Residential / Group Housing · 4 buildings · 7 unitsRERA P52100018732

Olympiadorous Phase I

Deedo IDDP-PUN-7CYC

Completion was pushed back 3 years and 2 months, to Feb 2027; no MahaRERA orders on record; 29% of its units are booked.

Lonavala (M Cl), Pune 410301 · by Neel Buildcon

DeliveryExtended 3 yrs 2 moPromised Dec 2023 · now due Feb 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales29% booked2 of 7 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 3 years and 2 months, to Feb 2027

  • This projectRegistered 29 Nov 2018, completion promised 30 Dec 2023, revised to 28 Feb 2027.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

4 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100018732
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210001873229 Nov 201830 Dec 202328 Feb 2027Neel BuildconProject page
Documents162

2 documents held by Deedo, 160 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Finance

  • PAN CardPAN Card-Neel Buildcon.pdf · uploaded 16 Nov 2018Source

Legal

  • Legal Title reportTitle Report.pdf · uploaded 16 Nov 2018Source
  • Declaration Form BForm-B-Afiidavit.pdf · uploaded 16 Nov 2018Source
  • Legal Title reportTitle Report Lonavala.pdf · uploaded 4 Jul 2020Source
  • Legal Title reportTitle-Report-Lonavala.pdf · uploaded 3 Aug 2020Source
  • Declaration Form BOlyampiodorus Phase I Revised Form B.pdf · uploaded 17 Apr 2025Source
Show all 162 documentsShow fewer documents

Migrated

  • 1 PAN CardPAN Card-Neel Buildcon.pdf · uploaded 16 Nov 2018Source
  • 1 Copy of the legal title reportTitle Report.pdf · uploaded 16 Nov 2018Source
  • 1 Details of encumbrancesEncumbrances.pdf · uploaded 16 Nov 2018Source
  • 1 Copy of Layout Approval (in case of layout)Plan-0001.pdf · uploaded 16 Nov 2018Source
  • 2 Copy of Layout Approval (in case of layout)Plan-0002.pdf · uploaded 16 Nov 2018Source
  • 3 Copy of Layout Approval (in case of layout)Plan-0003.pdf · uploaded 16 Nov 2018Source
  • 4 Copy of Layout Approval (in case of layout)Plan-0004.pdf · uploaded 16 Nov 2018Source
  • 1 Building Plan Approval (IOD)Plan-0001.pdf · uploaded 16 Nov 2018Source
  • 2 Building Plan Approval (IOD)Plan-0002.pdf · uploaded 16 Nov 2018Source
  • 3 Building Plan Approval (IOD)Plan-0003.pdf · uploaded 16 Nov 2018Source
  • 4 Building Plan Approval (IOD)Plan-0004.pdf · uploaded 16 Nov 2018Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC - Lonavala.pdf · uploaded 16 Nov 2018Source
  • 1 Declaration in FORM BForm-B-Afiidavit.pdf · uploaded 16 Nov 2018Source
  • 1 Proforma of Allotment letterAGREEMENT FOR SALE.pdf · uploaded 16 Nov 2018Source
  • 1 Certificates of CA (Form 3)Form-3-Olampiadorous-31-10-18.pdf · uploaded 23 Nov 2018Source
  • 1 Annual Audit Report of Statutory CA (Form 5)Form-5-Olympiodorous-FY-2018-19.pdf · uploaded 1 Oct 2019Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form-2A-Ph-I-Lonavala.pdf · uploaded 14 Feb 2020Source
  • 2 Copy of the legal title reportTitle Report Lonavala.pdf · uploaded 4 Jul 2020Source
  • 2 Proforma of Allotment letterAllotment Letter.pdf · uploaded 4 Jul 2020Source
  • 3 Proforma of Allotment letterAg-for-Sale-Bungalow-Lonavala.pdf · uploaded 4 Jul 2020Source
  • 3 Copy of the legal title reportTitle-Report-Lonavala.pdf · uploaded 3 Aug 2020Source
  • 4 Proforma of Allotment letterAgr-for-Sale.pdf · uploaded 3 Aug 2020Source
  • 5 Proforma of Allotment letterAllotment-Letter.pdf · uploaded 3 Aug 2020Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form-2A-Phase-I-Dec-2020.pdf · uploaded 27 Jan 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form-5-Olympiodorous-FY-2018-19.pdf · uploaded 31 Mar 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM-5-Olympio-2019-20-Phase-I.pdf · uploaded 31 Mar 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A - PHASE I.pdf · uploaded 3 Nov 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form-2A-Phase-I-Dec-2020.pdf · uploaded 3 Nov 2021Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form-2A-Phase-I-Dec-2020.pdf · uploaded 3 Nov 2021Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form-2A-Phase-I-June-2021.pdf · uploaded 3 Nov 2021Source
  • 5 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form-2A-Sept-2021.pdf · uploaded 3 Nov 2021Source
  • 1 Declaration about Commencement CertificateDec-Commencement Cert-Phase-I-Dec-21.pdf · uploaded 2 Feb 2022Source
  • 1 Disclosure of sold/ booked inventoryDiscl-of Sold-Unsold Inventory-Ph-I-Dec-21.pdf · uploaded 2 Feb 2022Source
  • 6 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form-2A-Phase-I-March-2022.pdf · uploaded 5 Aug 2022Source
  • 2 Disclosure of sold/ booked inventorySold Unsold Inventory-Phase-I-June-2022.pdf · uploaded 5 Aug 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form-5 Neel Buildcon Olympiodorous-I Mar 22.pdf · uploaded 12 Jan 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1-Arch-Cert-Phase-1-Mar-2023.pdf · uploaded 21 Apr 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2-Engg-Cert-Phase-I-Mar-2023.pdf · uploaded 21 Apr 2023Source
  • 3 Disclosure of sold/ booked inventorySold-Unsold-Phase-I-Mar-2023.pdf · uploaded 21 Apr 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form-5-Annual Report-Phase-I-2021-22.pdf · uploaded 21 Apr 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1-Arch-Cert-Phase-1-Mar-2023.pdf · uploaded 21 Jul 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2-Engg-Cert-Phase-I-Mar-2023.pdf · uploaded 21 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form-2A-Engineers' Certificate-Quality.pdf · uploaded 21 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form-2A-Cert-Phase-I-Mar-2023.pdf · uploaded 21 Jul 2023Source
  • 2 Certificates of CA (Form 3)Sold Unsold Inventory-Phase-I-June-2023.pdf · uploaded 21 Jul 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1-Phase-I-Olympia-June-2023.pdf · uploaded 22 Jul 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2-Phase-1-June-2023-Olympia.pdf · uploaded 22 Jul 2023Source
  • 4 Disclosure of sold/ booked inventorySold Unsold Inventory-Phase-I-June-2023.pdf · uploaded 22 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form-5-Phase I-2023.pdf · uploaded 30 Nov 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1-Phase-I-Sept-2023.pdf · uploaded 20 Dec 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2-Phase-I-Sept-2023.pdf · uploaded 20 Dec 2023Source
  • 5 Disclosure of sold/ booked inventorySold Unsold-Phase-I-Sept-23.pdf · uploaded 20 Dec 2023Source
  • 3 Certificates of CA (Form 3)Form-3-Phase-I-Sept-2023.pdf · uploaded 20 Dec 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1-Arch Cert-Phase-1-Dec-2023.pdf · uploaded 19 Jan 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2-Eng Cert-Phase-1-Dec-2023.pdf · uploaded 19 Jan 2024Source
  • 6 Disclosure of sold/ booked inventoryDecl-Sold-Unsold-Phase-1-Dec-2023.pdf · uploaded 19 Jan 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1-Arch-Cert-Phase-I-March-2024.pdf · uploaded 13 May 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2-Eng-Cert-Phase-I-March-2024.pdf · uploaded 13 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form-2A-Cert-Phase-I-March-2024.pdf · uploaded 13 May 2024Source
  • 7 Disclosure of sold/ booked inventorySold-Unsold-Phase-I-March-2024.pdf · uploaded 13 May 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1-Arch Cert-Phase-1-June-2024.pdf · uploaded 13 Dec 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect Certifiaccte - Phase I.pdf · uploaded 13 Dec 2024Source
  • 1 Certificates of CA (Form 3)Form-3-Phase-I-June-2024.pdf · uploaded 13 Dec 2024Source
  • 2 Certificates of CA (Form 3)Form-3-Phase-I-Sept-2024.pdf · uploaded 13 Dec 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2-Eng Cert-Phase-I-June-2024.pdf · uploaded 13 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer Certifiacte Phase I.pdf · uploaded 13 Dec 2024Source
  • 1 Disclosure of sold/ booked inventoryDecl-Sold Unsold-Phase-I-June-2024.pdf · uploaded 13 Dec 2024Source
  • 2 Disclosure of sold/ booked inventorySold Unsold Inventory - Phase I.pdf · uploaded 13 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5-Phase-I-2023-24.pdf · uploaded 5 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Olyampiadorus FORM1 - ARCHITECT CERTIFICATE Ph I Dec 24.pdf · uploaded 12 Apr 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Olyampiodorus Ph 1 FORM 1 - ARCHITECT CERTIFICATE Mar 25.pdf · uploaded 12 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Olyampiodrous FORM 2 - ENG CER - PHASE 1- DEC 2024 (1).pdf · uploaded 12 Apr 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Olyampiodrus FORM 2 - ENG CERTIFICATE - PHASE I Mar 2025.pdf · uploaded 12 Apr 2025Source
  • 1 Declaration in FORM BOlyampiodorus Phase I Revised Form B.pdf · uploaded 17 Apr 2025Source
  • 1 Certificates of CA (Form 3)Olyampiodorus Ph 1 FORM 3 - DEC 2024 PHASE I.pdf · uploaded 17 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryOlympioudouroud Sold Unsold Dec 2024.pdf · uploaded 17 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Olyampiodorus Phase I Form 2A 2022-23.pdf · uploaded 17 Apr 2025Source
  • 1 Other – Technicalpert chart final (8).pdf · uploaded 18 Apr 2025Source
  • Form 1Form-1-Phase-I-Olympia-June-2023.pdf · uploaded 4 Mar 2026Source
  • Form 2Form-2-Phase-I-June-2023.pdf · uploaded 4 Mar 2026Source
  • Form 3Form-3-Phase-I-June-2023.pdf · uploaded 4 Mar 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory-Phase-I-June-2023.pdf · uploaded 4 Mar 2026Source
  • Form 1Form-1-Phase-I-Sept-2023.pdf · uploaded 4 Mar 2026Source
  • Form 2Form-2-Phase-I-Sept-2023.pdf · uploaded 4 Mar 2026Source
  • Form 3Form-3-Phase-I-Sept-2023.pdf · uploaded 4 Mar 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold-Phase-I-Sept-23.pdf · uploaded 4 Mar 2026Source
  • Form 1Form-1-Arch-Cert-Phase-I-March-2024.pdf · uploaded 4 Mar 2026Source
  • Form 2Form-2-Eng-Cert-Phase-I-March-2024.pdf · uploaded 4 Mar 2026Source
  • Form 3Form-3-Phase-I-March-2024.pdf · uploaded 4 Mar 2026Source
  • Disclosure of Sold and Booked InventorySold-Unsold-Phase-I-March-2024.pdf · uploaded 4 Mar 2026Source
  • Form 1Form-1-Arch-Cert-Phase-1-June-2024.pdf · uploaded 4 Mar 2026Source
  • Form 2Form-2-Eng-Cert-Phase-I-June-2024.pdf · uploaded 4 Mar 2026Source
  • Form 3Form-3-Phase-I-June-2024.pdf · uploaded 4 Mar 2026Source
  • Disclosure of Sold and Booked InventoryDecl-Sold-Unsold-Phase-I-June-2024.pdf · uploaded 4 Mar 2026Source
  • Form 1Form-1-Arch-Cert-Phase-I-Sept-2024.pdf · uploaded 4 Mar 2026Source
  • Form 2Form-2-Eng-Cert-Phase-I-Sept-2024.pdf · uploaded 4 Mar 2026Source
  • Form 3Form-3-Phase-I-Sept-2024.pdf · uploaded 4 Mar 2026Source
  • Disclosure of Sold and Booked InventorySold-Unsold-Phase-I-Sept-2024.pdf · uploaded 4 Mar 2026Source
  • Form 1Form-1-Arch-Cert-Phase-I-Dec-2024.pdf · uploaded 4 Mar 2026Source
  • Form 2Form-2-Eng-Cert-Phase-1-Dec-2024.pdf · uploaded 4 Mar 2026Source
  • Form 3Form-3-RERA-Phase-I-Dec-2024.pdf · uploaded 4 Mar 2026Source
  • Disclosure of Sold and Booked InventoryDiscl-Sold-Unsold-Phase-I-Dec-2024.pdf · uploaded 4 Mar 2026Source
  • Form 1Form-1-Arch-Cert-Phase-I-March-2025.pdf · uploaded 4 Mar 2026Source
  • Form 2Form-2-Eng-Cert-Phase-I-March-2025.pdf · uploaded 4 Mar 2026Source
  • Form 3Form-3-Phase-I-March-2025.pdf · uploaded 4 Mar 2026Source
  • Disclosure of Sold and Booked InventoryDiscl-Sold-Unsold-Phase-1-March-2025.pdf · uploaded 4 Mar 2026Source
  • Withdrawal Update Form 1Form-1-Arch-Cert-Phase-1-Mar-2026.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 1Form-1-Arch-Cert-Phase-1-Mar-2026.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 1Form-1-Arch-Cert-Phase-1-June-2025.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 1Form-1-Arch-Cert-Phase-1-Sept-2025.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 1Form-1-Arch-Cert-Phase-1-Dec-2025.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 1Form-1-Arch-Cert-Phase-1-Mar-2026.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 2Form-2-Eng-Cert-Phase-I-March-2026.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 2Form-2-Eng-Cert-Phase-I-March-2026.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 2Form-2-Eng-Cert-Phase-I-June-2025.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 2Form-2-Eng-Cert-Phase-I-Sept-2025.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 2Form-2-Eng-Cert-Phase-I-Dec-2025.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 2Form-2-Eng-Cert-Phase-I-March-2026.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 3Form-3-Phase-I-Olympiadorous-March-2026.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 3Form-3-Phase-I-Olympiadorous-March-2026.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 3Form-3-Olympia-Phase-I-June-2025.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 3Form-3-RERA-Phase-I-Sep-2025.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 3Form-3-Olympia-Phase-I-Dec-2025.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 3Form-3-Phase-I-Olympiadorous-March-2026.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 1Form-1-Arch-Cert-Phase-1-Mar-2026.pdf · uploaded 14 Jul 2026Source
  • Withdrawal Update Form 2Form-2-Eng-Cert-Phase-I-March-2026.pdf · uploaded 14 Jul 2026Source
  • Withdrawal Update Form 3Form-3-Phase-I-Olympiadorous-March-2026.pdf · uploaded 14 Jul 2026Source
  • Form 2A (FY 2022-2023)Form-2A-Cert-Phase-I-Mar-2023.pdf · uploaded 14 Jul 2026Source
  • Form 2A (FY 2023-2024)Form-2A-Cert-Phase-I-March-2024.pdf · uploaded 14 Jul 2026Source
  • Form 2A (FY 2024-2025)Form-2A-Phase-2-March-2025.pdf · uploaded 14 Jul 2026Source
  • Form 2A (FY 2018-2019)Form-2A-2019.pdf · uploaded 16 Jul 2026Source
  • Form 2A (FY 2019-2020)Form-2A-2020.pdf · uploaded 16 Jul 2026Source
  • Form 2A (FY 2020-2021)Form-2A-2022.pdf · uploaded 16 Jul 2026Source
  • Form 2A (FY 2021-2022)Form-2A-2022.pdf · uploaded 16 Jul 2026Source
  • Form 2A (FY 2025-2026)Form-2A-2026.pdf · uploaded 16 Jul 2026Source

Technical

  • DocumentPlan-0001.pdf · uploaded 16 Nov 2018Source
  • DocumentPlan-0002.pdf · uploaded 16 Nov 2018Source
  • DocumentPlan-0003.pdf · uploaded 16 Nov 2018Source
  • DocumentPlan-0004.pdf · uploaded 16 Nov 2018Source
  • DocumentPlan-0001.pdf · uploaded 16 Nov 2018Source
  • DocumentPlan-0002.pdf · uploaded 16 Nov 2018Source
  • DocumentPlan-0003.pdf · uploaded 16 Nov 2018Source
  • DocumentPlan-0004.pdf · uploaded 16 Nov 2018Source
  • Other – Technicalpert chart final (8).pdf · uploaded 18 Apr 2025Source

Technical (Architect)

  • DocumentForm-1-Arch Cert-Phase-1-June-2024.pdf · uploaded 13 Dec 2024Source
  • DocumentForm 1 - Architect Certifiaccte - Phase I.pdf · uploaded 13 Dec 2024Source
  • DocumentOlyampiadorus FORM1 - ARCHITECT CERTIFICATE Ph I Dec 24.pdf · uploaded 12 Apr 2025Source
  • DocumentOlyampiodorus Ph 1 FORM 1 - ARCHITECT CERTIFICATE Mar 25.pdf · uploaded 12 Apr 2025Source
  • DocumentForm-1-Arch-Cert-Phase-1-Mar-2026.pdf · uploaded 14 Jul 2026Source

Technical (Engineer)

  • DocumentForm-2-Eng Cert-Phase-I-June-2024.pdf · uploaded 13 Dec 2024Source
  • DocumentForm 2 - Engineer Certifiacte Phase I.pdf · uploaded 13 Dec 2024Source
  • DocumentOlyampiodrous FORM 2 - ENG CER - PHASE 1- DEC 2024 (1).pdf · uploaded 12 Apr 2025Source
  • DocumentOlyampiodrus FORM 2 - ENG CERTIFICATE - PHASE I Mar 2025.pdf · uploaded 12 Apr 2025Source
  • DocumentForm-2-Eng-Cert-Phase-I-March-2026.pdf · uploaded 14 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 374/1, 374/2

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
A type bungalow, B type bungalow, C type bungalow, D type bungalow7 units in all
Address
374a, 374/1, 374/2, 374/3, At Village Khandala, Taluka MavalPIN 410301
Village
Lonavala (M Cl), Mawal taluka
Land area for this project
843 sq m (9,071 sq ft)
Permissible built-up area
1,121 sq m (12,070 sq ft)
Sanctioned built-up area
1,121 sq m (12,070 sq ft)
Recreational open space
1,004 sq m (10,802 sq ft)
Designated bank account
171
Developed in phases
Yes

Survey, CTS, gat or plot numbers

374/1374/2374/3374A

Land as published on MahaRERA's project page

374A,374/1,374/2,374/3

Boundaries

North
Old Khandala Road
South
15 Mtr Wide Dp Road
East
Cts No 374b
West
Cts No 372

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking7 units

2 of 7 units booked (29%), as the promoter reported to MahaRERA

A type bungalow · 2 unitsB type bungalow · 2 unitsC type bungalow · 2 unitsD type bungalow · 1 unit
BuildingTypeCarpet areaUnitsBooked
A TypeA type bungalow104.86 sq m · 1,129 sq ft22
B TypeB type bungalow128.52 sq m · 1,383 sq ft20
C TypeC type bungalow125.9 sq m · 1,355 sq ft20
D TypeD type bungalow124.12 sq m · 1,336 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals7

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectParakh Associates—
Chartered accountantKrishna R Moondra and Associates—
Chartered accountantSatyendra & Associates—
EngineerSwaraj Gangaram Mhatre—
EngineerVinod Shastri Shivram Shastri—
OtherGA Bhilare Consultants Private Limited—
OtherJayesh Gulabrai Mehta—

Source: MahaRERA project page. Contact details are not shown.