Ace Aurum
Deedo IDDP-PUN-CZTTMahaRERA shows it completed; no MahaRERA orders on record; 65% of its units are booked.
Ravet, Pune 412101 · Property rates in Ravet · by Jhamtani Realty Private Limited · 83% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- P52100024925Registered 12 Mar 2020, completion promised 30 Jun 2025.
- P52100025056Registered 18 Mar 2020, completion promised 30 Dec 2024.
- P52100025143Registered 19 Mar 2020, completion promised 30 Jun 2025.
- P52100026568Registered 4 Oct 2020, completion promised 30 Jun 2025.
- P52100026571Registered 4 Oct 2020, completion promised 30 Jun 2025.
No extension certificate on record.
5 registrations · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Other · Sep 2026No amount
- Family transfer · Jul 2025No amount
- Other · Jul 2025No amount
- Other · Jul 2025No amount
- Other · Jul 2025No amount
- Mortgage · May 2025No amount
- Mortgage · Apr 2025No amount
- Mortgage · Mar 2025No amount
- Primary sale · Mar 2024
- Primary sale · Jan 2024
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Sep 2026 | Tower 4 · 602 | Other | 640 sq ft | View Other, Sep 2026 | |
| Jul 2025 | Tower 4 · 201 | Family transfer | 640 sq ft | View Family transfer, Jul 2025 | |
| Jul 2025 | Tower 4 · 601 | Other | — | View Other, Jul 2025 | |
| Jul 2025 | Tower 4 · 305 | Other | 640 sq ft | View Other, Jul 2025 | |
| Jul 2025 | Tower 4 · 501 | Other | — | View Other, Jul 2025 | |
| May 2025 | Tower 4 · 106 | Mortgage | — | View Mortgage, May 2025 | |
| Apr 2025 | Tower 4 · 106 | Mortgage | — | View Mortgage, Apr 2025 | |
| Mar 2025 | Ace Aurum III Tower 06 · 203 | Mortgage | — | View Mortgage, Mar 2025 | |
| Mar 2024 | Tower 4 · 201 | Primary sale | 640 sq ft | View Primary sale, Mar 2024 | |
| Jan 2024 | Tower 4 · 205 | Primary sale | 640 sq ft | View Primary sale, Jan 2024 |
6 buildings
Open a building to see every flat, floor by floor.
- Ace Aurum III Tower 0110 floors · 28 units57% booked
- Ace Aurum III Tower 0210 floors · 28 units86% booked
- Ace Aurum III Tower 0310 floors · 28 units75% booked
- Ace Aurum III Tower 049 floors · 42 units29% booked
- Ace Aurum III Tower 0610 floors · 28 units96% booked
- Tower 4Size not on record23% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrations5
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100024925 | 12 Mar 2020 | 30 Jun 2025 | 30 Jun 2025 | Jhamtani Realty Private Limited | Project page |
| P52100025056 | 18 Mar 2020 | 30 Dec 2024 | 30 Dec 2024 | Jhamtani Realty Private Limited | Project page |
| P52100025143 | 19 Mar 2020 | 30 Jun 2025 | 30 Jun 2025 | Jhamtani Realty Private Limited | Project page |
| P52100026568 | 4 Oct 2020 | 30 Jun 2025 | 30 Jun 2025 | Jhamtani Realty Private Limited | Project page |
| P52100026571 | 4 Oct 2020 | 30 Jun 2025 | 30 Jun 2025 | Jhamtani Realty Private Limited | Project page |
Documents314
6 documents held by Deedo, 308 filings listed on MahaRERA's project page
Registration certificate (5)
- Registration certificateP52100024925 · 12 Mar 2020ViewSource
- Registration certificateP52100025056 · 8 Sep 2021ViewSource
- Registration certificateP52100025143 · 8 Sep 2021ViewSource
- Registration certificateP52100026568 · 8 Sep 2021ViewSource
- Registration certificateP52100026571 · 8 Sep 2021ViewSource
Other
- OtherP52100024925 · Date not statedView
Show all 314 documentsShow fewer documents
Finance
Legal
- Legal Title reportP52100024925 · Search and Title Report Dated 09-08-2019 RERA.pdf · uploaded 26 Feb 2020Source
- Legal Title reportP52100025056 · Search and Title Report Dated 09-08-2019 RERA.pdf · uploaded 26 Feb 2020Source
- Legal Title reportP52100025143 · Search and Title Report Dated 09-08-2019 RERA.pdf · uploaded 29 Feb 2020Source
- Declaration Form BP52100024925 · Declaration in FORM B BUILDER - Anup P Jhamtani Tower 4.pdf · uploaded 29 Feb 2020Source
- Declaration Form BP52100025056 · Declaration in FORM B BUILDER - Anup P Jhamtani Tower 6.pdf · uploaded 29 Feb 2020Source
- OtherP52100025143 · JRPL - NA Order.pdf · uploaded 2 Mar 2020Source
- Declaration Form BP52100025143 · Declaration in FORM B BUILDER - Anup P Jhamtani Tower 3.pdf · uploaded 2 Mar 2020Source
- OtherP52100024925 · JRPL - NA Order.pdf · uploaded 2 Mar 2020Source
- OtherP52100025056 · JRPL - NA Order.pdf · uploaded 2 Mar 2020Source
- Legal Title reportP52100026568 · LEGAL TITLE REPORT.pdf · uploaded 18 Sep 2020Source
- Legal Title reportP52100026571 · LEGAL TITLE REPORT.pdf · uploaded 18 Sep 2020Source
- Declaration Form BP52100026568 · Declaration in FORM B BUILDER - Anup P Jhamtani Tower 2.pdf · uploaded 24 Sep 2020Source
- Declaration Form BP52100026571 · Declaration in FORM B BUILDER - Anup P Jhamtani Tower 1.pdf · uploaded 24 Sep 2020Source
