Others · 3 buildings · 82 unitsRERA P52100047735

Vishwavihar

Deedo IDDP-PUN-9XQH

Its promised completion date, Sep 2025, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 44% of its units are booked.

Mordewadi, Pune 410503 · by Vishwa Developer & Promoter

Delivery1 yr 2 mo past duePromised Sep 2025 · no extension on record · not shown completedRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales44% booked36 of 82 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Its promised completion date, Sep 2025, has passed and MahaRERA does not show it completed

  • This projectRegistered 21 Nov 2022, completion promised 1 Sep 2025, and still not shown completed today.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100047735
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210004773521 Nov 20221 Sep 20251 Sep 2025Vishwa Developer & PromoterProject page
Documents99

1 document held by Deedo, 98 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardVishwa PAN card.pdf · uploaded 21 Oct 2022Source

Legal

  • Declaration Form BForm B Promoter declaration.pdf · uploaded 21 Oct 2022Source
  • Legal Title reportsearch report.pdf · uploaded 21 Oct 2022Source
  • Legal Title reportSearch Report in RERA format_compressed.pdf · uploaded 29 Oct 2022Source

Migrated

  • 1 a Details of encumbrances concerned to FinanceNo Encumbrance.pdf · uploaded 15 Oct 2022Source
  • 1 b Details of encumbrances concerned to LegalLegal encumbrance.pdf · uploaded 15 Oct 2022Source
  • 1 Declaration about Commencement CertificateFORM D COMMENCEMENT DECALRATION BANKHELE.pdf · uploaded 15 Oct 2022Source
Show all 99 documentsShow fewer documents

Migrated

  • 1 CERSAI detailsCERSAI Declaration.pdf · uploaded 15 Oct 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration for Bank details.pdf · uploaded 15 Oct 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH CERTIFICATE_merged (1)_organized.pdf · uploaded 19 Oct 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate_compressed.pdf · uploaded 19 Oct 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certi_merged_removed_organized (1).pdf · uploaded 19 Oct 2022Source
  • 1 PAN CardVishwa PAN card.pdf · uploaded 21 Oct 2022Source
  • 1 Copy of the legal title reportsearch report.pdf · uploaded 21 Oct 2022Source
  • 1 Copy of Layout Approval (in case of layout)Revised Main Layout.pdf · uploaded 21 Oct 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentR Wing C 5 6 n7.pdf · uploaded 21 Oct 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentR Wing D 1 to 6.pdf · uploaded 21 Oct 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentAminity 1.pdf · uploaded 21 Oct 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentAmenity 2.pdf · uploaded 21 Oct 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentRevised NA Order.pdf · uploaded 21 Oct 2022Source
  • 1 Declaration in FORM BForm B Promoter declaration.pdf · uploaded 21 Oct 2022Source
  • 1 Proforma of Agreement for saleVishwavihar - AFS.pdf · uploaded 21 Oct 2022Source
  • 1 Proforma of Allotment letterAllotment Letter_compressed.pdf · uploaded 21 Oct 2022Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report Of Allotment Letter.pdf · uploaded 21 Oct 2022Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report of Agreement For Sale.pdf · uploaded 21 Oct 2022Source
  • 2 Copy of the legal title reportSearch Report in RERA format_compressed.pdf · uploaded 29 Oct 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate oct 22 to dec 22.pdf · uploaded 10 Feb 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate oct 22 to dec 22_compressed.pdf · uploaded 10 Feb 2023Source
  • 1 Disclosure of sold/ booked inventorySold, Unsold, Booked Invenory Oct 22 to Dec22.pdf · uploaded 10 Feb 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 _compressed.pdf · uploaded 10 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)ilovepdf_merged (24)_compressed (1).pdf · uploaded 15 Feb 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Artichitect Certificate Jan 23 to March 23 P52100047735.pdf · uploaded 24 Apr 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Engineers Cet - P52100047735 March 2023.pdf · uploaded 24 Apr 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Assurance Certificate 2022-2023 Form 2A P52100047735.pdf · uploaded 24 Apr 2023Source
  • 2 Disclosure of sold/ booked inventorySold Unsold Booked Inventory Jan 23 to Mar 23 P52100047735.pdf · uploaded 24 Apr 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)C A Form 3-March 2023-P52100047735.pdf · uploaded 24 Apr 2023Source
  • 3 Disclosure of sold/ booked inventorySold Unsold Booked Inventory (P52100047735).pdf · uploaded 6 May 2023Source
  • 4 Disclosure of sold/ booked inventorySold Unsold Inventory P52100047735 received 09-05-2023.pdf · uploaded 9 May 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate (P52100047735).pdf · uploaded 31 May 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)form-3 Jan 23 To March 23 (P52100047735).pdf · uploaded 31 May 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 FY 2022-23 (P52100047735)).pdf · uploaded 31 May 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Quality Assurance Certificate 2022-2023 Form 2A P52100047735.pdf · uploaded 17 Jun 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 2022-23 (P52100047735)).pdf · uploaded 17 Jun 2023Source
  • 5 Disclosure of sold/ booked inventorySold Unsold Inventory P52100047735 (April 23 to Jun 23_compressed.pdf · uploaded 24 Jun 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Archtects Certificate(Rera No- P52100047735) April 23 to jun 23_compressed.pdf · uploaded 1 Jul 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)C A Form -3 (P52100047735) Q1_compressed.pdf · uploaded 1 Jul 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate (Rera P52100047735)_compressed.pdf · uploaded 3 Jul 2023Source
  • 6 Disclosure of sold/ booked inventorySold Unsold Inventory Rera NoP52100047735.pdf · uploaded 2 Oct 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate.pdf · uploaded 7 Oct 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate .pdf · uploaded 7 Oct 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA (Rere No P52100047735)_compressed.pdf · uploaded 3 Nov 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-Engineers Certificate (P52100047735)_compressed.pdf · uploaded 6 Nov 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Q3-P52100047735.pdf · uploaded 27 Jan 2024Source
  • 7 Disclosure of sold/ booked inventorySold Unsold Inventory Rera No P52100047735.pdf · uploaded 27 Jan 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate (Rera no P52100047735)Q2.pdf · uploaded 19 Feb 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 C A SATPUTE FINAL(P52100047735) Q3_compressed.pdf · uploaded 19 Feb 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - Engineers Certificate Quality Assurance (P52100047735)2023-24.pdf · uploaded 22 Apr 2024Source
  • 8 Disclosure of sold/ booked inventorySold Unsold Inventory Rera No P52100047735 (Q4).pdf · uploaded 22 Apr 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Jan 24 to march 24 P52100047735.pdf · uploaded 27 Apr 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate (Rera no P52100047735)Q4.pdf · uploaded 29 May 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form - 3 Rera No P52100047735 (2023-24) (Q4)-1-9_compressed.pdf · uploaded 29 May 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form - 5 Rera No P52100047735 (2023-24).pdf · uploaded 29 May 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Q1 (2024-25)-P52100047735.pdf · uploaded 15 Jul 2024Source
  • 9 Disclosure of sold/ booked inventorySold Unsold Inventory Rera No P52100047735 - 2024-25 Q1.pdf · uploaded 15 Jul 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 16 Aug 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_compressed.pdf · uploaded 16 Aug 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Q2 (2024-25)-P52100047735.pdf · uploaded 15 Oct 2024Source
  • 2 Disclosure of sold/ booked inventorySold Unsold Inventory.pdf · uploaded 15 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form - 3 sept_compressed.pdf · uploaded 5 Nov 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate sept.pdf · uploaded 5 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Q3 P52100047735 Dec_compressed.pdf · uploaded 10 Jan 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold Inventory Rera No P52100047735 Q3 dec_compressed.pdf · uploaded 10 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 C A SATPUTE FINAL Dec 24_compressed.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Dec 24.pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventorysold unsold revised .pdf · uploaded 11 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate P52100047735.pdf · uploaded 24 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 P52100047735 MARCH 25.pdf · uploaded 25 Apr 2025Source
  • Withdrawal Update Form 1Architects Certificate (P52100047735)2025-26 Q1.pdf · uploaded 20 Jul 2025Source
  • Withdrawal Update Form 2Form 2 Engineer Certificate.pdf · uploaded 20 Jul 2025Source
  • Withdrawal Update Form 3Form 3_compressed.pdf · uploaded 20 Jul 2025Source
  • Withdrawal Update Form 1Architects Certificate (P52100047735)2025-26 Q1.pdf · uploaded 8 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Engineer Certificate.pdf · uploaded 8 Oct 2025Source
  • Withdrawal Update Form 3Form 3_compressed.pdf · uploaded 8 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect Certificate April 25 to jun 25 P52100047735.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 2From 2 Sept 25.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 3Form 3 C A SATPUTE FINAL(P52100047735) Q-2(2025-26)_11zon.pdf · uploaded 18 Oct 2025Source

Technical

  • DocumentRevised Main Layout.pdf · uploaded 21 Oct 2022Source
  • DocumentR Wing C 5 6 n7.pdf · uploaded 21 Oct 2022Source
  • DocumentR Wing D 1 to 6.pdf · uploaded 21 Oct 2022Source
  • DocumentAminity 1.pdf · uploaded 21 Oct 2022Source
  • DocumentAmenity 2.pdf · uploaded 21 Oct 2022Source

Technical (Architect)

  • DocumentArchitects Certificate Q2 (2024-25)-P52100047735.pdf · uploaded 15 Oct 2024Source
  • DocumentArchitects Certificate Q3 P52100047735 Dec_compressed.pdf · uploaded 10 Jan 2025Source
  • DocumentForm 1 Architect Certificate April 25 to jun 25 P52100047735.pdf · uploaded 17 Oct 2025Source

Technical (Engineer)

  • DocumentForm 2 Engineer Certificate sept.pdf · uploaded 5 Nov 2024Source
  • DocumentForm 2 Engineer Certificate Dec 24.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 2 Engineer Certificate P52100047735.pdf · uploaded 24 Apr 2025Source
  • DocumentFrom 2 Sept 25.pdf · uploaded 17 Oct 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 12A/1, 12B/1

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
Doctors cabin, Hospital, Office no 1, Office no 2, Shop no 1, Shop no 10, Shop no 2, Shop no 3, Shop no 4, Shop no 5, Shop no 6, Shop no 7, Shop no 8, Shop no 9, Store no 1, 1 BHK 501, 1 BHK 503, 1 BHK 504, 1 BHK 506, 1 BHK 507, 1 BHK 509, 1 BHK 510, 1 BHK 512, 1 BHK 601, 1 BHK 603, 1 BHK 604, 1 BHK 606, 1 BHK 607, 1 BHK 609, 1 BHK 610, 1 BHK 612, 1 BHK 701, 1 BHK 703, 1 BHK 704, 1 BHK 706, 1 BHK 707, 1 BHK 709, 1 BHK 710, 1 BHK 712, 2BHK 502, 2 BHK 505, 2 BHK 508, 2 BHK 511, 2 BHK 602, 2 BHK 605, 2 BHK 608, 2 BHK 611, 2 BHK 702, 2 BHK 705, 2 BHK 708, 2 BHK 711, 2 BHK 101, 2 BHK 102, 2 BHK 103, 2 BHK 104, 2 BHK 201, 2BHK 202, 2 BHK 203, 2 BHK 204, 2 BHK 301, 2 BHK 302, 2 BHK 303, 2 BHK 304, 2 BHK 401, 2 BHK 402, 2 BHK 403, 2 BHK 404, 2 BHK 501, 2 BHK 502, 2 BHK 503, 2 BHK 504, 2 BHK 601, 2 BHK 603, 2 BHK 60482 units in all
Address
Survey No 12 Hissa No 9a+10 +11/1a, 12a/1, 12b/1, 13a And Survey No. 6 Hissa No 1a/1 (P), MancharPIN 410503
Village
Mordewadi, Ambegaon taluka
Land area for this project
2,000 sq m (21,528 sq ft)
Permissible built-up area
13,117 sq m (1,41,190 sq ft)
Sanctioned built-up area
8,117 sq m (87,370 sq ft)
Recreational open space
985 sq m (10,602 sq ft)
Designated bank account
41
Developed in phases
Yes

Survey, CTS, gat or plot numbers

12A/112B/113ASURVEY NO 12 HISSA NO 9A+10 +11/1ASURVEY NO. 6 HISSA NO 1A/1 (P)

Land as published on MahaRERA's project page

SURVEY NO 12 HISSA NO 9A+10 +11/1A, 12A/1, 12B/1, 13A AND SURVEY NO. 6 HISSA NO 1A/1 (P)

Boundaries

North
By Adj Hissa No 10
South
By S No 12 P And 13 P
East
By Adj S No 12 P
West
By 12 Mtr Wide Dp Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking82 units

36 of 82 units booked (44%), as the promoter reported to MahaRERA

Doctors cabin · 1 unitHospital · 2 unitsOffice no 1 · 1 unitOffice no 2 · 1 unitShop no 1 · 2 unitsShop no 10 · 1 unitShop no 2 · 2 unitsShop no 3 · 2 unitsShop no 4 · 2 unitsShop no 5 · 2 unitsShop no 6 · 2 unitsShop no 7 · 1 unitShop no 8 · 1 unitShop no 9 · 1 unitStore no 1 · 1 unit1 BHK 501 · 1 unit1 BHK 503 · 1 unit1 BHK 504 · 1 unit1 BHK 506 · 1 unit1 BHK 507 · 1 unit1 BHK 509 · 1 unit1 BHK 510 · 1 unit1 BHK 512 · 1 unit1 BHK 601 · 1 unit1 BHK 603 · 1 unit1 BHK 604 · 1 unit1 BHK 606 · 1 unit1 BHK 607 · 1 unit1 BHK 609 · 1 unit1 BHK 610 · 1 unit1 BHK 612 · 1 unit1 BHK 701 · 1 unit1 BHK 703 · 1 unit1 BHK 704 · 1 unit1 BHK 706 · 1 unit1 BHK 707 · 1 unit1 BHK 709 · 1 unit1 BHK 710 · 1 unit1 BHK 712 · 1 unit2BHK 502 · 1 unit2 BHK 505 · 1 unit2 BHK 508 · 1 unit2 BHK 511 · 1 unit2 BHK 602 · 2 units2 BHK 605 · 1 unit2 BHK 608 · 1 unit2 BHK 611 · 1 unit2 BHK 702 · 1 unit2 BHK 705 · 1 unit2 BHK 708 · 1 unit2 BHK 711 · 1 unit2 BHK 101 · 1 unit2 BHK 102 · 1 unit2 BHK 103 · 1 unit2 BHK 104 · 1 unit2 BHK 201 · 1 unit2BHK 202 · 1 unit2 BHK 203 · 1 unit2 BHK 204 · 1 unit2 BHK 301 · 1 unit2 BHK 302 · 1 unit2 BHK 303 · 1 unit2 BHK 304 · 1 unit2 BHK 401 · 1 unit2 BHK 402 · 1 unit2 BHK 403 · 1 unit2 BHK 404 · 1 unit2 BHK 501 · 1 unit2 BHK 502 · 1 unit2 BHK 503 · 1 unit2 BHK 504 · 1 unit2 BHK 601 · 1 unit2 BHK 603 · 1 unit2 BHK 604 · 1 unit
BuildingTypeCarpet areaUnitsBooked
Amenity BuildingDoctors cabin18 sq m · 194 sq ft10
Amenity BuildingHospital379.71 sq m · 4,087 sq ft10
Amenity BuildingHospital379.71 sq m · 4,087 sq ft10
Amenity BuildingOffice no 149.67 sq m · 535 sq ft10
Amenity BuildingOffice no 240.11 sq m · 432 sq ft10
Amenity BuildingShop no 118.34 sq m · 197 sq ft10
Amenity BuildingShop no 119.69 sq m · 212 sq ft10
Amenity BuildingShop no 1011.91 sq m · 128 sq ft10
Show all 82 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Amenity BuildingShop no 218.34 sq m · 197 sq ft10
Amenity BuildingShop no 219.69 sq m · 212 sq ft10
Amenity BuildingShop no 318.34 sq m · 197 sq ft10
Amenity BuildingShop no 319.69 sq m · 212 sq ft10
Amenity BuildingShop no 418.63 sq m · 201 sq ft10
Amenity BuildingShop no 423.45 sq m · 252 sq ft10
Amenity BuildingShop no 511.51 sq m · 124 sq ft10
Amenity BuildingShop no 523.45 sq m · 252 sq ft10
Amenity BuildingShop no 611.51 sq m · 124 sq ft10
Amenity BuildingShop no 623.45 sq m · 252 sq ft10
Amenity BuildingShop no 723.82 sq m · 256 sq ft10
Amenity BuildingShop no 819.54 sq m · 210 sq ft10
Amenity BuildingShop no 916.13 sq m · 174 sq ft10
Amenity BuildingStore no 155.31 sq m · 595 sq ft10
Building C1 BHK 50141.07 sq m · 442 sq ft10
Building C1 BHK 50341.28 sq m · 444 sq ft11
Building C1 BHK 50441.28 sq m · 444 sq ft10
Building C1 BHK 50641.07 sq m · 442 sq ft10
Building C1 BHK 50741.07 sq m · 442 sq ft11
Building C1 BHK 50941.28 sq m · 444 sq ft10
Building C1 BHK 51041.28 sq m · 444 sq ft11
Building C1 BHK 51241.07 sq m · 442 sq ft11
Building C1 BHK 60140.94 sq m · 441 sq ft10
Building C1 BHK 60341.21 sq m · 444 sq ft10
Building C1 BHK 60441.21 sq m · 444 sq ft10
Building C1 BHK 60640.94 sq m · 441 sq ft11
Building C1 BHK 60740.94 sq m · 441 sq ft11
Building C1 BHK 60941.21 sq m · 444 sq ft11
Building C1 BHK 61041.21 sq m · 444 sq ft11
Building C1 BHK 61240.94 sq m · 441 sq ft10
Building C1 BHK 70141.07 sq m · 442 sq ft10
Building C1 BHK 70341.28 sq m · 444 sq ft10
Building C1 BHK 70441.28 sq m · 444 sq ft10
Building C1 BHK 70641.07 sq m · 442 sq ft10
Building C1 BHK 70741.07 sq m · 442 sq ft10
Building C1 BHK 70941.28 sq m · 444 sq ft10
Building C1 BHK 71041.28 sq m · 444 sq ft10
Building C1 BHK 71241.28 sq m · 444 sq ft11
Building C2BHK 50255.61 sq m · 599 sq ft10
Building C2 BHK 50555.61 sq m · 599 sq ft11
Building C2 BHK 50855.61 sq m · 599 sq ft10
Building C2 BHK 51155.61 sq m · 599 sq ft11
Building C2 BHK 60255.51 sq m · 598 sq ft11
Building C2 BHK 60555.51 sq m · 598 sq ft11
Building C2 BHK 60855.51 sq m · 598 sq ft11
Building C2 BHK 61155.51 sq m · 598 sq ft10
Building C2 BHK 70255.61 sq m · 599 sq ft10
Building C2 BHK 70555.61 sq m · 599 sq ft10
Building C2 BHK 70855.61 sq m · 599 sq ft11
Building C2 BHK 71155.61 sq m · 599 sq ft11
Building D2 BHK 10157.77 sq m · 622 sq ft11
Building D2 BHK 10257.77 sq m · 622 sq ft11
Building D2 BHK 10357.77 sq m · 622 sq ft11
Building D2 BHK 10457.77 sq m · 622 sq ft11
Building D2 BHK 20157.77 sq m · 622 sq ft10
Building D2BHK 20257.77 sq m · 622 sq ft11
Building D2 BHK 20357.77 sq m · 622 sq ft11
Building D2 BHK 20457.77 sq m · 622 sq ft11
Building D2 BHK 30157.77 sq m · 622 sq ft11
Building D2 BHK 30257.77 sq m · 622 sq ft11
Building D2 BHK 30357.77 sq m · 622 sq ft10
Building D2 BHK 30457.77 sq m · 622 sq ft11
Building D2 BHK 40157.77 sq m · 622 sq ft11
Building D2 BHK 40257.77 sq m · 622 sq ft11
Building D2 BHK 40357.77 sq m · 622 sq ft10
Building D2 BHK 40457.77 sq m · 622 sq ft11
Building D2 BHK 50157.77 sq m · 622 sq ft11
Building D2 BHK 50257.77 sq m · 622 sq ft10
Building D2 BHK 50357.77 sq m · 622 sq ft11
Building D2 BHK 50457.77 sq m · 622 sq ft11
Building D2 BHK 60157.77 sq m · 622 sq ft11
Building D2 BHK 60257.77 sq m · 622 sq ft11
Building D2 BHK 60357.77 sq m · 622 sq ft11
Building D2 BHK 60457.77 sq m · 622 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals2

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectN N Pawar—
EngineerAvadhut Shete—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Mordewadi

All 7 projects in Mordewadi · Compare Vishwavihar with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology