Others · 1 building · 22 unitsRERA P52100029845

Vardhishnu

Deedo IDDP-PUN-MAZS

It is due for completion in Dec 2026, with no extension on record; no MahaRERA orders on record; 18% of its units are booked.

Sadashiv Peth, Pune 411030 · by Vishwam

DeliveryDue Dec 2026No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales18% booked4 of 22 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

It is due for completion in Dec 2026, with no extension on record

  • This projectRegistered 8 Jul 2021, completion promised 31 Dec 2026.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100029845
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000298458 Jul 202131 Dec 202631 Dec 2026VishwamProject page
Documents121

1 document held by Deedo, 120 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardIMG-20200824-WA0013.pdf · uploaded 26 Sep 2020Source

Legal

  • Declaration Form BDECLERATION VISHWAM.pdf · uploaded 30 Sep 2020Source
  • Legal Title reportTitle Report.pdf · uploaded 1 Jul 2021Source

Migrated

  • 1 PAN CardIMG-20200824-WA0013.pdf · uploaded 26 Sep 2020Source
  • 1 Building Plan Approval / NA Order for plotted developmentSanction Plan PDF.pdf · uploaded 26 Sep 2020Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Scanned Architect Certificate.pdf · uploaded 26 Sep 2020Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 26 Sep 2020Source
Show all 121 documentsShow fewer documents

