |
| Registered real estate agent | Dhanaji Uttam Pawar | — | P52100026797 |
| Registered real estate agent | Dhanaji Uttam Pawar | — | P52100048314 |
| Registered real estate agent | Dhanaji Uttam Pawar | — | P52100026800 |
| Registered real estate agent | Dhanaji Uttam Pawar | — | P52100026478 |
| Registered real estate agent | Dhanaji Uttam Pawar | — | P52100026795 |
| Registered real estate agent | Dhanaji Uttam Pawar | — | P52100031391 |
| Registered real estate agent | Dhanaji Uttam Pawar | — | P52100026480 |
| Registered real estate agent | Dhanaji Uttam Pawar | — | P52100026451 |
| Registered real estate agent | Dhanaji Uttam Pawar | — | P52100026785 |
| Registered real estate agent | Dhanaji Uttam Pawar | — | P52100028311 |
| Registered real estate agent | Ganesh Laxman Tatar | — | P52100049970 |
| Registered real estate agent | Himanshu Lohani | — | P52100049970 |
| Registered real estate agent | Himanshu Lohani | — | P52100026795 |
| Registered real estate agent | Himanshu Lohani | — | P52100031391 |
| Registered real estate agent | Himanshu Lohani | — | P52100026451 |
| Registered real estate agent | Himanshu Lohani | — | P52100034911 |
| Registered real estate agent | Hohs Realty Private Limited | — | P52100049970 |
| Registered real estate agent | Infinite Propadvisors LLP | — | P52100026479 |
| Registered real estate agent | Infinite Propadvisors LLP | — | P52100026797 |
| Registered real estate agent | Infinite Propadvisors LLP | — | P52100026795 |
| Registered real estate agent | Infinite Propadvisors LLP | — | P52100026800 |
| Registered real estate agent | Infinite Propadvisors LLP | — | P52100026785 |
| Registered real estate agent | Infinite Propadvisors LLP | — | P52100026451 |
| Registered real estate agent | Infinite Propadvisors LLP | — | P52100026478 |
| Registered real estate agent | Infinite Propadvisors LLP | — | P52100026480 |
| Registered real estate agent | Infinite Propadvisors LLP | — | P52100026779 |
| Registered real estate agent | Infinite Propadvisors LLP | — | P52100026452 |
| Registered real estate agent | Kailas Ramesh Jaiswal | — | P52100026479 |
| Registered real estate agent | Kailas Ramesh Jaiswal | — | P52100026451 |
| Registered real estate agent | Kailas Ramesh Jaiswal | — | P52100026478 |
| Registered real estate agent | Kailas Ramesh Jaiswal | — | P52100026779 |
| Registered real estate agent | Kailas Ramesh Jaiswal | — | P52100026480 |
| Registered real estate agent | Kailas Ramesh Jaiswal | — | P52100026795 |
| Registered real estate agent | Kailas Ramesh Jaiswal | — | P52100026800 |
| Registered real estate agent | Kailas Ramesh Jaiswal | — | P52100026785 |
| Registered real estate agent | Kailas Ramesh Jaiswal | — | P52100026452 |
| Registered real estate agent | Kailas Ramesh Jaiswal | — | P52100026797 |
| Registered real estate agent | Key Mansions Private Limited | — | P52100028308 |
| Registered real estate agent | Key Mansions Private Limited | — | P52100034911 |
| Registered real estate agent | Key Mansions Private Limited | — | P52100049970 |
| Registered real estate agent | Kprbsk Realtors Private Limited | — | P52100049970 |
| Registered real estate agent | krishna kumar rai | — | P52100026479 |
| Registered real estate agent | krishna kumar rai | — | P52100026451 |
| Registered real estate agent | krishna kumar rai | — | P52100026478 |
| Registered real estate agent | krishna kumar rai | — | P52100026800 |
| Registered real estate agent | krishna kumar rai | — | P52100026480 |
| Registered real estate agent | krishna kumar rai | — | P52100026795 |
| Registered real estate agent | krishna kumar rai | — | P52100026785 |
| Registered real estate agent | krishna kumar rai | — | P52100026452 |
| Registered real estate agent | krishna kumar rai | — | P52100026797 |
| Registered real estate agent | krishna kumar rai | — | P52100026779 |
| Registered real estate agent | Krushna Baburao Patil | — | P52100049970 |
| Registered real estate agent | Lalit Sharma | — | P52100026800 |
| Registered real estate agent | Lalit Sharma | — | P52100026451 |
| Registered real estate agent | Lalit Sharma | — | P52100026785 |
| Registered real estate agent | Lalit Sharma | — | P52100026797 |
| Registered real estate agent | Lalit Sharma | — | P52100026795 |
