Ceratec West Winds
Deedo IDDP-PUN-FSFYIt is due for completion in Feb 2029, with no extension on record; no MahaRERA orders on record; 92% of its units are booked.
Man, Pune 411057 · by Ceratec Lifespaces LLp
Buying a flat here?
See every deed registered on it.
It is due for completion in Feb 2029, with no extension on record
- This projectRegistered 17 Apr 2023, completion promised 28 Feb 2029.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100050497
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100050497 | 17 Apr 2023 | 28 Feb 2029 | 28 Feb 2029 | Ceratec Lifespaces LLp | Project page |
Documents162
1 document held by Deedo, 161 filings listed on MahaRERA's project page
Finance
Legal
- Legal Title report24-Maan Title Report-1-6_compressed.pdf · uploaded 8 Mar 2023Source
- Legal Title report24-Maan Title Report-7-12_compressed.pdf · uploaded 8 Mar 2023Source
- Declaration Form BForm B.pdf · uploaded 8 Mar 2023Source
- Other – Legal7-12 20-06-24.pdf · uploaded 11 Apr 2025Source
- Legal Title reportTitle and Search Report 10-06-2024_11zon.pdf · uploaded 11 Apr 2025Source
Show all 162 documentsShow fewer documents
Migrated
- 1 PAN Card01-Ceratec Lifespaces PAN-converted.pdf · uploaded 8 Mar 2023Source
- 1 Copy of the legal title report24-Maan Title Report-1-6_compressed.pdf · uploaded 8 Mar 2023Source
- 2 Copy of the legal title report24-Maan Title Report-7-12_compressed.pdf · uploaded 8 Mar 2023Source
- 1 a Details of encumbrances concerned to FinanceDeclaration of Encumbrances.pdf · uploaded 8 Mar 2023Source
- 1 b Details of encumbrances concerned to LegalDeclaration of Encumbrances.pdf · uploaded 8 Mar 2023Source
- 1 Copy of Layout Approval (in case of layout)HPSC1702_compressed.pdf · uploaded 8 Mar 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentHPSC1703_compressed.pdf · uploaded 8 Mar 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentHPSC1704_compressed.pdf · uploaded 8 Mar 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentHPSC1706_compressed.pdf · uploaded 8 Mar 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentHPSC1705_compressed.pdf · uploaded 8 Mar 2023Source
- 5 Building Plan Approval / NA Order for plotted development27- IOD (Full Potential Letter).pdf · uploaded 8 Mar 2023Source
- 1 Commencement Certificates / NA Order for plotted development07-Commencement Certificate_compressed.pdf · uploaded 8 Mar 2023Source
- 1 Declaration about Commencement CertificateDeclaration Of Commencement (4).pdf · uploaded 8 Mar 2023Source
- 1 Declaration in FORM BForm B.pdf · uploaded 8 Mar 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)28- Form 1 Architect Certificate.pdf · uploaded 8 Mar 2023Source
- 1 CERSAI detailsilovepdf_merged (3).pdf · uploaded 8 Mar 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form_3 R2.pdf · uploaded 8 Mar 2023Source
- 1 Disclosure of Interest in Other Real Estate Organizationsannand agrwal ceratec.pdf · uploaded 8 Mar 2023Source
- 2 Disclosure of Interest in Other Real Estate Organizationsyogesh dougall ceratec.pdf · uploaded 8 Mar 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsRavindra phate ceratec.pdf · uploaded 8 Mar 2023Source
- 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 8 Mar 2023Source
- 1 Proforma of Agreement for saleAGR-1 changes from rohini madam.pdf · uploaded 8 Mar 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about separate Bank Account.pdf · uploaded 8 Mar 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation report of Allotment Letter.pdf · uploaded 8 Mar 2023Source
- 1 Deviation Report with respect to model copy of AgreementCeratec_compressed.pdf · uploaded 8 Mar 2023Source
- 2 Deviation Report with respect to model copy of AgreementScannerGo_1678283766823_compressed.pdf · uploaded 8 Mar 2023Source
- 6 Building Plan Approval / NA Order for plotted development27-IOD 2 (1)_compressed.pdf · uploaded 3 Apr 2023Source
- 7 Building Plan Approval / NA Order for plotted development27-IOD 1 (2)_compressed (1)_compressed.pdf · uploaded 3 Apr 2023Source
- 1 Other – Technical27-IOD 2 (1)_compressed.pdf · uploaded 3 Apr 2023Source
- 2 Other – Technical27-IOD 1 (2)_compressed (1)_compressed.pdf · uploaded 3 Apr 2023Source
- 1 Other – FinanceForm 3 R3.pdf · uploaded 7 Apr 2023Source
- 3 Other – TechnicalForm_3 R2.pdf · uploaded 7 Apr 2023Source
- 2 Proforma of Agreement for saleAgreement to Sale.pdf · uploaded 8 May 2023Source
- 3 Proforma of Agreement for saleRevise Customer Agreement.pdf · uploaded 19 Jun 2023Source
- 2 a Details of encumbrances concerned to FinanceDeclaration of Encumbrances.pdf · uploaded 6 Oct 2023Source
- 2 b Details of encumbrances concerned to LegalDeclaration of Encumbrances.pdf · uploaded 6 Oct 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Sep 23.pdf · uploaded 6 Oct 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Sep 23.pdf · uploaded 6 Oct 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate - Sep 23 - Signed_11zon.pdf · uploaded 7 Oct 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate - Sep 23 - Signed_11zon (1).pdf · uploaded 18 Oct 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arct form Ceratec West Winds 3.pdf · uploaded 1 Feb 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 1 Feb 2024Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold or Booked Inventory - Dec 23.pdf · uploaded 1 Feb 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate - Compressed.pdf · uploaded 1 Feb 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Form Ceratec West Winds - Mar 24.pdf · uploaded 6 May 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGG CERTIFICATE.pdf · uploaded 6 May 2024Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Sold or Booked Inventory - Mar 24.pdf · uploaded 6 May 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate - Mar 24.pdf · uploaded 6 May 2024Source
- 2 Copy of Layout Approval (in case of layout)2.pdf · uploaded 13 May 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentLLP REVISED COMMENCEMENT.pdf · uploaded 13 May 2024Source
- 8 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 29 May 2024Source
- 9 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 29 May 2024Source
- 10 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 29 May 2024Source
- 11 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 29 May 2024Source
- 12 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 29 May 2024Source
- 13 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 29 May 2024Source
- 14 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 29 May 2024Source
- 15 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 29 May 2024Source
- 16 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 29 May 2024Source
- 17 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 29 May 2024Source
- 18 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 29 May 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentRevised CC 20240524.pdf · uploaded 29 May 2024Source
- 1 Copy of Layout Approval (in case of layout)2-10_compressed.pdf · uploaded 21 Nov 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentRevised Commencement 11-10-24.pdf · uploaded 21 Nov 2024Source
- 2 Commencement Certificates / NA Order for plotted development5-10_compressed.pdf · uploaded 21 Nov 2024Source
- 1 Building Plan Approval / NA Order for plotted development1-10_compressed.pdf · uploaded 21 Nov 2024Source
- 9 Building Plan Approval / NA Order for plotted development10-10_compressed.pdf · uploaded 21 Nov 2024Source
- 8 Building Plan Approval / NA Order for plotted development9-10_compressed.pdf · uploaded 21 Nov 2024Source
- 7 Building Plan Approval / NA Order for plotted development8-10_compressed.pdf · uploaded 21 Nov 2024Source
- 6 Building Plan Approval / NA Order for plotted development7-10_compressed.pdf · uploaded 21 Nov 2024Source
- 5 Building Plan Approval / NA Order for plotted development6-10_compressed.pdf · uploaded 21 Nov 2024Source
- 4 Building Plan Approval / NA Order for plotted development5-10_compressed.pdf · uploaded 21 Nov 2024Source
- 3 Building Plan Approval / NA Order for plotted development4-10_compressed.pdf · uploaded 21 Nov 2024Source
- 2 Building Plan Approval / NA Order for plotted development3-10_compressed.pdf · uploaded 21 Nov 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Sep 24.pdf · uploaded 23 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Signed.pdf · uploaded 23 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 23 Nov 2024Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold or Booked Inventory Sep 24.pdf · uploaded 23 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect certificate west wind.pdf · uploaded 14 Jan 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Certificate Form 1.pdf · uploaded 18 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 final.pdf · uploaded 18 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Form 2.pdf · uploaded 18 Jan 2025Source
- 1 Copy of the legal title reportTitle and Search Report 10-06-2024_11zon.pdf · uploaded 11 Apr 2025Source
- 1 Other – Legal7-12 20-06-24.pdf · uploaded 11 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA certificate - (1)_11zon.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer's Cerificate.pdf · uploaded 19 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Ceratec LifiespacesLLp Engineers Certificate west winds.pdf · uploaded 19 Apr 2025Source
- Form 1Form 1 Architect certificate - (1).pdf · uploaded 31 May 2025Source
- Form 2FORM 2.pdf · uploaded 31 May 2025Source
- Form 3FORM 3.pdf · uploaded 31 May 2025Source
- Disclosure of Sold and Booked InventoryCeratec Lifespaces LLP Disclosure of Sold booked Inventory_11zon.pdf · uploaded 31 May 2025Source
- Form 1FORM 1 Architect Certificate.pdf · uploaded 12 Aug 2025Source
- Form 2FORM 2 Engineer Certificate.pdf · uploaded 12 Aug 2025Source
- Form 3FORM 3 CA certificate WEST WINDS.pdf · uploaded 12 Aug 2025Source
- Disclosure of Sold and Booked InventorySold & booking Inventary WEST WINDS.pdf · uploaded 12 Aug 2025Source
- Form 1Form 1- CERATEC LIFE SPACE LLP 30-09-2025.pdf · uploaded 20 Nov 2025Source
- Form 2Form 2 Engineers certificate 30-09-2025.pdf · uploaded 20 Nov 2025Source
- Form 3Form 3 CA Certificate 30-09-2025.pdf · uploaded 20 Nov 2025Source
- Disclosure of Sold and Booked InventorySold-unsold west wind 30-09-2025.pdf · uploaded 20 Nov 2025Source
- Form 2A (FY 2024-2025)Form 2A- Engineers certificate - 2024-25.pdf · uploaded 20 Nov 2025Source
- Form 1Form 1 Architect certificate.pdf · uploaded 3 Feb 2026Source
- Form 2Form 2 Engineer certificate.pdf · uploaded 3 Feb 2026Source
- Form 3Form 3 CA Certificate.pdf · uploaded 3 Feb 2026Source
- Disclosure of Sold and Booked InventorySold booked inventory 31-12-2025.pdf · uploaded 3 Feb 2026Source
- Form 1Form 1- Architect certificate 31-03-2026.pdf · uploaded 24 Apr 2026Source
- Form 2Form 2- Engineer certificate 31-03-2026.pdf · uploaded 24 Apr 2026Source
- Form 3Form 3- CA certificate 23-04-2026 (3).pdf · uploaded 24 Apr 2026Source
- Disclosure of Sold and Booked InventorySold unsold inventory 31-03-2026.pdf · uploaded 24 Apr 2026Source
- Form 2A (FY 2025-2026)FORM 2A.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 3Form - 3 Ceratec Lifespaces.pdf · uploaded 21 Jul 2026Source
Technical
- DocumentHPSC1702_compressed.pdf · uploaded 8 Mar 2023Source
- DocumentHPSC1703_compressed.pdf · uploaded 8 Mar 2023Source
- DocumentHPSC1704_compressed.pdf · uploaded 8 Mar 2023Source
- DocumentHPSC1706_compressed.pdf · uploaded 8 Mar 2023Source
- DocumentHPSC1705_compressed.pdf · uploaded 8 Mar 2023Source
- Document27- IOD (Full Potential Letter).pdf · uploaded 8 Mar 2023Source
- Document27-IOD 2 (1)_compressed.pdf · uploaded 3 Apr 2023Source
- Document27-IOD 1 (2)_compressed (1)_compressed.pdf · uploaded 3 Apr 2023Source
- Other – Technical27-IOD 2 (1)_compressed.pdf · uploaded 3 Apr 2023Source
- Other – Technical27-IOD 1 (2)_compressed (1)_compressed.pdf · uploaded 3 Apr 2023Source
- Other – TechnicalForm_3 R2.pdf · uploaded 7 Apr 2023Source
- Document2.pdf · uploaded 13 May 2024Source
- Document1.pdf · uploaded 29 May 2024Source
- Document2.pdf · uploaded 29 May 2024Source
- Document3.pdf · uploaded 29 May 2024Source
- Document4.pdf · uploaded 29 May 2024Source
- Document5.pdf · uploaded 29 May 2024Source
- Document6.pdf · uploaded 29 May 2024Source
- Document7.pdf · uploaded 29 May 2024Source
- Document8.pdf · uploaded 29 May 2024Source
- Document9.pdf · uploaded 29 May 2024Source
- Document10.pdf · uploaded 29 May 2024Source
- Document11.pdf · uploaded 29 May 2024Source
- Document2-10_compressed.pdf · uploaded 21 Nov 2024Source
- Document1-10_compressed.pdf · uploaded 21 Nov 2024Source
- Document3-10_compressed.pdf · uploaded 21 Nov 2024Source
- Document4-10_compressed.pdf · uploaded 21 Nov 2024Source
- Document5-10_compressed.pdf · uploaded 21 Nov 2024Source
- Document6-10_compressed.pdf · uploaded 21 Nov 2024Source
- Document7-10_compressed.pdf · uploaded 21 Nov 2024Source
- Document8-10_compressed.pdf · uploaded 21 Nov 2024Source
- Document9-10_compressed.pdf · uploaded 21 Nov 2024Source
- Document10-10_compressed.pdf · uploaded 21 Nov 2024Source
Technical (Architect)
Technical (Engineer)
- DocumentEngineer Certificate.pdf · uploaded 23 Nov 2024Source
- DocumentEngineers Certificate Form 2.pdf · uploaded 18 Jan 2025Source
- DocumentForm 2 Engineer's Cerificate.pdf · uploaded 19 Apr 2025Source
- DocumentCeratec LifiespacesLLp Engineers Certificate west winds.pdf · uploaded 19 Apr 2025Source
- DocumentFORM 2.pdf · uploaded 21 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 165/2 Maan, Sr No 165/1
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Unit types
- Shop, 1BHK, 2BHK B, 2BHK S, 3BHK, 3 BHK DUPLEX, 4.5 BHK SIMPLEX, 5.5 BHK SIMPLEX, 2BHK172 units in all
- Address
- Sr No 165/1 and 165/2 Maan, Man, ManPIN 411057
- Village
- Man, Mulshi taluka
- Location
- 18.57472, 73.70585
- Land area for this project
- 20,988 sq m (2,25,913 sq ft)
- Permissible built-up area
- 73,208 sq m (7,88,003 sq ft)
- Sanctioned built-up area
- 15,128 sq m (1,62,836 sq ft)
- Recreational open space
- 1,627 sq m (17,511 sq ft)
- Designated bank account
- 76
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Sr No 165/1 and 165/2 Maan
Boundaries
- North
- Sr No 165
- South
- Maan Hinjawadi Road
- East
- Sr No 166
- West
- Sr No 164
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking172 units
158 of 172 units booked (92%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A1 Wing | Shop | 26.05 sq m · 280 sq ft | 0 | 0 |
| A Wing | 1BHK | 51.84 sq m · 558 sq ft | 3 | 3 |
| A Wing | 2BHK B | 72.04 sq m · 775 sq ft | 22 | 22 |
| A Wing | 2BHK B | 72.63 sq m · 782 sq ft | 17 | 17 |
| A Wing | 2BHK S | 67.89 sq m · 731 sq ft | 18 | 18 |
| A Wing | 2BHK S | 68.04 sq m · 732 sq ft | 21 | 20 |
| A Wing | 3BHK | 91.6 sq m · 986 sq ft | 22 | 19 |
| A Wing | 3BHK | 91.69 sq m · 987 sq ft | 22 | 19 |
Show all 15 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | 3BHK | 92.74 sq m · 998 sq ft | 22 | 20 |
| A Wing | 3BHK | 93.44 sq m · 1,006 sq ft | 21 | 16 |
| A Wing | 3 BHK DUPLEX | 147.25 sq m · 1,585 sq ft | 2 | 2 |
| A Wing | 4.5 BHK SIMPLEX | 145.82 sq m · 1,570 sq ft | 1 | 1 |
| A Wing | 5.5 BHK SIMPLEX | 164.41 sq m · 1,770 sq ft | 1 | 1 |
| C Wing | 2BHK | 59.91 sq m · 645 sq ft | 0 | 0 |
| D Wing | 1BHK | 36.91 sq m · 397 sq ft | 0 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Nebula Architects and interiors | — |
| Chartered accountant | CA Deepak Pardeshi | — |
| Chartered accountant | Kunal Jhamvar JHAMVAR | — |
| Engineer | Rohinee Engineers | — |
| Engineer | Sagar Ambadas Pawar | — |
Source: MahaRERA project page. Contact details are not shown.