Skip to content
Residential / Group Housing · 2 buildings · 112 unitsRERA P52100046393 +1

Ashapuri Vrundavan

Deedo IDDP-PUN-KF3H

Completion was pushed back 4 months to Oct 2026, and that date has passed too; no MahaRERA orders on record; 71% of its units are booked.

Pirangut, Pune 412115 · Property rates in Pirangut · by Ashapuri Developers

Delivery5 mo latePromised Jun 2026 · revised Oct 2026 · that date has passed tooRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales71% booked80 of 112 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months to Oct 2026, and that date has passed too

  • P52100046393Registered 22 Jun 2022, completion promised 30 Jun 2026, revised to 30 Oct 2026, and still not shown completed today.
  • P52100050898Registered 15 May 2023, completion promised 30 Jun 2026, revised to 30 Oct 2026, and still not shown completed today.

No extension certificate on record.

2 registrations · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrations2
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210004639322 Jun 202230 Jun 202630 Oct 2026Ashapuri DevelopersProject page
P5210005089815 May 202330 Jun 202630 Oct 2026Ashapuri DevelopersProject page
Documents203

2 documents held by Deedo, 201 filings listed on MahaRERA's project page

Registration certificate (2)

  • Registration certificateP52100050898 · 15 May 2023ViewSource
  • Registration certificateP52100046393 · 12 Aug 2026ViewSource

Finance

  • PAN CardP52100046393 · pan card.pdf · uploaded 10 Jun 2022Source
  • PAN CardP52100050898 · pan card.pdf · uploaded 18 Feb 2023Source

Legal

  • Declaration Form BP52100046393 · form b.pdf · uploaded 31 May 2022Source
  • Legal Title reportP52100046393 · title search new rera_11zon.pdf · uploaded 17 Jun 2022Source
  • Legal Title reportP52100050898 · legal Title Report_compressed.pdf · uploaded 22 Feb 2023Source
  • Declaration Form BP52100050898 · Form 'B' N K_11zon.pdf · uploaded 22 Feb 2023Source
Show all 203 documentsShow fewer documents

Migrated

  • 1 Commencement Certificates / NA Order for plotted developmentP52100046393 · commencement new.pdf · uploaded 25 May 2022Source
  • 1 Details of encumbrancesP52100046393 · encumbrance.pdf · uploaded 31 May 2022Source
  • 1 Copy of Layout Approval (in case of layout)P52100046393 · layout-compressed.pdf · uploaded 31 May 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100046393 · building plan b1 (1).pdf · uploaded 31 May 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100046393 · building plan b2 (1).pdf · uploaded 31 May 2022Source
  • 1 Declaration about Commencement CertificateP52100046393 · form d.pdf · uploaded 31 May 2022Source
  • 1 Declaration in FORM BP52100046393 · form b.pdf · uploaded 31 May 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046393 · form 1 arch cert.pdf · uploaded 31 May 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046393 · form 2 engi cert.pdf · uploaded 31 May 2022Source
  • 1 Proforma of Allotment letterP52100046393 · agreement to sale.pdf · uploaded 31 May 2022Source
  • 2 Proforma of Allotment letterP52100046393 · Allotment Letter - Ashapuri Vrindavan.pdf · uploaded 31 May 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046393 · form 3.pdf · uploaded 7 Jun 2022Source
  • 1 PAN CardP52100046393 · pan card.pdf · uploaded 10 Jun 2022Source
  • 1 Copy of the legal title reportP52100046393 · title search new rera_11zon.pdf · uploaded 17 Jun 2022Source
  • 1 CERSAI detailsP52100046393 · cersai new.pdf · uploaded 17 Jun 2022Source
  • 2 Copy of Layout Approval (in case of layout)P52100046393 · layoutnew1_compressed.pdf · uploaded 18 Oct 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentP52100046393 · wingB1new_compressed.pdf · uploaded 18 Oct 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentP52100046393 · wingB2new_compressed.pdf · uploaded 18 Oct 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52100046393 · COMMENCEMENT NEW compressed.pdf · uploaded 18 Oct 2022Source
  • 2 Declaration about Commencement CertificateP52100046393 · declaration COMMENC new ORIG.pdf · uploaded 18 Oct 2022Source
  • 1 PAN CardP52100050898 · pan card.pdf · uploaded 18 Feb 2023Source
  • 1 Copy of Layout Approval (in case of layout)P52100050898 · layoutnew1_compressed.pdf · uploaded 18 Feb 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100050898 · commencement 171022.pdf · uploaded 18 Feb 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050898 · form 1 v phase2_11zon.pdf · uploaded 18 Feb 2023Source
  • 1 Proforma of Allotment letterP52100050898 · allotment v phase 2 compressed.pdf · uploaded 18 Feb 2023Source
  • 1 Declaration about Commencement CertificateP52100050898 · Format D.pdf · uploaded 20 Feb 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP52100050898 · Annexure A.pdf · uploaded 20 Feb 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsP52100050898 · Annexure A Mihir.pdf · uploaded 20 Feb 2023Source
  • 1 Copy of the legal title reportP52100050898 · legal Title Report_compressed.pdf · uploaded 22 Feb 2023Source
  • 1 Declaration in FORM BP52100050898 · Form 'B' N K_11zon.pdf · uploaded 22 Feb 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050898 · FORM 2 ENGG CERT.pdf · uploaded 25 Feb 2023Source
  • 1 CERSAI detailsP52100050898 · CERSAI UNDERTAKING.pdf · uploaded 25 Feb 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050898 · form 3 ca cert_11zon.pdf · uploaded 25 Feb 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100050898 · building a.pdf · uploaded 28 Feb 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100050898 · layout vrundavan.pdf · uploaded 28 Feb 2023Source
  • 1 Proforma of Agreement for saleP52100050898 · MODEL FORM OF AGREEMENT RERA - Ashapuri Vrindavan II.pdf · uploaded 12 Mar 2023Source
  • 1 Deviation Report with respect to model copy of AgreementP52100050898 · No Deviation declaration.pdf · uploaded 12 Mar 2023Source
  • 1 a Details of encumbrances concerned to FinanceP52100050898 · encumbrance legal 2.pdf · uploaded 17 Mar 2023Source
  • 1 b Details of encumbrances concerned to LegalP52100050898 · encumbrance legal 2.pdf · uploaded 17 Mar 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100050898 · SEPERATE BANK AC FORMAT A (2).pdf · uploaded 17 Mar 2023Source
  • 1 Deviation Report with respect to Allotment letterP52100050898 · Deviation Report - Allotment Letter - revised.pdf · uploaded 24 Mar 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100046393 · form2A 22-23.pdf · uploaded 18 Sep 2023Source
  • 1 Disclosure of sold/ booked inventoryP52100046393 · SOLD UNSOLD sep 23.pdf · uploaded 18 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100046393 · form5 22-23.pdf · uploaded 18 Sep 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100046393 · FORM -2A VRUNDAVAN-1 31-03-24.pdf · uploaded 14 Jun 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100050898 · FORM-2A VRUNDAVAN-2 31-03-24.pdf · uploaded 2 Aug 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050898 · FORM 3 Vrundhavan - 2 31-12-23_compressed.pdf · uploaded 2 Aug 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050898 · FORM 3 VRUNDAVAN-2 31-03-24_compressed.pdf · uploaded 2 Aug 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050898 · Form 1 vrundavan phase 2 march 24.pdf · uploaded 19 Oct 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050898 · Form 1 vrundavan phase 2 march 24.pdf · uploaded 19 Oct 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050898 · form 1 vrundavan phase 31 dec 23.pdf · uploaded 19 Oct 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050898 · form 1 Vrundavan phase 30 jun 24.pdf · uploaded 19 Oct 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050898 · form 1 vrundavan phase 2 September 24.pdf · uploaded 19 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050898 · Form-3 Vrundavan phase-2 Dec 23_compressed.pdf · uploaded 19 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050898 · form 2 vrudavan phase dec 23.pdf · uploaded 19 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050898 · form 2 vrundavan phase 2 mar 24.pdf · uploaded 19 Oct 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050898 · form 2 vrundavan phase 2 june 24.pdf · uploaded 19 Oct 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050898 · form 2 vrundavan phase 2 sept 24.pdf · uploaded 19 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryP52100050898 · sold unsold Vrundavan phase-2 june 24.pdf · uploaded 19 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryP52100050898 · sold unsold Vrundavan phase-2 sept 24.pdf · uploaded 19 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046393 · form 1 vrundavan phase 1 dec 22.pdf · uploaded 19 Oct 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046393 · form 1 vrundavan phase 1 mar 23.pdf · uploaded 19 Oct 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046393 · form 1 vrundavan phase 1 june 23.pdf · uploaded 19 Oct 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046393 · form 1 vrundavan phase 1 sept 23.pdf · uploaded 19 Oct 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046393 · form 1 vrundavan phase 1 dec 23.pdf · uploaded 19 Oct 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046393 · form 1 vrundavan phase 1 march 24.pdf · uploaded 19 Oct 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046393 · form 1 vrundavan Phase 1 June 24.pdf · uploaded 19 Oct 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046393 · form 1 vrundavan Phase 1 sept 24.pdf · uploaded 19 Oct 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046393 · form 3 vrundavan phase 1 dec 23_11zon.pdf · uploaded 19 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046393 · form 3 vrundavan phase 1 june 23_11zon.pdf · uploaded 19 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046393 · form 3 vrundavan phase 1 mar 23_11zon.pdf · uploaded 19 Oct 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046393 · form 3 vrundavan phase 1 mar 24_11zon.pdf · uploaded 19 Oct 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046393 · form 2 vrundavan phase 1 mar 24.pdf · uploaded 19 Oct 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046393 · form 2 vrundavan phase 1 sept 24.pdf · uploaded 19 Oct 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046393 · Form 2 vrundavan phase 1 june 24.pdf · uploaded 19 Oct 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046393 · form 2 vrundavan phase 1 dec 23.pdf · uploaded 19 Oct 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046393 · form 2 vrundavan phase 1 sept 23.pdf · uploaded 19 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046393 · Form 2 vrundavan phase 1 june 23.pdf · uploaded 19 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046393 · form 2 vrundavan phase 1 mar 23.pdf · uploaded 19 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryP52100046393 · Sold unsold Vrundavan phase-1 june 24.pdf · uploaded 19 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryP52100046393 · sold unsold Vrundavan phase-1 sept 24.pdf · uploaded 19 Oct 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100046393 · form 2A vrundavan phase 1 mar 23.pdf · uploaded 19 Oct 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100046393 · form 2A vrundavan phase 1 mar 24.pdf · uploaded 19 Oct 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050898 · Form-1 vrundavan phase-2 june 23.pdf · uploaded 7 Nov 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050898 · Form-1 vrundavan phase-2 Sept 23.pdf · uploaded 7 Nov 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050898 · Form-3 Ashapuri Vrundavan phase-2 sept 24_compressed.pdf · uploaded 7 Nov 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050898 · Form-2 Vrundavan phase-2 sept 23.pdf · uploaded 7 Nov 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046393 · Form-1 vrundavan phase-1 Sept 22.pdf · uploaded 7 Nov 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046393 · Form-3 Ashapuri Vrundavan phase-1 june 24_11zon.pdf · uploaded 7 Nov 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046393 · Form-3 Ashapuri Vrundavan phase-1 sept 24_11zon.pdf · uploaded 7 Nov 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046393 · Form-3 Ashapuri Vrundavan phase-1 sept 23_11zon.pdf · uploaded 7 Nov 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046393 · Form-3 Ashapuri Vrundavan phase-1 sept 22_11zon.pdf · uploaded 7 Nov 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046393 · Form-2 Vrundavan phase-1 Dec 22.pdf · uploaded 7 Nov 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046393 · Form-2 Ashapuri Vrundavan phase-1 sept 22.pdf · uploaded 7 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050898 · Form-1 VRUNDHAVAN PHASE-2 31dec24.pdf · uploaded 7 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050898 · Form-3 VRUNDHAVAN PHASE-2 31dec24_compressed.pdf · uploaded 7 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050898 · Form-2 VRUNDHAVAN PHASE-2 31dec24.pdf · uploaded 7 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100050898 · Form-5 Vrundavan phase-2 31march24.pdf · uploaded 7 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046393 · Form-1 VRUNDHAVAN PHASE-1 31dec24.pdf · uploaded 7 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046393 · Form-3 VRUNDHAVAN PHASE-1 31dec24_compressed.pdf · uploaded 7 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046393 · FORM-2 VRUNDAVAN PHASE-1 31 DES 24.pdf · uploaded 7 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100046393 · Form-5 Vrundavan phase-1 31march24.pdf · uploaded 7 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050898 · Form 1 Vrundavan phase-2 march 25.pdf · uploaded 17 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050898 · Form-2 Vrundavan phase-2 march25.pdf · uploaded 17 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046393 · Form-2 Vrundavan phase-1 march25.pdf · uploaded 17 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050898 · FORM-3 _compressed (2).pdf · uploaded 3 May 2025Source
  • Form 1P52100046393 · Form 1 Vrundavan phase-1 march 25 (1).pdf · uploaded 26 May 2025Source
  • Form 2P52100046393 · Form-2 Vrundavan phase-1 march25.pdf · uploaded 26 May 2025Source
  • Form 3P52100046393 · FORM 3 CA CERTIFICATE.pdf · uploaded 26 May 2025Source
  • Disclosure of Sold and Booked InventoryP52100046393 · SOLD UNSOLD INVENTORY.pdf · uploaded 26 May 2025Source
  • Form 1P52100050898 · FORM 1 - 31-03-2025.pdf · uploaded 28 May 2025Source
  • Form 2P52100050898 · FORM 2 - 31-03-2025.pdf · uploaded 28 May 2025Source
  • Form 3P52100050898 · FORM 3 - 31-03-2025.pdf · uploaded 28 May 2025Source
  • Disclosure of Sold and Booked InventoryP52100050898 · a vrundavan phase 2 inventory.pdf · uploaded 28 May 2025Source
  • Form 1P52100050898 · Form-1 ARCHITECT CERTIFICATE.pdf · uploaded 6 Aug 2025Source
  • Form 2P52100050898 · Form-2 ENGINEER CERTIFICATE.pdf · uploaded 6 Aug 2025Source
  • Form 3P52100050898 · FORM 3 CA CERTIFICATE.pdf · uploaded 6 Aug 2025Source
  • Disclosure of Sold and Booked InventoryP52100050898 · SOLD UNSOLD INVENTORY.pdf · uploaded 6 Aug 2025Source
  • Form 2A (FY 2024-2025)P52100046393 · Form 2A Vrundavan phase-1 2024-2025.pdf · uploaded 6 Aug 2025Source
  • Form 5 (FY 2023-2024)P52100046393 · form 5 vrundavan phase 1 2023-2024.pdf · uploaded 6 Aug 2025Source
  • Withdrawal Update Form 1P52100046393 · FORM 1 ARCHITECT CERTIFICATE.pdf · uploaded 11 Nov 2025Source
  • Withdrawal Update Form 2P52100046393 · FORM 2 ENGINEERS CERTIFICATE.pdf · uploaded 11 Nov 2025Source
  • Withdrawal Update Form 3P52100046393 · FORM 3 CA CERTIFICATE.pdf · uploaded 11 Nov 2025Source
  • Withdrawal Update Form 1P52100046393 · Form-1 Vrundavan phase-1 17-11-2025.pdf · uploaded 17 Nov 2025Source
  • Withdrawal Update Form 2P52100046393 · form 2 Ashapuri Vrundavan phase I Sept 2025.pdf · uploaded 17 Nov 2025Source
  • Withdrawal Update Form 3P52100046393 · form 3 Vrundavan -Phase I 17-11-2025.pdf · uploaded 17 Nov 2025Source
  • Withdrawal Update Form 1P52100050898 · FORM-1 VRUNDHAVAN PHASE-2 1 sept 2025.pdf · uploaded 19 Nov 2025Source
  • Withdrawal Update Form 2P52100050898 · form 2 Ashapuri Vrundavan phase II Sept 2025.pdf · uploaded 19 Nov 2025Source
  • Withdrawal Update Form 3P52100050898 · form 3 Ashapuri Vrundavan phase II 19-11-2025.pdf · uploaded 19 Nov 2025Source
  • Form 5 (FY 2024-2025)P52100050898 · Form 5 Vrundavan phase II April 2024-2025.pdf · uploaded 4 Feb 2026Source
  • Form 5 (FY 2024-2025)P52100046393 · FORM-5 year 24-25 AD_Vrundavan Phase I (1).pdf · uploaded 26 Feb 2026Source
  • Withdrawal Update Form 1P52100050898 · FORM 1 VRUNDAVAN PHASE 2.pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 2P52100050898 · Form 2 Vrundavan phase II.pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 3P52100050898 · FORM 3 VRUNDAVAN PHASE 2.pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 1P52100046393 · Form 1 Vrundavan phase 1.pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 2P52100046393 · FORM 2.pdf · uploaded 27 Feb 2026Source
  • Withdrawal Update Form 3P52100046393 · FORM-3 VRUNDAVAN PHASE-1 DECEMBER 25.pdf · uploaded 27 Feb 2026Source
  • Form 5 (FY 2025-2026)P52100046393 · FORM-5 _FY 25-26 AV_Phase I.pdf · uploaded 21 Sep 2026Source
  • Withdrawal Update Form 1P52100050898 · FORM 1.pdf · uploaded 23 Sep 2026Source
  • Withdrawal Update Form 2P52100050898 · FORM 2.pdf · uploaded 23 Sep 2026Source
  • Withdrawal Update Form 3P52100050898 · FORM 3.pdf · uploaded 23 Sep 2026Source
  • Form 5 (FY 2025-2026)P52100050898 · FORM-5 _FY 25-26 AV_Phase II.pdf · uploaded 23 Sep 2026Source
  • Withdrawal Update Form 1P52100046393 · FORM 1.pdf · uploaded 23 Sep 2026Source
  • Withdrawal Update Form 2P52100046393 · FORM 2.pdf · uploaded 23 Sep 2026Source
  • Withdrawal Update Form 3P52100046393 · FORM 3.pdf · uploaded 23 Sep 2026Source

Technical

  • DocumentP52100046393 · layout-compressed.pdf · uploaded 31 May 2022Source
  • DocumentP52100046393 · building plan b1 (1).pdf · uploaded 31 May 2022Source
  • DocumentP52100046393 · building plan b2 (1).pdf · uploaded 31 May 2022Source
  • DocumentP52100046393 · layoutnew1_compressed.pdf · uploaded 18 Oct 2022Source
  • DocumentP52100046393 · wingB1new_compressed.pdf · uploaded 18 Oct 2022Source
  • DocumentP52100046393 · wingB2new_compressed.pdf · uploaded 18 Oct 2022Source
  • DocumentP52100050898 · layoutnew1_compressed.pdf · uploaded 18 Feb 2023Source
  • DocumentP52100050898 · building a.pdf · uploaded 28 Feb 2023Source
  • DocumentP52100050898 · layout vrundavan.pdf · uploaded 28 Feb 2023Source

Technical (Architect)

  • DocumentP52100050898 · Form 1 vrundavan phase 2 march 24.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100050898 · Form 1 vrundavan phase 2 march 24.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100050898 · form 1 vrundavan phase 31 dec 23.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100050898 · form 1 Vrundavan phase 30 jun 24.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100050898 · form 1 vrundavan phase 2 September 24.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100046393 · form 1 vrundavan phase 1 dec 22.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100046393 · form 1 vrundavan phase 1 mar 23.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100046393 · form 1 vrundavan phase 1 june 23.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100046393 · form 1 vrundavan phase 1 sept 23.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100046393 · form 1 vrundavan phase 1 dec 23.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100046393 · form 1 vrundavan phase 1 march 24.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100046393 · form 1 vrundavan Phase 1 June 24.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100046393 · form 1 vrundavan Phase 1 sept 24.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100050898 · Form-1 vrundavan phase-2 june 23.pdf · uploaded 7 Nov 2024Source
  • DocumentP52100050898 · Form-1 vrundavan phase-2 Sept 23.pdf · uploaded 7 Nov 2024Source
  • DocumentP52100046393 · Form-1 vrundavan phase-1 Sept 22.pdf · uploaded 7 Nov 2024Source
  • DocumentP52100050898 · Form-1 VRUNDHAVAN PHASE-2 31dec24.pdf · uploaded 7 Feb 2025Source
  • DocumentP52100046393 · Form-1 VRUNDHAVAN PHASE-1 31dec24.pdf · uploaded 7 Feb 2025Source
  • DocumentP52100050898 · Form 1 Vrundavan phase-2 march 25.pdf · uploaded 17 Apr 2025Source
  • DocumentP52100046393 · FORM 1.pdf · uploaded 23 Sep 2026Source
  • DocumentP52100050898 · FORM 1.pdf · uploaded 30 Sep 2026Source

Technical (Engineer)

  • DocumentP52100050898 · form 2 vrudavan phase dec 23.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100050898 · form 2 vrundavan phase 2 mar 24.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100050898 · form 2 vrundavan phase 2 june 24.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100050898 · form 2 vrundavan phase 2 sept 24.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100046393 · form 2 vrundavan phase 1 mar 23.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100046393 · Form 2 vrundavan phase 1 june 23.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100046393 · form 2 vrundavan phase 1 sept 23.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100046393 · form 2 vrundavan phase 1 dec 23.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100046393 · form 2 vrundavan phase 1 mar 24.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100046393 · Form 2 vrundavan phase 1 june 24.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100046393 · form 2 vrundavan phase 1 sept 24.pdf · uploaded 19 Oct 2024Source
  • DocumentP52100050898 · Form-2 Vrundavan phase-2 sept 23.pdf · uploaded 7 Nov 2024Source
  • DocumentP52100046393 · Form-2 Ashapuri Vrundavan phase-1 sept 22.pdf · uploaded 7 Nov 2024Source
  • DocumentP52100046393 · Form-2 Vrundavan phase-1 Dec 22.pdf · uploaded 7 Nov 2024Source
  • DocumentP52100050898 · Form-2 VRUNDHAVAN PHASE-2 31dec24.pdf · uploaded 7 Feb 2025Source
  • DocumentP52100046393 · FORM-2 VRUNDAVAN PHASE-1 31 DES 24.pdf · uploaded 7 Feb 2025Source
  • DocumentP52100050898 · Form-2 Vrundavan phase-2 march25.pdf · uploaded 17 Apr 2025Source
  • DocumentP52100046393 · Form-2 Vrundavan phase-1 march25.pdf · uploaded 17 Apr 2025Source
  • DocumentP52100050898 · FORM 2.pdf · uploaded 23 Sep 2026Source
  • DocumentP52100046393 · FORM 2.pdf · uploaded 23 Sep 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel gat no.320

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Phases
2
Unit types
—, 1BHK, 2BHK112 units in all
Address
gat no.320, gatno.320, near pirangut ghatPIN 412115
Village
Pirangut, Mulshi taluka
Land area for this project
1,657 sq m (17,836 sq ft)
Permissible built-up area
2,553 sq m (27,478 sq ft)
Sanctioned built-up area
2,119 sq m (22,805 sq ft)
Recreational open space
397 sq m (4,270 sq ft)
Designated bank account
99
Developed in phases
No
Also registered as
Ashapuri Vrundavan Phase I, Ashapuri Vrundavan Phase II

Survey, CTS, gat or plot numbers

gat no.320

Land as published on MahaRERA's project page

gat no.320

Boundaries

North
damu mukinda gole
South
ramchandra malhari gole
East
pune paud road
West
sangita ashok gole

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking112 units

80 of 112 units booked (71%), as the promoter reported to MahaRERA

— · 32 units1BHK · 60 units2BHK · 20 units
RERABuildingTypeCarpet areaUnitsBooked
P52100050898Building A——32—
P52100046393Building B1BHK38.64 sq m · 416 sq ft1010
P52100046393Building B1BHK38.85 sq m · 418 sq ft1010
P52100046393Building B1BHK38.92 sq m · 419 sq ft1010
P52100046393Building B1BHK39.45 sq m · 425 sq ft1010
P52100046393Building B1BHK43.07 sq m · 464 sq ft1010
P52100046393Building B1BHK43.67 sq m · 470 sq ft1010
P52100046393Building B2BHK58.91 sq m · 634 sq ft1010
P52100046393Building B2BHK60.23 sq m · 648 sq ft1010

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals10

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectAnanad Gadiya—P52100046393
ArchitectAnand Gadiya GADIYA—P52100050898
Chartered accountantKARWA YEOLEKAR And ASSOCIATES NILESH YEOLEKAR YEOLEKAR—P52100050898
Chartered accountantNaresh Navale &Associates—P52100046393
Chartered accountantNilesh B Yeolekar—P52100046393
Chartered accountantV S Fatehpur And Co—P52100050898
EngineerAmar Luniya—P52100050898
EngineerAmar Luniya—P52100046393
Otherk k associates—P52100050898
Otherk k associates—P52100046393

Source: MahaRERA project page. Contact details are not shown.

Other projects in Pirangut

All 50 projects in Pirangut · Compare Ashapuri Vrundavan with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology