Extended 4 mo16 floorsRERA P52100046506
A Wing, Kosmas A Wing
Deedo IDDP-PUN-9JJ3-AMahaRERA has not published a flat-by-flat record for this tower, and no registered deed names it yet.
Median saleNot on recordneeds 3 or more sales
Completion30 Apr 202731 Dec 2026 · revised
Units & parking in A Wing
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 45.6 m² (491 sq.ft) | 47 | Not on record |
| 2BHK | 62.6 m² (674 sq.ft) | 24 | Not on record |
| 2BHK | 67.3 m² (725 sq.ft) | 24 | Not on record |
| Shop | 24.3 m² (261 sq.ft) | 2 | Not on record |
| Shop | 24.3 m² (262 sq.ft) | 2 | Not on record |
| Shop | 25.7 m² (277 sq.ft) | 6 | Not on record |
| Shop | 30 m² (323 sq.ft) | 2 | Not on record |
| Shop | 30.1 m² (324 sq.ft) | 2 | Not on record |
| Shop | 31.2 m² (336 sq.ft) | 6 | Not on record |
Parking: Closed/Covered 65 · Open Space 30 (as declared to MahaRERA)
Construction progress (declared)
Work completed, as the promoter reported it to MahaRERA (Form 1). Not verified on site.
- Excavation100%
- Basement (if any)100%
- Podiums (if any)50%
- Plinth100%
- Stilt Floor100%
- Slabs of Super Structure100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
- Sanitary Fittings within the flats / premises0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
As registered with MahaRERA
- RERA registration
- P52100046506 · registered 10 Aug 2022
- Promised completion
- 31 Dec 2026
- Revised completion
- 30 Apr 2027
- Sanctioned habitable floors
- 16
- Sanctioned floors (incl. basement, stilt, podium)
- 16
- Units declared
- 0
- Homes
- 0
- Shops and offices
- 0
- MahaRERA status
- Certificate Signed
- Deedo ID
- DP-PUN-9JJ3-A
Questions about A Wing
When is A Wing due for completion?
The MahaRERA registration promises 31 Dec 2026, revised to 30 Apr 2027.
How many floors does A Wing have?
16 sanctioned habitable floors, as registered with MahaRERA.
Data through3 Nov 2026SourcesMahaRERA registration and project page · IGR Maharashtra Index IIFloors and units are as registered; a promoter can revise them in later filings. Party names appear only inside an unlocked Index II.Report a problemMethodology