Residential / Group Housing · 1 building · 44 unitsRERA P52100022480

Umed

Deedo IDDP-PUN-J9VQ

Completion was pushed back 4 months, to Nov 2026; no MahaRERA orders on record; 0% of its units are booked.

Kothrud, Pune 411038 · Property rates in Kothrud · Promoter: Runwal Realtors Pvt Ltd

DeliveryExtended 4 moPromised Jul 2026 · now due Nov 2026RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales0% booked0 of 44 units · as the promoter reported to MahaRERA
Umed project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

Completion was pushed back 4 months, to Nov 2026

  • This projectRegistered 25 Sep 2019, completion promised 31 Jul 2026, revised to 30 Nov 2026.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100022480
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210002248025 Sep 201931 Jul 202630 Nov 2026Runwal Realtors Pvt LtdProject page
Documents138

1 document held by Deedo, 137 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN RUNWAL REALTORS.pdf · uploaded 25 Jan 2023Source

Legal

  • Declaration Form BForm B.pdf · uploaded 30 Aug 2019Source
  • Legal Title reportTitle Report.pdf · uploaded 12 Sep 2019Source
  • OtherDECLARATION for consent and sold unsold.pdf · uploaded 29 Apr 2022Source

Migrated

  • 1 Details of encumbrancesEncumbrance Certificate.pdf · uploaded 30 Aug 2019Source
  • 1 Copy of Layout Approval (in case of layout)Commencement Certificate-small size.pdf · uploaded 30 Aug 2019Source
  • 2 Copy of Layout Approval (in case of layout)proposed LAYOUT.pdf · uploaded 30 Aug 2019Source
Show all 138 documentsShow fewer documents

Migrated

  • 1 Building Plan Approval / NA Order for plotted developmentCommencement Certificate-small size.pdf · uploaded 30 Aug 2019Source
  • 2 Building Plan Approval / NA Order for plotted developmentproposed LAYOUT.pdf · uploaded 30 Aug 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate-small size.pdf · uploaded 30 Aug 2019Source
  • 1 Declaration in FORM BForm B.pdf · uploaded 30 Aug 2019Source
  • 3 Copy of Layout Approval (in case of layout)PLAN SIZE CORRECT.pdf · uploaded 7 Sep 2019Source
  • 3 Building Plan Approval / NA Order for plotted developmentPLAN SIZE CORRECT.pdf · uploaded 7 Sep 2019Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Supera.pdf · uploaded 7 Sep 2019Source
  • 1 Copy of the legal title reportTitle Report.pdf · uploaded 12 Sep 2019Source
  • 1 Proforma of Allotment letterDeclaration for agreement.pdf · uploaded 19 Sep 2019Source
  • 1 Declaration about Commencement CertificateDeclaration for name and cost_compressed.pdf · uploaded 29 Apr 2022Source
  • 1 Disclosure of sold/ booked inventoryDECLARATION for consent and sold unsold.pdf · uploaded 29 Apr 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200236260362_For_Asset_Based_Search_29_04_2022_12_51_05_815.pdf · uploaded 29 Apr 2022Source
  • 1 OtherDECLARATION for consent and sold unsold.pdf · uploaded 29 Apr 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)20220502_131818_compressed.pdf · uploaded 2 May 2022Source
  • 1 PAN CardPAN RUNWAL REALTORS.pdf · uploaded 25 Jan 2023Source
  • 2 Details of encumbranceskothrud RERA update 25-Jan-2023 15-26-59.pdf · uploaded 25 Jan 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)kothrud RERA update 25-Jan-2023 15-26-59.pdf · uploaded 25 Jan 2023Source
  • 2 Disclosure of sold/ booked inventorykothrud RERA update 25-Jan-2023 15-26-59.pdf · uploaded 25 Jan 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)kothrud RERA update 25-Jan-2023 15-26-59.pdf · uploaded 25 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)kothrud RERA update 25-Jan-2023 15-26-59.pdf · uploaded 25 Jan 2023Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2022-23 Q1 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 22 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2024-25 Q3 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 21 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2024-25 Q2 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 20 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2024-25 Q1 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 19 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2023-24 Q4 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2023-24 Q3 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2023-24 Q2 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2023-24 Q1 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2022-23 Q4 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2022-23 Q3 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2022-23 Q2 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2019-20 Q2 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2021-22 Q4 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2021-22 Q3 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2021-22 Q2 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2021-22 Q1 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2020-21 Q4 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2020-21 Q3 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2020-21 Q2 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2020-21 Q1 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2019-20 Q4 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)UMED 2019-20 Q3 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)UMED 2022-23 Q2.pdf · uploaded 26 Feb 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)UMED 2022-23 Q3.pdf · uploaded 26 Feb 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)UMED 2022-23 Q4.pdf · uploaded 26 Feb 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)UMED 2023-24 Q1.pdf · uploaded 26 Feb 2025Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)UMED 2023-24 Q2.pdf · uploaded 26 Feb 2025Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)UMED 2023-24 Q3.pdf · uploaded 26 Feb 2025Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)UMED 2023-24 Q4.pdf · uploaded 26 Feb 2025Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)UMED 2024-25 Q2.pdf · uploaded 26 Feb 2025Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)UMED 2024-25 Q3.pdf · uploaded 26 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)UMED 2022-23 Q1.pdf · uploaded 26 Feb 2025Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 22-23 Q2.pdf · uploaded 26 Feb 2025Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 21-22 Q2.pdf · uploaded 26 Feb 2025Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 22-23 Q3.pdf · uploaded 26 Feb 2025Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 22-23 Q4.pdf · uploaded 26 Feb 2025Source
  • 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 23-24 Q1.pdf · uploaded 26 Feb 2025Source
  • 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 23-24 Q2.pdf · uploaded 26 Feb 2025Source
  • 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 23-24 Q3.pdf · uploaded 26 Feb 2025Source
  • 19 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 23-24 Q4.pdf · uploaded 26 Feb 2025Source
  • 20 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 24-25 Q1.pdf · uploaded 26 Feb 2025Source
  • 21 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 24-25 Q2.pdf · uploaded 26 Feb 2025Source
  • 22 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 24-25 Q3.pdf · uploaded 26 Feb 2025Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 22-23 Q1.pdf · uploaded 26 Feb 2025Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 21-22 Q4.pdf · uploaded 26 Feb 2025Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 21-22 Q3.pdf · uploaded 26 Feb 2025Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 21-22 Q1.pdf · uploaded 26 Feb 2025Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 20-21 Q4.pdf · uploaded 26 Feb 2025Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 20-21 Q3.pdf · uploaded 26 Feb 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 20-21 Q2.pdf · uploaded 26 Feb 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 20-21 Q1.pdf · uploaded 26 Feb 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 19-20 Q4.pdf · uploaded 26 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 19-20 Q3.pdf · uploaded 26 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)UMED ENGG 19-20 Q2.pdf · uploaded 26 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)19-20.pdf · uploaded 26 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)20-21.pdf · uploaded 26 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)21-22.pdf · uploaded 26 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)22-23.pdf · uploaded 26 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)23-24.pdf · uploaded 26 Feb 2025Source

Technical

  • DocumentCommencement Certificate-small size.pdf · uploaded 30 Aug 2019Source
  • Documentproposed LAYOUT.pdf · uploaded 30 Aug 2019Source
  • DocumentCommencement Certificate-small size.pdf · uploaded 30 Aug 2019Source
  • Documentproposed LAYOUT.pdf · uploaded 30 Aug 2019Source
  • DocumentPLAN SIZE CORRECT.pdf · uploaded 7 Sep 2019Source
  • DocumentPLAN SIZE CORRECT.pdf · uploaded 7 Sep 2019Source

Technical (Architect)

  • Documentkothrud RERA update 25-Jan-2023 15-26-59.pdf · uploaded 25 Jan 2023Source
  • DocumentUMED 2019-20 Q2 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2019-20 Q3 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2019-20 Q4 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2020-21 Q1 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2020-21 Q2 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2020-21 Q3 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2020-21 Q4 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2021-22 Q1 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2021-22 Q2 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2021-22 Q3 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2021-22 Q4 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2022-23 Q1 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2022-23 Q2 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2022-23 Q3 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2022-23 Q4 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2023-24 Q1 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2023-24 Q2 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2023-24 Q3 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2023-24 Q4 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2024-25 Q1 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2024-25 Q2 ARCHITECT.pdf · uploaded 20 Feb 2025Source
  • DocumentUMED 2024-25 Q3 ARCHITECT.pdf · uploaded 20 Feb 2025Source

Technical (Engineer)

  • DocumentUMED ENGG 19-20 Q2.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 19-20 Q3.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 19-20 Q4.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 20-21 Q1.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 20-21 Q2.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 20-21 Q3.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 20-21 Q4.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 21-22 Q1.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 21-22 Q2.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 21-22 Q3.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 21-22 Q4.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 22-23 Q1.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 22-23 Q2.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 22-23 Q3.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 22-23 Q4.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 23-24 Q1.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 23-24 Q2.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 23-24 Q3.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 23-24 Q4.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 24-25 Q1.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 24-25 Q2.pdf · uploaded 26 Feb 2025Source
  • DocumentUMED ENGG 24-25 Q3.pdf · uploaded 26 Feb 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvals98/1

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK44 units in all
Address
98/1, Bhusari Colony, KothrudPIN 411038
Village
Kothrud, Haveli taluka
Designated bank account
212
Developed in phases
No

Survey, CTS, gat or plot numbers

98/1

Boundaries

North
Sno 98 1 Part Wing C of Runwal Paradise
South
S No 150 Kothrud
East
Sno 98 1 Part Kothrud
West
Adjacent Wing A of Runwal Paradise

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking44 units

0 of 44 units booked (0%), as the promoter reported to MahaRERA

1BHK · 1 unit2BHK · 43 units
TypeCarpet areaUnitsBooked
1BHK48.58 sq m · 523 sq ft10
2BHK51.12 sq m · 550 sq ft220
2BHK57.1 sq m · 615 sq ft110
2BHK57.4 sq m · 618 sq ft100

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVilas tarwadi—
Chartered accountantGG Laddha & Asso—
EngineerShekhar Hatti—
OtherHadadare Construction—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology