Others · 3 buildings · 107 unitsRERA P52100025777

Kk Marks

Deedo IDDP-PUN-4X54

MahaRERA shows it completed, after its date was pushed back 7 months; no MahaRERA orders on record; 89% of its units are booked.

Ravet, Pune 412101 · Property rates in Ravet · by K K Group Infra Realty

DeliveryCompletedCompletion / occupancy certificate on MahaRERA · after a 7 mo extensionRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales89% booked95 of 107 units · as the promoter reported to MahaRERAPrice₹8,580 /sq ft3.4% above Ravet · 97 registered sales

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed, after its date was pushed back 7 months

  • This projectRegistered 14 Jul 2020, completion promised 30 Nov 2023, revised to 30 Jun 2024.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

All 106 deeds →
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Jul 2026Wing AMortgage—View Mortgage, Jul 2026
Jun 2026Wing A · 804Mortgage—View Mortgage, Jun 2026
Apr 2026Wing A · 106Resale421 sq ftView Resale, Apr 2026
Apr 2026Wing A · 304Mortgage—View Mortgage, Apr 2026
May 2025Wing A · 703Mortgage—View Mortgage, May 2025
Apr 2024Wing A · 503Primary sale393 sq ftView Primary sale, Apr 2024
Apr 2024Wing A · 203Primary sale393 sq ftView Primary sale, Apr 2024
Apr 2024Wing A · 103Primary sale390 sq ftView Primary sale, Apr 2024
Dec 2023Wing A · 609Primary sale409 sq ftView Primary sale, Dec 2023
Nov 2023Wing A · 208Primary sale409 sq ftView Primary sale, Nov 2023

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100025777
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210002577714 Jul 202030 Nov 202330 Jun 2024K K Group Infra RealtyProject page
Documents98

3 documents held by Deedo, 95 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Other

  • OtherDate not statedView

Finance

  • PAN CardKKMarks_Pancard.pdf · uploaded 2 Jul 2020Source

Legal

  • OtherKK_Partnership_DEED (1) (1).pdf · uploaded 2 Jul 2020Source
  • Declaration Form BformB (1).pdf · uploaded 2 Jul 2020Source
  • Legal Title reportKKMarks_Title (1).pdf · uploaded 2 Jul 2020Source
  • Declaration Form BForm B.pdf · uploaded 27 Jun 2024Source
Show all 98 documentsShow fewer documents

Migrated

  • 1 PAN CardKKMarks_Pancard.pdf · uploaded 2 Jul 2020Source
  • 1 Copy of the legal title reportKKMarks_Title (1).pdf · uploaded 2 Jul 2020Source
  • 1 Details of encumbrancesKKMarks_NO_Incumbarance.pdf · uploaded 2 Jul 2020Source
  • 1 Copy of Layout Approval (in case of layout)output (2) (3).pdf · uploaded 2 Jul 2020Source
  • 1 Building Plan Approval / NA Order for plotted developmentKKMarks_IOD_And_CC (1).pdf · uploaded 2 Jul 2020Source
  • 1 Commencement Certificates / NA Order for plotted developmentKKMarks_IOD_And_CC (1).pdf · uploaded 2 Jul 2020Source
  • 1 Declaration in FORM BformB (1).pdf · uploaded 2 Jul 2020Source
  • 1 Proforma of Allotment letterAgreemenr_KK_Marks.pdf · uploaded 2 Jul 2020Source
  • 1 OtherKK_Partnership_DEED (1) (1).pdf · uploaded 2 Jul 2020Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Certificate_MahaRERA_Registration.pdf · uploaded 7 Jul 2020Source
  • 2 Details of encumbrancesKKRera.pdf · uploaded 21 Jun 2021Source
  • 2 Proforma of Allotment letterRERA - SHAH - RAVET - 2020.pdf · uploaded 21 Jun 2021Source
  • 1 Declaration about Commencement Certificatedownload (3).pdf · uploaded 29 Jul 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1_KK.pdf · uploaded 29 Jul 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2_KK.pdf · uploaded 29 Jul 2021Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3_KK .pdf · uploaded 29 Jul 2021Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FOR KK MARKS - 02 DATED 31-12-2020.pdf · uploaded 21 May 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FOR KK MARKS - 03 DATED 31-03-2021.pdf · uploaded 21 May 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FOR KK MARKS - 05 DATED 30-09-2021.pdf · uploaded 21 May 2022Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FOR KK MARKS - 06 DATED 31-12-2021.pdf · uploaded 21 May 2022Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FOR KK MARKS - 07 DATED 31-03-2022.pdf · uploaded 21 May 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Sep.pdf · uploaded 21 May 2022Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Mar.pdf · uploaded 21 May 2022Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A June.pdf · uploaded 21 May 2022Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Sep21.pdf · uploaded 21 May 2022Source
  • 2 Declaration about Commencement CertificateDeclaration.pdf · uploaded 30 May 2022Source
  • 5 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Dec 20.pdf · uploaded 30 May 2022Source
  • 6 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Dec 21.pdf · uploaded 30 May 2022Source
  • 7 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Mar 22.pdf · uploaded 30 May 2022Source
  • 1 Disclosure of sold/ booked inventorySold Inventory June 21.pdf · uploaded 30 May 2022Source
  • 2 Disclosure of sold/ booked inventorySold Invertory Sep 21.pdf · uploaded 30 May 2022Source
  • 3 Disclosure of sold/ booked inventorySold Invertory Dec 21.pdf · uploaded 30 May 2022Source
  • 4 Disclosure of sold/ booked inventorysold Inventory March 22.pdf · uploaded 30 May 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 -KK MARKS 2020-21_0001_220530_171422.pdf · uploaded 30 May 2022Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)F-1_Arct Cert_KK Marks_Jun 22.pdf · uploaded 1 Jul 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)F-1_Arct Cert_KK Marks_Sep 22.pdf · uploaded 1 Jul 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)F-1_Arct Cert_KK Marks_Dec 22.pdf · uploaded 1 Jul 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)F-1_Arct Cert_KK Marks_Mar 23.pdf · uploaded 1 Jul 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)F-2_Eng Cert_KK Marks_Jun 22.pdf · uploaded 1 Jul 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)F-2_Eng Cert_KK Marks_Sep 22.pdf · uploaded 1 Jul 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)F-2_Eng Cert_KK Marks_Dec 22.pdf · uploaded 1 Jul 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)F-2_Eng Cert_KK Marks_Mar 23.pdf · uploaded 1 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A_Eng CertKK Marks_Mar23.pdf · uploaded 1 Jul 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)F-3_CA Cert_KK Marks_Jun22.pdf · uploaded 1 Jul 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)F-3_CA Cert_KK Marks_Sep22.pdf · uploaded 1 Jul 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)F-3_CA Cert_KK Marks_Dec22.pdf · uploaded 1 Jul 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)F-3_CA Cert_KK Marks_Mar23.pdf · uploaded 1 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)F-5_Annual Report_KK Marks_Mar22.pdf · uploaded 1 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)F-5_Annual Report_KK Marks_Mar23.pdf · uploaded 1 Jul 2023Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCC.pdf · uploaded 22 May 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31-03-21.pdf · uploaded 26 Jun 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31-12-21.pdf · uploaded 26 Jun 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31-03-22.pdf · uploaded 26 Jun 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 30-06-22.pdf · uploaded 26 Jun 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 30-09-22.pdf · uploaded 26 Jun 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31-12-22.pdf · uploaded 26 Jun 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31-03-23.pdf · uploaded 26 Jun 2024Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 30-06-23.pdf · uploaded 26 Jun 2024Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 30-09-23.pdf · uploaded 26 Jun 2024Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31-12-23.pdf · uploaded 26 Jun 2024Source
  • 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31-03-24.pdf · uploaded 26 Jun 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA SIGNED FORM 3 (FY 20-24).pdf · uploaded 26 Jun 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA SIGNED FORM 3 (FY 21-22).pdf · uploaded 26 Jun 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final FORM 3 (FY 21-22 Q-4).pdf · uploaded 26 Jun 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final FORM 3 (FY 22-23 Q-1).pdf · uploaded 26 Jun 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final FORM 3 (FY 22-23 Q-2).pdf · uploaded 26 Jun 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final FORM 3 (FY 22-23 Q-3).pdf · uploaded 26 Jun 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final FORM 3 (FY 22-23 Q-4).pdf · uploaded 26 Jun 2024Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final FORM 3 (FY 23-24 Q-1).pdf · uploaded 26 Jun 2024Source
  • 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final FORM 3 (FY 23-24 Q-2).pdf · uploaded 26 Jun 2024Source
  • 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final FORM 3 (FY 23-24 Q-3).pdf · uploaded 26 Jun 2024Source
  • 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final FORM 3 (FY 23-24 Q-4).pdf · uploaded 26 Jun 2024Source
  • 2 Declaration in FORM BForm B.pdf · uploaded 27 Jun 2024Source
  • 5 Disclosure of sold/ booked inventorySOLD 31-03-22.pdf · uploaded 27 Jun 2024Source
  • 6 Disclosure of sold/ booked inventorySOLD 30-06-22.pdf · uploaded 27 Jun 2024Source
  • 7 Disclosure of sold/ booked inventorySOLD 30-09-22.pdf · uploaded 27 Jun 2024Source
  • 8 Disclosure of sold/ booked inventorySOLD 31-12-22.pdf · uploaded 27 Jun 2024Source
  • 9 Disclosure of sold/ booked inventorySOLD 31-03-23.pdf · uploaded 27 Jun 2024Source
  • 10 Disclosure of sold/ booked inventorySOLD 30-06-23.pdf · uploaded 27 Jun 2024Source
  • 11 Disclosure of sold/ booked inventorySOLD 30-09-23.pdf · uploaded 27 Jun 2024Source
  • 12 Disclosure of sold/ booked inventorySOLD 31-12-23.pdf · uploaded 27 Jun 2024Source
  • 13 Disclosure of sold/ booked inventorySOLD 31-03-24.pdf · uploaded 27 Jun 2024View
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Final Form 1 30-06-23.pdf · uploaded 28 Jun 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Final Form 1 30-09-23.pdf · uploaded 28 Jun 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Final Form 1 31-12-23.pdf · uploaded 28 Jun 2024Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Final Form 1 31-03-24.pdf · uploaded 28 Jun 2024Source

Technical

  • Documentoutput (2) (3).pdf · uploaded 2 Jul 2020Source
  • DocumentKKMarks_IOD_And_CC (1).pdf · uploaded 2 Jul 2020Source

Technical (Architect)

  • DocumentFinal Form 1 31-03-24.pdf · uploaded 28 Jun 2024Source

Technical (Engineer)

  • DocumentFORM 2 31-03-24.pdf · uploaded 26 Jun 2024Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 100 PART 3

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
Office space, 2BHK107 units in all
Address
100 Part 3, A Road, RavetPIN 412101
Village
Ravet, Haveli taluka
Land area for this project
839 sq m (9,033 sq ft)
Permissible built-up area
8,330 sq m (89,662 sq ft)
Sanctioned built-up area
6,296 sq m (67,769 sq ft)
Recreational open space
321 sq m (3,455 sq ft)
Designated bank account
171
Developed in phases
Yes

Survey, CTS, gat or plot numbers

100 PART 3

Land as published on MahaRERA's project page

100 PART 3

Boundaries

North
45 Meter Dp Road
South
Survey Number 101 Part 1
East
Survey Number 150
West
Survey Number 100 Part 2

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking107 units

95 of 107 units booked (89%), as the promoter reported to MahaRERA

Office space · 0 units2BHK · 107 units
BuildingTypeCarpet areaUnitsBooked
oOffice space—00
Wing A2BHK12.6 sq m · 136 sq ft10
Wing A2BHK33.4 sq m · 360 sq ft10
Wing A2BHK34.2 sq m · 368 sq ft11
Wing A2BHK34.79 sq m · 374 sq ft55
Wing A2BHK34.98 sq m · 377 sq ft55
Wing A2BHK36.2 sq m · 390 sq ft21
Wing A2BHK36.47 sq m · 393 sq ft97
Show all 23 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Wing A2BHK36.48 sq m · 393 sq ft98
Wing A2BHK37.73 sq m · 406 sq ft10
Wing A2BHK37.77 sq m · 407 sq ft22
Wing A2BHK38.02 sq m · 409 sq ft1515
Wing A2BHK38.06 sq m · 410 sq ft1515
Wing A2BHK38.23 sq m · 412 sq ft44
Wing A2BHK38.39 sq m · 413 sq ft44
Wing A2BHK38.66 sq m · 416 sq ft10
Wing A2BHK39.08 sq m · 421 sq ft52
Wing A2BHK39.11 sq m · 421 sq ft11
Wing A2BHK39.25 sq m · 422 sq ft76
Wing A2BHK39.26 sq m · 423 sq ft33
Wing A2BHK39.3 sq m · 423 sq ft11
Wing A2BHK39.42 sq m · 424 sq ft1010
Wing A2BHK44.52 sq m · 479 sq ft55

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Vipul Pagaria—
Chartered accountantMpa Associates—
EngineerSarvsiddhant Consultant—
OtherCapsicum Global Advisory Pvt Ltd—
OtherGrace Construction—

Source: MahaRERA project page. Contact details are not shown.

Kk Marks in numbers

Registered deals, summarised

Deedo has 106 registered documents at Kk Marks, from Apr 2021 to Jul 2026: 97 sales, 7 mortgages. The median registered sale since Apr 2021 works out to about ₹8,600 per sq ft, at a median of ₹35 L a deal; 1% of sales were resales.

What is the price per sq ft at Kk Marks?
The median registered sale since Apr 2021 works out to about ₹8,600 per sq ft, at a median of ₹35 L a deal; 1% of sales were resales.
How many properties have been sold at Kk Marks?
97 sales are registered at Kk Marks, 1 of them a resale.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Kk Marks by Deedo, last updated with deals registered in Jul 2026.

Latest deal · Mortgage · Jul 2026

Exact price & Index II

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology