Completion was pushed back 4 months, to Jul 2027; no MahaRERA orders on record; 78% of its units are booked.

Ravet, Pune 412101 · Property rates in Ravet · by Bhoomi Infra

DeliveryExtended 4 moPromised Mar 2027 · now due Jul 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales78% booked14 of 18 units · as the promoter reported to MahaRERAPrice₹8,180 /sq ft1.4% below Ravet · 28 registered sales

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Jul 2027

  • This projectRegistered 12 Feb 2018, completion promised 31 Mar 2027, revised to 31 Jul 2027.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

All 31 deeds →
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Jun 2026Not on recordPrimary sale584 sq ftView Primary sale, Jun 2026
Apr 2026Not on recordPrimary sale399 sq ftView Primary sale, Apr 2026
Apr 2026Not on recordPrimary sale584 sq ftView Primary sale, Apr 2026
Jun 2024Skylar · 103Primary sale440 sq ftView Primary sale, Jun 2024
Jun 2024Skylar · 101Primary sale—View Primary sale, Jun 2024
Jun 2024Skylar · 105Mortgage—View Mortgage, Jun 2024
May 2024Skylar · 506Primary sale526 sq ftView Primary sale, May 2024
May 2024Skylar · 202Primary sale449 sq ftView Primary sale, May 2024
May 2024Skylar · 505Primary sale479 sq ftView Primary sale, May 2024
May 2024Skylar · 402Primary sale449 sq ftView Primary sale, May 2024

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100015279
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210001527912 Feb 201831 Mar 202731 Jul 2027Bhoomi InfraProject page
Documents334

2 documents held by Deedo, 332 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardPan Card.pdf · uploaded 7 Jan 2018Source

Legal

  • Legal Title reportSearch Report Bhoomi Infra (2).pdf · uploaded 7 Jan 2018Source
  • Declaration Form BFORM B PRAMOTER.pdf · uploaded 7 Jan 2018Source
  • Declaration Form BTSR SKYLAR_compressed.pdf · uploaded 16 Jul 2026Source
  • Declaration Form BSkylar 7 12 (1).pdf · uploaded 17 Jul 2026Source
  • Declaration Form Bsale deedSKYLAR_compressed.pdf · uploaded 17 Jul 2026Source
Show all 334 documentsShow fewer documents

Migrated

  • 1 PAN CardPan Card.pdf · uploaded 7 Jan 2018Source
  • 1 Copy of the legal title reportSearch Report Bhoomi Infra (2).pdf · uploaded 7 Jan 2018Source
  • 1 Details of encumbrancesEncumbarance.pdf · uploaded 7 Jan 2018Source
  • 1 Copy of Layout Approval (in case of layout)PLAN AND LAYOUT.pdf · uploaded 7 Jan 2018Source
  • 1 Building Plan Approval (IOD)PLAN AND LAYOUT.pdf · uploaded 7 Jan 2018Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 7 Jan 2018Source
  • 1 Declaration in FORM BFORM B PRAMOTER.pdf · uploaded 7 Jan 2018Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 7 Jan 2018Source
  • 1 Certificates of CA (Form 3)Form 3.pdf · uploaded 23 Jan 2018Source
  • 1 Proforma of Allotment letterBHOOMI INFRA.pdf · uploaded 23 Jan 2018Source
  • 2 Certificates of CA (Form 3)Form 3 march resize.pdf · uploaded 11 Jun 2018Source
  • 1 Certificates of CA (Form 5)bhoomi infra (1).pdf · uploaded 30 Sep 2018Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)22 Bhoomi Infra.pdf · uploaded 30 Dec 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)MS BHOOMI INFRA.pdf · uploaded 15 Mar 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Audit Report Bhoomi Infra_compressed.pdf · uploaded 25 Mar 2022Source
  • 1 Declaration about Commencement CertificateDeclaration- D.pdf · uploaded 25 Nov 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 - 2021-22.pdf · uploaded 28 Nov 2022Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect.pdf · uploaded 5 Dec 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)certi.pdf · uploaded 12 Dec 2022Source
  • 1 Disclosure of sold/ booked inventoryInventory 1.pdf · uploaded 12 Dec 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality 19-20.pdf · uploaded 20 Dec 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quality 20-21.pdf · uploaded 20 Dec 2022Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality 21-22.pdf · uploaded 20 Dec 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200255336632_For_Asset_Based_Search_20_12_2022_15_27_45_223.pdf · uploaded 20 Dec 2022Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Certificate 2019-2020.pdf · uploaded 1 Mar 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quality Certificate 2020-2021.pdf · uploaded 1 Mar 2023Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Certificate 2021-2022.pdf · uploaded 1 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)bhoomi infra.pdf · uploaded 24 Feb 2024Source
  • 2 Certificates of CA (Form 3)2 30 09 2018.pdf · uploaded 26 Apr 2025Source
  • 1 Certificates of CA (Form 3)1 30 6 18.pdf · uploaded 26 Apr 2025Source
  • 24 Certificates of CA (Form 3)24 31 3 24.pdf · uploaded 26 Apr 2025Source
  • 23 Certificates of CA (Form 3)23 31 12 23.pdf · uploaded 26 Apr 2025Source
  • 22 Certificates of CA (Form 3)22 30 9 23.pdf · uploaded 26 Apr 2025Source
  • 21 Certificates of CA (Form 3)21 30 6 23.pdf · uploaded 26 Apr 2025Source
  • 20 Certificates of CA (Form 3)20 31 3 23.pdf · uploaded 26 Apr 2025Source
  • 19 Certificates of CA (Form 3)19.pdf · uploaded 26 Apr 2025Source
  • 18 Certificates of CA (Form 3)18.pdf · uploaded 26 Apr 2025Source
  • 17 Certificates of CA (Form 3)17 30 6 22.pdf · uploaded 26 Apr 2025Source
  • 16 Certificates of CA (Form 3)16 Mar 22.pdf · uploaded 26 Apr 2025Source
  • 15 Certificates of CA (Form 3)15 31 12 2021.pdf · uploaded 26 Apr 2025Source
  • 14 Certificates of CA (Form 3)14 30 09 2021.pdf · uploaded 26 Apr 2025Source
  • 12 Certificates of CA (Form 3)12 31 03 2021.pdf · uploaded 26 Apr 2025Source
  • 13 Certificates of CA (Form 3)13 30 06 2021.pdf · uploaded 26 Apr 2025Source
  • 3 Certificates of CA (Form 3)3 Dec 18.pdf · uploaded 26 Apr 2025Source
  • 4 Certificates of CA (Form 3)4 31 03 2019.pdf · uploaded 26 Apr 2025Source
  • 5 Certificates of CA (Form 3)5 30 6 19.pdf · uploaded 26 Apr 2025Source
  • 6 Certificates of CA (Form 3)6 30 09 2019.pdf · uploaded 26 Apr 2025Source
  • 7 Certificates of CA (Form 3)7 31 12 2019.pdf · uploaded 26 Apr 2025Source
  • 8 Certificates of CA (Form 3)8 31 03 2020.pdf · uploaded 26 Apr 2025Source
  • 9 Certificates of CA (Form 3)9 30 06 2020.pdf · uploaded 26 Apr 2025Source
  • 10 Certificates of CA (Form 3)10 30 09 2020.pdf · uploaded 26 Apr 2025Source
  • 11 Certificates of CA (Form 3)11 31 12 2020.pdf · uploaded 26 Apr 2025Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)14 05 04 21.pdf · uploaded 26 Apr 2025Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)15 05 07 21.pdf · uploaded 26 Apr 2025Source
  • 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)16 Form 2 Sep 21.pdf · uploaded 26 Apr 2025Source
  • 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)17 31 12 21.pdf · uploaded 26 Apr 2025Source
  • 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)18 31 03 2022.pdf · uploaded 26 Apr 2025Source
  • 19 Engineer’s Certificate on Cost Incurred on Project (Form 2)19 30 06 22.pdf · uploaded 26 Apr 2025Source
  • 20 Engineer’s Certificate on Cost Incurred on Project (Form 2)20 30 09 22.pdf · uploaded 26 Apr 2025Source
  • 21 Engineer’s Certificate on Cost Incurred on Project (Form 2)21 31 12 2022.pdf · uploaded 26 Apr 2025Source
  • 22 Engineer’s Certificate on Cost Incurred on Project (Form 2)22 31 03 23.pdf · uploaded 26 Apr 2025Source
  • 23 Engineer’s Certificate on Cost Incurred on Project (Form 2)23 30 06 2023.pdf · uploaded 26 Apr 2025Source
  • 24 Engineer’s Certificate on Cost Incurred on Project (Form 2)24 30 09 23.pdf · uploaded 26 Apr 2025Source
  • 25 Engineer’s Certificate on Cost Incurred on Project (Form 2)25 31 12 23.pdf · uploaded 26 Apr 2025Source
  • 26 Engineer’s Certificate on Cost Incurred on Project (Form 2)26 31 03 24.pdf · uploaded 26 Apr 2025Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)13 Form 2 Dec 20.pdf · uploaded 26 Apr 2025Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)12 5 10 2020.pdf · uploaded 26 Apr 2025Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)11 05 07 20.pdf · uploaded 26 Apr 2025Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)10 05 04 20.pdf · uploaded 26 Apr 2025Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)9 5 01 2020.pdf · uploaded 26 Apr 2025Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 5 10 2019.pdf · uploaded 26 Apr 2025Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 5 07 2019.pdf · uploaded 26 Apr 2025Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 05 04 19.pdf · uploaded 26 Apr 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)5 5 01 2019.pdf · uploaded 26 Apr 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 5 10 2018.pdf · uploaded 26 Apr 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 5 07 2018.pdf · uploaded 26 Apr 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 5 03 2018.pdf · uploaded 26 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 5 02 18.pdf · uploaded 26 Apr 2025Source
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)14 Q2-21-22.pdf · uploaded 13 May 2025Source
  • 28 Certificates of Architect (Form 1)(Mandatory for only ongoing project)27 Q3-24-25.pdf · uploaded 13 May 2025Source
  • 27 Certificates of Architect (Form 1)(Mandatory for only ongoing project)26 Q2-24-25.pdf · uploaded 13 May 2025Source
  • 26 Certificates of Architect (Form 1)(Mandatory for only ongoing project)25 Q1-24-25.pdf · uploaded 13 May 2025Source
  • 25 Certificates of Architect (Form 1)(Mandatory for only ongoing project)24 Q4-23-24.pdf · uploaded 13 May 2025Source
  • 24 Certificates of Architect (Form 1)(Mandatory for only ongoing project)23 Q3-23-24.pdf · uploaded 13 May 2025Source
  • 23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)22 Q2-23-24.pdf · uploaded 13 May 2025Source
  • 22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)21 Q1-23-24.pdf · uploaded 13 May 2025Source
  • 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)20 Q4-22-23.pdf · uploaded 13 May 2025Source
  • 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)19 Q3-22-23.pdf · uploaded 13 May 2025Source
  • 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)18 Q2-22-23.pdf · uploaded 13 May 2025Source
  • 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)17 Q1-22-23.pdf · uploaded 13 May 2025Source
  • 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)16 Q4-21-22.pdf · uploaded 13 May 2025Source
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)15 Q3-21-22.pdf · uploaded 13 May 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)0 (Q4-17-18).pdf · uploaded 13 May 2025Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)13 (Q1-21-22).pdf · uploaded 13 May 2025Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)12 (Q4-20-21).pdf · uploaded 13 May 2025Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)11 (Q3-20-21).pdf · uploaded 13 May 2025Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)10 (Q2-20-21).pdf · uploaded 13 May 2025Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)9 (Q1-20-21).pdf · uploaded 13 May 2025Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)8 (Q4-19-20).pdf · uploaded 13 May 2025Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)7 (Q3-19-20).pdf · uploaded 13 May 2025Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)6 (Q2-19-20).pdf · uploaded 13 May 2025Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)5 (Q1-19-20).pdf · uploaded 13 May 2025Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)4 (Q4-18-19).pdf · uploaded 13 May 2025Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)3 (Q 3-18-19).pdf · uploaded 13 May 2025Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2 (Q2-18-19).pdf · uploaded 13 May 2025Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)1 (Q1-18-19).pdf · uploaded 13 May 2025Source
  • Form 10 (Q4-17-18).pdf · uploaded 16 Oct 2025Source
  • Form 11 (Q1-18-19).pdf · uploaded 16 Oct 2025Source
  • Form 12 (Q2-18-19).pdf · uploaded 16 Oct 2025Source
  • Form 13 (Q 3-18-19).pdf · uploaded 16 Oct 2025Source
  • Form 15 (Q1-19-20).pdf · uploaded 16 Oct 2025Source
  • Form 16 (Q2-19-20).pdf · uploaded 16 Oct 2025Source
  • Form 17 (Q3-19-20).pdf · uploaded 16 Oct 2025Source
  • Form 18 (Q4-19-20).pdf · uploaded 16 Oct 2025Source
  • Form 19 (Q1-20-21).pdf · uploaded 16 Oct 2025Source
  • Form 110 (Q2-20-21).pdf · uploaded 16 Oct 2025Source
  • Form 111 (Q3-20-21).pdf · uploaded 16 Oct 2025Source
  • Form 112 (Q4-20-21).pdf · uploaded 16 Oct 2025Source
  • Form 113 (Q1-21-22).pdf · uploaded 16 Oct 2025Source
  • Form 114 Q2-21-22.pdf · uploaded 16 Oct 2025Source
  • Form 116 Q4-21-22.pdf · uploaded 16 Oct 2025Source
  • Form 117 Q1-22-23.pdf · uploaded 16 Oct 2025Source
  • Form 118 Q2-22-23.pdf · uploaded 16 Oct 2025Source
  • Form 119 Q3-22-23.pdf · uploaded 16 Oct 2025Source
  • Form 14 (Q4-18-19).pdf · uploaded 16 Oct 2025Source
  • Form 22 Mar 18.pdf · uploaded 16 Oct 2025Source
  • Form 23 Jun 18.pdf · uploaded 16 Oct 2025Source
  • Form 24 Sep 18.pdf · uploaded 16 Oct 2025Source
  • Form 25 Dec 18.pdf · uploaded 16 Oct 2025Source
  • Form 27 Jun 19.pdf · uploaded 16 Oct 2025Source
  • Form 28 Sep 19.pdf · uploaded 16 Oct 2025Source
  • Form 29 Dec 19.pdf · uploaded 16 Oct 2025Source
  • Form 210 Mar 20.pdf · uploaded 16 Oct 2025Source
  • Form 211 Jun 20.pdf · uploaded 16 Oct 2025Source
  • Form 212 Sep 20.pdf · uploaded 16 Oct 2025Source
  • Form 213 Dec 20.pdf · uploaded 16 Oct 2025Source
  • Form 214 Mar 21.pdf · uploaded 16 Oct 2025Source
  • Form 215 Jun 21.pdf · uploaded 16 Oct 2025Source
  • Form 216 Sep 21.pdf · uploaded 16 Oct 2025Source
  • Form 218 Mar 22.pdf · uploaded 16 Oct 2025Source
  • Form 219 Jun 22.pdf · uploaded 16 Oct 2025Source
  • Form 220 Sep 22.pdf · uploaded 16 Oct 2025Source
  • Form 221 Dec 22.pdf · uploaded 16 Oct 2025Source
  • Form 26 Mar 19.pdf · uploaded 16 Oct 2025Source
  • Form 3Mar-18.pdf · uploaded 16 Oct 2025Source
  • Form 31 Jun 18.pdf · uploaded 16 Oct 2025Source
  • Form 32 Sep 18.pdf · uploaded 16 Oct 2025Source
  • Form 33 Dec 18.pdf · uploaded 16 Oct 2025Source
  • Form 35 Jun 19.pdf · uploaded 16 Oct 2025Source
  • Form 36 Sep 19.pdf · uploaded 16 Oct 2025Source
  • Form 37 Dec 19.pdf · uploaded 16 Oct 2025Source
  • Form 38 Mar 20.pdf · uploaded 16 Oct 2025Source
  • Form 39 Jun 20.pdf · uploaded 16 Oct 2025Source
  • Form 310 Sep 20.pdf · uploaded 16 Oct 2025Source
  • Form 311 Dec 20.pdf · uploaded 16 Oct 2025Source
  • Form 312 Mar 21.pdf · uploaded 16 Oct 2025Source
  • Form 313 Jun 21.pdf · uploaded 16 Oct 2025Source
  • Form 314 Sep 21.pdf · uploaded 16 Oct 2025Source
  • Form 316 Mar 22.pdf · uploaded 16 Oct 2025Source
  • Form 317 Jun 22.pdf · uploaded 16 Oct 2025Source
  • Form 318 Sep 22.pdf · uploaded 16 Oct 2025Source
  • Form 319 Dec 22.pdf · uploaded 16 Oct 2025Source
  • Form 34 Mar 19.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked Inventory01 Mar 18.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked Inventory02 Jun 18.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked Inventory03 Sep 18.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked Inventory04 Dec 18.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked InventoryDS6_30-6-2019.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked InventoryDS7_30-9-2019.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked Inventory05 Dec 19.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked InventoryDS8_31-3-2020.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked InventoryDS9_30-6-2020.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked InventoryDS10_30-9-2020.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked InventoryDS11_31-12-2020.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked InventoryDS12_31-3-2021.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked InventoryDS13_30-6-2021.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked InventoryDS14_30-9-2021.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked InventoryDS16_31-3-2022.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked InventoryDS17_30-6-2022.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked InventoryDS18_30-9-2022.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked InventoryDS19_31-12-2022.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked InventorySold Disclosure March-2019.pdf · uploaded 16 Oct 2025Source
  • Form 120 Q4-22-23 mar 23.pdf · uploaded 23 Feb 2026Source
  • Form 121 Q1-23-24 jun 23.pdf · uploaded 23 Feb 2026Source
  • Form 122 Q2-23-24 sep 23.pdf · uploaded 23 Feb 2026Source
  • Form 123 Q3-23-24 dec 23.pdf · uploaded 23 Feb 2026Source
  • Form 124 Q4-23-24 mar 24.pdf · uploaded 23 Feb 2026Source
  • Form 125 Q1-24-25 jun 24.pdf · uploaded 23 Feb 2026Source
  • Form 126 Q2-24-25 sep 24.pdf · uploaded 23 Feb 2026Source
  • Form 127 Q3-24-25 dec 24.pdf · uploaded 23 Feb 2026Source
  • Form 128 Q4 -24-25.pdf · uploaded 23 Feb 2026Source
  • Form 222_31-03-2023 mar 23.pdf · uploaded 23 Feb 2026Source
  • Form 223_30-06-2023 jun 23.pdf · uploaded 23 Feb 2026Source
  • Form 224_30-09-2023 sep 23.pdf · uploaded 23 Feb 2026Source
  • Form 225 Dec 23.pdf · uploaded 23 Feb 2026Source
  • Form 226_31-03-2024 mar 24.pdf · uploaded 23 Feb 2026Source
  • Form 227_Form2-June2024.pdf · uploaded 23 Feb 2026Source
  • Form 228_Form2-Sept2024.pdf · uploaded 23 Feb 2026Source
  • Form 229_Form2-Dec2024.pdf · uploaded 23 Feb 2026Source
  • Form 230_From2-March2025.pdf · uploaded 23 Feb 2026Source
  • Form 320 Mar 23.pdf · uploaded 23 Feb 2026Source
  • Form 321 Jun 23.pdf · uploaded 23 Feb 2026Source
  • Form 322 Sep 23.pdf · uploaded 23 Feb 2026Source
  • Form 323 Dec 23.pdf · uploaded 23 Feb 2026Source
  • Form 324 Mar 24.pdf · uploaded 23 Feb 2026Source
  • Form 325 Jun 24.pdf · uploaded 23 Feb 2026Source
  • Form 326 Sept 24.pdf · uploaded 23 Feb 2026Source
  • Form 327 Dec 24.pdf · uploaded 23 Feb 2026Source
  • Form 328 Mar 25.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryDS20_31-3-2023 mar 23.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryDS21_30-6-2023 jun 23.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryDS22_30-9-2023 sep 23.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryDS23_31-12-2023 dec 23.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryDS24_31-3-2024 mar 24.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryDS25_30-6-2024 jun 24.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryDS26_30-9-2024 sep 24.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked InventoryDS27_31-12-2024 dec 24.pdf · uploaded 23 Feb 2026Source
  • Disclosure of Sold and Booked Inventorymar 25.pdf · uploaded 23 Feb 2026Source
  • Withdrawal Update Form 1FORM 01 JUN 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 1FORM 01 JUN 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 1FORM 01 SEP 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 1FORM 01 SEP 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 1FORM 01 SEP 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 1FORM 01 DEC 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 1FORM 01 DEC 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 1FORM 01 DEC 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 2FORM 02 JUN 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 2FORM 02 JUN 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 2FORM 02 SEP 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 2FORM 02 SEP 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 2FORM 02 SEP 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 2FORM 02 DEC 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 2FORM 02 DEC 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 2FORM 02 DEC 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 3FORM 03 JUN 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 3FORM 03 JUN 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 3FORM 03 SEP 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 3FORM 03 SEP 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 3FORM 03 SEP 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 3FORM 03 DEC 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 3FORM 03 DEC 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 3FORM 03 DEC 25.pdf · uploaded 24 Feb 2026Source
  • Form 2A (FY 2017-2018)Form 2A FY17-18.pdf · uploaded 9 Mar 2026Source
  • Form 2A (FY 2018-2019)Form 2A FY18-19.pdf · uploaded 9 Mar 2026Source
  • Form 2A (FY 2019-2020)Form 2A FY19-20.pdf · uploaded 9 Mar 2026Source
  • Form 2A (FY 2020-2021)Form2A FY20-21.pdf · uploaded 9 Mar 2026Source
  • Form 2A (FY 2021-2022)Form2A FY21-22.pdf · uploaded 9 Mar 2026Source
  • Form 2A (FY 2022-2023)Form2A FY22-23.pdf · uploaded 9 Mar 2026Source
  • Form 2A (FY 2023-2024)Form2A FY23-24.pdf · uploaded 9 Mar 2026Source
  • Form 2A (FY 2024-2025)Form2A FY24-25.pdf · uploaded 9 Mar 2026Source
  • Form 5 (FY 2017-2018)Form 5 Skylar 2017 2018.pdf · uploaded 10 Mar 2026Source
  • Form 5 (FY 2018-2019)Form 5 Skylar 2018 2019.pdf · uploaded 10 Mar 2026Source
  • Form 5 (FY 2019-2020)Form 5 Skylar 2019 2020.pdf · uploaded 10 Mar 2026Source
  • Form 5 (FY 2020-2021)Form 5 Skylar 2020 2021.pdf · uploaded 10 Mar 2026Source
  • Form 5 (FY 2021-2022)Form 5 Skylar 2021 2022.pdf · uploaded 10 Mar 2026Source
  • Form 5 (FY 2022-2023)Form 5 Skylar 2022 2023.pdf · uploaded 10 Mar 2026Source
  • Form 5 (FY 2023-2024)Form 5 Skylar 2023 2024.pdf · uploaded 10 Mar 2026Source
  • Form 5 (FY 2024-2025)Form 5 Skylar 2024 2025.pdf · uploaded 10 Mar 2026Source
  • Withdrawal Update Form 1Form 1_Skylar_Bhoomi Infra_QPR 4 FY 25-26-1.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 234 Mar 26.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 332 Mar 26.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 1Form 1_QPR 1 Skylar_Bhoomi Infra_June 26.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2Form 2 Jun 26.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3form 3 skylar jun 26.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2025-2026)Skylar Form 5 FY 25-26 (1).pdf · uploaded 23 Sep 2026Source
  • Form 2A (FY 2025-2026)Form 2A 2025-26.pdf · uploaded 8 Oct 2026Source

Technical

  • DocumentPLAN AND LAYOUT.pdf · uploaded 7 Jan 2018Source
  • DocumentPLAN AND LAYOUT.pdf · uploaded 7 Jan 2018Source
  • DocumentLayout 01.pdf · uploaded 28 Feb 2026Source
  • DocumentPlan 02.pdf · uploaded 28 Feb 2026Source
  • DocumentPlan 03.pdf · uploaded 28 Feb 2026Source

Technical (Architect)

  • Document0 (Q4-17-18).pdf · uploaded 13 May 2025Source
  • Document1 (Q1-18-19).pdf · uploaded 13 May 2025Source
  • Document2 (Q2-18-19).pdf · uploaded 13 May 2025Source
  • Document3 (Q 3-18-19).pdf · uploaded 13 May 2025Source
  • Document4 (Q4-18-19).pdf · uploaded 13 May 2025Source
  • Document5 (Q1-19-20).pdf · uploaded 13 May 2025Source
  • Document6 (Q2-19-20).pdf · uploaded 13 May 2025Source
  • Document7 (Q3-19-20).pdf · uploaded 13 May 2025Source
  • Document8 (Q4-19-20).pdf · uploaded 13 May 2025Source
  • Document9 (Q1-20-21).pdf · uploaded 13 May 2025Source
  • Document10 (Q2-20-21).pdf · uploaded 13 May 2025Source
  • Document11 (Q3-20-21).pdf · uploaded 13 May 2025Source
  • Document12 (Q4-20-21).pdf · uploaded 13 May 2025Source
  • Document13 (Q1-21-22).pdf · uploaded 13 May 2025Source
  • Document14 Q2-21-22.pdf · uploaded 13 May 2025Source
  • Document15 Q3-21-22.pdf · uploaded 13 May 2025Source
  • Document16 Q4-21-22.pdf · uploaded 13 May 2025Source
  • Document17 Q1-22-23.pdf · uploaded 13 May 2025Source
  • Document18 Q2-22-23.pdf · uploaded 13 May 2025Source
  • Document19 Q3-22-23.pdf · uploaded 13 May 2025Source
  • Document20 Q4-22-23.pdf · uploaded 13 May 2025Source
  • Document21 Q1-23-24.pdf · uploaded 13 May 2025Source
  • Document22 Q2-23-24.pdf · uploaded 13 May 2025Source
  • Document23 Q3-23-24.pdf · uploaded 13 May 2025Source
  • Document24 Q4-23-24.pdf · uploaded 13 May 2025Source
  • Document25 Q1-24-25.pdf · uploaded 13 May 2025Source
  • Document26 Q2-24-25.pdf · uploaded 13 May 2025Source
  • Document27 Q3-24-25.pdf · uploaded 13 May 2025Source
  • DocumentForm 1_QPR 1 Skylar_Bhoomi Infra_June 26.pdf · uploaded 17 Jul 2026Source

Technical (Engineer)

  • Document2 5 03 2018.pdf · uploaded 26 Apr 2025Source
  • Document3 5 07 2018.pdf · uploaded 26 Apr 2025Source
  • Document4 5 10 2018.pdf · uploaded 26 Apr 2025Source
  • Document5 5 01 2019.pdf · uploaded 26 Apr 2025Source
  • Document6 05 04 19.pdf · uploaded 26 Apr 2025Source
  • Document7 5 07 2019.pdf · uploaded 26 Apr 2025Source
  • Document8 5 10 2019.pdf · uploaded 26 Apr 2025Source
  • Document9 5 01 2020.pdf · uploaded 26 Apr 2025Source
  • Document10 05 04 20.pdf · uploaded 26 Apr 2025Source
  • Document11 05 07 20.pdf · uploaded 26 Apr 2025Source
  • Document12 5 10 2020.pdf · uploaded 26 Apr 2025Source
  • Document13 Form 2 Dec 20.pdf · uploaded 26 Apr 2025Source
  • Document14 05 04 21.pdf · uploaded 26 Apr 2025Source
  • Document15 05 07 21.pdf · uploaded 26 Apr 2025Source
  • Document16 Form 2 Sep 21.pdf · uploaded 26 Apr 2025Source
  • Document17 31 12 21.pdf · uploaded 26 Apr 2025Source
  • Document18 31 03 2022.pdf · uploaded 26 Apr 2025Source
  • Document19 30 06 22.pdf · uploaded 26 Apr 2025Source
  • Document20 30 09 22.pdf · uploaded 26 Apr 2025Source
  • Document21 31 12 2022.pdf · uploaded 26 Apr 2025Source
  • Document22 31 03 23.pdf · uploaded 26 Apr 2025Source
  • Document23 30 06 2023.pdf · uploaded 26 Apr 2025Source
  • Document24 30 09 23.pdf · uploaded 26 Apr 2025Source
  • Document25 31 12 23.pdf · uploaded 26 Apr 2025Source
  • Document26 31 03 24.pdf · uploaded 26 Apr 2025Source
  • DocumentForm 2 Jun 26.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel SR NO 94

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1 BHK, 2 BHK18 units in all
Address
Sr No 94, Ravet Road, RavetPIN 412101
Village
Pimpri Chinchawad (M Corp.), Haveli taluka
Land area for this project
991 sq m (10,666 sq ft)
Permissible built-up area
1,743 sq m (18,757 sq ft)
Sanctioned built-up area
1,743 sq m (18,757 sq ft)
Designated bank account
171
Developed in phases
No

Survey, CTS, gat or plot numbers

SR NO 94

Land as published on MahaRERA's project page

SR NO 94

Boundaries

North
Road Plot No 13
South
Road
East
Plot No 7
West
Open Space

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking18 units

14 of 18 units booked (78%), as the promoter reported to MahaRERA

1 BHK · 10 units2 BHK · 8 units
TypeCarpet areaUnitsBooked
1 BHK43.87 sq m · 472 sq ft66
1 BHK45.32 sq m · 488 sq ft44
2 BHK60.48 sq m · 651 sq ft84

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectKaustubh Babar—
Chartered accountantPrachi S Agarwal—
EngineerPrafulla Sudhakar Badhe—
EngineerRahul Kapse—

Source: MahaRERA project page. Contact details are not shown.

Skylar in numbers

Registered deals, summarised

Deedo has 31 registered documents at Skylar, from Aug 2018 to Jun 2026: 28 sales, 3 mortgages. The median registered sale since Aug 2018 works out to about ₹8,200 per sq ft, at a median of ₹35 L a deal; 0% of sales were resales.

What is the price per sq ft at Skylar?
The median registered sale since Aug 2018 works out to about ₹8,200 per sq ft, at a median of ₹35 L a deal; 0% of sales were resales.
How many properties have been sold at Skylar?
28 sales are registered at Skylar.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Skylar by Deedo, last updated with deals registered in Jun 2026.

Latest deal · Primary sale · Jun 2026

₹25–50 L

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology