Residential / Group Housing · 2 buildings · 23 unitsRERA P52100051581

Quality Royal Park

Deedo IDDP-PUN-7APP

It is due for completion in Mar 2027, with no extension on record; no MahaRERA orders on record; 43% of its units are booked.

Otur, Pune 412409 · by Quality Construction

DeliveryDue Mar 2027No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales43% booked10 of 23 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

It is due for completion in Mar 2027, with no extension on record

  • This projectRegistered 27 Jun 2023, completion promised 31 Mar 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100051581
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210005158127 Jun 202331 Mar 202731 Mar 2027Quality ConstructionProject page
Documents130

1 document held by Deedo, 129 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardNew Pan Quality Construction.pdf · uploaded 15 May 2023Source

Legal

  • Legal Title reportSearch and Title RERA Gat No 189 14.pdf · uploaded 15 May 2023Source
  • Declaration Form BRERA Builder Declaration Form B.pdf · uploaded 17 May 2023Source

Migrated

  • 1 PAN CardNew Pan Quality Construction.pdf · uploaded 15 May 2023Source
  • 1 Copy of the legal title reportSearch and Title RERA Gat No 189 14.pdf · uploaded 15 May 2023Source
  • 1 Copy of Layout Approval (in case of layout)1 of 3.pdf · uploaded 15 May 2023Source
  • 1 Building Plan Approval / NA Order for plotted development2 of 3.pdf · uploaded 15 May 2023Source
Show all 130 documentsShow fewer documents

Migrated

  • 1 Commencement Certificates / NA Order for plotted development189 14 NA order Quality Royal Park.pdf · uploaded 15 May 2023Source
  • 1 Declaration about Commencement CertificateDeclaration about cc.pdf · uploaded 15 May 2023Source
  • 1 CERSAI detailsCERSAI QRP.pdf · uploaded 15 May 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsChandrakant Annexure A.pdf · uploaded 15 May 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsRushil Annexure A.pdf · uploaded 15 May 2023Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsSharmila PDF.pdf · uploaded 15 May 2023Source
  • 1 Proforma of Agreement for saleQuality Royal Park Model agreement as per RER.pdf · uploaded 15 May 2023Source
  • 1 Proforma of Allotment letterQuality Royal Park Allotment letter.pdf · uploaded 15 May 2023Source
  • 1 Deviation Report with respect to Allotment letterDeviation allotment letter.pdf · uploaded 15 May 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation agreement.pdf · uploaded 15 May 2023Source
  • 1 Declaration in FORM BRERA Builder Declaration Form B.pdf · uploaded 17 May 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)1MB CA certificate Q Royal Doc.pdf · uploaded 17 May 2023Source
  • 1 a Details of encumbrances concerned to FinanceEncumbrance letter financepage0001.pdf · uploaded 15 Jun 2023Source
  • 2 a Details of encumbrances concerned to FinanceEncumbrance letter legalpage0001.pdf · uploaded 15 Jun 2023Source
  • 1 b Details of encumbrances concerned to LegalEncumbrance letter financepage0001.pdf · uploaded 15 Jun 2023Source
  • 2 b Details of encumbrances concerned to LegalEncumbrance letter legalpage0001.pdf · uploaded 15 Jun 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeperate Bank Letter Quality Royal Parkpage0001Copy.pdf · uploaded 15 Jun 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form - 1 JUNE 2023 Quality Royal Park.pdf · uploaded 17 May 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 SEPTEMBER 2023 Quality Royal Park.pdf · uploaded 17 May 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 December 2023 Quality Royal Park.pdf · uploaded 17 May 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 MARCH 2024 Quality Royal Park.pdf · uploaded 17 May 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2 Quality Royal Park, June 2023.pdf · uploaded 17 May 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2, Quality Royal Park, September 2023.pdf · uploaded 17 May 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2 December 2023 Quality Royal Park.pdf · uploaded 17 May 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2 , March 2024 Quality Royal Park.pdf · uploaded 17 May 2024Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of sold JUNE 2023 Quality Royal Park.pdf · uploaded 17 May 2024Source
  • 2 Disclosure of sold/ booked inventoryDisclousure of sold SEPTEMBER 2023 Quality Royal Park.pdf · uploaded 17 May 2024Source
  • 3 Disclosure of sold/ booked inventoryDisclosure of sold December 2023 Quality Royal Park.pdf · uploaded 17 May 2024Source
  • 4 Disclosure of sold/ booked inventoryDisclosure of sold MARCH 2024 Quality Royal Park.pdf · uploaded 17 May 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form - 3 JUNE 2023 Quality Royal Park.pdf · uploaded 17 May 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 SEPTEMBER 2023 Quality Royal Park.pdf · uploaded 17 May 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 December 2024 Quality Royal Park.pdf · uploaded 17 May 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 MARCH 2024 Quality Royal Park.pdf · uploaded 17 May 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects certificate 30-6-24.pdf · uploaded 2 Aug 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineerscertificate_Quality_Royal_Park.pdf · uploaded 2 Aug 2024Source
  • 5 Disclosure of sold/ booked inventoryQuality Park Disclosure June 24.pdf · uploaded 2 Aug 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 Quality Royal 30624_compressed.pdf · uploaded 2 Aug 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Royal Park (form 3).pdf · uploaded 22 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Royal Park (form 5).pdf · uploaded 22 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 19 Nov 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate.pdf · uploaded 19 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 19 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 19 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 19 Nov 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 19 Nov 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 19 Nov 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate.pdf · uploaded 19 Nov 2024Source
  • Form 1Form 1 upto 31-03-2024.pdf · uploaded 31 Jul 2025Source
  • Form 2Form 2 upto 31-03-2024.pdf · uploaded 31 Jul 2025Source
  • Form 3Form 3 upto 31-03-2024.pdf · uploaded 31 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold and booked inventory upto 31-03-2024.pdf · uploaded 31 Jul 2025Source
  • Form 1Form 1 upto 31-12-2023.pdf · uploaded 31 Jul 2025Source
  • Form 2Form 2 upto 31-12-2023.pdf · uploaded 31 Jul 2025Source
  • Form 3Form 3 upto 31-12-2023.pdf · uploaded 31 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold and booked inventory upto 31-12-2023.pdf · uploaded 31 Jul 2025Source
  • Form 1Form 1 upto 30-09-2023.pdf · uploaded 31 Jul 2025Source
  • Form 2Form 2 upto 30-09-2023.pdf · uploaded 31 Jul 2025Source
  • Form 3Form 3 upto 30-09-2023.pdf · uploaded 31 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclousure of sold and booked inventory upto 30-09-2023.pdf · uploaded 31 Jul 2025Source
  • Form 1Form 1 upto 30-06-2023.pdf · uploaded 31 Jul 2025Source
  • Form 2Form 2 upto 30-06-2023.pdf · uploaded 31 Jul 2025Source
  • Form 3Form 3 upto 30-06-2023.pdf · uploaded 31 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of sod and booked inventory upto 30-06-2023.pdf · uploaded 31 Jul 2025Source
  • Form 1form 1 upto 30-06-2024.pdf · uploaded 31 Jul 2025Source
  • Form 2form 2 upto 30-06-2024.pdf · uploaded 31 Jul 2025Source
  • Form 3form 3 upto 30-06-2024.pdf · uploaded 31 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold and booked inventory upto 30-06-2024.pdf · uploaded 31 Jul 2025Source
  • Form 1form 1 upto 31-03-2025.pdf · uploaded 1 Aug 2025Source
  • Form 2form 2 upto 31-03-2025.pdf · uploaded 1 Aug 2025Source
  • Form 3form 3 upto 31-03-2025.pdf · uploaded 1 Aug 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold and booked inventory upto 31-03-2025.pdf · uploaded 1 Aug 2025Source
  • Form 1Form 1 upto 30-09-2024.pdf · uploaded 1 Aug 2025Source
  • Form 2Form 2 upto 30-09-2024.pdf · uploaded 1 Aug 2025Source
  • Form 3Form 3 upto 30-09-2024.pdf · uploaded 1 Aug 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold and Booked inventory upto 30-09-2024.pdf · uploaded 1 Aug 2025Source
  • Form 1Form 1 upto 31-12-2024.pdf · uploaded 1 Aug 2025Source
  • Form 2Form 2 upto 31-12-2024.pdf · uploaded 1 Aug 2025Source
  • Form 3Form 3 upto 31-12-2024.pdf · uploaded 1 Aug 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold and booked inventory upto 31-12-2024.pdf · uploaded 1 Aug 2025Source
  • Form 5 (FY 2024-2025)FORM 5.pdf · uploaded 14 Nov 2025Source
  • Form 2A (FY 2024-2025)FORM 2A.pdf · uploaded 15 Nov 2025Source
  • Withdrawal Update Form 1form 1 upto 30-06-2025.pdf · uploaded 5 Dec 2025Source
  • Withdrawal Update Form 2form 2 upto 30-06-2025.pdf · uploaded 5 Dec 2025Source
  • Withdrawal Update Form 3form 3 upto 30-06-2025.pdf · uploaded 5 Dec 2025Source
  • Withdrawal Update Form 1form 1 upto 30-06-2025.pdf · uploaded 5 Jan 2026Source
  • Withdrawal Update Form 2form 2 upto 30-06-2025.pdf · uploaded 5 Jan 2026Source
  • Withdrawal Update Form 3form 3 upto 30-06-2025.pdf · uploaded 5 Jan 2026Source
  • Form 2A (FY 2023-2024)FORM 2A.pdf · uploaded 5 Jan 2026Source
  • Form 2A (FY 2025-2026)FORM 2A.pdf · uploaded 5 Jan 2026Source
  • Form 5 (FY 2023-2024)Form 5 Quality Royal park (2023-2024).pdf · uploaded 5 Jan 2026Source
  • Withdrawal Update Form 1form 1 upto 30-06-2025.pdf · uploaded 8 Jan 2026Source
  • Withdrawal Update Form 1form 1 upto 30-06-2025.pdf · uploaded 8 Jan 2026Source
  • Withdrawal Update Form 1form 1 upto 30-06-2025.pdf · uploaded 8 Jan 2026Source
  • Withdrawal Update Form 2form 2 upto 30-06-2025.pdf · uploaded 8 Jan 2026Source
  • Withdrawal Update Form 2form 2 upto 30-06-2025.pdf · uploaded 8 Jan 2026Source
  • Withdrawal Update Form 2form 2 upto 30-06-2025.pdf · uploaded 8 Jan 2026Source
  • Withdrawal Update Form 3form 3 upto 30-06-2025.pdf · uploaded 8 Jan 2026Source
  • Withdrawal Update Form 3form 3 upto 30-06-2025.pdf · uploaded 8 Jan 2026Source
  • Withdrawal Update Form 3form 3 upto 30-06-2025.pdf · uploaded 8 Jan 2026Source
  • Withdrawal Update Form 1form 1 upto 30-06-2025.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 2form 2 upto 30-06-2025.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 3form 3 upto 30-06-2025.pdf · uploaded 13 Jan 2026Source
  • Withdrawal Update Form 1form 1 upto 31-12-2025.pdf · uploaded 17 Aug 2026Source
  • Withdrawal Update Form 1form 1 upto 31-03-2026.pdf · uploaded 17 Aug 2026Source
  • Withdrawal Update Form 1form 1 upto 31-03-2026.pdf · uploaded 17 Aug 2026Source
  • Withdrawal Update Form 1form 1 upto 30-06-2026.pdf · uploaded 17 Aug 2026Source
  • Withdrawal Update Form 2form 2 upto 31-12-2025.pdf · uploaded 17 Aug 2026Source
  • Withdrawal Update Form 2form 2 upto 31-03-2026.pdf · uploaded 17 Aug 2026Source
  • Withdrawal Update Form 2form 2 upto 31-03-2026.pdf · uploaded 17 Aug 2026Source
  • Withdrawal Update Form 2form 2 upto 30-06-2026.pdf · uploaded 17 Aug 2026Source
  • Withdrawal Update Form 3form 3 upto 31-12-2025.pdf · uploaded 17 Aug 2026Source
  • Withdrawal Update Form 3form 3 upto 31-03-2026.pdf · uploaded 17 Aug 2026Source
  • Withdrawal Update Form 3form 3 upto 31-03-2026.pdf · uploaded 17 Aug 2026Source
  • Withdrawal Update Form 3form 3 upto 30-06-2026.pdf · uploaded 17 Aug 2026Source

Technical

  • Document1 of 3.pdf · uploaded 15 May 2023Source
  • Document2 of 3.pdf · uploaded 15 May 2023Source

Technical (Architect)

  • DocumentArchitect Certificate.pdf · uploaded 19 Nov 2024Source
  • DocumentArchitect Certificate.pdf · uploaded 19 Nov 2024Source
  • Documentform 1 upto 30-06-2026.pdf · uploaded 17 Aug 2026Source

Technical (Engineer)

  • DocumentEngg Certificate.pdf · uploaded 19 Nov 2024Source
  • DocumentEngg Certificate.pdf · uploaded 19 Nov 2024Source
  • Documentform 2 upto 30-06-2026.pdf · uploaded 17 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel S No 189/14 Otur

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
2BHK, 3BHK, Bungalow23 units in all
Address
S No 189/14 Otur, S No 189/14, OturPIN 412409
Village
Otur, Junnar taluka
Land area for this project
2,700 sq m (29,063 sq ft)
Permissible built-up area
2,705 sq m (29,120 sq ft)
Sanctioned built-up area
2,705 sq m (29,120 sq ft)
Recreational open space
2,705 sq m (29,120 sq ft)
Designated bank account
99
Developed in phases
Yes

Survey, CTS, gat or plot numbers

S No 189/14 Otur

Land as published on MahaRERA's project page

S No 189/14 Otur

Boundaries

North
S no 189 10 189 5
South
S No 186 5
East
S No 189 10 189 5
West
S No 189 13

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking23 units

10 of 23 units booked (43%), as the promoter reported to MahaRERA

2BHK · 12 units3BHK · 2 unitsBungalow · 9 units
BuildingTypeCarpet areaUnitsBooked
Building wing A2BHK78.79 sq m · 848 sq ft64
Building wing A2BHK80.07 sq m · 862 sq ft63
Building wing A3BHK91.58 sq m · 986 sq ft10
Building wing A3BHK97.81 sq m · 1,053 sq ft10
Building wing BBungalow130 sq m · 1,399 sq ft93

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectArchitect Swapnil C Parashar—
Chartered accountantJ R Mulla and Associates—
EngineerStructural Engineer Prudent Designs Pvt Ltd—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology