Residential / Group Housing · 2 buildings · 72 unitsRERA P52100018235

Downtown

Deedo IDDP-PUN-5961

Completion was pushed back 4 months, to Jan 2027; no MahaRERA orders on record; 49% of its units are booked.

Mahalunge, Pune 411045 · by Samarttha Buildcon

DeliveryExtended 4 moPromised Sep 2026 · now due Jan 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales49% booked35 of 72 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Jan 2027

  • This projectRegistered 16 Oct 2018, completion promised 30 Sep 2026, revised to 30 Jan 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100018235
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210001823516 Oct 201830 Sep 202630 Jan 2027Samarttha BuildconProject page
Documents112

1 document held by Deedo, 111 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardBUILDCON PANCARD ( PDF ).pdf · uploaded 11 Oct 2018Source

Legal

  • Legal Title reportTITEL CERTIFICATE.pdf · uploaded 11 Oct 2018Source
  • Declaration Form BForm b Company.pdf · uploaded 11 Oct 2018Source
  • Declaration Form BForm B.pdf · uploaded 10 Jun 2023Source
  • Declaration Form BForm B - Affidavit Cum Declaration 11-02-2025.pdf · uploaded 11 Feb 2025Source

Migrated

  • 1 PAN CardBUILDCON PANCARD ( PDF ).pdf · uploaded 11 Oct 2018Source
  • 1 Copy of the legal title reportTITEL CERTIFICATE.pdf · uploaded 11 Oct 2018Source
Show all 112 documentsShow fewer documents

Migrated

  • 1 Details of encumbrancesNon Incumbereances Declaration.pdf · uploaded 11 Oct 2018Source
  • 1 Copy of Layout Approval (in case of layout)Picasa.pdf · uploaded 11 Oct 2018Source
  • 1 Building Plan Approval (IOD)commencement cert.pdf · uploaded 11 Oct 2018Source
  • 1 Commencement Certificates / NA Order for plotted developmentcommencement cert.pdf · uploaded 11 Oct 2018Source
  • 1 Declaration in FORM BForm b Company.pdf · uploaded 11 Oct 2018Source
  • 1 Certificates of CA (Form 3)C A Certificate Samarttha Buildcon.pdf · uploaded 11 Oct 2018Source
  • 1 Proforma of Allotment letterAgreement Samarttha Bc.pdf · uploaded 11 Oct 2018Source
  • 1 Certificates of CA (Form 5)Form 5.pdf · uploaded 16 Jan 2019Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cert Rera R.pdf · uploaded 10 Oct 2020Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Mhalunge RED.pdf · uploaded 10 Oct 2020Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate 30092020.pdf · uploaded 10 Oct 2020Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A 30092020.pdf · uploaded 10 Oct 2020Source
  • 2 Certificates of CA (Form 3)Form 3 APRIL 2019.pdf · uploaded 10 Oct 2020Source
  • 1 Declaration about Commencement CertificateFormat D - Declaration of CC.pdf · uploaded 27 Apr 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)From I - Architech Certificate.pdf · uploaded 27 Apr 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 27 Apr 2022Source
  • 1 CERSAI detailsCERSAI Report Dated 27-04-2022 S No 6.pdf · uploaded 27 Apr 2022Source
  • 1 Disclosure of sold/ booked inventorySold n Unsold.pdf · uploaded 27 Apr 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 - FY 2018-19.pdf · uploaded 27 Apr 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 - 2019-20.pdf · uploaded 27 Apr 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 - 2020-21.pdf · uploaded 27 Apr 2022Source
  • 2 Declaration in FORM BForm B.pdf · uploaded 10 Jun 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form I.pdf · uploaded 10 Jun 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2 A _ Annexure C.pdf · uploaded 10 Jun 2023Source
  • 2 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 10 Jun 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)form 5.pdf · uploaded 10 Jun 2023Source
  • 1 Declaration in FORM BForm B - Affidavit Cum Declaration 11-02-2025.pdf · uploaded 11 Feb 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of sold_ booked inventory 01-07-2023.pdf · uploaded 11 Feb 2025Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of sold_ booked inventory 01-10-2023.pdf · uploaded 11 Feb 2025Source
  • 3 Disclosure of sold/ booked inventoryDisclosure of sold_ booked inventory 01-01-2024.pdf · uploaded 11 Feb 2025Source
  • 4 Disclosure of sold/ booked inventoryDisclosure of sold_ booked inventory 01-04-2024.pdf · uploaded 11 Feb 2025Source
  • 5 Disclosure of sold/ booked inventoryDisclosure of sold_ booked inventory 01-07-2024.pdf · uploaded 11 Feb 2025Source
  • 6 Disclosure of sold/ booked inventoryDisclosure of sold_ booked inventory 01-10-2024.pdf · uploaded 11 Feb 2025Source
  • 7 Disclosure of sold/ booked inventoryDisclosure of sold_ booked inventory 01-01-2025.pdf · uploaded 11 Feb 2025Source
  • 1 Copy of Layout Approval (in case of layout)Plan 1 of 7 _ Layout.pdf · uploaded 21 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECTS CERTIFICATE DT 01-07-2023.pdf · uploaded 21 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECTS CERTIFICATE DT 01-10-2023.pdf · uploaded 21 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECTS CERTIFICATE DT 01-01-2024.pdf · uploaded 21 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECTS CERTIFICATE DT 01-04-2024.pdf · uploaded 21 Feb 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECTS CERTIFICATE DT 01-07-2024.pdf · uploaded 21 Feb 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECTS CERTIFICATE DT 01-10-2024.pdf · uploaded 21 Feb 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECTS CERTIFICATE DT 01-01-2025.pdf · uploaded 21 Feb 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate 21-02-2022.pdf · uploaded 21 Feb 2025Source
  • 3 Building Plan Approval (IOD)Plan 4 of 7.pdf · uploaded 21 Feb 2025Source
  • 5 Building Plan Approval (IOD)Plan 6 of 7.pdf · uploaded 21 Feb 2025Source
  • 4 Building Plan Approval (IOD)Plan 5 of 7.pdf · uploaded 21 Feb 2025Source
  • 2 Building Plan Approval (IOD)Plan 3 of 7.pdf · uploaded 21 Feb 2025Source
  • 1 Building Plan Approval (IOD)Plan 2 of 7.pdf · uploaded 21 Feb 2025Source
  • 1 Declaration about Commencement CertificateFormat D- Declaration to CC.pdf · uploaded 21 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A_Ending 2023.pdf · uploaded 21 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A_ Ending 2024.pdf · uploaded 21 Feb 2025Source
  • DocumentArchitects certificate March 2025.pdf · uploaded 29 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySold unsold inventory March 2025.pdf · uploaded 29 Apr 2025Source
  • 1 Certificates of CA (Form 3)Form 3 fy 23-24.pdf · uploaded 8 May 2025Source
  • 2 Certificates of CA (Form 3)Form 3 Fy 24-25.pdf · uploaded 8 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Fy 23-24.pdf · uploaded 8 May 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Fy 24-25.pdf · uploaded 8 May 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Fy 23-24.pdf · uploaded 8 May 2025Source
  • 1 Certificates of CA (Form 3)Form 3 - Quarter 1.pdf · uploaded 10 Jun 2025Source
  • 2 Certificates of CA (Form 3)Form 3 - Quarter 2.pdf · uploaded 10 Jun 2025Source
  • 3 Certificates of CA (Form 3)Form 3 - Quarter 3.pdf · uploaded 10 Jun 2025Source
  • 4 Certificates of CA (Form 3)Form 3 - Quarter 4.pdf · uploaded 10 Jun 2025Source
  • 1 Certificates of CA (Form 3)Quarter 1 (1).pdf · uploaded 19 Jun 2025Source
  • 2 Certificates of CA (Form 3)Quarter 2 (1).pdf · uploaded 19 Jun 2025Source
  • 3 Certificates of CA (Form 3)Quarter 3 (1).pdf · uploaded 19 Jun 2025Source
  • 4 Certificates of CA (Form 3)Quarter 4 (1).pdf · uploaded 19 Jun 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)Form 5 Fy 24-25.pdf · uploaded 19 Jun 2025Source
  • Form 1Form 1 .pdf · uploaded 29 Nov 2025Source
  • Form 2Form 2 .pdf · uploaded 29 Nov 2025Source
  • Form 3Form 3 .pdf · uploaded 29 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold unsold inventry .pdf · uploaded 29 Nov 2025Source
  • Withdrawal Update Form 1form 1 2025.pdf · uploaded 29 Nov 2025Source
  • Withdrawal Update Form 2Form 2 Fy 25.pdf · uploaded 29 Nov 2025Source
  • Withdrawal Update Form 3Form 3 .pdf · uploaded 29 Nov 2025Source
  • Withdrawal Update Form 1FORM 1 Q2 25-26.pdf · uploaded 3 Apr 2026Source
  • Withdrawal Update Form 2FORM 2 Q2 25-26.pdf · uploaded 3 Apr 2026Source
  • Withdrawal Update Form 3FORM 3 Q2 25-26.pdf · uploaded 3 Apr 2026Source
  • Form 5 (FY 2025-2026)Form 5 25-26.pdf · uploaded 3 Jun 2026Source
  • Withdrawal Update Form 1Form 1 Q3 25-26.pdf · uploaded 3 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 Q3 25-26.pdf · uploaded 3 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 Q3 25-26.pdf · uploaded 3 Jul 2026Source
  • Withdrawal Update Form 1Form 1 Q4 25-26.pdf · uploaded 4 Jul 2026Source
  • Withdrawal Update Form 2Form 2 Q4.pdf · uploaded 4 Jul 2026Source
  • Withdrawal Update Form 3form 3 Q4.pdf · uploaded 4 Jul 2026Source

Technical

  • Documentcommencement cert.pdf · uploaded 11 Oct 2018Source
  • DocumentPicasa.pdf · uploaded 11 Oct 2018Source
  • DocumentPlan 1 of 7 _ Layout.pdf · uploaded 21 Feb 2025Source
  • DocumentPlan 2 of 7.pdf · uploaded 21 Feb 2025Source
  • DocumentPlan 3 of 7.pdf · uploaded 21 Feb 2025Source
  • DocumentPlan 4 of 7.pdf · uploaded 21 Feb 2025Source
  • DocumentPlan 5 of 7.pdf · uploaded 21 Feb 2025Source
  • DocumentPlan 6 of 7.pdf · uploaded 21 Feb 2025Source

Technical (Architect)

  • DocumentFORM 1 ARCHITECTS CERTIFICATE DT 01-07-2023.pdf · uploaded 21 Feb 2025Source
  • DocumentFORM 1 ARCHITECTS CERTIFICATE DT 01-10-2023.pdf · uploaded 21 Feb 2025Source
  • DocumentFORM 1 ARCHITECTS CERTIFICATE DT 01-01-2024.pdf · uploaded 21 Feb 2025Source
  • DocumentFORM 1 ARCHITECTS CERTIFICATE DT 01-04-2024.pdf · uploaded 21 Feb 2025Source
  • DocumentFORM 1 ARCHITECTS CERTIFICATE DT 01-07-2024.pdf · uploaded 21 Feb 2025Source
  • DocumentFORM 1 ARCHITECTS CERTIFICATE DT 01-10-2024.pdf · uploaded 21 Feb 2025Source
  • DocumentFORM 1 ARCHITECTS CERTIFICATE DT 01-01-2025.pdf · uploaded 21 Feb 2025Source
  • DocumentArchitects certificate March 2025.pdf · uploaded 29 Apr 2025Source
  • DocumentForm 1 Q4 25-26.pdf · uploaded 4 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 Fy 23-24.pdf · uploaded 8 May 2025Source
  • DocumentForm 2 Fy 24-25.pdf · uploaded 8 May 2025Source
  • DocumentForm 2 Q4.pdf · uploaded 4 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel SR NO 6

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
T1, T10 1BHK, T11 1BHK, T12, T13, T14, T2, T3, T4, T5, T6, T7, T8, T9, T10, T11, T15, T16, T17, T1872 units in all
Address
Sr No 6, Off National Highway No 4 Bye Pass, MahalungePIN 411045
Village
Mahalunge, Mulshi taluka
Land area for this project
5,100 sq m (54,896 sq ft)
Permissible built-up area
4,028 sq m (43,357 sq ft)
Sanctioned built-up area
3,471 sq m (37,361 sq ft)
Recreational open space
477 sq m (5,134 sq ft)
Designated bank account
196
Developed in phases
Yes

Survey, CTS, gat or plot numbers

SR NO 6

Land as published on MahaRERA's project page

SR NO 6

Boundaries

North
Sr No 7
South
Sr No 5
East
Road
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking72 units

35 of 72 units booked (49%), as the promoter reported to MahaRERA

T1 · 4 unitsT10 1BHK · 4 unitsT11 1BHK · 4 unitsT12 · 4 unitsT13 · 4 unitsT14 · 4 unitsT2 · 4 unitsT3 · 4 unitsT4 · 6 unitsT5 · 4 unitsT6 · 4 unitsT7 · 4 unitsT8 · 6 unitsT9 · 4 unitsT10 · 2 unitsT11 · 2 unitsT15 · 2 unitsT16 · 2 unitsT17 · 2 unitsT18 · 2 units
BuildingTypeCarpet areaUnitsBooked
AbT147.4 sq m · 510 sq ft21
AbT10 1BHK33.83 sq m · 364 sq ft41
AbT11 1BHK34.13 sq m · 367 sq ft44
AbT1246.36 sq m · 499 sq ft22
AbT1344.48 sq m · 479 sq ft21
AbT1446.13 sq m · 497 sq ft21
AbT243.97 sq m · 473 sq ft20
AbT344.18 sq m · 476 sq ft21
Show all 32 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
AbT447.61 sq m · 512 sq ft20
AbT547.17 sq m · 508 sq ft22
AbT643.9 sq m · 473 sq ft21
AbT741.2 sq m · 443 sq ft21
AbT847.38 sq m · 510 sq ft22
AbT944.58 sq m · 480 sq ft21
CdT146.7 sq m · 503 sq ft22
CdT1046.7 sq m · 503 sq ft22
CdT1146.53 sq m · 501 sq ft20
CdT1242.46 sq m · 457 sq ft21
CdT1342.34 sq m · 456 sq ft21
CdT1446.47 sq m · 500 sq ft21
CdT1546.53 sq m · 501 sq ft21
CdT1646.53 sq m · 501 sq ft21
CdT1750.98 sq m · 549 sq ft22
CdT1850.75 sq m · 546 sq ft20
CdT242.36 sq m · 456 sq ft22
CdT350.98 sq m · 549 sq ft20
CdT442.41 sq m · 456 sq ft40
CdT546.47 sq m · 500 sq ft22
CdT642.33 sq m · 456 sq ft20
CdT750.78 sq m · 547 sq ft21
CdT846.54 sq m · 501 sq ft40
CdT942.39 sq m · 456 sq ft21

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSwapnil P Kshirsagar—
EngineerG A Bhilare—
EngineerSagar Uttam Gaikwad—

Source: MahaRERA project page. Contact details are not shown.