Amarillo Town
Deedo IDDP-PUN-75ECMahaRERA shows it completed; no MahaRERA orders on record; 56% of its units are booked.
Ravet, Pune 412101 · Property rates in Ravet · by Wakadkar Brothers
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 29 Apr 2022, completion promised 31 Dec 2025.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Sep 2026
- Primary sale · Aug 2026
- Primary sale · Aug 2026
- Primary sale · Aug 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
- Primary sale · Jun 2026
- Primary sale · Jun 2026
- Primary sale · Jun 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Sep 2026 | Amarillo Town · 611 | Primary sale | 634 sq ft | View Primary sale, Sep 2026 | |
| Aug 2026 | Amarillo Town · 710 | Primary sale | 634 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | Amarillo Town · 711 | Primary sale | 634 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | Amarillo Town · 105 | Primary sale | 645 sq ft | View Primary sale, Aug 2026 | |
| Jul 2026 | Amarillo Town · 205 | Primary sale | 645 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | Amarillo Town · 703 | Primary sale | 643 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | Amarillo Town · 1311 | Primary sale | 634 sq ft | View Primary sale, Jul 2026 | |
| Jun 2026 | Amarillo Town · 1310 | Primary sale | 634 sq ft | View Primary sale, Jun 2026 | |
| Jun 2026 | Amarillo Town · 512 | Primary sale | 645 sq ft | View Primary sale, Jun 2026 | |
| Jun 2026 | Amarillo Town · 1110 | Primary sale | 634 sq ft | View Primary sale, Jun 2026 |
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100035039
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100035039 | 29 Apr 2022 | 31 Dec 2025 | 31 Dec 2025 | Wakadkar Brothers | Project page |
Documents128
1 document held by Deedo, 127 filings listed on MahaRERA's project page
Finance
- PAN CardWakadkar Brothers Pancard.pdf · uploaded 4 Apr 2022Source
Legal
Migrated
- 1 PAN CardWakadkar Brothers Pancard.pdf · uploaded 4 Apr 2022Source
- 1 Copy of the legal title reporttitle report.pdf · uploaded 4 Apr 2022Source
- 1 Details of encumbrancesEncumbrance Certificate.pdf · uploaded 4 Apr 2022Source
- 1 Copy of Layout Approval (in case of layout)1-5.pdf · uploaded 4 Apr 2022Source
Show all 128 documentsShow fewer documents
Migrated
- 1 Building Plan Approval / NA Order for plotted development2-5.pdf · uploaded 4 Apr 2022Source
- 2 Building Plan Approval / NA Order for plotted development3-5.pdf · uploaded 4 Apr 2022Source
- 3 Building Plan Approval / NA Order for plotted development4-5_compressed.pdf · uploaded 4 Apr 2022Source
- 4 Building Plan Approval / NA Order for plotted development5-5.pdf · uploaded 4 Apr 2022Source
- 1 Declaration about Commencement CertificateCirculat No 32.pdf · uploaded 4 Apr 2022Source
- 1 Declaration in FORM BForm B Promoter.pdf · uploaded 4 Apr 2022Source
- 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 4 Apr 2022Source
- 2 Proforma of Allotment letterWakadkar Brothers Rera Draft.pdf · uploaded 4 Apr 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT RAVET.pdf · uploaded 12 Apr 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200236087921_For_Asset_Based_Search_27_04_2022_16_53_27_693.pdf · uploaded 27 Apr 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Signed Copy.pdf · uploaded 27 Apr 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 COMPRESSED.pdf · uploaded 12 Sep 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate_compressed.pdf · uploaded 12 Sep 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed (1).pdf · uploaded 12 Sep 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 21 Oct 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Revised.pdf · uploaded 21 Oct 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Signed.pdf · uploaded 21 Oct 2022Source
- 1 Disclosure of sold/ booked inventoryW Bros Sold Booked Inventory.pdf · uploaded 23 Nov 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jan 2023Source
- 2 Disclosure of sold/ booked inventorySold Circular.pdf · uploaded 23 Jan 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Form 3.pdf · uploaded 23 Jan 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Revised.pdf · uploaded 25 Jan 2023Source
- 2 Details of encumbrancesencumbrance declaration.pdf · uploaded 23 Mar 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)MAnasvi Architect Form 1.pdf · uploaded 29 Apr 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 29 Apr 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Engineers Certificate for Quality Assurance.pdf · uploaded 29 Apr 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE.pdf · uploaded 29 Apr 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCommencement Scan Copy.pdf · uploaded 14 Jun 2023Source
- 2 Copy of Layout Approval (in case of layout)Revised Lay Out Plan Highlighted.pdf · uploaded 29 Jun 2023Source
- 5 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 29 Jun 2023Source
- 6 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 29 Jun 2023Source
- 7 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 29 Jun 2023Source
- 8 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 29 Jun 2023Source
- 9 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 29 Jun 2023Source
- 2 Declaration about Commencement CertificateCommencement Scan Copy.pdf · uploaded 29 Jun 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 29 Jun 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 29 Jun 2023Source
- 3 Disclosure of sold/ booked inventorySold Circular.pdf · uploaded 29 Jun 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 29 Jun 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 COMPPRESSED.pdf · uploaded 2 Nov 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 2 Nov 2023Source
- 4 Disclosure of sold/ booked inventorysold Inventry.pdf · uploaded 2 Nov 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)final form 3 COMPRESSED.pdf · uploaded 2 Nov 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Cdrtificate.pdf · uploaded 15 Feb 2024Source
- 5 Disclosure of sold/ booked inventoryAmarillo Town Sold Booked Inv.pdf · uploaded 15 Feb 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Upload.pdf · uploaded 15 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 CA Promoters Signed Wakadkar Brothers.pdf · uploaded 16 Feb 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 21 Feb 2024Source
- 3 Copy of Layout Approval (in case of layout)1.pdf · uploaded 10 Apr 2024Source
- 10 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 10 Apr 2024Source
- 11 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 10 Apr 2024Source
- 12 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 10 Apr 2024Source
- 13 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 10 Apr 2024Source
- 14 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 10 Apr 2024Source
- 15 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 10 Apr 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentdoc02331220240406135923.pdf · uploaded 10 Apr 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 22 Apr 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate.pdf · uploaded 22 Apr 2024Source
- 6 Disclosure of sold/ booked inventorySold Inventry.pdf · uploaded 22 Apr 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Upload.pdf · uploaded 22 Apr 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1E.pdf · uploaded 20 Jul 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2E.pdf · uploaded 20 Jul 2024Source
- 7 Disclosure of sold/ booked inventoryAMARILLO SOLD-BOOKED INVENTRY.pdf · uploaded 20 Jul 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Upload_compressed.pdf · uploaded 20 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Amarillo town Form 1 ARCHITECT'S CERTIFICATE For RERA.pdf · uploaded 19 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 UPLOAD.pdf · uploaded 19 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Amarillo Town Engineers Certificate.pdf · uploaded 19 Oct 2024Source
- 2 Disclosure of sold/ booked inventorySold Unsold Summary.pdf · uploaded 25 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 CA Promoter Signed.pdf · uploaded 30 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Final_compressed.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 19 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySold Circular.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Final.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Final_compressed.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Final.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySold Circular.pdf · uploaded 19 Apr 2025Source
- Form 1Form 1 Final.pdf · uploaded 18 Jul 2025Source
- Form 2Form 2 Final.pdf · uploaded 18 Jul 2025Source
- Form 3Form 3 Final_compressed.pdf · uploaded 18 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Circular.pdf · uploaded 18 Jul 2025Source
- Withdrawal Update Form 1Form 1_compressed.pdf · uploaded 7 Oct 2025Source
- Withdrawal Update Form 2Form 2 Final.pdf · uploaded 7 Oct 2025Source
- Withdrawal Update Form 3Form 3 Final.pdf · uploaded 7 Oct 2025Source
- Withdrawal Update Form 1Withdrawal Update Form1.pdf · uploaded 19 Oct 2025Source
- Withdrawal Update Form 2Withdrawal Update Form2.pdf · uploaded 19 Oct 2025Source
- Withdrawal Update Form 3Withdrawal Update Form3 Final.pdf · uploaded 19 Oct 2025Source
- Withdrawal Update Form 1Architect Certificate_compressed.pdf · uploaded 12 Jan 2026Source
- Withdrawal Update Form 2Engineers Certificate_compressed.pdf · uploaded 12 Jan 2026Source
- Withdrawal Update Form 3Form 3 Final_compressed.pdf · uploaded 12 Jan 2026Source
- Form 5 (FY 2024-2025)Form 5 Final 24-25.pdf · uploaded 5 Feb 2026Source
- Form 2A (FY 2024-2025)Form 2A_compressed.pdf · uploaded 9 Mar 2026Source
- Occupational CertificateCompletion and OC Mail SS.pdf · uploaded 17 Mar 2026Source
- Form 5 (FY 2025-2026)Form 5 final fy 2025- 26.pdf · uploaded 29 Sep 2026Source
Technical
- Document1-5.pdf · uploaded 4 Apr 2022Source
- Document2-5.pdf · uploaded 4 Apr 2022Source
- Document3-5.pdf · uploaded 4 Apr 2022Source
- Document4-5_compressed.pdf · uploaded 4 Apr 2022Source
- Document5-5.pdf · uploaded 4 Apr 2022Source
- DocumentRevised Lay Out Plan Highlighted.pdf · uploaded 29 Jun 2023Source
- Document2.pdf · uploaded 29 Jun 2023Source
- Document3.pdf · uploaded 29 Jun 2023Source
- Document4.pdf · uploaded 29 Jun 2023Source
- Document6.pdf · uploaded 29 Jun 2023Source
- Document7.pdf · uploaded 29 Jun 2023Source
- Document1.pdf · uploaded 10 Apr 2024Source
- Document2.pdf · uploaded 10 Apr 2024Source
- Document3.pdf · uploaded 10 Apr 2024Source
- Document4.pdf · uploaded 10 Apr 2024Source
- Document5.pdf · uploaded 10 Apr 2024Source
- Document6.pdf · uploaded 10 Apr 2024Source
- Document7.pdf · uploaded 10 Apr 2024Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 150/3 P 150/4
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK160 units in all
- Address
- 150/3 P 150/4, Ravet, RavetPIN 412101
- Village
- Ravet, Haveli taluka
- Location
- 18.61911, 73.80480
- Land area for this project
- 3,800 sq m (40,903 sq ft)
- Permissible built-up area
- 13,681 sq m (1,47,257 sq ft)
- Sanctioned built-up area
- 13,673 sq m (1,47,176 sq ft)
- Recreational open space
- 380 sq m (4,090 sq ft)
- Designated bank account
- 51
- Developed in phases
- No
- Also registered as
- Amarillo Taun, अमरिल्लो टाऊन
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
150/3 P 150/4
Boundaries
- North
- By Properties Bearing Survey No 150 3 And 150 4
- South
- By Properties Bearing Survey No 150 3 And 150 4
- East
- Property Of Vishwas And Sudhakar Bhondve From 151
- West
- By Survey No 150 2 And Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking160 units
90 of 160 units booked (56%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 58.89 sq m · 634 sq ft | 54 | 37 |
| 2BHK | 58.98 sq m · 635 sq ft | 24 | 17 |
| 2BHK | 59.75 sq m · 643 sq ft | 26 | 9 |
| 2BHK | 59.88 sq m · 645 sq ft | 52 | 24 |
| 2BHK | 59.98 sq m · 646 sq ft | 2 | 2 |
| 2BHK | 71.19 sq m · 766 sq ft | 2 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Manasvi Architect | — |
| Chartered accountant | Pgmj And Associates | — |
| Engineer | Suyesh Waghole | — |
Source: MahaRERA project page. Contact details are not shown.
Amarillo Town in numbers
Registered deals, summarised
Deedo has 119 registered documents at Amarillo Town, from Aug 2022 to Sep 2026: 113 sales, 4 mortgages. The median registered sale since Aug 2022 works out to about ₹7,300 per sq ft, at a median of ₹47 L a deal; 0% of sales were resales.
- What is the price per sq ft at Amarillo Town?
- The median registered sale since Aug 2022 works out to about ₹7,300 per sq ft, at a median of ₹47 L a deal; 0% of sales were resales.
- How many properties have been sold at Amarillo Town?
- 113 sales are registered at Amarillo Town.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Amarillo Town by Deedo, last updated with deals registered in Sep 2026.
Latest deal · Primary sale · Sep 2026
₹50–75 L