Deedo IDDP-PUN-NQF4MahaRERA shows it completed; no MahaRERA orders on record; 90% of its units are booked.
Ravet, Pune 412101 · Property rates in Ravet · by Vivanta Realty · 100% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 15 May 2023, completion promised 31 Dec 2026.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- Building-A15 floors · 62 units94% booked
- Building-B15 floors · 194 units89% booked
- Building-C15 floors · 152 units89% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100050915
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100050915 | 15 May 2023 | 31 Dec 2026 | 31 Dec 2026 | Vivanta Realty | Project page |
Documents375
1 document held by Deedo, 374 filings listed on MahaRERA's project page
Finance
- PAN Card1 PAN Card.pdf · uploaded 28 Feb 2023Source
Legal
Migrated
- 1 PAN Card1 PAN Card.pdf · uploaded 28 Feb 2023Source
- 1 Copy of the legal title reportSEARCH REPORT - 2023.pdf · uploaded 28 Feb 2023Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT PLAN - 01.pdf · uploaded 28 Feb 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentPLAN NO - 02.pdf · uploaded 28 Feb 2023Source
Show all 375 documentsShow fewer documents
Migrated
- 1 Commencement Certificates / NA Order for plotted developmentCC - YASHADA WINDSONG - 2023.pdf · uploaded 28 Feb 2023Source
- 1 Declaration about Commencement CertificateDECLERATION FOR - YASHADA WINDSONG.pdf · uploaded 28 Feb 2023Source
- 1 Declaration in FORM BDECLARATION - VASANT KATE.pdf · uploaded 28 Feb 2023Source
- 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 28 Feb 2023Source
- 1 a Details of encumbrances concerned to FinanceEncumbrance Legal .PDF · uploaded 1 Mar 2023Source
- 1 b Details of encumbrances concerned to LegalEncumbrance Legal .PDF · uploaded 1 Mar 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentPLAN NO - 03.pdf · uploaded 1 Mar 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentPLAN NO - 04.pdf · uploaded 1 Mar 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentPLAN NO - 05.pdf · uploaded 1 Mar 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentPLAN NO - 06.pdf · uploaded 1 Mar 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentPLAN NO - 07.pdf · uploaded 1 Mar 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentPLAN NO - 08.pdf · uploaded 1 Mar 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentPLAN NO - 09.pdf · uploaded 1 Mar 2023Source
- 9 Building Plan Approval / NA Order for plotted developmentPLAN NO - 10.pdf · uploaded 1 Mar 2023Source
- 10 Building Plan Approval / NA Order for plotted developmentPLAN NO - 12.pdf · uploaded 1 Mar 2023Source
- 11 Building Plan Approval / NA Order for plotted developmentPLAN NO - 13.pdf · uploaded 1 Mar 2023Source
- 12 Building Plan Approval / NA Order for plotted developmentPLAN NO - 14.pdf · uploaded 1 Mar 2023Source
- 13 Building Plan Approval / NA Order for plotted developmentPLAN NO - 16.pdf · uploaded 1 Mar 2023Source
- 14 Building Plan Approval / NA Order for plotted developmentPLAN NO - 17.pdf · uploaded 1 Mar 2023Source
- 15 Building Plan Approval / NA Order for plotted developmentPLAN NO - 18.pdf · uploaded 1 Mar 2023Source
- 16 Building Plan Approval / NA Order for plotted developmentPLAN NO - 18.pdf · uploaded 1 Mar 2023Source
- 17 Building Plan Approval / NA Order for plotted developmentPLAN NO - 19.pdf · uploaded 1 Mar 2023Source
- 18 Building Plan Approval / NA Order for plotted developmentPLANN O - 11.pdf · uploaded 1 Mar 2023Source
- 2 a Details of encumbrances concerned to FinanceEncumbrance Finance.PDF · uploaded 3 Mar 2023Source
- 2 b Details of encumbrances concerned to LegalEncumbrance Finance.PDF · uploaded 3 Mar 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsJadhav Sir Disclosure.PDF · uploaded 3 Mar 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsVasant Sir Discolsure.PDF · uploaded 3 Mar 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsJoshi Sir Discolsure.PDF · uploaded 3 Mar 2023Source
- 1 Proforma of Agreement for saleAgreement Draft Yashada Windsong 03-03-2023.pdf · uploaded 3 Mar 2023Source
- 1 Deviation Report with respect to Allotment letterallotment letter deviation r1.PDF · uploaded 3 Mar 2023Source
- 1 Deviation Report with respect to model copy of Agreementagreement deviation r1.PDF · uploaded 3 Mar 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameACCOUNT DECALARTION 03 03 2023.PDF · uploaded 8 Mar 2023Source
- 1 CERSAI detailsWindsong Undertaking 1.pdf · uploaded 24 Mar 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 WINDSONG.pdf · uploaded 29 Apr 2023Source
- 2 Copy of Layout Approval (in case of layout)LAYOUT PLAN NO - 01.pdf · uploaded 8 Jun 2023Source
- 19 Building Plan Approval / NA Order for plotted developmentPLAN NO - 02.pdf · uploaded 8 Jun 2023Source
- 20 Building Plan Approval / NA Order for plotted developmentPLAN NO - 03.pdf · uploaded 8 Jun 2023Source
- 21 Building Plan Approval / NA Order for plotted developmentPLAN NO - 04.pdf · uploaded 8 Jun 2023Source
- 22 Building Plan Approval / NA Order for plotted developmentPLAN NO - 05.pdf · uploaded 8 Jun 2023Source
- 23 Building Plan Approval / NA Order for plotted developmentPLAN NO - 06.pdf · uploaded 8 Jun 2023Source
- 24 Building Plan Approval / NA Order for plotted developmentPLAN NO - 07.pdf · uploaded 8 Jun 2023Source
- 25 Building Plan Approval / NA Order for plotted developmentPLAN NO - 08.pdf · uploaded 8 Jun 2023Source
- 26 Building Plan Approval / NA Order for plotted developmentPLAN NO - 09.pdf · uploaded 8 Jun 2023Source
- 27 Building Plan Approval / NA Order for plotted developmentPLAN NO - 10.pdf · uploaded 8 Jun 2023Source
- 28 Building Plan Approval / NA Order for plotted developmentPLAN NO - 11.pdf · uploaded 8 Jun 2023Source
- 29 Building Plan Approval / NA Order for plotted developmentPLAN NO - 12.pdf · uploaded 8 Jun 2023Source
- 30 Building Plan Approval / NA Order for plotted developmentPLAN NO - 13.pdf · uploaded 8 Jun 2023Source
- 31 Building Plan Approval / NA Order for plotted developmentPLAN NO - 14.pdf · uploaded 8 Jun 2023Source
- 32 Building Plan Approval / NA Order for plotted developmentPLAN NO - 15.pdf · uploaded 8 Jun 2023Source
- 33 Building Plan Approval / NA Order for plotted developmentPLAN NO - 16.pdf · uploaded 8 Jun 2023Source
- 34 Building Plan Approval / NA Order for plotted developmentPLAN NO - 17.pdf · uploaded 8 Jun 2023Source
- 35 Building Plan Approval / NA Order for plotted developmentPLAN NO - 18.pdf · uploaded 8 Jun 2023Source
- 36 Building Plan Approval / NA Order for plotted developmentPLAN NO - 19.pdf · uploaded 8 Jun 2023Source
- 37 Building Plan Approval / NA Order for plotted developmentPLAN NO - 20.pdf · uploaded 8 Jun 2023Source
- 38 Building Plan Approval / NA Order for plotted developmentPLAN NO - 20A.pdf · uploaded 8 Jun 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCC - YASHADA WINDSONG - 2023.pdf · uploaded 8 Jun 2023Source
- 3 Copy of Layout Approval (in case of layout)LAYOUT PLAN NO - 01.pdf · uploaded 8 Dec 2023Source
- 39 Building Plan Approval / NA Order for plotted developmentPLAN NO - 02 PARKING LAYOUT.pdf · uploaded 8 Dec 2023Source
- 40 Building Plan Approval / NA Order for plotted developmentPLAN NO - 03 A GF MZ.pdf · uploaded 8 Dec 2023Source
- 41 Building Plan Approval / NA Order for plotted developmentPLAN NO - 04 A 2 3.pdf · uploaded 8 Dec 2023Source
- 42 Building Plan Approval / NA Order for plotted developmentPLAN NO - 05.pdf · uploaded 8 Dec 2023Source
- 43 Building Plan Approval / NA Order for plotted developmentPLAN NO - 06.pdf · uploaded 8 Dec 2023Source
- 44 Building Plan Approval / NA Order for plotted developmentPLAN NO - 07.pdf · uploaded 8 Dec 2023Source
- 45 Building Plan Approval / NA Order for plotted developmentPLAN NO - 08 A SEC.pdf · uploaded 8 Dec 2023Source
- 46 Building Plan Approval / NA Order for plotted developmentPLAN NO - 09 B.pdf · uploaded 8 Dec 2023Source
- 47 Building Plan Approval / NA Order for plotted developmentPLAN NO - 10.pdf · uploaded 8 Dec 2023Source
- 48 Building Plan Approval / NA Order for plotted developmentPLAN NO - 11.pdf · uploaded 8 Dec 2023Source
- 49 Building Plan Approval / NA Order for plotted developmentPLAN NO - 12 B 3.pdf · uploaded 8 Dec 2023Source
- 50 Building Plan Approval / NA Order for plotted developmentPLAN NO - 13.pdf · uploaded 8 Dec 2023Source
- 51 Building Plan Approval / NA Order for plotted developmentPLAN NO - 14.pdf · uploaded 8 Dec 2023Source
- 52 Building Plan Approval / NA Order for plotted developmentPLAN NO - 15.pdf · uploaded 8 Dec 2023Source
- 53 Building Plan Approval / NA Order for plotted developmentPLAN NO - 16.pdf · uploaded 8 Dec 2023Source
- 54 Building Plan Approval / NA Order for plotted developmentPLAN NO - 17 B SEC.pdf · uploaded 8 Dec 2023Source
- 55 Building Plan Approval / NA Order for plotted developmentPLAN NO - 18 ELE.pdf · uploaded 8 Dec 2023Source
- 56 Building Plan Approval / NA Order for plotted developmentPLAN NO - 19 C.pdf · uploaded 8 Dec 2023Source
- 57 Building Plan Approval / NA Order for plotted developmentPLAN NO - 20.pdf · uploaded 8 Dec 2023Source
- 58 Building Plan Approval / NA Order for plotted developmentPLAN NO - 21.pdf · uploaded 8 Dec 2023Source
- 59 Building Plan Approval / NA Order for plotted developmentPLAN NO - 21.pdf · uploaded 8 Dec 2023Source
- 60 Building Plan Approval / NA Order for plotted developmentPLAN NO - 22.pdf · uploaded 8 Dec 2023Source
- 61 Building Plan Approval / NA Order for plotted developmentPLAN NO - 23.pdf · uploaded 8 Dec 2023Source
- 62 Building Plan Approval / NA Order for plotted developmentPLAN NO - 24.pdf · uploaded 8 Dec 2023Source
- 63 Building Plan Approval / NA Order for plotted developmentPLAN NO - 25.pdf · uploaded 8 Dec 2023Source
- 64 Building Plan Approval / NA Order for plotted developmentPLAN NO - 26.pdf · uploaded 8 Dec 2023Source
- 65 Building Plan Approval / NA Order for plotted developmentPLAN NO - 28.pdf · uploaded 8 Dec 2023Source
- 66 Building Plan Approval / NA Order for plotted developmentPLAN NO - 27.pdf · uploaded 8 Dec 2023Source
- 3 Commencement Certificates / NA Order for plotted developmentCC - YASHADA WINDSONG - 2023.pdf · uploaded 8 Dec 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM - 1 - YASHADA WINDSONG 01-03-2023.pdf · uploaded 4 Jan 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM - 1 YASHADA WINDSONG JUNE 2023.pdf · uploaded 4 Jan 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM - 1 YASHADA WINDSONG SEPT 2023.pdf · uploaded 4 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM - 1 YASHADA WINDSONG DEC 2023.pdf · uploaded 4 Jan 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 WINDSONG FEB 23.PDF · uploaded 4 Jan 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 WINDSONG JUNE 23.PDF · uploaded 4 Jan 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 WINDSONG SEPT 23.PDF · uploaded 4 Jan 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3 windsong_SEPT 2023.pdf · uploaded 4 Jan 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)windsong form3_SEPT 2023 PROMOTOR SIGN.PDF · uploaded 4 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 WINDSONG 30 06 2023.pdf · uploaded 4 Jan 2024Source
- 1 Disclosure of sold/ booked inventoryYASHADA WINDSONG_001.pdf · uploaded 5 Jan 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 YASHADA WINDSONG MARCH 2024.pdf · uploaded 27 Apr 2024Source
- 2 Disclosure of sold/ booked inventoryWINDSONG SOLD UNSOLD MARCH 2024.pdf · uploaded 27 Apr 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)YASHADA WINDSONG FORM 3 UP TO 31 3 2024.pdf · uploaded 27 Apr 2024Source
- 67 Building Plan Approval / NA Order for plotted developmentLAYOUT PLAN - 01.pdf · uploaded 7 May 2024Source
- 68 Building Plan Approval / NA Order for plotted developmentPLAN NO - 02.pdf · uploaded 7 May 2024Source
- 69 Building Plan Approval / NA Order for plotted developmentPLAN NO - 03.pdf · uploaded 7 May 2024Source
- 70 Building Plan Approval / NA Order for plotted developmentPLAN NO - 04.pdf · uploaded 7 May 2024Source
- 71 Building Plan Approval / NA Order for plotted developmentPLAN NO - 05.pdf · uploaded 7 May 2024Source
- 72 Building Plan Approval / NA Order for plotted developmentPLAN NO - 06.pdf · uploaded 7 May 2024Source
- 73 Building Plan Approval / NA Order for plotted developmentPLAN NO - 06.pdf · uploaded 7 May 2024Source
- 74 Building Plan Approval / NA Order for plotted developmentPLAN NO - 07.pdf · uploaded 7 May 2024Source
- 75 Building Plan Approval / NA Order for plotted developmentPLAN NO - 08.pdf · uploaded 7 May 2024Source
- 76 Building Plan Approval / NA Order for plotted developmentPLAN NO - 09.pdf · uploaded 7 May 2024Source
- 77 Building Plan Approval / NA Order for plotted developmentPLAN NO - 10.pdf · uploaded 7 May 2024Source
- 78 Building Plan Approval / NA Order for plotted developmentPLAN NO - 11.pdf · uploaded 7 May 2024Source
- 79 Building Plan Approval / NA Order for plotted developmentPLAN NO - 12.pdf · uploaded 7 May 2024Source
- 80 Building Plan Approval / NA Order for plotted developmentPLAN NO - 13.pdf · uploaded 7 May 2024Source
- 81 Building Plan Approval / NA Order for plotted developmentPLAN NO - 14.pdf · uploaded 7 May 2024Source
- 82 Building Plan Approval / NA Order for plotted developmentPLAN NO - 14.pdf · uploaded 7 May 2024Source
- 83 Building Plan Approval / NA Order for plotted developmentPLAN NO - 15.pdf · uploaded 7 May 2024Source
- 84 Building Plan Approval / NA Order for plotted developmentPLAN NO - 16.pdf · uploaded 7 May 2024Source
- 85 Building Plan Approval / NA Order for plotted developmentPLAN NO - 17.pdf · uploaded 7 May 2024Source
- 86 Building Plan Approval / NA Order for plotted developmentPLAN NO - 18.pdf · uploaded 7 May 2024Source
- 87 Building Plan Approval / NA Order for plotted developmentPLAN NO - 19.pdf · uploaded 7 May 2024Source
- 88 Building Plan Approval / NA Order for plotted developmentPLAN NO - 20.pdf · uploaded 7 May 2024Source
- 89 Building Plan Approval / NA Order for plotted developmentPLAN NO - 21.pdf · uploaded 7 May 2024Source
- 90 Building Plan Approval / NA Order for plotted developmentPLAN NO - 22.pdf · uploaded 7 May 2024Source
- 91 Building Plan Approval / NA Order for plotted developmentPLAN NO - 23.pdf · uploaded 7 May 2024Source
- 92 Building Plan Approval / NA Order for plotted developmentPLAN NO - 24.pdf · uploaded 7 May 2024Source
- 93 Building Plan Approval / NA Order for plotted developmentPLAN NO - 24.pdf · uploaded 7 May 2024Source
- 94 Building Plan Approval / NA Order for plotted developmentPLAN NO - 25.pdf · uploaded 7 May 2024Source
- 95 Building Plan Approval / NA Order for plotted developmentPLAN NO - 26.pdf · uploaded 7 May 2024Source
- 96 Building Plan Approval / NA Order for plotted developmentPLAN NO - 27.pdf · uploaded 7 May 2024Source
- 97 Building Plan Approval / NA Order for plotted developmentPLAN NO - 28.pdf · uploaded 7 May 2024Source
- 98 Building Plan Approval / NA Order for plotted developmentPLAN NO - 28.pdf · uploaded 7 May 2024Source
- 99 Building Plan Approval / NA Order for plotted developmentPLAN NO - 28.pdf · uploaded 7 May 2024Source
- 100 Building Plan Approval / NA Order for plotted developmentPLAN NO - 29.pdf · uploaded 7 May 2024Source
- 101 Building Plan Approval / NA Order for plotted developmentPLAN NO - 30.pdf · uploaded 7 May 2024Source
- 102 Building Plan Approval / NA Order for plotted developmentPLAN NO - 31.pdf · uploaded 7 May 2024Source
- 4 Commencement Certificates / NA Order for plotted developmentCC - YASHADA WINDSONG - 2024.pdf · uploaded 7 May 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 YASHADA WINDSONG JUNE 2024.pdf · uploaded 31 Jul 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Yashada windsong form 2 june 2024_31072024162151.PDF · uploaded 31 Jul 2024Source
- 3 Disclosure of sold/ booked inventorywindsong june 2024.pdf · uploaded 31 Jul 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FPRM-3-YASHADA WINDSONG.pdf · uploaded 13 Aug 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Windsong Form 1 Sep 2024.PDF · uploaded 18 Oct 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Windsong Form 3 Sep 2024.PDF · uploaded 18 Oct 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Windsong Form 2 Sep 2024.PDF · uploaded 18 Oct 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)WINDSONG- FORM 2-MARCH 2024.PDF · uploaded 18 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryWINDSONG_001-Sept 2024-compressed.pdf · uploaded 18 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Windsong form 2A-march 2024.PDF · uploaded 18 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Windsong Form 5 Sep 2024_18102024143659.PDF · uploaded 18 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)WINDSONG FORM 1_DEC 2024.PDF · uploaded 16 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Yashada Windsong Form 3 Dec 2024.PDF · uploaded 16 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Yashada Windsong Form 3 Dec 2024.pdf · uploaded 16 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)WINDSONG_FORM 2_DEC 2024.PDF · uploaded 16 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)WINDSONG FORM 1_DEC 2024.PDF · uploaded 16 Jan 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Windsong Form 3 revised.pdf · uploaded 22 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Windsong- Form 1 - March 2025.PDF · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Windsong form 3_march 2025.PDF · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Windsong- Form 2 - March 2025.PDF · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryYashada windsong_19042025155741.PDF · uploaded 19 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Windsong- Form 2A - March 2025.PDF · uploaded 19 Apr 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Windsong form 3_march 2025 r1.PDF · uploaded 21 Apr 2025Source
- Form 1Windsong- Form 1 - March 2025.PDF · uploaded 23 Jun 2025Source
- Form 1Form 1 · uploaded 23 Jun 2025Source
- Form 1Windsong Form 1 Sep 2024.PDF · uploaded 23 Jun 2025Source
- Form 1FORM 1 YASHADA WINDSONG JUNE 2024.pdf · uploaded 23 Jun 2025Source
- Form 2Windsong- Form 2 - March 2025.PDF · uploaded 23 Jun 2025Source
- Form 2WINDSONG_FORM 2_DEC 2024.PDF · uploaded 23 Jun 2025Source
- Form 2Windsong Form 2 Sep 2024.PDF · uploaded 23 Jun 2025Source
- Form 2Yashada windsong form 2 june 2024_31072024162151.PDF · uploaded 23 Jun 2025Source
- Form 3Windsong form 3_march 2025 r1.PDF · uploaded 23 Jun 2025Source
- Form 3Yashada Windsong Form 3 Dec 2024.pdf · uploaded 23 Jun 2025Source
- Form 3Windsong Form 3 Sep 2024.PDF · uploaded 23 Jun 2025Source
- Form 3FPRM-3-YASHADA WINDSONG.pdf · uploaded 23 Jun 2025Source
- Disclosure of Sold and Booked InventoryYASHADA WINDSONG_001.pdf · uploaded 23 Jun 2025Source
- Disclosure of Sold and Booked InventoryWINDSONG DEC 2024.pdf · uploaded 23 Jun 2025Source
- Disclosure of Sold and Booked InventoryWINDSONG_001-Sept 2024-compressed.pdf · uploaded 23 Jun 2025Source
- Disclosure of Sold and Booked Inventorywindsong june 2024.pdf · uploaded 23 Jun 2025Source
- OthersWindsong- Form 2A - March 2025.PDF · uploaded 23 Jun 2025Source
- Withdrawal Update Form 1Windsong - Form 1_17072025131733.PDF · uploaded 19 Jul 2025Source
- Withdrawal Update Form 2Windsong Form 2 updated_19072025114418.PDF · uploaded 19 Jul 2025Source
- Withdrawal Update Form 3Windsong form 3_19072025112308.PDF · uploaded 19 Jul 2025Source
- Withdrawal Update Form 1Windsong Form1 Sept 2025.PDF · uploaded 17 Oct 2025Source
- Withdrawal Update Form 1Windsong Form1 Sept 2025.PDF · uploaded 17 Oct 2025Source
- Withdrawal Update Form 1Windsong Form1 Sept 2025.PDF · uploaded 17 Oct 2025Source
- Withdrawal Update Form 1Windsong Form1 Sept 2025.PDF · uploaded 17 Oct 2025Source
- Withdrawal Update Form 1Windsong Form1 Sept 2025.PDF · uploaded 17 Oct 2025Source
- Withdrawal Update Form 2Windsong Form2 Sept2025 scanned.PDF · uploaded 17 Oct 2025Source
- Withdrawal Update Form 2Windsong Form2 Sept2025 scanned.PDF · uploaded 17 Oct 2025Source
- Withdrawal Update Form 2Windsong Form2 Sept2025 scanned.PDF · uploaded 17 Oct 2025Source
- Withdrawal Update Form 2Windsong Form2 Sept2025 scanned.PDF · uploaded 17 Oct 2025Source
- Withdrawal Update Form 2Windsong Form2 Sept2025 scanned.PDF · uploaded 17 Oct 2025Source
- Withdrawal Update Form 3Windsong Form3 Sep 2025 scanned.PDF · uploaded 17 Oct 2025Source
- Withdrawal Update Form 3Windsong Form3 Sep 2025 scanned.PDF · uploaded 17 Oct 2025Source
- Withdrawal Update Form 3Windsong Form3 Sep 2025 scanned.PDF · uploaded 17 Oct 2025Source
- Withdrawal Update Form 3Windsong Form3 Sep 2025 scanned.PDF · uploaded 17 Oct 2025Source
- Withdrawal Update Form 3Windsong Form3 Sep 2025 scanned.PDF · uploaded 17 Oct 2025Source
- Form 5 (FY 2024-2025)Windsong Form 5 2024-2025.PDF · uploaded 3 Jan 2026Source
- Withdrawal Update Form 1Form-1-Windsong_DEC 2025.PDF · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2Form-2 Yashada Windsong_31-12-2025....PDF · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3Windsong Form 3 Dec 2025.pdf · uploaded 19 Jan 2026Source
- Form 1Form 1 dec 2024.pdf · uploaded 5 Feb 2026Source
- Form 1Windsong- Form 1 - March 2025.PDF · uploaded 5 Feb 2026Source
- Form 2WINDSONG_FORM 2_DEC 2024.PDF · uploaded 5 Feb 2026Source
- Form 2Windsong- Form 2 - March 2025.PDF · uploaded 5 Feb 2026Source
- Form 3Yashada Windsong Form 3 Dec 2024.pdf · uploaded 5 Feb 2026Source
- Form 3Windsong Form 3 revised.pdf · uploaded 5 Feb 2026Source
- Disclosure of Sold and Booked InventoryWINDSONG DEC 2024.pdf · uploaded 5 Feb 2026Source
- Disclosure of Sold and Booked InventoryYASHADA WINDSONG 1.pdf · uploaded 5 Feb 2026Source
- Form 2A (FY 2023-2024)Windsong Form 2A March 2025.PDF · uploaded 26 Mar 2026Source
- Form 2A (FY 2024-2025)Windsong Form 2A March 2025.PDF · uploaded 26 Mar 2026Source
- Form 2A (FY 2025-2026)Windsong - Form 2A_17042026151747.PDF · uploaded 18 Apr 2026Source
- Withdrawal Update Form 1Windsong - Form 1_17042026151628.PDF · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2Windsong - Form 2_17042026151706.PDF · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3Form 3 march 2026-Windsong_20042026124735.PDF · uploaded 20 Apr 2026Source
- Occupational CertificateFINAL COMPLITION CERTIFICATE - YASHADA WINDSONG - 2026.pdf · uploaded 4 Jul 2026Source
- Occupational CertificateForm 4.pdf · uploaded 4 Jul 2026Source
- Occupational CertificateCompletion Screen shot.pdf · uploaded 16 Jul 2026Source
- Withdrawal Update Form 1Form 1 - Windsong_18072026115644.PDF · uploaded 18 Jul 2026Source
- Withdrawal Update Form 2Form 2 - Windsong_18072026115048.PDF · uploaded 18 Jul 2026Source
- Withdrawal Update Form 3Form 3-Windsong_18072026114513_compressed (1).pdf · uploaded 18 Jul 2026Source
Technical
- DocumentPLAN NO - 02.pdf · uploaded 28 Feb 2023Source
- DocumentLAYOUT PLAN - 01.pdf · uploaded 28 Feb 2023Source
- DocumentPLAN NO - 03.pdf · uploaded 1 Mar 2023Source
- DocumentPLAN NO - 04.pdf · uploaded 1 Mar 2023Source
- DocumentPLAN NO - 05.pdf · uploaded 1 Mar 2023Source
- DocumentPLAN NO - 09.pdf · uploaded 1 Mar 2023Source
- DocumentPLAN NO - 08.pdf · uploaded 1 Mar 2023Source
- DocumentPLAN NO - 07.pdf · uploaded 1 Mar 2023Source
- DocumentPLAN NO - 06.pdf · uploaded 1 Mar 2023Source
- DocumentPLAN NO - 10.pdf · uploaded 1 Mar 2023Source
- DocumentPLAN NO - 12.pdf · uploaded 1 Mar 2023Source
- DocumentPLAN NO - 13.pdf · uploaded 1 Mar 2023Source
- DocumentPLAN NO - 14.pdf · uploaded 1 Mar 2023Source
- DocumentPLAN NO - 16.pdf · uploaded 1 Mar 2023Source
- DocumentPLAN NO - 17.pdf · uploaded 1 Mar 2023Source
- DocumentPLAN NO - 18.pdf · uploaded 1 Mar 2023Source
- DocumentPLAN NO - 18.pdf · uploaded 1 Mar 2023Source
- DocumentPLAN NO - 19.pdf · uploaded 1 Mar 2023Source
- DocumentPLANN O - 11.pdf · uploaded 1 Mar 2023Source
- DocumentLAYOUT PLAN NO - 01.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 02.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 03.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 04.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 05.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 06.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 07.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 08.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 09.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 10.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 11.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 12.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 13.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 14.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 15.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 16.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 17.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 18.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 19.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 20.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 20A.pdf · uploaded 8 Jun 2023Source
- DocumentPLAN NO - 21.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 22.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 23.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 24.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 25.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 26.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 28.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 27.pdf · uploaded 8 Dec 2023Source
- DocumentLAYOUT PLAN NO - 01.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 02 PARKING LAYOUT.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 03 A GF MZ.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 04 A 2 3.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 05.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 06.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 07.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 08 A SEC.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 09 B.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 10.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 11.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 12 B 3.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 13.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 14.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 15.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 16.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 17 B SEC.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 18 ELE.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 19 C.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 20.pdf · uploaded 8 Dec 2023Source
- DocumentPLAN NO - 21.pdf · uploaded 8 Dec 2023Source
- DocumentLAYOUT PLAN - 01.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 02.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 03.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 04.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 05.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 06.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 06.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 07.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 08.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 09.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 10.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 11.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 12.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 13.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 14.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 14.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 15.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 16.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 17.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 18.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 19.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 20.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 21.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 22.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 23.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 24.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 24.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 25.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 26.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 27.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 28.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 28.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 28.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 29.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 30.pdf · uploaded 7 May 2024Source
- DocumentPLAN NO - 31.pdf · uploaded 7 May 2024Source
- DocumentLAYOUT PLAN NO - 01.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 02.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 03.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 04.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 05 A BUILDING.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 06.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 07.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 08.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 09.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 10 B BUILDING.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 11.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 12.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 13.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 14.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 15.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 16.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 17.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 18.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 20.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 21.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 22 C BUILDING.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 23.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 24.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 25.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 26.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 27.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 28.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 29.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 30.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 31.pdf · uploaded 5 Feb 2026Source
- DocumentPLAN NO - 19.pdf · uploaded 5 Feb 2026Source
- OthersCC - YASHADA WINDSONG - 2025.pdf · uploaded 5 Feb 2026Source
- OthersFINAL COMPLITION CERTIFICATE - YASHADA WINDSONG - 2026.pdf · uploaded 5 Feb 2026Source
Technical (Architect)
Technical (Engineer)
- DocumentWindsong Form 2 Sep 2024.PDF · uploaded 18 Oct 2024Source
- DocumentWINDSONG- FORM 2-MARCH 2024.PDF · uploaded 18 Oct 2024Source
- DocumentWINDSONG_FORM 2_DEC 2024.PDF · uploaded 16 Jan 2025Source
- DocumentWINDSONG FORM 1_DEC 2024.PDF · uploaded 16 Jan 2025Source
- DocumentWindsong- Form 2 - March 2025.PDF · uploaded 19 Apr 2025Source
- DocumentForm 2 - Windsong_18072026115048.PDF · uploaded 18 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 104P, 105P RAVET
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 3BHK, Shop, 1BHK, 2BHK, 4BHK408 units in all
- Address
- 104p And 105p Ravet, S No 104p & 105p Near Sb Patil College, RavetPIN 412101
- Village
- Ravet, Haveli taluka
- Location
- 18.65396, 73.74494
- Designated bank account
- 171
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Boundaries
- North
- 105 P
- South
- 105-2
- East
- S No 104 And 108
- West
- Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking408 units
366 of 408 units booked (90%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building-A | 3BHK | 113.4 sq m · 1,221 sq ft | 1 | 1 |
| Building-A | 3BHK | 117.13 sq m · 1,261 sq ft | 12 | 11 |
| Building-A | 3BHK | 119.69 sq m · 1,288 sq ft | 11 | 10 |
| Building-A | 3BHK | 120.8 sq m · 1,300 sq ft | 1 | 1 |
| Building-A | 3BHK | 127.11 sq m · 1,368 sq ft | 11 | 11 |
| Building-A | 3BHK | 128.15 sq m · 1,379 sq ft | 12 | 12 |
| Building-A | Shop | 26.17 sq m · 282 sq ft | 1 | 1 |
| Building-A | Shop | 28.51 sq m · 307 sq ft | 1 | 1 |
Show all 113 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building-A | Shop | 30.4 sq m · 327 sq ft | 1 | 0 |
| Building-A | Shop | 30.62 sq m · 330 sq ft | 1 | 1 |
| Building-A | Shop | 34.25 sq m · 369 sq ft | 1 | 0 |
| Building-A | Shop | 37.02 sq m · 398 sq ft | 1 | 1 |
| Building-A | Shop | 37.93 sq m · 408 sq ft | 1 | 1 |
| Building-A | Shop | 41.52 sq m · 447 sq ft | 1 | 1 |
| Building-A | Shop | 45.23 sq m · 487 sq ft | 1 | 1 |
| Building-A | Shop | 47.87 sq m · 515 sq ft | 1 | 1 |
| Building-A | Shop | 48.38 sq m · 521 sq ft | 1 | 1 |
| Building-A | Shop | 54.27 sq m · 584 sq ft | 1 | 1 |
| Building-A | Shop | 58.73 sq m · 632 sq ft | 1 | 1 |
| Building-A | Shop | 60.12 sq m · 647 sq ft | 1 | 1 |
| Building-B | 1BHK | 46.97 sq m · 506 sq ft | 1 | 0 |
| Building-B | 1BHK | 49.58 sq m · 534 sq ft | 1 | 1 |
| Building-B | 1BHK | 49.78 sq m · 536 sq ft | 1 | 0 |
| Building-B | 2BHK | 66.44 sq m · 715 sq ft | 1 | 0 |
| Building-B | 2BHK | 68.6 sq m · 738 sq ft | 1 | 0 |
| Building-B | 2BHK | 74.95 sq m · 807 sq ft | 1 | 0 |
| Building-B | 2BHK | 74.95 sq m · 807 sq ft | 12 | 10 |
| Building-B | 2BHK | 75.48 sq m · 812 sq ft | 1 | 0 |
| Building-B | 2BHK | 75.48 sq m · 812 sq ft | 12 | 10 |
| Building-B | 2BHK | 75.84 sq m · 816 sq ft | 1 | 1 |
| Building-B | 2BHK | 76.23 sq m · 821 sq ft | 10 | 9 |
| Building-B | 2BHK | 77.23 sq m · 831 sq ft | 1 | 1 |
| Building-B | 2BHK | 79.5 sq m · 856 sq ft | 1 | 0 |
| Building-B | 2BHK | 79.5 sq m · 856 sq ft | 2 | 2 |
| Building-B | 2BHK | 79.68 sq m · 858 sq ft | 22 | 21 |
| Building-B | 2BHK | 79.68 sq m · 858 sq ft | 1 | 0 |
| Building-B | 2BHK | 79.72 sq m · 858 sq ft | 12 | 11 |
| Building-B | 2BHK | 79.72 sq m · 858 sq ft | 1 | 0 |
| Building-B | 2BHK | 79.73 sq m · 858 sq ft | 22 | 20 |
| Building-B | 2BHK | 79.73 sq m · 858 sq ft | 1 | 0 |
| Building-B | 2BHK | 80.05 sq m · 862 sq ft | 1 | 1 |
| Building-B | 2BHK | 80.12 sq m · 862 sq ft | 10 | 10 |
| Building-B | 2BHK | 80.69 sq m · 869 sq ft | 1 | 1 |
| Building-B | 2BHK | 80.73 sq m · 869 sq ft | 1 | 1 |
| Building-B | 2BHK | 81.12 sq m · 873 sq ft | 1 | 1 |
| Building-B | 2BHK | 85.37 sq m · 919 sq ft | 1 | 0 |
| Building-B | 3BHK | 83.87 sq m · 903 sq ft | 2 | 2 |
| Building-B | 3BHK | 83.98 sq m · 904 sq ft | 2 | 2 |
| Building-B | 3BHK | 99.67 sq m · 1,073 sq ft | 1 | 1 |
| Building-B | 3BHK | 100.95 sq m · 1,087 sq ft | 12 | 11 |
| Building-B | 3BHK | 101.01 sq m · 1,087 sq ft | 9 | 8 |
| Building-B | 3BHK | 101.12 sq m · 1,088 sq ft | 1 | 1 |
| Building-B | 3BHK | 101.46 sq m · 1,092 sq ft | 8 | 8 |
| Building-B | 3BHK | 102.46 sq m · 1,103 sq ft | 1 | 1 |
| Building-B | Shop | 24.25 sq m · 261 sq ft | 1 | 1 |
| Building-B | Shop | 27.29 sq m · 294 sq ft | 1 | 1 |
| Building-B | Shop | 27.38 sq m · 295 sq ft | 4 | 4 |
| Building-B | Shop | 27.95 sq m · 301 sq ft | 6 | 6 |
| Building-B | Shop | 28.4 sq m · 306 sq ft | 1 | 1 |
| Building-B | Shop | 30.73 sq m · 331 sq ft | 1 | 1 |
| Building-B | Shop | 31.51 sq m · 339 sq ft | 1 | 1 |
| Building-B | Shop | 32.1 sq m · 346 sq ft | 3 | 3 |
| Building-B | Shop | 32.55 sq m · 350 sq ft | 1 | 1 |
| Building-B | Shop | 38.67 sq m · 416 sq ft | 1 | 1 |
| Building-B | Shop | 43.23 sq m · 465 sq ft | 1 | 1 |
| Building-B | Shop | 43.38 sq m · 467 sq ft | 4 | 4 |
| Building-B | Shop | 44.22 sq m · 476 sq ft | 5 | 5 |
| Building-B | Shop | 44.69 sq m · 481 sq ft | 1 | 1 |
| Building-B | Shop | 44.88 sq m · 483 sq ft | 1 | 1 |
| Building-B | Shop | 48.69 sq m · 524 sq ft | 1 | 1 |
| Building-B | Shop | 49.63 sq m · 534 sq ft | 1 | 1 |
| Building-B | Shop | 50.58 sq m · 544 sq ft | 3 | 3 |
| Building-B | Shop | 51.57 sq m · 555 sq ft | 1 | 1 |
| Building-C | 1BHK | 35.8 sq m · 385 sq ft | 2 | 0 |
| Building-C | 1BHK | 47 sq m · 506 sq ft | 1 | 0 |
| Building-C | 1BHK | 49.54 sq m · 533 sq ft | 1 | 0 |
| Building-C | 1BHK | 49.88 sq m · 537 sq ft | 2 | 0 |
| Building-C | 1BHK | 50 sq m · 538 sq ft | 1 | 0 |
| Building-C | 2BHK | 71.36 sq m · 768 sq ft | 36 | 32 |
| Building-C | 2BHK | 71.99 sq m · 775 sq ft | 1 | 1 |
| Building-C | 2BHK | 72.07 sq m · 776 sq ft | 10 | 10 |
| Building-C | 2BHK | 78.19 sq m · 842 sq ft | 1 | 1 |
| Building-C | 2BHK | 79.65 sq m · 857 sq ft | 11 | 11 |
| Building-C | 2BHK | 79.97 sq m · 861 sq ft | 1 | 1 |
| Building-C | 2BHK | 80.18 sq m · 863 sq ft | 10 | 10 |
| Building-C | 2BHK | 81.49 sq m · 877 sq ft | 1 | 1 |
| Building-C | 2BHK | 84.12 sq m · 905 sq ft | 2 | 2 |
| Building-C | 2BHK | 86.46 sq m · 931 sq ft | 2 | 2 |
| Building-C | 3BHK | 101.14 sq m · 1,089 sq ft | 1 | 1 |
| Building-C | 3BHK | 101.49 sq m · 1,092 sq ft | 8 | 8 |
| Building-C | 3BHK | 102.64 sq m · 1,105 sq ft | 1 | 1 |
| Building-C | 3BHK | 103.48 sq m · 1,114 sq ft | 10 | 10 |
| Building-C | 4BHK | 166.35 sq m · 1,791 sq ft | 12 | 12 |
| Building-C | Shop | 24 sq m · 258 sq ft | 2 | 2 |
| Building-C | Shop | 26.8 sq m · 288 sq ft | 2 | 2 |
| Building-C | Shop | 27.29 sq m · 294 sq ft | 4 | 4 |
| Building-C | Shop | 27.95 sq m · 301 sq ft | 1 | 1 |
| Building-C | Shop | 28.18 sq m · 303 sq ft | 4 | 3 |
| Building-C | Shop | 28.45 sq m · 306 sq ft | 1 | 1 |
| Building-C | Shop | 29.2 sq m · 314 sq ft | 1 | 0 |
| Building-C | Shop | 31.51 sq m · 339 sq ft | 1 | 1 |
| Building-C | Shop | 31.8 sq m · 342 sq ft | 2 | 2 |
| Building-C | Shop | 36.18 sq m · 389 sq ft | 1 | 1 |
| Building-C | Shop | 38.25 sq m · 412 sq ft | 2 | 2 |
| Building-C | Shop | 42.6 sq m · 459 sq ft | 2 | 1 |
| Building-C | Shop | 43.19 sq m · 465 sq ft | 4 | 4 |
| Building-C | Shop | 44.22 sq m · 476 sq ft | 1 | 1 |
| Building-C | Shop | 44.78 sq m · 482 sq ft | 4 | 3 |
| Building-C | Shop | 45.08 sq m · 485 sq ft | 1 | 1 |
| Building-C | Shop | 46.55 sq m · 501 sq ft | 1 | 0 |
| Building-C | Shop | 49.95 sq m · 538 sq ft | 1 | 1 |
| Building-C | Shop | 50.4 sq m · 543 sq ft | 2 | 2 |
| Building-C | Shop | 57.78 sq m · 622 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Vilas Jagganath Yele | — |
| Chartered accountant | Ms B A Company | — |
| Chartered accountant | Shalini Baheti | — |
| Engineer | Hiralal Bhaskar Sonawane | — |
| Registered real estate agent | Prakash Ramchandra Bhagat | — |
Source: MahaRERA project page. Contact details are not shown.