| Registered real estate agent | Lalit Sharma | — | P52100026478 |
| Registered real estate agent | Lalit Sharma | — | P52100026779 |
| Registered real estate agent | Lalit Sharma | — | P52100026480 |
| Registered real estate agent | Lalit Sharma | — | P52100026479 |
| Registered real estate agent | Lalit Sharma | — | P52100026452 |
| Registered real estate agent | Latifa Munaf Inamdar | — | P52100049970 |
| Registered real estate agent | Mahesh Ganesh Gaikwad | — | P52100049970 |
| Registered real estate agent | Mahesh Ganesh Gaikwad | — | P52100028311 |
| Registered real estate agent | Mahesh Ganesh Gaikwad | — | P52100048377 |
| Registered real estate agent | Mahesh Ganesh Gaikwad | — | P52100026480 |
| Registered real estate agent | Mahesh Ganesh Gaikwad | — | P52100031515 |
| Registered real estate agent | Mahesh Ganesh Gaikwad | — | P52100034911 |
| Registered real estate agent | Mahesh Ganesh Gaikwad | — | P52100031391 |
| Registered real estate agent | Mahesh Ganesh Gaikwad | — | P52100026785 |
| Registered real estate agent | Makaan Hunt Pvt Ltd | — | P52100026785 |
| Registered real estate agent | Makaan Hunt Pvt Ltd | — | P52100049970 |
| Registered real estate agent | Manisha Lifespaces Consulting Pvt. Ltd. | — | P52100048314 |
| Registered real estate agent | Manisha Lifespaces Consulting Pvt. Ltd. | — | P52100028308 |
| Registered real estate agent | Manisha Lifespaces Consulting Pvt. Ltd. | — | P52100031515 |
| Registered real estate agent | Manisha Lifespaces Consulting Pvt. Ltd. | — | P52100049970 |
| Registered real estate agent | Manisha Lifespaces Consulting Pvt. Ltd. | — | P52100026797 |
| Registered real estate agent | Manish Gaur | — | P52100026451 |
| Registered real estate agent | Manish Gaur | — | P52100026452 |
| Registered real estate agent | Manish Gaur | — | P52100026479 |
| Registered real estate agent | Manish Gaur | — | P52100026478 |
| Registered real estate agent | Manish Gaur | — | P52100026480 |
| Registered real estate agent | Metro Homes | — | P52100049970 |
| Registered real estate agent | Metro Homes | — | P52100048377 |
| Registered real estate agent | Metro Homes | — | P52100048314 |
| Registered real estate agent | Mint Lifespaces | — | P52100026785 |
| Registered real estate agent | Mint Lifespaces | — | P52100026779 |
| Registered real estate agent | Mint Lifespaces | — | P52100026479 |
| Registered real estate agent | Mint Lifespaces | — | P52100026795 |
| Registered real estate agent | Mint Lifespaces | — | P52100026797 |
| Registered real estate agent | Mint Lifespaces | — | P52100026452 |
| Registered real estate agent | Mint Lifespaces | — | P52100026478 |
| Registered real estate agent | Mint Lifespaces | — | P52100026480 |
| Registered real estate agent | Mint Lifespaces | — | P52100026800 |
| Registered real estate agent | Mint Lifespaces | — | P52100026451 |
| Registered real estate agent | Mitosh Subhash Navale | — | P52100049970 |
| Registered real estate agent | Mukti Property Consultans Pvt Ltd | — | P52100026452 |
| Registered real estate agent | Mukti Property Consultans Pvt Ltd | — | P52100026451 |
| Registered real estate agent | Mukti Property Consultans Pvt Ltd | — | P52100026479 |
| Registered real estate agent | Mukti Property Consultans Pvt Ltd | — | P52100026478 |
| Registered real estate agent | Mukti Property Consultans Pvt Ltd | — | P52100026795 |
| Registered real estate agent | Mukti Property Consultans Pvt Ltd | — | P52100026779 |
| Registered real estate agent | Mukti Property Consultans Pvt Ltd | — | P52100026800 |
| Registered real estate agent | Mukti Property Consultans Pvt Ltd | — | P52100026480 |
| Registered real estate agent | Mukti Property Consultans Pvt Ltd | — | P52100026785 |
| Registered real estate agent | Mukti Property Consultans Pvt Ltd | — | P52100026797 |
| Registered real estate agent | Mukund Namase | — | P52100049970 |
| Registered real estate agent | Mukund Namase | — | P52100048377 |
| Registered real estate agent | Mukund Namase | — | P52100031391 |
| Registered real estate agent | Nestrov Consulting Private Limited | — | P52100026478 |
| Registered real estate agent | Nestrov Consulting Private Limited | — | P52100026779 |
| Registered real estate agent | Nestrov Consulting Private Limited | — | P52100026479 |
| Registered real estate agent | Nestrov Consulting Private Limited | — | P52100026800 |
| Registered real estate agent | Nestrov Consulting Private Limited | — | P52100026795 |
| Registered real estate agent | Nestrov Consulting Private Limited | — | P52100026480 |
| Registered real estate agent | Nestrov Consulting Private Limited | — | P52100026451 |
| Registered real estate agent | Nestrov Consulting Private Limited | — | P52100026785 |
| Registered real estate agent | Nestrov Consulting Private Limited | — | P52100026452 |
| Registered real estate agent | Nestrov Consulting Private Limited | — | P52100026797 |
| Registered real estate agent | Nihal Mallikarjun Gaikwad | — | P52100049970 |
| Registered real estate agent | Nilesh Mafatlalji Vyas | — | P52100026795 |
| Registered real estate agent | Nilesh Mafatlalji Vyas | — | P52100026785 |
| Registered real estate agent | Nilesh Mafatlalji Vyas | — | P52100026800 |
| Registered real estate agent | Nilesh Mafatlalji Vyas | — | P52100026478 |
| Registered real estate agent | Nilesh Mafatlalji Vyas | — | P52100026479 |
| Registered real estate agent | Nilesh Mafatlalji Vyas | — | P52100026452 |
| Registered real estate agent | Nilesh Mafatlalji Vyas | — | P52100026779 |
| Registered real estate agent | Nilesh Mafatlalji Vyas | — | P52100026797 |
| Registered real estate agent | Nilesh Mafatlalji Vyas | — | P52100026451 |
| Registered real estate agent | Nilesh Mafatlalji Vyas | — | P52100026480 |
| Registered real estate agent | Ninad Nitin Khumkar | — | P52100034911 |
| Registered real estate agent | Ninad Nitin Khumkar | — | P52100048377 |
| Registered real estate agent | Omkar Rajendra Jante | — | P52100049970 |
| Registered real estate agent | Prachi Rahul Bansode | — | P52100034911 |
| Registered real estate agent | Pradeep Laxman Musale | — | P52100049970 |
| Registered real estate agent | Prashant Pawar | — | P52100049970 |
| Registered real estate agent | Prateek Vinod Gupta | — | P52100048377 |
| Registered real estate agent | Praviin Pratap Pawar | — | P52100026479 |
| Registered real estate agent | Praviin Pratap Pawar | — | P52100026785 |
| Registered real estate agent | Praviin Pratap Pawar | — | P52100026795 |
| Registered real estate agent | Praviin Pratap Pawar | — | P52100026480 |
| Registered real estate agent | Praviin Pratap Pawar | — | P52100026478 |
| Registered real estate agent | Praviin Pratap Pawar | — | P52100026452 |
| Registered real estate agent | Praviin Pratap Pawar | — | P52100026800 |
| Registered real estate agent | Praviin Pratap Pawar | — | P52100026451 |
| Registered real estate agent | Praviin Pratap Pawar | — | P52100026797 |
| Registered real estate agent | Praviin Pratap Pawar | — | P52100026779 |
| Registered real estate agent | Prerana Ventures LLP | — | P52100026480 |
| Registered real estate agent | Prerana Ventures LLP | — | P52100026785 |
| Registered real estate agent | Prerana Ventures LLP | — | P52100026452 |
| Registered real estate agent | Prerana Ventures LLP | — | P52100026478 |
| Registered real estate agent | Prerana Ventures LLP | — | P52100026800 |
| Registered real estate agent | Prerana Ventures LLP | — | P52100026479 |
| Registered real estate agent | Prerana Ventures LLP | — | P52100026779 |
| Registered real estate agent | Prerana Ventures LLP | — | P52100026451 |
| Registered real estate agent | Prerana Ventures LLP | — | P52100026795 |
| Registered real estate agent | Prerana Ventures LLP | — | P52100026797 |
| Registered real estate agent | ProIndia Realty Private Limited | — | P52100049970 |
| Registered real estate agent | ProIndia Realty Private Limited | — | P52100048377 |
| Registered real estate agent | Propbizz Real Estate | — | P52100028308 |
| Registered real estate agent | Propbizz Real Estate | — | P52100026800 |
| Registered real estate agent | Propbizz Real Estate | — | P52100049970 |
| Registered real estate agent | Propbizz Real Estate | — | P52100026480 |
| Registered real estate agent | Propbizz Real Estate | — | P52100026779 |
| Registered real estate agent | Propbizz Real Estate | — | P52100026452 |
| Registered real estate agent | Propbizz Real Estate | — | P52100031515 |
| Registered real estate agent | Propbizz Real Estate | — | P52100048314 |
| Registered real estate agent | Propbizz Real Estate | — | P52100034911 |
| Registered real estate agent | Propbizz Real Estate | — | P52100054174 |
| Registered real estate agent | Propbizz Real Estate | — | P52100026451 |
| Registered real estate agent | Propbizz Real Estate | — | P52100048377 |
| Registered real estate agent | Propbizz Real Estate | — | P52100028311 |
| Registered real estate agent | Propbizz Real Estate | — | P52100026795 |
| Registered real estate agent | Propbuying Realtors Pvt Ltd | — | P52100026795 |
| Registered real estate agent | Propbuying Realtors Pvt Ltd | — | P52100026779 |
| Registered real estate agent | Propbuying Realtors Pvt Ltd | — | P52100026480 |
| Registered real estate agent | Propbuying Realtors Pvt Ltd | — | P52100026800 |
| Registered real estate agent | Propbuying Realtors Pvt Ltd | — | P52100026797 |
| Registered real estate agent | Propbuying Realtors Pvt Ltd | — | P52100026479 |
| Registered real estate agent | Propbuying Realtors Pvt Ltd | — | P52100026451 |
| Registered real estate agent | Propbuying Realtors Pvt Ltd | — | P52100026452 |
| Registered real estate agent | Propbuying Realtors Pvt Ltd | — | P52100026785 |
| Registered real estate agent | Propbuying Realtors Pvt Ltd | — | P52100026478 |
| Registered real estate agent | Propertypistol Realty Private Limited | — | P52100034911 |
| Registered real estate agent | Propertypistol Realty Private Limited | — | P52100049970 |
| Registered real estate agent | Propertypistol Realty Private Limited | — | P52100028308 |
| Registered real estate agent | Propertypistol Realty Private Limited | — | P52100031515 |
| Registered real estate agent | Propertypistol Realty Private Limited | — | P52100026797 |
| Registered real estate agent | Propertypistol Realty Private Limited | — | P52100031391 |
| Registered real estate agent | Propertypistol Realty Private Limited | — | P52100026785 |
| Registered real estate agent | Prop Magica Property Consultants LLP | — | P52100026797 |
| Registered real estate agent | Prop Magica Property Consultants LLP | — | P52100026800 |
| Registered real estate agent | Prop Magica Property Consultants LLP | — | P52100026478 |
| Registered real estate agent | Prop Magica Property Consultants LLP | — | P52100026452 |
| Registered real estate agent | Prop Magica Property Consultants LLP | — | P52100026479 |
| Registered real estate agent | Prop Magica Property Consultants LLP | — | P52100026785 |
| Registered real estate agent | Prop Magica Property Consultants LLP | — | P52100026795 |
| Registered real estate agent | Prop Magica Property Consultants LLP | — | P52100026779 |
| Registered real estate agent | Prop Magica Property Consultants LLP | — | P52100026451 |
| Registered real estate agent | Prop Magica Property Consultants LLP | — | P52100026480 |
| Registered real estate agent | proprise property consulting private limited | — | P52100026800 |
| Registered real estate agent | proprise property consulting private limited | — | P52100026451 |
| Registered real estate agent | proprise property consulting private limited | — | P52100026795 |
| Registered real estate agent | proprise property consulting private limited | — | P52100026779 |
| Registered real estate agent | proprise property consulting private limited | — | P52100026452 |
| Registered real estate agent | proprise property consulting private limited | — | P52100026478 |
| Registered real estate agent | proprise property consulting private limited | — | P52100026480 |
| Registered real estate agent | proprise property consulting private limited | — | P52100026797 |
| Registered real estate agent | proprise property consulting private limited | — | P52100026479 |
| Registered real estate agent | proprise property consulting private limited | — | P52100026785 |
| Registered real estate agent | Prop Solutions4u | — | P52100026480 |
| Registered real estate agent | Prop Solutions4u | — | P52100026479 |
| Registered real estate agent | Prop Solutions4u | — | P52100026478 |
| Registered real estate agent | Prop Solutions4u | — | P52100026451 |
| Registered real estate agent | Prop Solutions4u | — | P52100026452 |
| Registered real estate agent | Propsolutions4u Private Limited | — | P52100026795 |
| Registered real estate agent | Propsolutions4u Private Limited | — | P52100049970 |
| Registered real estate agent | Proptiger Marketing Services Private Limited | — | P52100026452 |
| Registered real estate agent | Proptiger Marketing Services Private Limited | — | P52100026785 |
| Registered real estate agent | Pruthviraj Mohanrao Patil | — | P52100026785 |
| Registered real estate agent | Pruthviraj Mohanrao Patil | — | P52100026779 |
| Registered real estate agent | Pruthviraj Mohanrao Patil | — | P52100026797 |
| Registered real estate agent | Pruthviraj Mohanrao Patil | — | P52100026480 |
| Registered real estate agent | Pruthviraj Mohanrao Patil | — | P52100026452 |
| Registered real estate agent | Pruthviraj Mohanrao Patil | — | P52100026479 |
| Registered real estate agent | Pruthviraj Mohanrao Patil | — | P52100026478 |
| Registered real estate agent | Pruthviraj Mohanrao Patil | — | P52100026451 |
| Registered real estate agent | Pruthviraj Mohanrao Patil | — | P52100026795 |
| Registered real estate agent | Pruthviraj Mohanrao Patil | — | P52100026800 |
| Registered real estate agent | Rahul Kumar Sharma | — | P52100026479 |
| Registered real estate agent | Rahul Kumar Sharma | — | P52100026480 |
| Registered real estate agent | Rahul Kumar Sharma | — | P52100026452 |
| Registered real estate agent | Rahul Kumar Sharma | — | P52100026451 |
| Registered real estate agent | Rahul Kumar Sharma | — | P52100026478 |
| Registered real estate agent | Rahul Nanabhau Gawali | — | P52100026795 |
| Registered real estate agent | Rahul Nanabhau Gawali | — | P52100026785 |
| Registered real estate agent | Rahul Nanabhau Gawali | — | P52100026800 |
| Registered real estate agent | Rahul Nanabhau Gawali | — | P52100026452 |
| Registered real estate agent | Rahul Nanabhau Gawali | — | P52100026479 |
| Registered real estate agent | Rahul Nanabhau Gawali | — | P52100026478 |
| Registered real estate agent | Rahul Nanabhau Gawali | — | P52100026451 |
| Registered real estate agent | Rahul Nanabhau Gawali | — | P52100026480 |
| Registered real estate agent | Rahul Nanabhau Gawali | — | P52100026797 |
| Registered real estate agent | Rahul Nanabhau Gawali | — | P52100026779 |
| Registered real estate agent | Rahul Shrivastava | — | P52100026479 |
| Registered real estate agent | Rahul Shrivastava | — | P52100026795 |
| Registered real estate agent | Rahul Shrivastava | — | P52100026797 |
| Registered real estate agent | Rahul Shrivastava | — | P52100026478 |
| Registered real estate agent | Rahul Shrivastava | — | P52100026785 |
| Registered real estate agent | Rahul Shrivastava | — | P52100026451 |
| Registered real estate agent | Rahul Shrivastava | — | P52100026800 |
| Registered real estate agent | Rahul Shrivastava | — | P52100026480 |
| Registered real estate agent | Rahul Shrivastava | — | P52100026779 |
| Registered real estate agent | Rahul Shrivastava | — | P52100026452 |
| Registered real estate agent | Rajendra Namdeo Kale | — | P52100026797 |
| Registered real estate agent | Rajendra Namdeo Kale | — | P52100026785 |
| Registered real estate agent | Rajendra Namdeo Kale | — | P52100026451 |
| Registered real estate agent | Rajendra Namdeo Kale | — | P52100026800 |
| Registered real estate agent | Rajendra Namdeo Kale | — | P52100026779 |
| Registered real estate agent | Rajendra Namdeo Kale | — | P52100026480 |
| Registered real estate agent | Rajendra Namdeo Kale | — | P52100026452 |
| Registered real estate agent | Rajendra Namdeo Kale | — | P52100026795 |
| Registered real estate agent | Rajendra Namdeo Kale | — | P52100026479 |
| Registered real estate agent | Rajendra Namdeo Kale | — | P52100026478 |
| Registered real estate agent | Rajesh Tukaram Kamthe | — | P52100026480 |
| Registered real estate agent | Rajesh Tukaram Kamthe | — | P52100026785 |
| Registered real estate agent | Rajesh Tukaram Kamthe | — | P52100026452 |
| Registered real estate agent | Rajesh Tukaram Kamthe | — | P52100026451 |
| Registered real estate agent | Rajesh Tukaram Kamthe | — | P52100026478 |
| Registered real estate agent | Rajesh Tukaram Kamthe | — | P52100026779 |
| Registered real estate agent | Rajesh Tukaram Kamthe | — | P52100026797 |
| Registered real estate agent | Rajesh Tukaram Kamthe | — | P52100026479 |
| Registered real estate agent | Rajesh Tukaram Kamthe | — | P52100026800 |
| Registered real estate agent | Rajesh Tukaram Kamthe | — | P52100026795 |
| Registered real estate agent | Ravindra Keshavrao Yadav | — | P52100026478 |
| Registered real estate agent | Ravindra Keshavrao Yadav | — | P52100026480 |
| Registered real estate agent | Ravindra Keshavrao Yadav | — | P52100026452 |
| Registered real estate agent | Ravindra Keshavrao Yadav | — | P52100026785 |
| Registered real estate agent | Ravindra Keshavrao Yadav | — | P52100026779 |
| Registered real estate agent | Ravindra Keshavrao Yadav | — | P52100026797 |
| Registered real estate agent | Ravindra Keshavrao Yadav | — | P52100026800 |
| Registered real estate agent | Ravindra Keshavrao Yadav | — | P52100048377 |
| Registered real estate agent | Ravindra Keshavrao Yadav | — | P52100049970 |
| Registered real estate agent | Ravindra Keshavrao Yadav | — | P52100026479 |
| Registered real estate agent | Ravindra Keshavrao Yadav | — | P52100026451 |
| Registered real estate agent | Ravindra Keshavrao Yadav | — | P52100026795 |
| Registered real estate agent | Rishabh Jain | — | P52100049970 |
| Registered real estate agent | Ritesh Baban Palave | — | P52100026795 |
| Registered real estate agent | Ritesh Baban Palave | — | P52100026779 |
| Registered real estate agent | Ritesh Baban Palave | — | P52100026480 |
| Registered real estate agent | Ritesh Baban Palave | — | P52100026478 |
| Registered real estate agent | Ritesh Baban Palave | — | P52100049970 |
| Registered real estate agent | Ritesh Baban Palave | — | P52100026785 |
| Registered real estate agent | Ritesh Baban Palave | — | P52100026800 |
| Registered real estate agent | Ritesh Baban Palave | — | P52100026451 |
| Registered real estate agent | Ritesh Baban Palave | — | P52100026479 |
| Registered real estate agent | Ritesh Baban Palave | — | P52100026452 |
| Registered real estate agent | Ritesh Baban Palave | — | P52100026797 |
| Registered real estate agent | Ritesh Baban Palave | — | P52100028308 |
| Registered real estate agent | Ritesh Baban Palave | — | P52100028311 |
| Registered real estate agent | Ritesh Baban Palave | — | P52100034911 |
| Registered real estate agent | Sachiv Vaid | — | P52100048377 |
| Registered real estate agent | Sachiv Vaid | — | P52100049970 |
| Registered real estate agent | Sachiv Vaid | — | P52100048314 |
| Registered real estate agent | Sagar Ram Kadam | — | P52100049970 |
| Registered real estate agent | Samrat Spaces Pvt. Ltd. | — | P52100049970 |
| Registered real estate agent | Seema Deepak Khomane | — | P52100049970 |
| Registered real estate agent | Seema Deepak Khomane | — | P52100048377 |
| Registered real estate agent | Seema Deepak Khomane | — | P52100028308 |
| Registered real estate agent | Seema Deepak Khomane | — | P52100034911 |
| Registered real estate agent | Shriram Vitthalrao Makal | — | P52100026785 |
| Registered real estate agent | Shriram Vitthalrao Makal | — | P52100028311 |
| Registered real estate agent | Shriram Vitthalrao Makal | — | P52100049970 |
| Registered real estate agent | Smc Real Estate Advisors Private Limited | — | P52100048314 |
| Registered real estate agent | Smc Real Estate Advisors Private Limited | — | P52100031515 |
| Registered real estate agent | Smc Real Estate Advisors Private Limited | — | P52100034911 |
| Registered real estate agent | Smc Real Estate Advisors Private Limited | — | P52100048377 |
| Registered real estate agent | Smita Ashok Mane | — | P52100026480 |
| Registered real estate agent | Smita Ashok Mane | — | P52100026451 |
| Registered real estate agent | Smita Ashok Mane | — | P52100026785 |
| Registered real estate agent | Smita Ashok Mane | — | P52100026452 |
| Registered real estate agent | Smita Ashok Mane | — | P52100026478 |
| Registered real estate agent | Smita Ashok Mane | — | P52100026800 |
| Registered real estate agent | Smita Ashok Mane | — | P52100026795 |
| Registered real estate agent | Smita Ashok Mane | — | P52100026797 |
| Registered real estate agent | Smita Ashok Mane | — | P52100026479 |
| Registered real estate agent | Smita Ashok Mane | — | P52100026779 |
| Registered real estate agent | Somnath Vinayak Ghule | — | P52100026795 |
| Registered real estate agent | Somnath Vinayak Ghule | — | P52100026480 |
| Registered real estate agent | Somnath Vinayak Ghule | — | P52100026800 |
| Registered real estate agent | Somnath Vinayak Ghule | — | P52100026479 |
| Registered real estate agent | Somnath Vinayak Ghule | — | P52100026451 |
| Registered real estate agent | Somnath Vinayak Ghule | — | P52100026452 |
| Registered real estate agent | Somnath Vinayak Ghule | — | P52100026478 |
| Registered real estate agent | Somnath Vinayak Ghule | — | P52100026785 |
| Registered real estate agent | Somnath Vinayak Ghule | — | P52100026779 |
| Registered real estate agent | Somnath Vinayak Ghule | — | P52100026797 |
| Registered real estate agent | Square Yards Consulting Private Limited | — | P52100034911 |
| Registered real estate agent | Square Yards Consulting Private Limited | — | P52100048377 |
| Registered real estate agent | Swapnil Kailas Sarode | — | P52100026779 |
| Registered real estate agent | Swapnil Kailas Sarode | — | P52100026451 |
| Registered real estate agent | Swapnil Kailas Sarode | — | P52100026800 |
| Registered real estate agent | Swapnil Kailas Sarode | — | P52100026795 |
| Registered real estate agent | Swapnil Kailas Sarode | — | P52100026478 |
| Registered real estate agent | Swapnil Kailas Sarode | — | P52100026479 |
| Registered real estate agent | Swapnil Kailas Sarode | — | P52100026452 |
| Registered real estate agent | Swapnil Kailas Sarode | — | P52100026785 |
| Registered real estate agent | Swapnil Kailas Sarode | — | P52100026797 |
| Registered real estate agent | Swapnil Kailas Sarode | — | P52100026480 |
| Registered real estate agent | Vaibhav Ankush Shukl | — | P52100026478 |
| Registered real estate agent | Vaibhav Ankush Shukl | — | P52100026785 |
| Registered real estate agent | Vaibhav Ankush Shukl | — | P52100026480 |
| Registered real estate agent | Vaibhav Ankush Shukl | — | P52100026452 |
| Registered real estate agent | Vaibhav Ankush Shukl | — | P52100026797 |
| Registered real estate agent | Vaibhav Ankush Shukl | — | P52100026795 |
| Registered real estate agent | Vaibhav Ankush Shukl | — | P52100026451 |
| Registered real estate agent | Vaibhav Ankush Shukl | — | P52100026800 |
| Registered real estate agent | Vaibhav Ankush Shukl | — | P52100026779 |
| Registered real estate agent | Vaibhav Ankush Shukl | — | P52100026479 |
| Registered real estate agent | Vaibhav Ramesh Bedarkar | — | P52100026800 |
| Registered real estate agent | Vaibhav Ramesh Bedarkar | — | P52100026785 |
| Registered real estate agent | Vaibhav Ramesh Bedarkar | — | P52100026478 |
| Registered real estate agent | Vaibhav Ramesh Bedarkar | — | P52100026797 |
| Registered real estate agent | Vaibhav Ramesh Bedarkar | — | P52100026795 |
| Registered real estate agent | Vaibhav Ramesh Bedarkar | — | P52100026452 |
| Registered real estate agent | Vaibhav Ramesh Bedarkar | — | P52100026480 |
| Registered real estate agent | Vaibhav Ramesh Bedarkar | — | P52100026779 |
| Registered real estate agent | Vaibhav Ramesh Bedarkar | — | P52100026451 |
| Registered real estate agent | Vaibhav Ramesh Bedarkar | — | P52100026479 |
| Registered real estate agent | Vandana Jeetnarayan Mourya | — | P52100026795 |
| Registered real estate agent | Vandana Jeetnarayan Mourya | — | P52100026800 |
| Registered real estate agent | Vandana Jeetnarayan Mourya | — | P52100026779 |
| Registered real estate agent | Vandana Jeetnarayan Mourya | — | P52100026451 |
| Registered real estate agent | Vandana Jeetnarayan Mourya | — | P52100026452 |
| Registered real estate agent | Vandana Jeetnarayan Mourya | — | P52100026785 |
| Registered real estate agent | Vandana Jeetnarayan Mourya | — | P52100026797 |
| Registered real estate agent | Vandana Jeetnarayan Mourya | — | P52100026480 |
| Registered real estate agent | Vandana Jeetnarayan Mourya | — | P52100026479 |
| Registered real estate agent | Vandana Jeetnarayan Mourya | — | P52100026478 |
| Registered real estate agent | Victor DSouza | — | P52100031391 |
| Registered real estate agent | Victor DSouza | — | P52100048314 |
| Registered real estate agent | Victor DSouza | — | P52100028308 |
| Registered real estate agent | Victor DSouza | — | P52100028311 |
| Registered real estate agent | Victor DSouza | — | P52100034911 |
| Registered real estate agent | Vijay Rickabchand Rathod | — | P52100026478 |
| Registered real estate agent | Vijay Rickabchand Rathod | — | P52100026452 |
| Registered real estate agent | Vijay Rickabchand Rathod | — | P52100026451 |
| Registered real estate agent | Vijay Rickabchand Rathod | — | P52100026479 |
| Registered real estate agent | Vijay Rickabchand Rathod | — | P52100026480 |
| Registered real estate agent | Viral Singh Chauhan | — | P52100026452 |
| Registered real estate agent | Viral Singh Chauhan | — | P52100026479 |
| Registered real estate agent | Viral Singh Chauhan | — | P52100026451 |
| Registered real estate agent | Viral Singh Chauhan | — | P52100026478 |
| Registered real estate agent | Viral Singh Chauhan | — | P52100026480 |
| Registered real estate agent | Vivek Sunil Shere | — | P52100026478 |
| Registered real estate agent | Vivek Sunil Shere | — | P52100026479 |
| Registered real estate agent | Vivek Sunil Shere | — | P52100026795 |
| Registered real estate agent | Vivek Sunil Shere | — | P52100026779 |
| Registered real estate agent | Vivek Sunil Shere | — | P52100026452 |
| Registered real estate agent | Vivek Sunil Shere | — | P52100026785 |
| Registered real estate agent | Vivek Sunil Shere | — | P52100026797 |
| Registered real estate agent | Vivek Sunil Shere | — | P52100026480 |
| Registered real estate agent | Vivek Sunil Shere | — | P52100026451 |
| Registered real estate agent | Vivek Sunil Shere | — | P52100026800 |
| Registered real estate agent | W4 Realty | — | P52100026480 |
| Registered real estate agent | W4 Realty | — | P52100026478 |
| Registered real estate agent | W4 Realty | — | P52100026795 |
| Registered real estate agent | W4 Realty | — | P52100026451 |
| Registered real estate agent | W4 Realty | — | P52100026800 |
| Registered real estate agent | W4 Realty | — | P52100026785 |
| Registered real estate agent | W4 Realty | — | P52100026479 |
| Registered real estate agent | W4 Realty | — | P52100026452 |
| Registered real estate agent | W4 Realty | — | P52100026779 |
| Registered real estate agent | W4 Realty | — | P52100026797 |
| Registered real estate agent | Yogesh Jadhav | — | P52100049970 |
| Registered real estate agent | Yogesh Jagannath Poman | — | P52100026785 |
| Registered real estate agent | Yogesh Jagannath Poman | — | P52100026478 |
| Registered real estate agent | Yogesh Jagannath Poman | — | P52100026452 |
| Registered real estate agent | Yogesh Jagannath Poman | — | P52100026451 |
| Registered real estate agent | Yogesh Jagannath Poman | — | P52100026479 |
| Registered real estate agent | Yogesh Jagannath Poman | — | P52100026779 |
| Registered real estate agent | Yogesh Jagannath Poman | — | P52100026800 |
| Registered real estate agent | Yogesh Jagannath Poman | — | P52100026480 |
| Registered real estate agent | Yogesh Jagannath Poman | — | P52100026795 |
| Registered real estate agent | Yogesh Jagannath Poman | — | P52100026797 |
| Registered real estate agent | Yogesh Narayan Kalbhor | — | P52100034911 |
| Registered real estate agent | Yogesh Narayan Kalbhor | — | P52100049970 |
Source: MahaRERA project page. Contact details are not shown.
Joyville Hadapsar Annexe in numbers
Registered deals, summarised
Deedo has 312 registered documents at Joyville Hadapsar Annexe, from Jul 2023 to Oct 2026: 298 sales, 9 mortgages. The median registered sale since Jul 2023 works out to about ₹10,600 per sq ft, at a median of ₹65 L a deal; 0% of sales were resales.
- What is the price per sq ft at Joyville Hadapsar Annexe?
- The median registered sale since Jul 2023 works out to about ₹10,600 per sq ft, at a median of ₹65 L a deal; 0% of sales were resales.
- How many properties have been sold at Joyville Hadapsar Annexe?
- 298 sales are registered at Joyville Hadapsar Annexe.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Joyville Hadapsar Annexe by Deedo, last updated with deals registered in Oct 2026.
Latest deal · Rental · Oct 2026
₹10–20k / month