Devkamal Heights
Deedo IDDP-PUN-4TZ7MahaRERA shows it completed; no MahaRERA orders on record; 75% of its units are booked.
Rahatani, Pune 411017 · by Mrs Kamal Devram Hole
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 9 Feb 2022, completion promised 30 Oct 2026.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100033247
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100033247 | 9 Feb 2022 | 30 Oct 2026 | 30 Oct 2026 | Mrs Kamal Devram Hole | Project page |
Documents151
1 document held by Deedo, 150 filings listed on MahaRERA's project page
Finance
- PAN Cardkamal pancard.pdf · uploaded 22 Jan 2022Source
Legal
Show all 151 documentsShow fewer documents
Migrated
- 2 Copy of the legal title reportFormat A (3).pdf · uploaded 22 Jan 2022Source
- 1 Details of encumbrancesEncumbrance.pdf · uploaded 22 Jan 2022Source
- 1 Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 22 Jan 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentLayout Plan.pdf · uploaded 22 Jan 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentcommecment.pdf · uploaded 22 Jan 2022Source
- 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 22 Jan 2022Source
- 1 Declaration in FORM BForm B_compressed.pdf · uploaded 22 Jan 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1_compressed (1).pdf · uploaded 22 Jan 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engg Certificate_compressed.pdf · uploaded 22 Jan 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 22 Jan 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200228600533_For_Asset_Based_Search_22_01_2022_16_47_59_381.pdf · uploaded 22 Jan 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Rera FORM 3_compressed.pdf · uploaded 22 Jan 2022Source
- 1 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 22 Jan 2022Source
- 2 Proforma of Allotment letterAgreement to sale.pdf · uploaded 22 Jan 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 4 Nov 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 4 Nov 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 4 Nov 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Scan 26 Dec 2022.pdf · uploaded 23 Jan 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Devkamal Heights .pdf · uploaded 23 Jan 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)devkamal rera certificate.pdf · uploaded 23 Jan 2023Source
- 1 Disclosure of sold/ booked inventorySold unsold.pdf · uploaded 23 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5.pdf · uploaded 23 Feb 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 (3).pdf · uploaded 10 Apr 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Adobe Scan May 01, 2023 (2).pdf · uploaded 22 May 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM FINAL UPLOAD.pdf · uploaded 20 Jun 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)devkamal f1.pdf · uploaded 22 Jun 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Devkamal Heights F2.pdf · uploaded 1 Jul 2023Source
- 1 Proforma of Agreement for saleREVISED BLANK DRAFT.pdf · uploaded 1 Jul 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Devkamal Realties CA Certificate_compressed.pdf · uploaded 14 Jul 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1 SEP 2023.pdf · uploaded 9 Oct 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Devkamal October 23.pdf · uploaded 9 Oct 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)devkamal.pdf · uploaded 21 Oct 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 .pdf · uploaded 30 Jan 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 26 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Devkamal Realties.pdf · uploaded 18 May 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Devkamal Realties.pdf · uploaded 18 May 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Devkamal Realties (1).pdf · uploaded 23 May 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentComplition Certificate_removed.pdf · uploaded 23 May 2024Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentdevkaml Hights completion letter.pdf · uploaded 23 May 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Archictect Certificate.pdf · uploaded 26 Oct 2024Source
- 1 Architect’s Certificate on Completion of Project (Form 4)Complition Certificate.pdf · uploaded 26 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)signed F2 (1).pdf · uploaded 26 Oct 2024Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)Scan 26 Oct 2024.pdf · uploaded 26 Oct 2024Source
- 2 Architect’s Certificate on Completion of Project (Form 4)GetUserDocumentFileContent.pdf · uploaded 27 Nov 2024Source
- 1 Copy of the legal title reportflow legal report_merged_compressed.pdf · uploaded 21 Dec 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 MARCH 2022.pdf · uploaded 21 Dec 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SEP 2022.pdf · uploaded 21 Dec 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 MARCH 2023.pdf · uploaded 21 Dec 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 JUNE 2023.pdf · uploaded 21 Dec 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SEP 2023.pdf · uploaded 21 Dec 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 DEC 2023.pdf · uploaded 21 Dec 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 MARCH 2024.pdf · uploaded 21 Dec 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SEP2022.pdf · uploaded 21 Dec 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Devkamal Realties.pdf · uploaded 21 Dec 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 JUNE 2023 (2).pdf · uploaded 21 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SEP 2022.pdf · uploaded 21 Dec 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 MARCH 2023.pdf · uploaded 21 Dec 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 MARCH 2022.pdf · uploaded 21 Dec 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 MARCH 2022.pdf · uploaded 21 Dec 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)FORMAT A.pdf · uploaded 21 Dec 2024Source
- 1 Other – TechnicalIOD LETTER.pdf · uploaded 21 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A 2022-2023.pdf · uploaded 21 Dec 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectDisclosure for secured Unsecured.pdf · uploaded 21 Dec 2024Source
- Form 1F1.pdf · uploaded 28 Jul 2025Source
- Form 2F2.pdf · uploaded 28 Jul 2025Source
- Form 3F3.pdf · uploaded 28 Jul 2025Source
- Disclosure of Sold and Booked InventorySU.pdf · uploaded 28 Jul 2025Source
- Form 1F1.pdf · uploaded 28 Jul 2025Source
- Form 2F2.pdf · uploaded 28 Jul 2025Source
- Form 3F3.pdf · uploaded 28 Jul 2025Source
- Disclosure of Sold and Booked InventorySU.pdf · uploaded 28 Jul 2025Source
- Form 1F1.pdf · uploaded 28 Jul 2025Source
- Form 2F2.pdf · uploaded 28 Jul 2025Source
- Form 3F3.pdf · uploaded 28 Jul 2025Source
- Disclosure of Sold and Booked InventorySU.pdf · uploaded 28 Jul 2025Source
- Form 1F1.pdf · uploaded 28 Jul 2025Source
- Form 2F2.pdf · uploaded 28 Jul 2025Source
- Form 3F3.pdf · uploaded 28 Jul 2025Source
- Disclosure of Sold and Booked InventorySU.pdf · uploaded 28 Jul 2025Source
- Form 1F1.pdf · uploaded 13 Dec 2025Source
- Form 2F2.pdf · uploaded 13 Dec 2025Source
- Form 3Form 3 s.pdf · uploaded 13 Dec 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD March 2022.pdf · uploaded 13 Dec 2025Source
- Form 1F1.pdf · uploaded 13 Dec 2025Source
- Form 2F2.pdf · uploaded 13 Dec 2025Source
- Form 3Form 3 s.pdf · uploaded 13 Dec 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD Jun 2022.pdf · uploaded 13 Dec 2025Source
- Form 1F1.pdf · uploaded 13 Dec 2025Source
- Form 2F2.pdf · uploaded 13 Dec 2025Source
- Form 3F3.pdf · uploaded 13 Dec 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD Sep 22.pdf · uploaded 13 Dec 2025Source
- Form 1F1.pdf · uploaded 13 Dec 2025Source
- Form 2F2.pdf · uploaded 13 Dec 2025Source
- Form 3F3.pdf · uploaded 13 Dec 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD Dec 2022 1.pdf · uploaded 13 Dec 2025Source
- Form 5 (FY 2021-2022)2021-22.pdf · uploaded 19 Dec 2025Source
- Form 1F1.pdf · uploaded 27 Dec 2025Source
- Form 2Form 2 s.pdf · uploaded 27 Dec 2025Source
- Form 3Form 3 s.pdf · uploaded 27 Dec 2025Source
- Disclosure of Sold and Booked InventorySU.pdf · uploaded 27 Dec 2025Source
- Form 2A (FY 2021-2022)2A 21-22.pdf · uploaded 6 Jan 2026Source
- Form 2A (FY 2022-2023)2A 22-23.pdf · uploaded 6 Jan 2026Source
- Form 2A (FY 2023-2024)2A 23-24.pdf · uploaded 6 Jan 2026Source
- Form 5 (FY 2022-2023)form 5 rera 22-23 (1).pdf · uploaded 6 Jan 2026Source
- Form 5 (FY 2023-2024)rera form 5 23-24 (1).pdf · uploaded 6 Jan 2026Source
- Form 1Devkamal Form 1.pdf · uploaded 3 Feb 2026Source
- Form 2Devkamal Form 2.pdf · uploaded 3 Feb 2026Source
- Form 3Devkamal Form 3.pdf · uploaded 3 Feb 2026Source
- Disclosure of Sold and Booked InventoryDevkamal Sold Unsold.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1Devkamal Form 1.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1Devkamal Form 1.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1Devkamal Form 1.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 2Devkamal Form 2.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 2Devkamal Form 2.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 2Devkamal Form 2.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3Devkamal Form 3.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3Devkamal Form 3.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3Devkamal Form 3.pdf · uploaded 3 Feb 2026Source
- Form 2A (FY 2024-2025)23-23 2A Devkamal.pdf · uploaded 3 Feb 2026Source
- Form 2A (FY 2025-2026)23-23 2A Devkamal.pdf · uploaded 3 Feb 2026Source
- Form 5 (FY 2024-2025)Devkamal 23-24 Form 5.pdf · uploaded 3 Feb 2026Source
- Occupational Certificatedevkaml Hights completion letter.pdf · uploaded 3 Feb 2026Source
- Occupational CertificateOc Verification.pdf · uploaded 3 Feb 2026Source
- Occupational CertificateDevkamal Sanction.pdf · uploaded 3 Feb 2026Source
- Occupational CertificateDevkamal A.pdf · uploaded 3 Feb 2026Source
Technical
Technical (Architect)
- DocumentArchictect Certificate.pdf · uploaded 26 Oct 2024Source
- DocumentFORM 1 MARCH 2022.pdf · uploaded 21 Dec 2024Source
- DocumentFORM 1 SEP 2022.pdf · uploaded 21 Dec 2024Source
- DocumentFORM 1 MARCH 2023.pdf · uploaded 21 Dec 2024Source
- DocumentFORM 1 JUNE 2023.pdf · uploaded 21 Dec 2024Source
- DocumentFORM 1 SEP 2023.pdf · uploaded 21 Dec 2024Source
- DocumentFORM 1 DEC 2023.pdf · uploaded 21 Dec 2024Source
- DocumentFORM 1 MARCH 2024.pdf · uploaded 21 Dec 2024Source
- DocumentDevkamal Form 1.pdf · uploaded 3 Feb 2026Source
Technical (Engineer)
- Documentsigned F2 (1).pdf · uploaded 26 Oct 2024Source
- DocumentFORM 2 SEP 2022.pdf · uploaded 21 Dec 2024Source
- DocumentFORM 2 MARCH 2023.pdf · uploaded 21 Dec 2024Source
- DocumentFORM 2 MARCH 2022.pdf · uploaded 21 Dec 2024Source
- DocumentFORM 2 MARCH 2022.pdf · uploaded 21 Dec 2024Source
- DocumentDevkamal Form 2.pdf · uploaded 3 Feb 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 73 P CTS NO 4171 RAHATANIat Haveli
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- —12 units in all
- Address
- 73 P Cts No 4171 Rahatani, Rahatani, RahataniPIN 411017
- Village
- Pimpri Chinchawad (M Corp.), Haveli taluka
- Location
- 18.60334, 73.79321
- Land area for this project
- 292 sq m (3,145 sq ft)
- Permissible built-up area
- 722 sq m (7,773 sq ft)
- Sanctioned built-up area
- 722 sq m (7,773 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 76
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
73 P CTS NO 4171 RAHATANI
Boundaries
- North
- Cts No 4197 To 4202
- South
- 9 M Wide D P Road
- East
- Cts No4171 P
- West
- Cts No 4172
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking12 units
12 units registered
| Type | Carpet area | Units |
|---|---|---|
| — | — | 12 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals7
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Gautam Shah | — |
| Chartered accountant | CA Ajinkya Jangada | — |
| Chartered accountant | Mahavir Parakh | — |
| Chartered accountant | Rohit Mane And Co | — |
| Engineer | Mr Rajesh Hole | — |
| Engineer | Rohinee Badgujar | — |
| Other | Kashinath Construction | — |
Source: MahaRERA project page. Contact details are not shown.