Residential / Group Housing · 2 buildings · 86 unitsRERA P52100046579

Shri Icon

It is due for completion in Dec 2026, with no extension on record; no MahaRERA orders on record; 26% of its units are booked.

Moshi, Pune 412105 · Property rates in Moshi · Promoter: Shri Samarth Buildtech

DeliveryDue Dec 2026No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales26% booked22 of 86 units · as the promoter reported to MahaRERAPrice₹7,040 /sq ft2.6% above Moshi · 41 registered sales
Shri Icon project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

It is due for completion in Dec 2026, with no extension on record

  • This projectRegistered 19 Aug 2022, completion promised 31 Dec 2026.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

All 42 deeds →
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Oct 2026Unit 904Primary sale505 sq ftView Primary sale, Oct 2026
Oct 2026Unit 504Primary sale505 sq ftView Primary sale, Oct 2026
Oct 2026Unit 606Primary sale737 sq ftView Primary sale, Oct 2026
Oct 2026Unit 303Primary sale396 sq ftView Primary sale, Oct 2026
Sep 2026Unit 804Primary sale505 sq ftView Primary sale, Sep 2026
Sep 2026Unit 805Primary sale500 sq ftView Primary sale, Sep 2026
Jul 2026Unit 1008Primary sale522 sq ftView Primary sale, Jul 2026
Jul 2026Unit 604Primary sale505 sq ftView Primary sale, Jul 2026
Jul 2026Unit 608Primary sale404 sq ftView Primary sale, Jul 2026
Jun 2026Unit 902Primary sale541 sq ftView Primary sale, Jun 2026

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100046579
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210004657919 Aug 202231 Dec 202631 Dec 2026Shri Samarth BuildtechProject page
Documents194

2 documents held by Deedo, 192 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN Card1) Shri Samarth Buildtech-Pancard.pdf · uploaded 4 Jul 2022Source

Legal

  • Legal Title reportAdvocate - 4 - Format A-Search Title_compressed.pdf · uploaded 4 Jul 2022Source
  • Declaration Form B9) Fom B On stamp Paper.pdf · uploaded 4 Jul 2022Source
  • Legal Title reportSearch Report - Gat No256_compressed.pdf · uploaded 8 Aug 2022Source
  • Declaration Form BP52100046579_FileName_0.pdf · uploaded 30 Dec 2024Source

Migrated

  • 1 PAN Card1) Shri Samarth Buildtech-Pancard.pdf · uploaded 4 Jul 2022Source
Show all 194 documentsShow fewer documents

Migrated

  • 1 Copy of the legal title reportAdvocate - 4 - Format A-Search Title_compressed.pdf · uploaded 4 Jul 2022Source
  • 1 a Details of encumbrances concerned to Finance17) Encumbrances Certificate.pdf · uploaded 4 Jul 2022Source
  • 1 b Details of encumbrances concerned to Legal17) Encumbrances Certificate.pdf · uploaded 4 Jul 2022Source
  • 1 Copy of Layout Approval (in case of layout)Layout Plan (2)_compressed.pdf · uploaded 4 Jul 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentPlan 1_compressed.pdf · uploaded 4 Jul 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentPlan 2_compressed.pdf · uploaded 4 Jul 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentPlan 3_compressed.pdf · uploaded 4 Jul 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentPlan 4_compressed.pdf · uploaded 4 Jul 2022Source
  • 1 Commencement Certificates / NA Order for plotted development5) Commencement Certificate - Shri Icon_compressed.pdf · uploaded 4 Jul 2022Source
  • 1 Declaration about Commencement Certificate16) Format -D.pdf · uploaded 4 Jul 2022Source
  • 1 Declaration in FORM B9) Fom B On stamp Paper.pdf · uploaded 4 Jul 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect - 5 - Certificate Form 1_compressed (2).pdf · uploaded 4 Jul 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200241409269_For_Asset_Based_Search_04_07_2022_16_38_20_889.pdf · uploaded 4 Jul 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_compressed.pdf · uploaded 4 Jul 2022Source
  • 1 Proforma of Allotment letterFinal Agreement to sale draft.pdf · uploaded 4 Jul 2022Source
  • 2 Proforma of Allotment letter23) Allotment letter_compressed.pdf · uploaded 4 Jul 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same3) Encumbrance on Bank Account.pdf · uploaded 4 Jul 2022Source
  • 1 Deviation Report with respect to Allotment letter2) Deviation Report on Allotment letter.pdf · uploaded 4 Jul 2022Source
  • 1 Deviation Report with respect to model copy of Agreement1) Deviation Report on Agreement To sale.pdf · uploaded 4 Jul 2022Source
  • 5 Building Plan Approval / NA Order for plotted developmentIOD Letter.pdf · uploaded 6 Jul 2022Source
  • 2 Copy of the legal title reportSearch Report - Gat No256_compressed.pdf · uploaded 8 Aug 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)CA Certifiacate_compressed.pdf · uploaded 31 Dec 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate.pdf · uploaded 31 Dec 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Shri Icon.pdf · uploaded 31 Dec 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Architech certificate.pdf · uploaded 31 Dec 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certifiacate_compressed.pdf · uploaded 31 Dec 2022Source
  • 2 a Details of encumbrances concerned to Financedocuments.pdf · uploaded 2 Jan 2023Source
  • 2 b Details of encumbrances concerned to Legaldocuments.pdf · uploaded 2 Jan 2023Source
  • 1 Disclosure of sold/ booked inventorySold unsold.pdf · uploaded 23 Feb 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 23 Apr 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 23 Apr 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2 A.pdf · uploaded 25 Apr 2024Source
  • 2 Disclosure of sold/ booked inventorySold Unsold Inventroy - Shri Icon.pdf · uploaded 25 Apr 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)signed F1.pdf · uploaded 23 Jul 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)signed f2.pdf · uploaded 23 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)signed F2a.pdf · uploaded 23 Jul 2024Source
  • 3 Disclosure of sold/ booked inventorysigned sold unsold.pdf · uploaded 23 Jul 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)signed F3_compressed (5).pdf · uploaded 23 Jul 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentFLOOR PLAN A Wing_compressed.pdf · uploaded 29 Oct 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentFLOOR PLAN B wing_compressed.pdf · uploaded 29 Oct 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Shri Samarth Buildtech - Form - 5.pdf · uploaded 14 Nov 2024Source
  • 1 Declaration in FORM BP52100046579_FileName_0.pdf · uploaded 30 Dec 2024Source
  • 1 Declaration about Commencement CertificateDeclaration Commencement1.pdf · uploaded 30 Dec 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Sep 24.pdf · uploaded 3 Jan 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)9) Form 1 29-12-2023.pdf · uploaded 3 Jan 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)11) Form 1 06-10-2023.pdf · uploaded 3 Jan 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)13) Form1 05-07-2023.pdf · uploaded 3 Jan 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)12) Form1 24-03-2023.pdf · uploaded 3 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)8) Form 1 29-9-2022.pdf · uploaded 3 Jan 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)7) Form 1 30-12-2022.pdf · uploaded 3 Jan 2025Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)10) Form 1 31-12-2024(1).pdf · uploaded 3 Jan 2025Source
  • 8 Disclosure of sold/ booked inventoryBook inventry 31-12-2024.pdf · uploaded 3 Jan 2025Source
  • 7 Disclosure of sold/ booked inventorySold unsold - Shri Icon .pdf · uploaded 3 Jan 2025Source
  • 6 Disclosure of sold/ booked inventoryBook inventry 29-12-2023.pdf · uploaded 3 Jan 2025Source
  • 5 Disclosure of sold/ booked inventoryBook inventry 06-10-2023(1).pdf · uploaded 3 Jan 2025Source
  • 4 Disclosure of sold/ booked inventoryBook inventry 05-07-2023.pdf · uploaded 3 Jan 2025Source
  • 3 Disclosure of sold/ booked inventoryBook inventry 25-3-2023.pdf · uploaded 3 Jan 2025Source
  • 2 Disclosure of sold/ booked inventoryBook inventry 30-12-2022.pdf · uploaded 3 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryBook inventry 30-09-2022.pdf · uploaded 3 Jan 2025Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 FORM 2 - 06-01-2025 correct.pdf · uploaded 14 Jan 2025Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 Form - 2 30-09-24 correct.pdf · uploaded 14 Jan 2025Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 FORM 2 - 07-03-2024 correct.pdf · uploaded 14 Jan 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)5 FORM 2 - 29-12-2023 correct uploaded.pdf · uploaded 14 Jan 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 FORM 2 - 30-06-2023 correct.pdf · uploaded 14 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 FORM 2 - 30-03-2023 correct.pdf · uploaded 14 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Form - 2 30-12-22 correct.pdf · uploaded 14 Jan 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 FORM 2 - 06-10-2023 correct.pdf · uploaded 14 Jan 2025Source
  • 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 Form1 Architect Certifcate 19-06-2024.pdf · uploaded 21 Jan 2025Source
  • 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)7 Form1 Architect Certifcate 31-12-2024 done.pdf · uploaded 21 Jan 2025Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 Form1 Architect Certifcate 29-12-2023.pdf · uploaded 21 Jan 2025Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Form1 Architect Certifcate 06-10-23 uploade d.pdf · uploaded 21 Jan 2025Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Form1 Architect Certifcate 05-07-2023.pdf · uploaded 21 Jan 2025Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 Form1 Architect Certifcate 24-03-2023.pdf · uploaded 21 Jan 2025Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)8 Form 1 Architect Certifcate 30-12-2022.PDF · uploaded 21 Jan 2025Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)5 Form1 Architect Certifcate 29-09-2022 uploaded.pdf · uploaded 21 Jan 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)4 Form 3 30-6-23_compressed.pdf · uploaded 21 Jan 2025Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)9 Form 3 30-9-24.pdf · uploaded 21 Jan 2025Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)8 Form 3 30-6-24.pdf · uploaded 21 Jan 2025Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)7 Form 3 31-3-24.pdf · uploaded 21 Jan 2025Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)6 Form 3 31-12-2023.pdf · uploaded 21 Jan 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)5 Form 3 30-9-23.pdf · uploaded 21 Jan 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 Form 3 31-3-23(1)_compressed.pdf · uploaded 21 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)2 Form3 31_12_2022.pdf · uploaded 21 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 Form 3 - 30_09_2022.pdf · uploaded 21 Jan 2025Source
  • 13 Disclosure of sold/ booked inventory06-10-2023 shri icon.pdf · uploaded 21 Jan 2025Source
  • 17 Disclosure of sold/ booked inventory10-10-2024 shri icon.pdf · uploaded 21 Jan 2025Source
  • 16 Disclosure of sold/ booked inventory19-06-2024 shri icon.pdf · uploaded 21 Jan 2025Source
  • 15 Disclosure of sold/ booked inventory07-03-2024 shri icon.pdf · uploaded 21 Jan 2025Source
  • 14 Disclosure of sold/ booked inventory29-12-2023 shri icon.pdf · uploaded 21 Jan 2025Source
  • 12 Disclosure of sold/ booked inventory05-07-2023 shri icon.pdf · uploaded 21 Jan 2025Source
  • 11 Disclosure of sold/ booked inventory25-03-2023 shri icon.pdf · uploaded 21 Jan 2025Source
  • 9 Disclosure of sold/ booked inventory30-09-2022 sold unsold shri icon.pdf · uploaded 21 Jan 2025Source
  • 10 Disclosure of sold/ booked inventory30-12-2022 sold unsold shri icon.pdf · uploaded 21 Jan 2025Source
  • 1 Proforma of Agreement for saleAFS SHRI ICON FINAL.pdf · uploaded 21 Jan 2025Source
  • 1 Disclosure of Interest in Other Real Estate Organizations5 Annexure A - Jitendra Bapurao Khupse .pdf · uploaded 21 Jan 2025Source
  • 2 Disclosure of Interest in Other Real Estate Organizations6 Annexure A - Mr Rohit Rajendra Jadhav.pdf · uploaded 21 Jan 2025Source
  • 3 Disclosure of Interest in Other Real Estate Organizations7 Annexure A - Mr Sachin Bapurao Khupse.pdf · uploaded 21 Jan 2025Source
  • 1 Disclosure for secured/unsecured finance availed for the project11) Disclosure Secured Unsecured A- Shri Icon.pdf · uploaded 21 Jan 2025Source
  • 1 a Details of encumbrances concerned to FinanceNo Encumbrance Certificate (4).pdf · uploaded 22 Jan 2025Source
  • 18 Disclosure of sold/ booked inventory10 sold Inventory 31-12-24.pdf · uploaded 22 Jan 2025Source
  • 1 b Details of encumbrances concerned to LegalNo Encumbrance Certificate (4).pdf · uploaded 22 Jan 2025Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)10 Form 3 31-12-24 SHRI_compressed.pdf · uploaded 24 Jan 2025Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)9 Form 3 30-9-24 SHRI_compressed.pdf · uploaded 24 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)1 Shri Samarth Buildtech 22-23 - Form - 5.pdf · uploaded 24 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)2 Shri Samarth Buildtech 23-24 - Form - 5.pdf · uploaded 24 Jan 2025Source
  • 19 Disclosure of sold/ booked inventoryShri Icon final Sold unsold Dec 24.pdf · uploaded 27 Jan 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)12 Form 2A - 2022-2023.pdf · uploaded 29 Jan 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)11 Form 2A - 2023-2024.pdf · uploaded 29 Jan 2025Source
  • 1 Copy of Layout Approval (in case of layout)Shri Iocn - Recent Plan Copy_2_11zon.pdf · uploaded 29 Mar 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommrencement Certi 28 02 25.pdf · uploaded 29 Mar 2025Source
  • 1 Declaration about Commencement CertificateDeclaration About Comm Certificate.pdf · uploaded 29 Mar 2025Source
  • 1 Disclosure of sold/ booked inventory11 - Rewise Sold Inventory 31-12-24.pdf · uploaded 1 Apr 2025Source
  • 1 Copy of Layout Approval (in case of layout)Shri Icon - Layout Plan-1.pdf · uploaded 2 Apr 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentShri Icon - Plan-2.pdf · uploaded 2 Apr 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentShri Icon - Plan-3.pdf · uploaded 2 Apr 2025Source
  • 3 Building Plan Approval / NA Order for plotted developmentShri Icon - Plan-4.pdf · uploaded 2 Apr 2025Source
  • 4 Building Plan Approval / NA Order for plotted developmentShri Icon - Plan-5.pdf · uploaded 2 Apr 2025Source
  • 5 Building Plan Approval / NA Order for plotted developmentShri Icon - Plan-6.pdf · uploaded 2 Apr 2025Source
  • 6 Building Plan Approval / NA Order for plotted developmentShri Icon - Plan-7.pdf · uploaded 2 Apr 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate Verification For RERA No - P52100046579.pdf · uploaded 4 Apr 2025Source
  • 1 Other – TechnicalCommencement Certificate Verification For RERA No - P52100046579.pdf · uploaded 4 Apr 2025Source
  • Form 1Form1.pdf · uploaded 7 Jul 2025Source
  • Form 2FORM 2.pdf · uploaded 7 Jul 2025Source
  • Form 3Form 3.pdf · uploaded 7 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Inventroy.pdf · uploaded 7 Jul 2025Source
  • Form 2A (FY 2024-2025)13 Form 2A - 2024-2025.pdf · uploaded 7 Jul 2025Source
  • Withdrawal Update Form 1Form 1-30-06-2025.pdf · uploaded 10 Feb 2026Source
  • Withdrawal Update Form 1Form 1 - 30-09-2025.pdf · uploaded 10 Feb 2026Source
  • Withdrawal Update Form 2FORM 2 - 30-06-2025.pdf · uploaded 10 Feb 2026Source
  • Withdrawal Update Form 2FORM 2 - 30_09_2025.pdf · uploaded 10 Feb 2026Source
  • Withdrawal Update Form 3Form 3 30-06-2025.pdf · uploaded 10 Feb 2026Source
  • Withdrawal Update Form 3Form 3 30-09-2025.pdf · uploaded 10 Feb 2026Source
  • Withdrawal Update Form 114 - Form1 Architect Certifcate 31-12-2025.pdf · uploaded 8 Apr 2026Source
  • Withdrawal Update Form 214 - FORM 2 - 31-12-2025.pdf · uploaded 8 Apr 2026Source
  • Withdrawal Update Form 314 - Form 3 31-12-2025 (2).pdf · uploaded 8 Apr 2026Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 20 Aug 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 20 Aug 2026Source
  • Withdrawal Update Form 3FORM 3 fINAL.pdf · uploaded 20 Aug 2026Source
  • Form 2A (FY 2025-2026)Form 2A - 2026-2027.pdf · uploaded 20 Aug 2026Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 4 Sep 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 4 Sep 2026Source
  • Withdrawal Update Form 3Form 3 (2).pdf · uploaded 4 Sep 2026Source

Technical

  • DocumentLayout Plan (2)_compressed.pdf · uploaded 4 Jul 2022Source
  • DocumentPlan 1_compressed.pdf · uploaded 4 Jul 2022Source
  • DocumentPlan 2_compressed.pdf · uploaded 4 Jul 2022Source
  • DocumentPlan 3_compressed.pdf · uploaded 4 Jul 2022Source
  • DocumentPlan 4_compressed.pdf · uploaded 4 Jul 2022Source
  • DocumentIOD Letter.pdf · uploaded 6 Jul 2022Source
  • DocumentFLOOR PLAN A Wing_compressed.pdf · uploaded 29 Oct 2024Source
  • DocumentFLOOR PLAN B wing_compressed.pdf · uploaded 29 Oct 2024Source
  • DocumentShri Iocn - Recent Plan Copy_2_11zon.pdf · uploaded 29 Mar 2025Source
  • DocumentShri Icon - Layout Plan-1.pdf · uploaded 2 Apr 2025Source
  • DocumentShri Icon - Plan-2.pdf · uploaded 2 Apr 2025Source
  • DocumentShri Icon - Plan-3.pdf · uploaded 2 Apr 2025Source
  • DocumentShri Icon - Plan-4.pdf · uploaded 2 Apr 2025Source
  • DocumentShri Icon - Plan-5.pdf · uploaded 2 Apr 2025Source
  • DocumentShri Icon - Plan-6.pdf · uploaded 2 Apr 2025Source
  • DocumentShri Icon - Plan-7.pdf · uploaded 2 Apr 2025Source
  • Other – TechnicalCommencement Certificate Verification For RERA No - P52100046579.pdf · uploaded 4 Apr 2025Source

Technical (Architect)

  • Document8) Form 1 29-9-2022.pdf · uploaded 3 Jan 2025Source
  • Document7) Form 1 30-12-2022.pdf · uploaded 3 Jan 2025Source
  • Document12) Form1 24-03-2023.pdf · uploaded 3 Jan 2025Source
  • Document13) Form1 05-07-2023.pdf · uploaded 3 Jan 2025Source
  • Document11) Form 1 06-10-2023.pdf · uploaded 3 Jan 2025Source
  • Document9) Form 1 29-12-2023.pdf · uploaded 3 Jan 2025Source
  • DocumentArchitect Certificate Sep 24.pdf · uploaded 3 Jan 2025Source
  • Document10) Form 1 31-12-2024(1).pdf · uploaded 3 Jan 2025Source
  • Document5 Form1 Architect Certifcate 29-09-2022 uploaded.pdf · uploaded 21 Jan 2025Source
  • Document8 Form 1 Architect Certifcate 30-12-2022.PDF · uploaded 21 Jan 2025Source
  • Document4 Form1 Architect Certifcate 24-03-2023.pdf · uploaded 21 Jan 2025Source
  • Document1 Form1 Architect Certifcate 05-07-2023.pdf · uploaded 21 Jan 2025Source
  • Document2 Form1 Architect Certifcate 06-10-23 uploade d.pdf · uploaded 21 Jan 2025Source
  • Document6 Form1 Architect Certifcate 29-12-2023.pdf · uploaded 21 Jan 2025Source
  • Document3 Form1 Architect Certifcate 19-06-2024.pdf · uploaded 21 Jan 2025Source
  • Document7 Form1 Architect Certifcate 31-12-2024 done.pdf · uploaded 21 Jan 2025Source
  • DocumentFORM 1.pdf · uploaded 4 Sep 2026Source

Technical (Engineer)

  • Document1 Form - 2 30-12-22 correct.pdf · uploaded 14 Jan 2025Source
  • Document2 FORM 2 - 30-03-2023 correct.pdf · uploaded 14 Jan 2025Source
  • Document3 FORM 2 - 30-06-2023 correct.pdf · uploaded 14 Jan 2025Source
  • Document4 FORM 2 - 06-10-2023 correct.pdf · uploaded 14 Jan 2025Source
  • Document5 FORM 2 - 29-12-2023 correct uploaded.pdf · uploaded 14 Jan 2025Source
  • Document6 FORM 2 - 07-03-2024 correct.pdf · uploaded 14 Jan 2025Source
  • Document7 Form - 2 30-09-24 correct.pdf · uploaded 14 Jan 2025Source
  • Document8 FORM 2 - 06-01-2025 correct.pdf · uploaded 14 Jan 2025Source
  • DocumentFORM 2.pdf · uploaded 4 Sep 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsGat no 256 P

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
Flat 101 landowner, Flat 102 landowner, flat 103 Landowner, Flat 104 Landowner, Flat 201 1 bhk, Flat 202 2bhk, Flat 203 landowner, Flat 204 landowner, Flat 301 1 bhk, Flat 302 2bhk, Flat 303 2bhk, Flat 304 1 bhk, Flat 401 1 bhk, Flat 402 2 bhk, Flat 403 2 bhk, Flat 404 1 bhk, flat 501 1bhk, Flat 502 2 bhk, office 102 landowner, Office 103, Office 1 landowner, office 206 landowner, Office 303, office 304 landowner, office 305 landowner, Office no.101, Office No. 2, Office No. 201, Office no 202, Office No. 203, Office no. 204, office No.205, Office No.207, office no 208, Office No 301, Office No 302, Office no. 306, Office No 307, Office No.308, office No. 309, Shop 01 landowner, shop no. 02, Shop no.04 landowner, Shop no. 05, Shop no 06, shop no 3 landowner, flat 101 landowner, flat 102 1 bhk, flat 103 1bhk, flat 104 2bhk, flat 105 2 bhk, flat 106 1 bhk, flat 107 1bhk, flat 108 2bhk, flat 201 2bhk, flat 202 landowner, flat 203 1 bhk, flat 204 2bhk, flat 205 2bhk, flat 206 1 bhk, flat 207 landowner, flat 208 2 bhk, flat 301 2bhk, flat 302 1bhk, flat 303 landowner, flat 304 2 bhk, flat 305 2bhk, flat 306 1 bhk, flat 307 1 bhk, flat 308 landowner, flat 401 2 bhk, flat 402 1bhk, flat 403 1bhk, flat 404 2bhk, flat 405 landowner, flat 406 1 bhk, flat 407 1 bhk, flat 408 2bhk, flat 501 2hk, flat 502 1 bhk, flat 503 1bhk, flat 504 2bhk, flat 505 2 bhk, flat 506 1bhk, flat 507 1 bhk, flat 508 2bhk86 units in all
Address
Gat no 256 P, Moshi, PunePIN 412105
Village
Moshi, Haveli taluka
Designated bank account
76
Developed in phases
Yes

Survey, CTS, gat or plot numbers

Gat no 256 P

Boundaries

North
By 30 M Wide PCMC DP Road
South
By Remaining Property of Mr Himmat Raghunath Saste
East
By Property of Harish Dilip Saste and other
West
By Property of Janardan Ghige and Others

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking86 units

22 of 86 units booked (26%), as the promoter reported to MahaRERA

Flat 101 landowner · 1 unitFlat 102 landowner · 1 unitflat 103 Landowner · 1 unitFlat 104 Landowner · 1 unitFlat 201 1 bhk · 1 unitFlat 202 2bhk · 1 unitFlat 203 landowner · 1 unitFlat 204 landowner · 1 unitFlat 301 1 bhk · 1 unitFlat 302 2bhk · 1 unitFlat 303 2bhk · 1 unitFlat 304 1 bhk · 1 unitFlat 401 1 bhk · 1 unitFlat 402 2 bhk · 1 unitFlat 403 2 bhk · 1 unitFlat 404 1 bhk · 1 unitflat 501 1bhk · 1 unitFlat 502 2 bhk · 1 unitoffice 102 landowner · 1 unitOffice 103 · 1 unitOffice 1 landowner · 1 unitoffice 206 landowner · 1 unitOffice 303 · 1 unitoffice 304 landowner · 1 unitoffice 305 landowner · 1 unitOffice no.101 · 1 unitOffice No. 2 · 1 unitOffice No. 201 · 1 unitOffice no 202 · 1 unitOffice No. 203 · 1 unitOffice no. 204 · 1 unitoffice No.205 · 1 unitOffice No.207 · 1 unitoffice no 208 · 1 unitOffice No 301 · 1 unitOffice No 302 · 1 unitOffice no. 306 · 1 unitOffice No 307 · 1 unitOffice No.308 · 1 unitoffice No. 309 · 1 unitShop 01 landowner · 1 unitshop no. 02 · 1 unitShop no.04 landowner · 1 unitShop no. 05 · 1 unitShop no 06 · 1 unitshop no 3 landowner · 1 unitflat 101 landowner · 1 unitflat 102 1 bhk · 1 unitflat 103 1bhk · 1 unitflat 104 2bhk · 1 unitflat 105 2 bhk · 1 unitflat 106 1 bhk · 1 unitflat 107 1bhk · 1 unitflat 108 2bhk · 1 unitflat 201 2bhk · 1 unitflat 202 landowner · 1 unitflat 203 1 bhk · 1 unitflat 204 2bhk · 1 unitflat 205 2bhk · 1 unitflat 206 1 bhk · 1 unitflat 207 landowner · 1 unitflat 208 2 bhk · 1 unitflat 301 2bhk · 1 unitflat 302 1bhk · 1 unitflat 303 landowner · 1 unitflat 304 2 bhk · 1 unitflat 305 2bhk · 1 unitflat 306 1 bhk · 1 unitflat 307 1 bhk · 1 unitflat 308 landowner · 1 unitflat 401 2 bhk · 1 unitflat 402 1bhk · 1 unitflat 403 1bhk · 1 unitflat 404 2bhk · 1 unitflat 405 landowner · 1 unitflat 406 1 bhk · 1 unitflat 407 1 bhk · 1 unitflat 408 2bhk · 1 unitflat 501 2hk · 1 unitflat 502 1 bhk · 1 unitflat 503 1bhk · 1 unitflat 504 2bhk · 1 unitflat 505 2 bhk · 1 unitflat 506 1bhk · 1 unitflat 507 1 bhk · 1 unitflat 508 2bhk · 1 unit
BuildingTypeCarpet areaUnitsBooked
A WIngFlat 101 landowner37.17 sq m · 400 sq ft10
A WIngFlat 102 landowner49.23 sq m · 530 sq ft10
A WIngflat 103 Landowner49.23 sq m · 530 sq ft10
A WIngFlat 104 Landowner37.17 sq m · 400 sq ft10
A WIngFlat 201 1 bhk37.22 sq m · 401 sq ft10
A WIngFlat 202 2bhk49.2 sq m · 530 sq ft10
A WIngFlat 203 landowner49.2 sq m · 530 sq ft10
A WIngFlat 204 landowner37.22 sq m · 401 sq ft10
Show all 86 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
A WIngFlat 301 1 bhk37.17 sq m · 400 sq ft11
A WIngFlat 302 2bhk49.23 sq m · 530 sq ft11
A WIngFlat 303 2bhk49.23 sq m · 530 sq ft10
A WIngFlat 304 1 bhk37.17 sq m · 400 sq ft11
A WIngFlat 401 1 bhk37.22 sq m · 401 sq ft10
A WIngFlat 402 2 bhk49.2 sq m · 530 sq ft10
A WIngFlat 403 2 bhk49.2 sq m · 530 sq ft10
A WIngFlat 404 1 bhk37.22 sq m · 401 sq ft11
A WIngflat 501 1bhk37.17 sq m · 400 sq ft11
A WIngFlat 502 2 bhk49.23 sq m · 530 sq ft11
A WIngoffice 102 landowner61.69 sq m · 664 sq ft10
A WIngOffice 10315.06 sq m · 162 sq ft10
A WIngOffice 1 landowner30.2 sq m · 325 sq ft10
A WIngoffice 206 landowner19.82 sq m · 213 sq ft10
A WIngOffice 30324.7 sq m · 266 sq ft10
A WIngoffice 304 landowner24.7 sq m · 266 sq ft10
A WIngoffice 305 landowner24.7 sq m · 266 sq ft10
A WIngOffice no.10161.66 sq m · 664 sq ft10
A WIngOffice No. 250.91 sq m · 548 sq ft10
A WIngOffice No. 20119.85 sq m · 214 sq ft10
A WIngOffice no 20219.82 sq m · 213 sq ft10
A WIngOffice No. 20319.82 sq m · 213 sq ft10
A WIngOffice no. 20419.82 sq m · 213 sq ft10
A WIngoffice No.20519.82 sq m · 213 sq ft10
A WIngOffice No.20761.66 sq m · 664 sq ft10
A WIngoffice no 20861.67 sq m · 664 sq ft10
A WIngOffice No 30124.74 sq m · 266 sq ft10
A WIngOffice No 30224.7 sq m · 266 sq ft10
A WIngOffice no. 30624.74 sq m · 266 sq ft10
A WIngOffice No 30734.76 sq m · 374 sq ft10
A WIngOffice No.30834.65 sq m · 373 sq ft10
A WIngoffice No. 30918.91 sq m · 204 sq ft10
A WIngShop 01 landowner50.88 sq m · 548 sq ft10
A WIngshop no. 0230.13 sq m · 324 sq ft10
A WIngShop no.04 landowner30.13 sq m · 324 sq ft10
A WIngShop no. 0530.13 sq m · 324 sq ft10
A WIngShop no 0630.13 sq m · 324 sq ft10
A WIngshop no 3 landowner30.13 sq m · 324 sq ft10
B Wingflat 101 landowner46.9 sq m · 505 sq ft10
B Wingflat 102 1 bhk37.17 sq m · 400 sq ft10
B Wingflat 103 1bhk36.26 sq m · 390 sq ft10
B Wingflat 104 2bhk46.58 sq m · 501 sq ft10
B Wingflat 105 2 bhk46.09 sq m · 496 sq ft10
B Wingflat 106 1 bhk36.26 sq m · 390 sq ft10
B Wingflat 107 1bhk37.17 sq m · 400 sq ft10
B Wingflat 108 2bhk46.79 sq m · 504 sq ft11
B Wingflat 201 2bhk46.79 sq m · 504 sq ft11
B Wingflat 202 landowner37.22 sq m · 401 sq ft10
B Wingflat 203 1 bhk36.35 sq m · 391 sq ft10
B Wingflat 204 2bhk46.62 sq m · 502 sq ft10
B Wingflat 205 2bhk44.18 sq m · 476 sq ft11
B Wingflat 206 1 bhk36.35 sq m · 391 sq ft10
B Wingflat 207 landowner37.22 sq m · 401 sq ft10
B Wingflat 208 2 bhk46.79 sq m · 504 sq ft11
B Wingflat 301 2bhk46.9 sq m · 505 sq ft11
B Wingflat 302 1bhk37.17 sq m · 400 sq ft11
B Wingflat 303 landowner36.26 sq m · 390 sq ft10
B Wingflat 304 2 bhk46.58 sq m · 501 sq ft10
B Wingflat 305 2bhk46.09 sq m · 496 sq ft11
B Wingflat 306 1 bhk36.26 sq m · 390 sq ft10
B Wingflat 307 1 bhk37.17 sq m · 400 sq ft11
B Wingflat 308 landowner46.9 sq m · 505 sq ft10
B Wingflat 401 2 bhk46.79 sq m · 504 sq ft11
B Wingflat 402 1bhk37.22 sq m · 401 sq ft10
B Wingflat 403 1bhk36.35 sq m · 391 sq ft10
B Wingflat 404 2bhk46.62 sq m · 502 sq ft10
B Wingflat 405 landowner44.18 sq m · 476 sq ft10
B Wingflat 406 1 bhk36.35 sq m · 391 sq ft10
B Wingflat 407 1 bhk37.22 sq m · 401 sq ft10
B Wingflat 408 2bhk46.79 sq m · 504 sq ft11
B Wingflat 501 2hk46.9 sq m · 505 sq ft11
B Wingflat 502 1 bhk37.17 sq m · 400 sq ft11
B Wingflat 503 1bhk36.26 sq m · 390 sq ft11
B Wingflat 504 2bhk46.58 sq m · 501 sq ft10
B Wingflat 505 2 bhk46.09 sq m · 496 sq ft10
B Wingflat 506 1bhk36.26 sq m · 390 sq ft11
B Wingflat 507 1 bhk37.17 sq m · 400 sq ft11
B Wingflat 508 2bhk46.9 sq m · 505 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
Chartered accountantMr Varad S Kulkarni—
Chartered accountantNipun Bhandari—
EngineerAbhijit Shinde—

Source: MahaRERA project page. Contact details are not shown.

Shri Icon in numbers

Registered deals, summarised

Deedo has 42 registered documents at Shri Icon, from Jan 2026 to Oct 2026: 41 sales, 1 mortgage. The median registered sale works out to about ₹7,000 per sq ft, at a median of ₹32 L a deal; 0% of sales were resales.

What is the price per sq ft at Shri Icon?
The median registered sale works out to about ₹7,000 per sq ft, at a median of ₹32 L a deal; 0% of sales were resales.
How many properties have been sold at Shri Icon?
41 sales are registered at Shri Icon.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Shri Icon by Deedo, last updated with deals registered in Oct 2026.

Latest deal · Primary sale · Oct 2026

₹25–50 L

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Methodology