- OtherP52100026568 · OTHER.pdf · uploaded 26 Sep 2020Source
- OtherP52100026571 · OTHER.pdf · uploaded 26 Sep 2020Source
- OtherP52100024925 · Format C Consent of allottees compressed.pdf · uploaded 4 Apr 2022Source
Migrated
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024925 · Engineer Certificate Tower 04.pdf · uploaded 25 Feb 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024925 · Form 3 Ca Certificate Tower 4.PDF · uploaded 25 Feb 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100025056 · Engineer Certificate Tower 06.pdf · uploaded 25 Feb 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025056 · Form 3 Ca Certificate Tower 6.PDF · uploaded 25 Feb 2020Source
- 1 Copy of the legal title reportP52100024925 · Search and Title Report Dated 09-08-2019 RERA.pdf · uploaded 26 Feb 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100024925 · CC RERA.pdf · uploaded 26 Feb 2020Source
- 1 Copy of the legal title reportP52100025056 · Search and Title Report Dated 09-08-2019 RERA.pdf · uploaded 26 Feb 2020Source
- 1 Copy of Layout Approval (in case of layout)P52100025056 · Sheet No 01-09 LAYOUT RERA.pdf · uploaded 26 Feb 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100025056 · CC RERA.pdf · uploaded 26 Feb 2020Source
- 1 PAN CardP52100024925 · Pan Card RERA.pdf · uploaded 27 Feb 2020Source
- 1 Copy of Layout Approval (in case of layout)P52100024925 · Sheet No 01-09 LAYOUT RERA.pdf · uploaded 27 Feb 2020Source
- 1 PAN CardP52100025056 · Pan Card RERA.pdf · uploaded 27 Feb 2020Source
- 1 PAN CardP52100025143 · Pan Card RERA.pdf · uploaded 29 Feb 2020Source
- 1 Copy of the legal title reportP52100025143 · Search and Title Report Dated 09-08-2019 RERA.pdf · uploaded 29 Feb 2020Source
- 1 Details of encumbrancesP52100025143 · Self Declaration Regarding Encumbrances Jhamtani Realty Private Limited Tower 03.pdf · uploaded 29 Feb 2020Source
- 1 Copy of Layout Approval (in case of layout)P52100025143 · Sheet No 01-09 LAYOUT RERA.pdf · uploaded 29 Feb 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100025143 · CC RERA.pdf · uploaded 29 Feb 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100025143 · Engineer Certificate Tower 03 RERA.pdf · uploaded 29 Feb 2020Source
- 1 Details of encumbrancesP52100024925 · Self Declaration Regarding Encumbrances Jhamtani Realty Private Limited Tower 04.pdf · uploaded 29 Feb 2020Source
- 1 Declaration in FORM BP52100024925 · Declaration in FORM B BUILDER - Anup P Jhamtani Tower 4.pdf · uploaded 29 Feb 2020Source
- 1 Details of encumbrancesP52100025056 · Self Declaration Regarding Encumbrances Jhamtani Realty Private Limited Tower 06.pdf · uploaded 29 Feb 2020Source
- 1 Declaration in FORM BP52100025056 · Declaration in FORM B BUILDER - Anup P Jhamtani Tower 6.pdf · uploaded 29 Feb 2020Source
- 1 Declaration in FORM BP52100025143 · Declaration in FORM B BUILDER - Anup P Jhamtani Tower 3.pdf · uploaded 2 Mar 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025143 · ACE AURUM 3 TOWER 3 CA CERTIFICATE.pdf · uploaded 2 Mar 2020Source
- 1 OtherP52100025143 · JRPL - NA Order.pdf · uploaded 2 Mar 2020Source
- 1 OtherP52100024925 · JRPL - NA Order.pdf · uploaded 2 Mar 2020Source
- 1 OtherP52100025056 · JRPL - NA Order.pdf · uploaded 2 Mar 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100025143 · 200303-IOD Layout For RERA FINAL.pdf · uploaded 4 Mar 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100024925 · 200303-IOD Layout For RERA FINAL.pdf · uploaded 4 Mar 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100025056 · 200303-IOD Layout For RERA FINAL.pdf · uploaded 4 Mar 2020Source
- 1 Proforma of Allotment letterP52100025143 · DRAFT ACE AURUM III TOWER 3 05032020.pdf · uploaded 5 Mar 2020Source
- 2 Proforma of Allotment letterP52100025143 · DRAFT ALLOTMENT LETTER.pdf · uploaded 5 Mar 2020Source
- 1 Proforma of Allotment letterP52100024925 · DRAFT ACE AURUM III TOWER 4 05032020.pdf · uploaded 5 Mar 2020Source
- 2 Proforma of Allotment letterP52100024925 · DRAFT ALLOTMENT LETTER.pdf · uploaded 5 Mar 2020Source
- 3 Proforma of Allotment letterP52100024925 · DRAFT ALLOTMENT LETTER.pdf · uploaded 5 Mar 2020Source
- 1 Proforma of Allotment letterP52100025056 · DRAFT ACE AURUM III TOWER 6 05032020.pdf · uploaded 5 Mar 2020Source
- 2 Proforma of Allotment letterP52100025056 · DRAFT ALLOTMENT LETTER.pdf · uploaded 5 Mar 2020Source
- 1 PAN CardP52100026568 · pan card.pdf · uploaded 18 Sep 2020Source
- 1 Copy of the legal title reportP52100026568 · LEGAL TITLE REPORT.pdf · uploaded 18 Sep 2020Source
- 1 Details of encumbrancesP52100026568 · Self Declaration Regarding Encumbrances Jhamtani Realty Private Limited Tower 02 (1).pdf · uploaded 18 Sep 2020Source
- 1 Copy of Layout Approval (in case of layout)P52100026568 · LAYOUT PLAN OF ACE AURUM III.pdf · uploaded 18 Sep 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100026568 · LAYOUT PLAN OF ACE AURUM III.pdf · uploaded 18 Sep 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100026568 · COMMENCEMENT CERTIFICATE.pdf · uploaded 18 Sep 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026568 · ENGINEER CERTIFICATE TOWER 02.pdf · uploaded 18 Sep 2020Source
- 1 Proforma of Allotment letterP52100026568 · AGREEMENT TO SALE.pdf · uploaded 18 Sep 2020Source
- 1 PAN CardP52100026571 · pan card.pdf · uploaded 18 Sep 2020Source
- 1 Copy of the legal title reportP52100026571 · LEGAL TITLE REPORT.pdf · uploaded 18 Sep 2020Source
- 1 Details of encumbrancesP52100026571 · Self Declaration Regarding Encumbrances Jhamtani Realty Private Limited Tower 01.pdf · uploaded 18 Sep 2020Source
- 1 Copy of Layout Approval (in case of layout)P52100026571 · LAYOUT PLAN OF ACE AURUM III.pdf · uploaded 18 Sep 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100026571 · COMMENCEMENT CERTIFICATE.pdf · uploaded 18 Sep 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026571 · ENGINEER CERTIFICATE TOWER 01.pdf · uploaded 18 Sep 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026568 · Form 3 ace aurum tower 2 cert.pdf · uploaded 21 Sep 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026571 · Form 3 ace aurum tower 1 cert.pdf · uploaded 21 Sep 2020Source
- 1 Declaration in FORM BP52100026568 · Declaration in FORM B BUILDER - Anup P Jhamtani Tower 2.pdf · uploaded 24 Sep 2020Source
- 1 Declaration in FORM BP52100026571 · Declaration in FORM B BUILDER - Anup P Jhamtani Tower 1.pdf · uploaded 24 Sep 2020Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100026568 · Commencement certificate ace aurum III.pdf · uploaded 26 Sep 2020Source
- 2 Proforma of Allotment letterP52100026568 · ALLOTMENT LETTER 2.pdf · uploaded 26 Sep 2020Source
- 1 OtherP52100026568 · OTHER.pdf · uploaded 26 Sep 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100026571 · LAYOUT PLAN OF ACE AURUM III.pdf · uploaded 26 Sep 2020Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100026571 · Commencement certificate ace aurum III.pdf · uploaded 26 Sep 2020Source
- 1 Proforma of Allotment letterP52100026571 · ALLOTMENT LETTER 2.pdf · uploaded 26 Sep 2020Source
- 1 OtherP52100026571 · OTHER.pdf · uploaded 26 Sep 2020Source
- 2 Proforma of Allotment letterP52100026571 · AGREEMENT TO SALE.pdf · uploaded 30 Sep 2020Source
- 2 Details of encumbrancesP52100025143 · ec tower 3.pdf · uploaded 23 Dec 2020Source
- 2 Details of encumbrancesP52100024925 · ec tower 4.pdf · uploaded 23 Dec 2020Source
- 2 Details of encumbrancesP52100025056 · ec tower 6.pdf · uploaded 23 Dec 2020Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100025143 · JRPL-Tower-3.pdf · uploaded 18 Jun 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100024925 · JRPL-Tower-4.pdf · uploaded 18 Jun 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100025056 · JRPL-Tower-6.pdf · uploaded 18 Jun 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025143 · Form 3 Aurum 3 Tower 3 160721.PDF · uploaded 7 Sep 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024925 · Form 3 Aurum 3 Tower 4 160721.PDF · uploaded 7 Sep 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025056 · Form 3 Aurum 3 Tower 6 160721.PDF · uploaded 7 Sep 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026568 · Form 3 Aurum 3 tower 2 160721.pdf · uploaded 7 Sep 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026571 · Form 3 Aurum 3 tower1 160721.pdf · uploaded 7 Sep 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100025143 · Form 01 T3.pdf · uploaded 19 Oct 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100025143 · Form 02 T2.pdf · uploaded 19 Oct 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024925 · Form 01 4 and 5.pdf · uploaded 19 Oct 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024925 · Form 02 T4.pdf · uploaded 19 Oct 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100025056 · Form 01 T6.pdf · uploaded 19 Oct 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100025056 · Form 02 T6.pdf · uploaded 19 Oct 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026568 · Form 02 T2.pdf · uploaded 19 Oct 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026571 · Form 01 T1.pdf · uploaded 19 Oct 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026571 · Form 02 T1.pdf · uploaded 19 Oct 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026568 · Form 02 T2.pdf · uploaded 20 Oct 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025143 · Form -3 Tower-03_merged-signed.pdf · uploaded 8 Feb 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025056 · Form -3 Tower -06-signed.pdf · uploaded 8 Feb 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026568 · Form -3 Tower-02_merged-signed.pdf · uploaded 8 Feb 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026571 · Form-3- Tower-01_merged-signed.pdf · uploaded 8 Feb 2022Source
- 2 Copy of Layout Approval (in case of layout)P52100024925 · Sheet No 01-08 Compressed.pdf · uploaded 4 Apr 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100024925 · CC BP-Ravet-48-2021 Dated 28-05-2021.pdf · uploaded 4 Apr 2022Source
- 1 Declaration about Commencement CertificateP52100024925 · Declration abt CC.pdf · uploaded 4 Apr 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100024925 · form 2A.pdf · uploaded 4 Apr 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100024925 · form 2A.pdf · uploaded 4 Apr 2022Source
- 1 Disclosure of sold/ booked inventoryP52100024925 · JRPL T-4 Disclosure Of Sold Dt 28-03-2022.pdf · uploaded 4 Apr 2022View
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024925 · Form 3_Ace Aurum 3 T-4 Compressed.pdf · uploaded 4 Apr 2022Source
- 2 OtherP52100024925 · Format C Consent of allottees compressed.pdf · uploaded 4 Apr 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100025143 · ACE AURUM III TOWER 03.pdf · uploaded 20 Jul 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025143 · FORM 3 ACE AURUM III TOWER 03.pdf · uploaded 20 Jul 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024925 · ACE AURUM III TOWER 04 and 05.pdf · uploaded 20 Jul 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024925 · FORM 3 ACE AURUM III TOWER 04 and 05.pdf · uploaded 20 Jul 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100025056 · ACE AURUM III TOWER 06.pdf · uploaded 20 Jul 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025056 · FORM 3 ACE AURUM III TOWER 06.pdf · uploaded 20 Jul 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026568 · ACE AURUM III TOWER 02.pdf · uploaded 20 Jul 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026568 · ACE AURUM III TOWER 02.pdf · uploaded 20 Jul 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026571 · ACE AURUM III TOWER 01.pdf · uploaded 20 Jul 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026571 · FORM 3 ACE AURUM III TOWER 01.pdf · uploaded 20 Jul 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100025143 · 220630 - RERA Certificate - T3.pdf · uploaded 29 Jul 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024925 · 220630 - RERA Certificate - T4.pdf · uploaded 29 Jul 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100025056 · 220630 - RERA Certificate - T6.pdf · uploaded 29 Jul 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026568 · 220630 - RERA Certificate - T2.pdf · uploaded 29 Jul 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026571 · 220630 - RERA Certificate - T1.pdf · uploaded 29 Jul 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100025143 · ACE AURUM III TOWER 03.pdf · uploaded 12 Oct 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025143 · ACE AURUM III TOWER 03.pdf · uploaded 12 Oct 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024925 · ACE AURUM III TOWER 04 and 05.pdf · uploaded 12 Oct 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024925 · ACE AURUM III TOWER 04 and 05.pdf · uploaded 12 Oct 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100025056 · ACE AURUM III TOWER 06.pdf · uploaded 12 Oct 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025056 · ACE AURUM III TOWER 06.pdf · uploaded 12 Oct 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026568 · ACE AURUM III TOWER 02.pdf · uploaded 12 Oct 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026568 · ACE AURUM III TOWER 02.pdf · uploaded 12 Oct 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026571 · ACE AURUM III TOWER 01.pdf · uploaded 12 Oct 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026571 · ACE AURUM III TOWER 01.pdf · uploaded 12 Oct 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100025143 · ACE AURUM III TOWER 03.pdf · uploaded 18 Oct 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024925 · ACE AURUM III TOWER 04 and 05.pdf · uploaded 18 Oct 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100025056 · ACE AURUM III TOWER 06.pdf · uploaded 18 Oct 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026568 · ACE AURUM III TOWER 02.pdf · uploaded 18 Oct 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026571 · ACE AURUM III TOWER 01.pdf · uploaded 18 Oct 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100025143 · ACE AURUM III TOWER 03.pdf · uploaded 9 Jan 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024925 · ACE AURUM III TOWER 04.pdf · uploaded 9 Jan 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100025056 · ACE AURUM III TOWER 06.pdf · uploaded 9 Jan 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026568 · ACE AURUM III TOWER 02.pdf · uploaded 9 Jan 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026571 · ACE AURUM III TOWER 01.pdf · uploaded 9 Jan 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100025143 · Tower 3.pdf · uploaded 14 Jan 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025143 · Tower 33.pdf · uploaded 14 Jan 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024925 · Tower 2.pdf · uploaded 14 Jan 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024925 · Tower 4.pdf · uploaded 14 Jan 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024925 · Tower 44.pdf · uploaded 14 Jan 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100025056 · Tower 6.pdf · uploaded 14 Jan 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025056 · Tower 66.pdf · uploaded 14 Jan 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026568 · Tower 2.pdf · uploaded 14 Jan 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026568 · Tower 22.pdf · uploaded 14 Jan 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026571 · Tower 1.pdf · uploaded 14 Jan 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026571 · Tower 12.pdf · uploaded 14 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100025143 · ACE AURUM III TOWER 03.pdf · uploaded 20 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100025143 · T3.pdf · uploaded 20 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100024925 · ACE AURUM TOWER 04.pdf · uploaded 20 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100024925 · T4.pdf · uploaded 20 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100025056 · ACE AURUM III TOWER 06.pdf · uploaded 20 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100025056 · T6.pdf · uploaded 20 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026568 · ACE AURUM III TOWER 02.pdf · uploaded 20 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100026568 · T2.pdf · uploaded 20 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100026571 · ACE AURUM III TOWER 01.pdf · uploaded 20 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100026571 · T1.pdf · uploaded 20 Jan 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100025143 · JRPL T3.pdf · uploaded 7 Apr 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025143 · Signed_JRPL T3.pdf · uploaded 7 Apr 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024925 · JRPL T4.pdf · uploaded 7 Apr 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024925 · Signed_JRPL T4.pdf · uploaded 7 Apr 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100025056 · JRPL T6.pdf · uploaded 7 Apr 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025056 · Signed_JRPL T6.pdf · uploaded 7 Apr 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026568 · JRPL T2.pdf · uploaded 7 Apr 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026568 · Signed_JRPL T2.pdf · uploaded 7 Apr 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026571 · JRPL T1.pdf · uploaded 7 Apr 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026571 · Signed_JRPL T1.pdf · uploaded 7 Apr 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100025143 · T3.pdf · uploaded 11 Apr 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024925 · T4.pdf · uploaded 11 Apr 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100025056 · T6.pdf · uploaded 11 Apr 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026568 · T2.pdf · uploaded 11 Apr 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026571 · T1.pdf · uploaded 19 Apr 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100025143 · T 3.pdf · uploaded 6 Jul 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100025143 · T 3.pdf · uploaded 6 Jul 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100024925 · T 4.pdf · uploaded 6 Jul 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024925 · T 4.pdf · uploaded 6 Jul 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100025056 · T 6.pdf · uploaded 6 Jul 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100025056 · T 6.pdf · uploaded 6 Jul 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026568 · T 2.pdf · uploaded 6 Jul 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026568 · T 2.pdf · uploaded 6 Jul 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100026571 · T 1.pdf · uploaded 6 Jul 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026571 · T 1.pdf · uploaded 6 Jul 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025143 · T3.pdf · uploaded 7 Jul 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024925 · T4.pdf · uploaded 7 Jul 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025056 · T6.pdf · uploaded 7 Jul 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026568 · T2.pdf · uploaded 7 Jul 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026571 · T1.pdf · uploaded 7 Jul 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100025143 · T 3.pdf · uploaded 30 Sep 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100024925 · T 4.pdf · uploaded 30 Sep 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100025056 · T 6.pdf · uploaded 30 Sep 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026568 · T 2.pdf · uploaded 30 Sep 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100026571 · T 1.pdf · uploaded 30 Sep 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025143 · ACE AURUM 3 TOWER 3 N DSC_11zon.pdf · uploaded 7 Oct 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100024925 · ACE AURUM 3 TOWER 4 DSC_11zon.pdf · uploaded 7 Oct 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100025056 · ACE AURUM 3 TOWER 6 DSC_11zon.pdf · uploaded 7 Oct 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026568 · ACE AURUM 3 TOWER 2 N DSC_11zon.pdf · uploaded 7 Oct 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100026571 · ACE AURUM 3 TOWER 1 DSC_11zon.pdf · uploaded 7 Oct 2023Source
- 1 Architect’s Certificate on Completion of Project (Form 4)P52100025143 · Ace Aurum III Tower 3 - Form 4.pdf · uploaded 20 Dec 2023Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100025143 · Ace Aurum III OC.pdf · uploaded 21 Dec 2023Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100024925 · Ace Aurum III OC.pdf · uploaded 21 Dec 2023Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100025056 · Ace Aurum III OC.pdf · uploaded 21 Dec 2023Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100026568 · Ace Aurum III OC.pdf · uploaded 21 Dec 2023Source
- 2 Architect’s Certificate on Completion of Project (Form 4)P52100026568 · Ace Aurum III Tower 2 - Form 4.pdf · uploaded 21 Dec 2023Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100026571 · Ace Aurum III OC.pdf · uploaded 21 Dec 2023Source
- 2 Architect’s Certificate on Completion of Project (Form 4)P52100025143 · Form 4 - ACE Autum III - Tower 3.pdf · uploaded 25 Dec 2023Source
- 2 Architect’s Certificate on Completion of Project (Form 4)P52100025056 · Form 4 - ACE Autum III - Tower 6.pdf · uploaded 25 Dec 2023Source
- 3 Architect’s Certificate on Completion of Project (Form 4)P52100026568 · Form 4 - ACE Autum III - Tower 2.pdf · uploaded 25 Dec 2023Source
- 2 Architect’s Certificate on Completion of Project (Form 4)P52100026571 · Form 4 - ACE Autum III - Tower 1.pdf · uploaded 25 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100025143 · ACE AURUM 3 T-3 MAR 23.pdf · uploaded 27 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100024925 · ACE AURUM 3 T-4 MAR 23.pdf · uploaded 27 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100025056 · ACE AURUM 3 T-6 MAR 23.pdf · uploaded 27 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100026568 · ACE AURUM 3 T-2 MAR 23.pdf · uploaded 27 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100026571 · ACE AURUM 3 T-1 MAR 23.pdf · uploaded 27 Dec 2023Source
- 3 Architect’s Certificate on Completion of Project (Form 4)P52100024925 · Form 4 - ACE Autum III - Tower 4.pdf · uploaded 2 Jan 2024Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100025143 · ACE AURAM 3 Soc Regi Certificate.pdf · uploaded 9 May 2024Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100024925 · ACE AURAM 3 Soc Regi Certificate.pdf · uploaded 9 May 2024Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100025056 · ACE AURAM 3 Soc Regi Certificate.pdf · uploaded 9 May 2024Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100026568 · ACE AURAM 3 Soc Regi Certificate.pdf · uploaded 9 May 2024Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100026571 · ACE AURAM 3 Soc Regi Certificate.pdf · uploaded 9 May 2024Source
- 2 Copy of Layout Approval (in case of layout)P52100025143 · 1.pdf · uploaded 7 Aug 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100025143 · 1.pdf · uploaded 7 Aug 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100025143 · 2.pdf · uploaded 7 Aug 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100025143 · 7.pdf · uploaded 7 Aug 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100025143 · 8.pdf · uploaded 7 Aug 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100025143 · CC Bp Ravet 25 2023.pdf · uploaded 7 Aug 2024Source
- 3 Copy of Layout Approval (in case of layout)P52100024925 · 1.pdf · uploaded 7 Aug 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100024925 · 1.pdf · uploaded 7 Aug 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100024925 · 2.pdf · uploaded 7 Aug 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100024925 · 10.pdf · uploaded 7 Aug 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100024925 · 9.pdf · uploaded 7 Aug 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentP52100024925 · CC Bp Ravet 25 2023.pdf · uploaded 7 Aug 2024Source
- 2 Copy of Layout Approval (in case of layout)P52100026568 · 1.pdf · uploaded 7 Aug 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100026568 · 1.pdf · uploaded 7 Aug 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100026568 · 2.pdf · uploaded 7 Aug 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100026568 · 5.pdf · uploaded 7 Aug 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100026568 · 6.pdf · uploaded 7 Aug 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentP52100026568 · CC Bp Ravet 25 2023.pdf · uploaded 7 Aug 2024Source
- 2 Copy of Layout Approval (in case of layout)P52100026571 · 1 of 12.pdf · uploaded 7 Aug 2024Source
- 3 Copy of Layout Approval (in case of layout)P52100026571 · 1.pdf · uploaded 7 Aug 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100026571 · 1 of 12.pdf · uploaded 7 Aug 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100026571 · 2.pdf · uploaded 7 Aug 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100026571 · 3.pdf · uploaded 7 Aug 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100026571 · 4.pdf · uploaded 7 Aug 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentP52100026571 · CC Bp Ravet 25 2023.pdf · uploaded 7 Aug 2024Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100026571 · Completion Certificate Dt 24 04 2024.pdf · uploaded 7 Aug 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100025143 · ACE AURUM 3 TOWER 3 FORM 5 2023-24.pdf · uploaded 3 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100024925 · ACE AURUM 3 TOWER 4 FORM 5 2023-24.pdf · uploaded 3 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100025056 · ACE AURUM 3 TOWER 6 FORM 5 2023-24.pdf · uploaded 3 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026568 · ACE AURUM 3 TOWER 2 FORM 5 2023-24.pdf · uploaded 3 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100026571 · ACE AURUM 3 TOWER 1 FORM 5 2023-24.pdf · uploaded 3 Jan 2025Source
Technical
- DocumentP52100025056 · Sheet No 01-09 LAYOUT RERA.pdf · uploaded 26 Feb 2020Source
- DocumentP52100024925 · Sheet No 01-09 LAYOUT RERA.pdf · uploaded 27 Feb 2020Source
- DocumentP52100025143 · Sheet No 01-09 LAYOUT RERA.pdf · uploaded 29 Feb 2020Source
- DocumentP52100025143 · 200303-IOD Layout For RERA FINAL.pdf · uploaded 4 Mar 2020Source
- DocumentP52100024925 · 200303-IOD Layout For RERA FINAL.pdf · uploaded 4 Mar 2020Source
- DocumentP52100025056 · 200303-IOD Layout For RERA FINAL.pdf · uploaded 4 Mar 2020Source
- DocumentP52100026568 · LAYOUT PLAN OF ACE AURUM III.pdf · uploaded 18 Sep 2020Source
- DocumentP52100026568 · LAYOUT PLAN OF ACE AURUM III.pdf · uploaded 18 Sep 2020Source
- DocumentP52100026571 · LAYOUT PLAN OF ACE AURUM III.pdf · uploaded 18 Sep 2020Source
- DocumentP52100026571 · LAYOUT PLAN OF ACE AURUM III.pdf · uploaded 26 Sep 2020Source
- DocumentP52100024925 · Sheet No 01-08 Compressed.pdf · uploaded 4 Apr 2022Source
- DocumentP52100025143 · 1.pdf · uploaded 7 Aug 2024Source
- DocumentP52100025143 · 1.pdf · uploaded 7 Aug 2024Source
- DocumentP52100025143 · 2.pdf · uploaded 7 Aug 2024Source
- DocumentP52100025143 · 7.pdf · uploaded 7 Aug 2024Source
- DocumentP52100025143 · 8.pdf · uploaded 7 Aug 2024Source
- DocumentP52100024925 · 1.pdf · uploaded 7 Aug 2024Source
- DocumentP52100024925 · 2.pdf · uploaded 7 Aug 2024Source
- DocumentP52100024925 · 1.pdf · uploaded 7 Aug 2024Source
- DocumentP52100024925 · 10.pdf · uploaded 7 Aug 2024Source
- DocumentP52100024925 · 9.pdf · uploaded 7 Aug 2024Source
- DocumentP52100026568 · 1.pdf · uploaded 7 Aug 2024Source
- DocumentP52100026568 · 1.pdf · uploaded 7 Aug 2024Source
- DocumentP52100026568 · 2.pdf · uploaded 7 Aug 2024Source
- DocumentP52100026568 · 5.pdf · uploaded 7 Aug 2024Source
- DocumentP52100026568 · 6.pdf · uploaded 7 Aug 2024Source
- DocumentP52100026571 · 3.pdf · uploaded 7 Aug 2024Source
- DocumentP52100026571 · 4.pdf · uploaded 7 Aug 2024Source
- DocumentP52100026571 · 1 of 12.pdf · uploaded 7 Aug 2024Source
- DocumentP52100026571 · 1 of 12.pdf · uploaded 7 Aug 2024Source
- DocumentP52100026571 · 1.pdf · uploaded 7 Aug 2024Source
- DocumentP52100026571 · 2.pdf · uploaded 7 Aug 2024Source
Technical (Architect)
Technical (Engineer)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 45/1/1 P
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Phases
- 5
- Unit types
- 2BHK, 1BHK154 units in all
- Address
- 45/1/1 P, Brt Road, RavetPIN 412101
- Village
- Pimpri Chinchawad (M Corp.), Haveli taluka
- Location
- 19.38750, 75.16320
- Land area for this project
- 1,100 sq m (11,840 sq ft)
- Permissible built-up area
- 3,170 sq m (34,122 sq ft)
- Sanctioned built-up area
- 3,170 sq m (34,122 sq ft)
- Recreational open space
- 53 sq m (574 sq ft)
- Designated bank account
- 171
- Developed in phases
- No
- Also registered as
- Ace Aurum III Tower 04, Ace Aurum III Tower 06, Ace Aurum III Tower 03, Ace Aurum III Tower 02, Ace Aurum III Tower 01
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
45/1/1 P
Boundaries
- North
- By Property Of Ace Aurum III Tower 05
- South
- By Property Of Proposed Project Of Jrpl
- East
- By Property Of Survey No 45 Part
- West
- By Property Survey No 60-2- 3
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking154 units
100 of 154 units booked (65%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100026571 | Ace Aurum III Tower 01 | 2BHK | 71.96 sq m · 775 sq ft | 28 | 16 |
| P52100026568 | Ace Aurum III Tower 02 | 2BHK | 50.38 sq m · 542 sq ft | 6 | 5 |
| P52100026568 | Ace Aurum III Tower 02 | 2BHK | 50.55 sq m · 544 sq ft | 8 | 8 |
| P52100026568 | Ace Aurum III Tower 02 | 2BHK | 50.85 sq m · 547 sq ft | 6 | 5 |
| P52100026568 | Ace Aurum III Tower 02 | 2BHK | 50.94 sq m · 548 sq ft | 8 | 6 |
| P52100025143 | Ace Aurum III Tower 03 | 2BHK | 48.79 sq m · 525 sq ft | 6 | 4 |
| P52100025143 | Ace Aurum III Tower 03 | 2BHK | 48.88 sq m · 526 sq ft | 8 | 6 |
| P52100025143 | Ace Aurum III Tower 03 | 2BHK | 50.54 sq m · 544 sq ft | 6 | 5 |
Show all 15 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100025143 | Ace Aurum III Tower 03 | 2BHK | 50.63 sq m · 545 sq ft | 8 | 6 |
| P52100024925 | Ace Aurum III Tower 04 | 2BHK | 50.69 sq m · 546 sq ft | 14 | 0 |
| P52100024925 | Ace Aurum III Tower 04 | 2BHK | 59.49 sq m · 640 sq ft | 28 | 12 |
| P52100025056 | Ace Aurum III Tower 06 | 1BHK | 30.77 sq m · 331 sq ft | 6 | 6 |
| P52100025056 | Ace Aurum III Tower 06 | 1BHK | 30.9 sq m · 333 sq ft | 8 | 8 |
| P52100025056 | Ace Aurum III Tower 06 | 1BHK | 30.98 sq m · 333 sq ft | 6 | 6 |
| P52100025056 | Ace Aurum III Tower 06 | 1BHK | 31.11 sq m · 335 sq ft | 8 | 7 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals20
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Dwaipayan Chakravarty | — | P52100025056 |
| Architect | Dwaipayan Chakravarty | — | P52100025143 |
| Architect | Dwaipayan Chakravarty | — | P52100026568 |
| Architect | Dwaipayan Chakravarty | — | P52100024925 |
| Architect | Dwaipayan Chakravarty | — | P52100026571 |
| Chartered accountant | Ravi Talreja | — | P52100025056 |
| Chartered accountant | Ravi Talreja | — | P52100026568 |
| Chartered accountant | Ravi Talreja | — | P52100026571 |
Show all 20 professionalsShow fewer professionals
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Chartered accountant | Ravi Talreja | — | P52100024925 |
| Chartered accountant | Ravi Talreja | — | P52100025143 |
| Engineer | kailas Badgujar | — | P52100025056 |
| Engineer | Kailas Badgujar | — | P52100024925 |
| Engineer | Kailash Badgujar | — | P52100025143 |
| Engineer | Kailash Badgujar | — | P52100026571 |
| Engineer | Kailash Badgujar | — | P52100026568 |
| Registered real estate agent | Jhamtani Sales And Services Pvt Ltd | — | P52100026571 |
| Registered real estate agent | Jhamtani Sales And Services Pvt Ltd | — | P52100024925 |
| Registered real estate agent | Jhamtani Sales And Services Pvt Ltd | — | P52100025143 |
| Registered real estate agent | Jhamtani Sales And Services Pvt Ltd | — | P52100025056 |
| Registered real estate agent | Jhamtani Sales And Services Pvt Ltd | — | P52100026568 |
Source: MahaRERA project page. Contact details are not shown.
Ace Aurum in numbers
Registered deals, summarised
Deedo has 109 registered documents at Ace Aurum, from Dec 2020 to Sep 2026: 97 sales, 6 mortgages. The median registered sale since Dec 2020 works out to about ₹7,500 per sq ft, at a median of ₹43 L a deal; 0% of sales were resales.
- What is the price per sq ft at Ace Aurum?
- The median registered sale since Dec 2020 works out to about ₹7,500 per sq ft, at a median of ₹43 L a deal; 0% of sales were resales.
- How many properties have been sold at Ace Aurum?
- 97 sales are registered at Ace Aurum.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Ace Aurum by Deedo, last updated with deals registered in Sep 2026.
Latest deal · Other · Sep 2026
Exact price & Index II