Migrated

  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Scanned CA Certificate.pdf · uploaded 26 Sep 2020Source
  • 1 Declaration in FORM BDECLERATION VISHWAM.pdf · uploaded 30 Sep 2020Source
  • 1 Proforma of Allotment letterSCANNED ALLOTMENT LETTER.pdf · uploaded 30 Sep 2020Source
  • 2 Proforma of Allotment letterSCANNED BOOKING FORM.pdf · uploaded 30 Sep 2020Source
  • 1 Copy of Layout Approval (in case of layout)Sanction Plan PDF.pdf · uploaded 28 Jan 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement.pdf · uploaded 28 Jan 2021Source
  • 1 Declaration about Commencement CertificateDecleration for commencement.pdf · uploaded 22 Jun 2021Source
  • 1 Copy of the legal title reportTitle Report.pdf · uploaded 1 Jul 2021Source
  • 1 Details of encumbrancesTitle Report.pdf · uploaded 1 Jul 2021Source
  • 1 CERSAI detailsCERSAI Search Report.pdf · uploaded 7 Apr 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentcommencement CertIficate 22-11-2021.pdf · uploaded 23 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form -5 CA.pdf · uploaded 23 Jan 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Qualty Assurance Certificate_compressed.pdf · uploaded 22 Feb 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclouser of Interest in other Real Estate Orgn.pdf · uploaded 22 Feb 2023Source
  • 1 Proforma of Agreement for salePROFORMA AGREEMENT TO SALE.pdf · uploaded 22 Feb 2023Source
  • 3 Proforma of Allotment letterAnnexure -A.pdf · uploaded 22 Feb 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDiclaration about Seperate Bank Account.pdf · uploaded 22 Feb 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate-29 April 23.pdf · uploaded 11 May 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate 150723.pdf · uploaded 31 Aug 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineer Certificate.pdf · uploaded 31 Aug 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vishwam RERA Form 3 CA.pdf · uploaded 31 Aug 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 31032023.pdf · uploaded 4 Mar 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)IMG_0001.pdf · uploaded 23 Apr 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Vardhishnu (01-01-2022)-compressed.pdf · uploaded 2 Jul 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Vardhishnu (01-01-2023)-compressed.pdf · uploaded 2 Jul 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Vardhishnu (01-01-2024)-compressed.pdf · uploaded 2 Jul 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Vardhishnu (01-04-2022)-compressed.pdf · uploaded 2 Jul 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Vardhishnu (01-04-2023)-compressed.pdf · uploaded 2 Jul 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Vardhishnu (01-04-2024)-compressed.pdf · uploaded 2 Jul 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Vardhishnu (01-07-2022)-compressed.pdf · uploaded 2 Jul 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Vardhishnu (01-07-2023)-compressed.pdf · uploaded 2 Jul 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Vardhishnu (01-10-2021)-compressed.pdf · uploaded 2 Jul 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Vardhishnu (01-10-2022)-compressed.pdf · uploaded 2 Jul 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Vardhishnu (01-10-2023)-compressed.pdf · uploaded 2 Jul 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate_Vardhishnu (30-06-2022)_compressed.pdf · uploaded 10 Jul 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate_Vardhishnu (30-09-2022)_compressed.pdf · uploaded 10 Jul 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate_Vardhishnu (30-09-2023)_compressed.pdf · uploaded 10 Jul 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate_Vardhishnu (31-03-2022)_compressed.pdf · uploaded 10 Jul 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate_Vardhishnu (31-12-2023)_compressed.pdf · uploaded 10 Jul 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)010423.pdf · uploaded 28 Nov 2024Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)011023.pdf · uploaded 28 Nov 2024Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)011022.pdf · uploaded 28 Nov 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)011021.pdf · uploaded 28 Nov 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)010723.pdf · uploaded 28 Nov 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)010722.pdf · uploaded 28 Nov 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)010424.pdf · uploaded 28 Nov 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)010422.pdf · uploaded 28 Nov 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)010124.pdf · uploaded 28 Nov 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)010123.pdf · uploaded 28 Nov 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)010122.pdf · uploaded 28 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)310324 2A.pdf · uploaded 28 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Architect Certificate.pdf · uploaded 9 Jan 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-Q1 - converted.pdf · uploaded 21 Jan 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 -Q2 - converted.pdf · uploaded 21 Jan 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Q3 - converted.pdf · uploaded 21 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_June 24 - converted.pdf · uploaded 21 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Sep 24 - converted.pdf · uploaded 21 Jan 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Dec 24 - converted.pdf · uploaded 21 Jan 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 -Q3.pdf · uploaded 21 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 -Q2.pdf · uploaded 21 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2 -Q1.pdf · uploaded 21 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure_March 22.pdf · uploaded 21 Jan 2025Source
  • 2 Disclosure of sold/ booked inventoryDisclosure_March 23.pdf · uploaded 21 Jan 2025Source
  • 3 Disclosure of sold/ booked inventoryDisclosure_March 24.pdf · uploaded 21 Jan 2025Source
  • 4 Disclosure of sold/ booked inventoryDisclosure_June 24.pdf · uploaded 21 Jan 2025Source
  • 5 Disclosure of sold/ booked inventoryDisclosure_Sep 24.pdf · uploaded 21 Jan 2025Source
  • 6 Disclosure of sold/ booked inventoryDisclosure_Dec 24.pdf · uploaded 21 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5- FY 2023-24.pdf · uploaded 22 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 -Q4.pdf · uploaded 24 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 03.pdf · uploaded 24 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-Q4.pdf · uploaded 24 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure_of_Sold_Booked_Inventory- Mar-25.pdf · uploaded 24 Apr 2025Source
  • Withdrawal Update Form 1ARCHITECT Form 1.pdf · uploaded 23 Aug 2025Source
  • Withdrawal Update Form 2Engineer From 2.pdf · uploaded 23 Aug 2025Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 23 Aug 2025Source
  • Withdrawal Update Form 1ARCHITECT CERTIFICATE SEP 2025.pdf · uploaded 30 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Engineer.pdf · uploaded 30 Oct 2025Source
  • Withdrawal Update Form 3FORM-3 Q2.pdf · uploaded 30 Oct 2025Source
  • Form 5 (FY 2024-2025)Form 5 2024-25.pdf · uploaded 30 Oct 2025Source
  • Withdrawal Update Form 1From1 Architect.pdf · uploaded 22 Jan 2026Source
  • Withdrawal Update Form 2Form 2 Engineer Certificate_260120_185855.pdf · uploaded 22 Jan 2026Source
  • Withdrawal Update Form 3From 3 CA_compressed.pdf · uploaded 22 Jan 2026Source
  • Withdrawal Update Form 1Form_1_March_26.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 2From_2_March_2026.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 3F3_VISHWAM_March_26.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 24 Jul 2026Source
  • Withdrawal Update Form 2Form 1.pdf · uploaded 24 Jul 2026Source
  • Withdrawal Update Form 3F3_VISHWAM_March_26.pdf · uploaded 24 Jul 2026Source
  • Form 2A (FY 2025-2026)Form -2A.pdf · uploaded 19 Aug 2026Source

Technical

  • DocumentSanction Plan PDF.pdf · uploaded 26 Sep 2020Source
  • DocumentSanction Plan PDF.pdf · uploaded 28 Jan 2021Source

Technical (Architect)

  • DocumentForm 1_Architect Certificate.pdf · uploaded 9 Jan 2025Source
  • DocumentForm 1-Q1 - converted.pdf · uploaded 21 Jan 2025Source
  • DocumentForm 1 -Q2 - converted.pdf · uploaded 21 Jan 2025Source
  • DocumentForm 1- Q3 - converted.pdf · uploaded 21 Jan 2025Source
  • DocumentForm -1 -Q4.pdf · uploaded 24 Apr 2025Source
  • DocumentForm 1.pdf · uploaded 24 Jul 2026Source

Technical (Engineer)

  • Document010122.pdf · uploaded 28 Nov 2024Source
  • Document010123.pdf · uploaded 28 Nov 2024Source
  • Document010124.pdf · uploaded 28 Nov 2024Source
  • Document010422.pdf · uploaded 28 Nov 2024Source
  • Document010423.pdf · uploaded 28 Nov 2024Source
  • Document010424.pdf · uploaded 28 Nov 2024Source
  • Document010722.pdf · uploaded 28 Nov 2024Source
  • Document010723.pdf · uploaded 28 Nov 2024Source
  • Document011021.pdf · uploaded 28 Nov 2024Source
  • Document011022.pdf · uploaded 28 Nov 2024Source
  • Document011023.pdf · uploaded 28 Nov 2024Source
  • DocumentFrom 2 -Q1.pdf · uploaded 21 Jan 2025Source
  • DocumentForm 2 -Q2.pdf · uploaded 21 Jan 2025Source
  • DocumentForm 2 -Q3.pdf · uploaded 21 Jan 2025Source
  • DocumentForm 2-Q4.pdf · uploaded 24 Apr 2025Source
  • DocumentForm 1.pdf · uploaded 24 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel CTS NO 1199

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 1RK, 2BHK, Office space, Shop22 units in all
Address
Cts No 1199, Limaye Wadi, Sadashiv PethPIN 411030
Village
Pune (M Corp.), Pune City taluka
Land area for this project
286 sq m (3,078 sq ft)
Permissible built-up area
798 sq m (8,590 sq ft)
Sanctioned built-up area
572 sq m (6,157 sq ft)
Recreational open space
286 sq m (3,078 sq ft)
Designated bank account
43
Developed in phases
No

Survey, CTS, gat or plot numbers

CTS NO 1199

Land as published on MahaRERA's project page

CTS NO 1199

Boundaries

North
Cts No 1215
South
9 M Wide Road
East
Cts No 1198
West
Cts No 1200

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking22 units

4 of 22 units booked (18%), as the promoter reported to MahaRERA

1BHK · 5 units1RK · 8 units2BHK · 5 unitsOffice space · 1 unitShop · 3 units
TypeCarpet areaUnitsBooked
1BHK24.04 sq m · 259 sq ft21
1BHK32.6 sq m · 351 sq ft10
1BHK42.63 sq m · 459 sq ft11
1BHK43.1 sq m · 464 sq ft10
1RK13.26 sq m · 143 sq ft21
1RK15.91 sq m · 171 sq ft20
1RK16.23 sq m · 175 sq ft10
1RK16.24 sq m · 175 sq ft11
Show all 13 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
1RK19.55 sq m · 210 sq ft20
2BHK70.44 sq m · 758 sq ft50
Office space205.47 sq m · 2,212 sq ft10
Shop76.78 sq m · 826 sq ft10
Shop87.02 sq m · 937 sq ft20

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectGroup Consultants—
Chartered accountantBIPIN VORA and ASSOCIATES—
EngineerGanesh Anna Ranjane—
EngineerSamir Ramesh Wadodkar—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology