Utopia Gold
Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 76% of its units are booked.
Moshi, Pune 412105 · Property rates in Moshi · Promoter: Akshay Deepak Panjabi
Completion was pushed back 4 months, to Apr 2027
- This projectRegistered 9 Feb 2022, completion promised 31 Dec 2026, revised to 30 Apr 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
4 buildings
Open a building to see every flat, floor by floor.
- Utopia Gold - Tower A18 floors · 153 units59% booked
- Utopia Gold - Tower B18 floors · 136 units82% booked
- Utopia Gold - Tower C18 floors · 136 units83% booked
- Utopia Gold - Tower D18 floors · 119 units85% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100033254
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100033254 | 9 Feb 2022 | 31 Dec 2026 | 30 Apr 2027 | Akshay Deepak Panjabi | Project page |
Documents228
1 document held by Deedo, 227 filings listed on MahaRERA's project page
Finance
- PAN Cardakshay panjabi pancard.pdf · uploaded 10 Jan 2022Source
Legal
Show all 228 documentsShow fewer documents
Migrated
- 1 CERSAI detailsCERSAI_Search_Report_200227489051_For_Asset_Based_Search_05_01_2022_19_17_05_474.pdf · uploaded 5 Jan 2022Source
- 1 Proforma of Allotment letterallotment letter.pdf · uploaded 5 Jan 2022Source
- 2 Proforma of Allotment letterdrafts.pdf · uploaded 5 Jan 2022Source
- 1 Declaration about Commencement Certificatecircular 32.pdf · uploaded 6 Jan 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3-1-3.pdf · uploaded 6 Jan 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3-4-7.pdf · uploaded 6 Jan 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3-8-10.pdf · uploaded 6 Jan 2022Source
- 1 PAN Cardakshay panjabi pancard.pdf · uploaded 10 Jan 2022Source
- 1 Copy of Layout Approval (in case of layout)Layout plan 1.pdf · uploaded 25 Jan 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentFirst Floor Plan 3.pdf · uploaded 25 Jan 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentfloor plan 2.pdf · uploaded 25 Jan 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentFloor Plan 4.pdf · uploaded 25 Jan 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentfloor plan 5.pdf · uploaded 25 Jan 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentfloor plan 6.pdf · uploaded 25 Jan 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentfloor plan 7.pdf · uploaded 25 Jan 2022Source
- 7 Building Plan Approval / NA Order for plotted developmentfloor plan 8.pdf · uploaded 25 Jan 2022Source
- 8 Building Plan Approval / NA Order for plotted developmentfloor plan 9.pdf · uploaded 25 Jan 2022Source
- 9 Building Plan Approval / NA Order for plotted developmentfloor plan 10.pdf · uploaded 25 Jan 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement certificate_UTG D.pdf · uploaded 26 Jan 2022Source
- 2 Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 17 May 2022Source
- 10 Building Plan Approval / NA Order for plotted developmentBuilding Approval Plan.pdf · uploaded 17 May 2022Source
- 1 OtherBooking Form.pdf · uploaded 9 Jun 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Final_compressed.pdf · uploaded 22 Jun 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect certificate (1)_compressed.pdf · uploaded 28 Jul 2022Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold andbooked inventory(8)_compressed.pdf · uploaded 28 Jul 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Final_compressed.pdf · uploaded 28 Jul 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 28 Jul 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 architect certificate_compressed.pdf · uploaded 30 Jul 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_compressed.pdf · uploaded 30 Jul 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Revised_compressed.pdf · uploaded 30 Jul 2022Source
- 3 Copy of Layout Approval (in case of layout)default 0002.pdf · uploaded 23 Aug 2022Source
- 11 Building Plan Approval / NA Order for plotted developmentdefault 0003.pdf · uploaded 23 Aug 2022Source
- 12 Building Plan Approval / NA Order for plotted developmentdefault 0004 (1).pdf · uploaded 23 Aug 2022Source
- 13 Building Plan Approval / NA Order for plotted developmentdefault 0005.pdf · uploaded 23 Aug 2022Source
- 14 Building Plan Approval / NA Order for plotted developmentdefault 0006.pdf · uploaded 23 Aug 2022Source
- 15 Building Plan Approval / NA Order for plotted developmentdefault 0007.pdf · uploaded 23 Aug 2022Source
- 16 Building Plan Approval / NA Order for plotted developmentdefault 0008.pdf · uploaded 23 Aug 2022Source
- 17 Building Plan Approval / NA Order for plotted developmentdefault 0009.pdf · uploaded 23 Aug 2022Source
- 18 Building Plan Approval / NA Order for plotted developmentdefault 0010.pdf · uploaded 23 Aug 2022Source
- 19 Building Plan Approval / NA Order for plotted developmentdefault 0011.pdf · uploaded 23 Aug 2022Source
- 20 Building Plan Approval / NA Order for plotted developmentdefault 0012.pdf · uploaded 23 Aug 2022Source
- 21 Building Plan Approval / NA Order for plotted developmentdefault 0013.pdf · uploaded 23 Aug 2022Source
- 22 Building Plan Approval / NA Order for plotted developmentdefault 0014.pdf · uploaded 23 Aug 2022Source
- 23 Building Plan Approval / NA Order for plotted developmentdefault 0015.pdf · uploaded 23 Aug 2022Source
- 24 Building Plan Approval / NA Order for plotted developmentdefault 0016.pdf · uploaded 23 Aug 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentRevised CC dated 04-08-2022.pdf · uploaded 23 Aug 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 31 Oct 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Eng certificate revised.pdf · uploaded 31 Oct 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Signed_compressed.pdf · uploaded 31 Oct 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Signed.pdf · uploaded 21 Dec 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 ARCHITECT CERTIFICATE-signed.pdf · uploaded 20 Jan 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q3.pdf · uploaded 20 Jan 2023Source
- 2 Disclosure of sold/ booked inventorySold Circular.pdf · uploaded 20 Jan 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final form 3.pdf · uploaded 20 Jan 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 15 May 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 15 May 2023Source
- 3 Disclosure of sold/ booked inventorySold Circular 29.pdf · uploaded 15 May 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Final.pdf · uploaded 15 May 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 28 Jul 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 28 Jul 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (30-9-2023).pdf · uploaded 2 Nov 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Final Form 2.pdf · uploaded 10 Nov 2023Source
- 4 Disclosure of sold/ booked inventorysold booked invnetory.pdf · uploaded 10 Nov 2023Source
- 5 Disclosure of sold/ booked inventorysold unsold inventory.pdf · uploaded 10 Nov 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)final form 3.pdf · uploaded 10 Nov 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)fORM 3 COMPRESS.pdf · uploaded 10 Nov 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2 A (Quality Assurance Certificate).pdf · uploaded 26 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 Client.pdf · uploaded 31 Dec 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Jan 2024Source
- 6 Disclosure of sold/ booked inventoryDisclosure of sold booked inventory.pdf · uploaded 20 Jan 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)e_Form 2.pdf · uploaded 30 Jan 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SIGNED akshay sir-signed-compressed.pdf · uploaded 30 Jan 2024Source
- 4 Copy of Layout Approval (in case of layout)01.pdf · uploaded 26 Mar 2024Source
- 25 Building Plan Approval / NA Order for plotted developmentA WING 1-18 ALL FLOOR PLAN.pdf · uploaded 26 Mar 2024Source
- 26 Building Plan Approval / NA Order for plotted developmentA WING TERRACE FLOOR.pdf · uploaded 26 Mar 2024Source
- 27 Building Plan Approval / NA Order for plotted developmentAREA STATEMENT -LAYOUT ABCD.pdf · uploaded 26 Mar 2024Source
- 28 Building Plan Approval / NA Order for plotted developmentB WING 7,12,17 FLOOR PLAN.pdf · uploaded 26 Mar 2024Source
- 29 Building Plan Approval / NA Order for plotted developmentB WING ELEVATION.pdf · uploaded 26 Mar 2024Source
- 30 Building Plan Approval / NA Order for plotted developmentBASEMENT -A,B,C,D.pdf · uploaded 26 Mar 2024Source
- 31 Building Plan Approval / NA Order for plotted developmentC WING 7,12,17 FLOOR PLAN.pdf · uploaded 26 Mar 2024Source
- 32 Building Plan Approval / NA Order for plotted developmentC WING ELEVATION.pdf · uploaded 26 Mar 2024Source
- 33 Building Plan Approval / NA Order for plotted developmentD WING 1-18 ALL FLOOR PLAN.pdf · uploaded 26 Mar 2024Source
- 34 Building Plan Approval / NA Order for plotted developmentD WING TERRACE FLOOR AND ELEVATION.pdf · uploaded 26 Mar 2024Source
- 35 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 26 Mar 2024Source
- 36 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 26 Mar 2024Source
- 37 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 26 Mar 2024Source
- 38 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 26 Mar 2024Source
- 39 Building Plan Approval / NA Order for plotted development13.pdf · uploaded 26 Mar 2024Source
- 40 Building Plan Approval / NA Order for plotted development07.pdf · uploaded 26 Mar 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentrevised cc 21-11-22.pdf · uploaded 26 Mar 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Upload.pdf · uploaded 20 Apr 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 upload.pdf · uploaded 20 Apr 2024Source
- 7 Disclosure of sold/ booked inventorysold inventories.pdf · uploaded 20 Apr 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Upload File_11zon.pdf · uploaded 20 Apr 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 20 Jul 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 ( april to June 2024).pdf · uploaded 20 Jul 2024Source
