Aria
Deedo IDDP-PUN-AY2ACompletion was pushed back 4 months, to Apr 2030; no MahaRERA orders on record; 0% of its units are booked.
Punawale, Pune 411033 · by Aurigaa Realtors
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2030
- This projectRegistered 19 Jun 2025, completion promised 31 Dec 2029, revised to 30 Apr 2030.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
4 buildings
Open a building to see every flat, floor by floor.
- A Building17 floors · 134 units0% booked
- B Building16 floors · 188 units0% booked
- C Building16 floors · 33 units0% booked
- D Building2 floors · 4 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100080612
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100080612 | 19 Jun 2025 | 31 Dec 2029 | 30 Apr 2030 | Aurigaa Realtors | Project page |
Documents137
1 document held by Deedo, 136 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD.pdf · uploaded 25 Apr 2025Source
Legal
Migrated
- 1 PAN CardPAN CARD.pdf · uploaded 25 Apr 2025Source
- 1 Copy of the legal title reportTITLE REPORT.pdf · uploaded 25 Apr 2025Source
- 1 a Details of encumbrances concerned to FinanceENCUMBERENCE DETAILS.pdf · uploaded 25 Apr 2025Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT PLAN.pdf · uploaded 25 Apr 2025Source
Show all 137 documentsShow fewer documents
Migrated
- 1 Proforma of Allotment letterALLOTTMENT LETTER NEW.pdf · uploaded 25 Apr 2025Source
- 1 Declaration in FORM BFORM B PROMOTER.pdf · uploaded 25 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 25 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 25 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 25 Apr 2025Source
- 1 Commencement Certificates / NA Order for plotted development1 Commencement Certificates _ NA Order for plotted development-1-4.pdf · uploaded 25 Apr 2025Source
- 17 Building Plan Approval / NA Order for plotted developmentPLAN 17.pdf · uploaded 25 Apr 2025Source
- 16 Building Plan Approval / NA Order for plotted developmentPLAN 16.pdf · uploaded 25 Apr 2025Source
- 15 Building Plan Approval / NA Order for plotted developmentPLAN 15.pdf · uploaded 25 Apr 2025Source
- 14 Building Plan Approval / NA Order for plotted developmentPLAN 14.pdf · uploaded 25 Apr 2025Source
- 13 Building Plan Approval / NA Order for plotted developmentPLAN 13.pdf · uploaded 25 Apr 2025Source
- 12 Building Plan Approval / NA Order for plotted developmentPLAN 12.pdf · uploaded 25 Apr 2025Source
- 11 Building Plan Approval / NA Order for plotted developmentPLAN 11.pdf · uploaded 25 Apr 2025Source
- 10 Building Plan Approval / NA Order for plotted developmentPLAN 10.pdf · uploaded 25 Apr 2025Source
- 8 Building Plan Approval / NA Order for plotted developmentPLAN 8.pdf · uploaded 25 Apr 2025Source
- 7 Building Plan Approval / NA Order for plotted developmentPLAN 7.pdf · uploaded 25 Apr 2025Source
- 6 Building Plan Approval / NA Order for plotted developmentPLAN 6.pdf · uploaded 25 Apr 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentPLAN 5.pdf · uploaded 25 Apr 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentPLAN 4.pdf · uploaded 25 Apr 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentPLAN 3.pdf · uploaded 25 Apr 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentPLAN 2.pdf · uploaded 25 Apr 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentPLAN 1.pdf · uploaded 25 Apr 2025Source
- 9 Building Plan Approval / NA Order for plotted developmentPLAN 9.pdf · uploaded 25 Apr 2025Source
- 1 Declaration about Commencement CertificateCC DECLARATION.pdf · uploaded 25 Apr 2025Source
- 1 CERSAI detailsCERSAI DETAILS.pdf · uploaded 25 Apr 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)FORMAT A FINAL.pdf · uploaded 25 Apr 2025Source
- 1 Deviation Report with respect to Allotment letterDEVIATION REPORT.pdf · uploaded 25 Apr 2025Source
- 1 b Details of encumbrances concerned to LegalENCUMBERENCE DETAILS.pdf · uploaded 25 Apr 2025Source
- 1 Other – TechnicalANNEXURE A.pdf · uploaded 25 Apr 2025Source
- 1 Deviation Report with respect to model copy of AgreementDEVIATION REPORT OF AN AGREEMENT.pdf · uploaded 25 Apr 2025Source
- 1 Proforma of Agreement for saleAGREEMENT TO SELL FINAL.pdf · uploaded 25 Apr 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDISCLOSURE OF INTEREST.pdf · uploaded 25 Apr 2025Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)FORMAT B NEW.pdf · uploaded 25 Apr 2025Source
- 1 Disclosure for secured/unsecured finance availed for the projectDisclosure-Aria_compressed.pdf · uploaded 25 Apr 2025Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 16 Aug 2025Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 16 Aug 2025Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 16 Aug 2025Source
- Withdrawal Update Form 1Aria Form 1.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 2Aria Form 2.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 3Aria Form 3.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 1Form 1 Aria.pdf · uploaded 14 Jan 2026Source
- Withdrawal Update Form 2Form 2 Aria.pdf · uploaded 14 Jan 2026Source
- Withdrawal Update Form 3Form 3 Aria.pdf · uploaded 14 Jan 2026Source
- Withdrawal Update Form 1Aria Form 1.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2Form 2 Aria.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3Form 3 Aria.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1Form 1 Aria.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2Form 2 Aria.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3Form 3 Aria.pdf · uploaded 20 Jul 2026Source
- Form 2A (FY 2025-2026)Form 2 A Aria.pdf · uploaded 6 Aug 2026Source
- Form 5 (FY 2025-2026)Form 5 both signed Aria.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 1Q2 Form 1 Aria.pdf · uploaded 9 Oct 2026Source
- Withdrawal Update Form 2Q2 Form 2 Aria.pdf · uploaded 9 Oct 2026Source
- Withdrawal Update Form 3Form 3 Aria.pdf · uploaded 9 Oct 2026Source
Technical
- DocumentLAYOUT PLAN.pdf · uploaded 25 Apr 2025Source
- DocumentPLAN 1.pdf · uploaded 25 Apr 2025Source
- DocumentPLAN 2.pdf · uploaded 25 Apr 2025Source
- DocumentPLAN 3.pdf · uploaded 25 Apr 2025Source
- DocumentPLAN 4.pdf · uploaded 25 Apr 2025Source
- DocumentPLAN 5.pdf · uploaded 25 Apr 2025Source
- DocumentPLAN 6.pdf · uploaded 25 Apr 2025Source
- DocumentPLAN 7.pdf · uploaded 25 Apr 2025Source
- DocumentPLAN 8.pdf · uploaded 25 Apr 2025Source
- DocumentPLAN 9.pdf · uploaded 25 Apr 2025Source
- DocumentPLAN 10.pdf · uploaded 25 Apr 2025Source
- DocumentPLAN 11.pdf · uploaded 25 Apr 2025Source
- DocumentPLAN 12.pdf · uploaded 25 Apr 2025Source
- DocumentPLAN 13.pdf · uploaded 25 Apr 2025Source
- DocumentPLAN 14.pdf · uploaded 25 Apr 2025Source
- DocumentPLAN 15.pdf · uploaded 25 Apr 2025Source
- DocumentPLAN 16.pdf · uploaded 25 Apr 2025Source
- DocumentPLAN 17.pdf · uploaded 25 Apr 2025Source
- Other – TechnicalANNEXURE A.pdf · uploaded 25 Apr 2025Source
- DocumentLayout.pdf · uploaded 23 Aug 2025Source
- DocumentC 2.pdf · uploaded 25 Aug 2025Source
- DocumentC3.pdf · uploaded 25 Aug 2025Source
- DocumentC4.pdf · uploaded 25 Aug 2025Source
- DocumentC5.pdf · uploaded 25 Aug 2025Source
- DocumentC6.pdf · uploaded 25 Aug 2025Source
- DocumentC7.pdf · uploaded 25 Aug 2025Source
- DocumentC8.pdf · uploaded 25 Aug 2025Source
- DocumentC9.pdf · uploaded 25 Aug 2025Source
- DocumentC10.pdf · uploaded 25 Aug 2025Source
- DocumentC11.pdf · uploaded 25 Aug 2025Source
- DocumentC12.pdf · uploaded 25 Aug 2025Source
- DocumentC13.pdf · uploaded 25 Aug 2025Source
- DocumentC14.pdf · uploaded 25 Aug 2025Source
- DocumentC15.pdf · uploaded 25 Aug 2025Source
- DocumentC16.pdf · uploaded 25 Aug 2025Source
- DocumentC17.pdf · uploaded 25 Aug 2025Source
- DocumentC18.pdf · uploaded 25 Aug 2025Source
- DocumentPlan 1.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 2.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 3.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 4.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 5.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 6.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 7.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 8.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 9.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 10.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 11.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 12.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 13.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 14.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 15.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 16.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 17.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 18.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 1.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 2.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 3.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 4.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 5.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 6.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 7.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 8.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 9.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 10.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 11.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 12.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 13.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 14.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 15.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 16.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 17.pdf · uploaded 3 Apr 2026Source
- DocumentPlan 18.pdf · uploaded 3 Apr 2026Source
Technical (Architect)
- DocumentQ2 Form 1 Aria.pdf · uploaded 6 Oct 2026Source
Technical (Engineer)
- DocumentQ2 Form 2 Aria.pdf · uploaded 6 Oct 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 10/1C (PT)+10/1D/2 (PT), 10/2 (PT)
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, Shop, 2BHK, 3BHK359 units in all
- Address
- Survey No. 10 (Pt), Hissa No. 10/1a+10/1b, 10/1c (Pt)+10/1d/2 (Pt), 10/2 (Pt), Plot No. A, Punawale, PunawalePIN 411033
- Village
- Punawale, Mulshi taluka
- Location
- 18.69486, 73.74876
- Land area for this project
- 10,537 sq m (1,13,421 sq ft)
- Permissible built-up area
- 41,778 sq m (4,49,695 sq ft)
- Sanctioned built-up area
- 41,768 sq m (4,49,585 sq ft)
- Recreational open space
- 1,054 sq m (11,347 sq ft)
- Designated bank account
- 220
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SURVEY NO. 10 (PT), HISSA NO. 10/1A+10/1B, 10/1C (PT)+10/1D/2 (PT), 10/2 (PT), PLOT NO. A
Boundaries
- North
- SURVEY NO 10 Part
- South
- 18 Mtr Dp Road
- East
- Project Of Aurigaa Realtors
- West
- Project Of Paras Multispace LLP
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking359 units
0 of 359 units booked (0%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Building | 1BHK | 43.33 sq m · 466 sq ft | 2 | 0 |
| A Building | 1BHK | 43.68 sq m · 470 sq ft | 1 | 0 |
| A Building | 1BHK | 44.93 sq m · 484 sq ft | 1 | 0 |
| A Building | 1BHK | 46.35 sq m · 499 sq ft | 19 | 0 |
| A Building | 1BHK | 46.36 sq m · 499 sq ft | 30 | 0 |
| A Building | 1BHK | 46.37 sq m · 499 sq ft | 13 | 0 |
| A Building | 1BHK | 47.39 sq m · 510 sq ft | 1 | 0 |
| A Building | 1BHK | 47.63 sq m · 513 sq ft | 16 | 0 |
Show all 40 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Building | 1BHK | 47.92 sq m · 516 sq ft | 16 | 0 |
| A Building | 1BHK | 48.1 sq m · 518 sq ft | 33 | 0 |
| A Building | Shop | 121.27 sq m · 1,305 sq ft | 1 | 0 |
| A Building | Shop | 175.48 sq m · 1,889 sq ft | 1 | 0 |
| B Building | 2BHK | 51.98 sq m · 560 sq ft | 2 | 0 |
| B Building | 2BHK | 52.1 sq m · 561 sq ft | 3 | 0 |
| B Building | 2BHK | 52.13 sq m · 561 sq ft | 1 | 0 |
| B Building | 2BHK | 52.16 sq m · 561 sq ft | 3 | 0 |
| B Building | 2BHK | 52.17 sq m · 562 sq ft | 1 | 0 |
| B Building | 2BHK | 52.25 sq m · 562 sq ft | 2 | 0 |
| B Building | 2BHK | 59.96 sq m · 645 sq ft | 15 | 0 |
| B Building | 2BHK | 59.98 sq m · 646 sq ft | 15 | 0 |
| B Building | 2BHK | 60.1 sq m · 647 sq ft | 82 | 0 |
| B Building | 2BHK | 60.11 sq m · 647 sq ft | 15 | 0 |
| B Building | 2BHK | 60.16 sq m · 648 sq ft | 15 | 0 |
| B Building | 2BHK | 60.2 sq m · 648 sq ft | 15 | 0 |
| B Building | 2BHK | 60.27 sq m · 649 sq ft | 15 | 0 |
| B Building | 2BHK | 86.34 sq m · 929 sq ft | 4 | 0 |
| C Building | 2BHK | 59.66 sq m · 642 sq ft | 2 | 0 |
| C Building | 2BHK | 59.8 sq m · 644 sq ft | 3 | 0 |
| C Building | 2BHK | 59.85 sq m · 644 sq ft | 3 | 0 |
| C Building | 2BHK | 59.98 sq m · 646 sq ft | 2 | 0 |
| C Building | 2BHK | 60.05 sq m · 646 sq ft | 2 | 0 |
| C Building | 2BHK | 60.09 sq m · 647 sq ft | 3 | 0 |
| C Building | 2BHK | 60.1 sq m · 647 sq ft | 3 | 0 |
| C Building | 2BHK | 60.15 sq m · 647 sq ft | 3 | 0 |
| C Building | 2BHK | 60.19 sq m · 648 sq ft | 3 | 0 |
| C Building | 2BHK | 60.22 sq m · 648 sq ft | 3 | 0 |
| C Building | 2BHK | 60.31 sq m · 649 sq ft | 6 | 0 |
| D Building | 3BHK | 88.56 sq m · 953 sq ft | 2 | 0 |
| D Building | 3BHK | 88.57 sq m · 953 sq ft | 1 | 0 |
| D Building | 3BHK | 88.66 sq m · 954 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Manoj Tatooskar | — |
| Chartered accountant | Azam Mulani And Associates | — |
| Engineer | Rohinee Badgujar | — |
| Engineer | Shriram Lomate | — |
Source: MahaRERA project page. Contact details are not shown.