- 8 Disclosure of sold/ booked inventorydisclosure of sold inventories.pdf · uploaded 20 Jul 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Upload_compressed.pdf · uploaded 23 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 18 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Upload_compressed.pdf · uploaded 18 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Upload.pdf · uploaded 18 Oct 2024Source
- 2 Disclosure of sold/ booked inventorySold_compressed.pdf · uploaded 18 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Upload_.pdf · uploaded 24 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 18 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Final_compressed.pdf · uploaded 18 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Final.pdf · uploaded 18 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySold Circular Final_compressed.pdf · uploaded 18 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 30 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Final_compressed.pdf · uploaded 30 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 30 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySold Circular.pdf · uploaded 30 Apr 2025Source
- Form 1ARCHITECT CERTIFICATE.pdf · uploaded 19 Jul 2025Source
- Form 2Form 2.pdf · uploaded 19 Jul 2025Source
- Form 3Form 3 Final_compressed.pdf · uploaded 19 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Circular.pdf · uploaded 19 Jul 2025Source
- Withdrawal Update Form 1Form1.pdf · uploaded 9 Oct 2025Source
- Withdrawal Update Form 2Form2.pdf · uploaded 9 Oct 2025Source
- Withdrawal Update Form 3Form3.pdf · uploaded 9 Oct 2025Source
- Withdrawal Update Form 1Form1.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 11 Oct 2025Source
- Form 2A (FY 2024-2025)Form 2A Final.pdf · uploaded 7 Nov 2025Source
- Form 5 (FY 2024-2025)Form 5 Final.pdf · uploaded 14 Nov 2025Source
- Withdrawal Update Form 1Form 1 Final.pdf · uploaded 14 Jan 2026Source
- Withdrawal Update Form 2Form 2 Final.pdf · uploaded 14 Jan 2026Source
- Withdrawal Update Form 3Form 3 Final.pdf · uploaded 14 Jan 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 11 Apr 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 11 Apr 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 11 Apr 2026Source
- Form 2A (FY 2025-2026)Form 2A.pdf · uploaded 24 Apr 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 17 Jul 2026Source
- Withdrawal Update Form 2FORM 2 signed.pdf · uploaded 17 Jul 2026Source
- Withdrawal Update Form 3Form 3 Final.pdf · uploaded 17 Jul 2026Source
Technical
- DocumentLayout plan 1.pdf · uploaded 25 Jan 2022Source
- DocumentFirst Floor Plan 3.pdf · uploaded 25 Jan 2022Source
- Documentfloor plan 2.pdf · uploaded 25 Jan 2022Source
- DocumentFloor Plan 4.pdf · uploaded 25 Jan 2022Source
- Documentfloor plan 5.pdf · uploaded 25 Jan 2022Source
- Documentfloor plan 6.pdf · uploaded 25 Jan 2022Source
- Documentfloor plan 7.pdf · uploaded 25 Jan 2022Source
- Documentfloor plan 8.pdf · uploaded 25 Jan 2022Source
- Documentfloor plan 9.pdf · uploaded 25 Jan 2022Source
- Documentfloor plan 10.pdf · uploaded 25 Jan 2022Source
- DocumentLayout Plan.pdf · uploaded 17 May 2022Source
- DocumentBuilding Approval Plan.pdf · uploaded 17 May 2022Source
- Documentdefault 0002.pdf · uploaded 23 Aug 2022Source
- Documentdefault 0003.pdf · uploaded 23 Aug 2022Source
- Documentdefault 0004 (1).pdf · uploaded 23 Aug 2022Source
- Documentdefault 0005.pdf · uploaded 23 Aug 2022Source
- Documentdefault 0006.pdf · uploaded 23 Aug 2022Source
- Documentdefault 0007.pdf · uploaded 23 Aug 2022Source
- Documentdefault 0008.pdf · uploaded 23 Aug 2022Source
- Documentdefault 0009.pdf · uploaded 23 Aug 2022Source
- Documentdefault 0010.pdf · uploaded 23 Aug 2022Source
- Documentdefault 0011.pdf · uploaded 23 Aug 2022Source
- Documentdefault 0012.pdf · uploaded 23 Aug 2022Source
- Documentdefault 0013.pdf · uploaded 23 Aug 2022Source
- Documentdefault 0014.pdf · uploaded 23 Aug 2022Source
- Documentdefault 0015.pdf · uploaded 23 Aug 2022Source
- Documentdefault 0016.pdf · uploaded 23 Aug 2022Source
- Document01.pdf · uploaded 26 Mar 2024Source
- DocumentA WING 1-18 ALL FLOOR PLAN.pdf · uploaded 26 Mar 2024Source
- DocumentA WING TERRACE FLOOR.pdf · uploaded 26 Mar 2024Source
- DocumentAREA STATEMENT -LAYOUT ABCD.pdf · uploaded 26 Mar 2024Source
- DocumentB WING 7,12,17 FLOOR PLAN.pdf · uploaded 26 Mar 2024Source
- DocumentB WING ELEVATION.pdf · uploaded 26 Mar 2024Source
- DocumentBASEMENT -A,B,C,D.pdf · uploaded 26 Mar 2024Source
- DocumentC WING 7,12,17 FLOOR PLAN.pdf · uploaded 26 Mar 2024Source
- DocumentC WING ELEVATION.pdf · uploaded 26 Mar 2024Source
- DocumentD WING 1-18 ALL FLOOR PLAN.pdf · uploaded 26 Mar 2024Source
- DocumentD WING TERRACE FLOOR AND ELEVATION.pdf · uploaded 26 Mar 2024Source
- Document3.pdf · uploaded 26 Mar 2024Source
- Document4.pdf · uploaded 26 Mar 2024Source
- Document7.pdf · uploaded 26 Mar 2024Source
- Document10.pdf · uploaded 26 Mar 2024Source
- Document13.pdf · uploaded 26 Mar 2024Source
- Document07.pdf · uploaded 26 Mar 2024Source
- DocumentLayout.pdf · uploaded 16 Feb 2026Source
- DocumentBuilding Plan 1.pdf · uploaded 16 Feb 2026Source
- DocumentBuilding Plan 2.pdf · uploaded 16 Feb 2026Source
- DocumentBuilding Plan 3.pdf · uploaded 16 Feb 2026Source
- DocumentBuilding Plan 4.pdf · uploaded 16 Feb 2026Source
- DocumentBuilding Plan 5.pdf · uploaded 16 Feb 2026Source
- DocumentBuilding Plan 6.pdf · uploaded 16 Feb 2026Source
- DocumentBuilding Plan 7.pdf · uploaded 16 Feb 2026Source
- DocumentBuilding Plan 8.pdf · uploaded 16 Feb 2026Source
- DocumentBuilding Plan 9.pdf · uploaded 16 Feb 2026Source
- DocumentBuilding Plan 10.pdf · uploaded 16 Feb 2026Source
- DocumentBuilding Plan 11.pdf · uploaded 16 Feb 2026Source
- DocumentBuilding Plan 12.pdf · uploaded 16 Feb 2026Source
- DocumentBuilding Plan 13.pdf · uploaded 16 Feb 2026Source
- DocumentBuilding Plan 14.pdf · uploaded 16 Feb 2026Source
- DocumentBuilding Plan 15.pdf · uploaded 16 Feb 2026Source
- DocumentBuilding Plan 16.pdf · uploaded 16 Feb 2026Source
- DocumentBuilding Plan.pdf · uploaded 16 Feb 2026Source
- DocumentLayout.pdf · uploaded 11 Apr 2026Source
- DocumentBuilding Plan 1.pdf · uploaded 11 Apr 2026Source
- DocumentBuilding Plan 2.pdf · uploaded 11 Apr 2026Source
- DocumentBuilding Plan 3.pdf · uploaded 11 Apr 2026Source
- DocumentBuilding Plan 4.pdf · uploaded 11 Apr 2026Source
- DocumentBuilding Plan 5.pdf · uploaded 11 Apr 2026Source
- DocumentBuilding Plan 6.pdf · uploaded 11 Apr 2026Source
- DocumentBuilding Plan 7.pdf · uploaded 11 Apr 2026Source
- DocumentBuilding Plan 8.pdf · uploaded 11 Apr 2026Source
- DocumentBuilding Plan 9.pdf · uploaded 11 Apr 2026Source
- DocumentBuilding Plan 10.pdf · uploaded 11 Apr 2026Source
- DocumentBuilding Plan 11.pdf · uploaded 11 Apr 2026Source
- DocumentBuilding Plan 12.pdf · uploaded 11 Apr 2026Source
- DocumentBuilding Plan 13.pdf · uploaded 11 Apr 2026Source
- DocumentBuilding Plan 14.pdf · uploaded 11 Apr 2026Source
- DocumentBuilding Plan 16.pdf · uploaded 11 Apr 2026Source
- DocumentCommencement Certificate.pdf · uploaded 11 Apr 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvals129 p AT BORHADEWADI
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, Shop544 units in all
- Address
- 129 p AT BORHADEWADI, BORHADEWADI MOSHI PUNE, BORHADEWADI MOSHI PUNEPIN 412105
- Village
- Moshi, Haveli taluka
- Location
- 18.67974, 73.83699
- Designated bank account
- 76
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Boundaries
- North
- By Gat No 132
- South
- By Plot No 8 Part
- East
- By Gat No 130
- West
- By Plot No 5 Part
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking544 units
416 of 544 units booked (76%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Utopia Gold - Tower A | 2BHK | 49.87 sq m · 537 sq ft | 10 | 0 |
| Utopia Gold - Tower A | 2BHK | 55.15 sq m · 594 sq ft | 18 | 9 |
| Utopia Gold - Tower A | 2BHK | 59.19 sq m · 637 sq ft | 123 | 82 |
| Utopia Gold - Tower A | Shop | 30.48 sq m · 328 sq ft | 1 | 0 |
| Utopia Gold - Tower A | Shop | 42.6 sq m · 459 sq ft | 1 | 0 |
| Utopia Gold - Tower B | 2BHK | 49.78 sq m · 536 sq ft | 3 | 0 |
| Utopia Gold - Tower B | 2BHK | 56.97 sq m · 613 sq ft | 69 | 63 |
| Utopia Gold - Tower B | 2BHK | 58.46 sq m · 629 sq ft | 54 | 48 |
Show all 32 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Utopia Gold - Tower B | Shop | 28.58 sq m · 308 sq ft | 1 | 0 |
| Utopia Gold - Tower B | Shop | 28.59 sq m · 308 sq ft | 1 | 0 |
| Utopia Gold - Tower B | Shop | 29.02 sq m · 312 sq ft | 1 | 0 |
| Utopia Gold - Tower B | Shop | 29.03 sq m · 312 sq ft | 4 | 0 |
| Utopia Gold - Tower B | Shop | 29.22 sq m · 315 sq ft | 2 | 0 |
| Utopia Gold - Tower B | Shop | 53 sq m · 570 sq ft | 1 | 0 |
| Utopia Gold - Tower C | 2BHK | 49.78 sq m · 536 sq ft | 3 | 0 |
| Utopia Gold - Tower C | 2BHK | 56.97 sq m · 613 sq ft | 69 | 62 |
| Utopia Gold - Tower C | 2BHK | 58.46 sq m · 629 sq ft | 54 | 51 |
| Utopia Gold - Tower C | Shop | 28.59 sq m · 308 sq ft | 2 | 0 |
| Utopia Gold - Tower C | Shop | 29.03 sq m · 312 sq ft | 5 | 0 |
| Utopia Gold - Tower C | Shop | 29.22 sq m · 315 sq ft | 2 | 0 |
| Utopia Gold - Tower C | Shop | 53 sq m · 570 sq ft | 1 | 0 |
| Utopia Gold - Tower D | 2BHK | 49.96 sq m · 538 sq ft | 2 | 0 |
| Utopia Gold - Tower D | 2BHK | 55.15 sq m · 594 sq ft | 18 | 17 |
| Utopia Gold - Tower D | 2BHK | 59.19 sq m · 637 sq ft | 90 | 84 |
| Utopia Gold - Tower D | Shop | 26.74 sq m · 288 sq ft | 1 | 0 |
| Utopia Gold - Tower D | Shop | 29.03 sq m · 312 sq ft | 2 | 0 |
| Utopia Gold - Tower D | Shop | 29.97 sq m · 323 sq ft | 1 | 0 |
| Utopia Gold - Tower D | Shop | 30.63 sq m · 330 sq ft | 1 | 0 |
| Utopia Gold - Tower D | Shop | 34 sq m · 366 sq ft | 1 | 0 |
| Utopia Gold - Tower D | Shop | 48.8 sq m · 525 sq ft | 1 | 0 |
| Utopia Gold - Tower D | Shop | 53.08 sq m · 571 sq ft | 1 | 0 |
| Utopia Gold - Tower D | Shop | 59.92 sq m · 645 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals8
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Dream Space Architectures | — |
| Chartered accountant | Pgmj And Associates | — |
| Engineer | Ismail Hasaan Sab | — |
| Engineer | Prashant Kulkarni | — |
| Engineer | Rambhau Gorakh Sonawane | — |
| Engineer | Sarang Patil | — |
| Engineer | Vishal Janardan Patil | — |
| Other | Deepak Patel | — |
Source: MahaRERA project page. Contact details are not shown.