Skip to content
Residential / Group Housing · 4 buildings · 208 unitsRERA P52100000181

Neuleaf Techd

It is due for completion in Jun 2033, with no extension on record; no MahaRERA orders on record; 73% of its units are booked.

Kothrud, Pune 412115 · Property rates in Kothrud · Promoter: Neuleaf Lifespace Developers LLP

DeliveryDue Jun 2033No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales73% booked151 of 208 units · as the promoter reported to MahaRERA
Neuleaf Techd project report cardPDF: delivery, regulatory orders, people on record, every tower and the registered deals — for your bank or lawyerSee what's inside · from ₹1,499

It is due for completion in Jun 2033, with no extension on record

  • This projectRegistered 10 Jul 2017, completion promised 30 Jun 2033.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

4 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100000181
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210000018110 Jul 201730 Jun 203330 Jun 2033Neuleaf Lifespace Developers LLPProject page
Documents178

2 documents held by Deedo, 176 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardPan Card.pdf · uploaded 16 Jun 2017Source

Legal

  • Legal Title reportMohol search and title report 1 years Bhugaon 2017.pdf · uploaded 17 Jun 2017Source
  • Declaration Form BAffidavite Form B.pdf · uploaded 23 Jun 2017Source
  • Declaration Form BForm 1 B GRACE LAND REV 01 2017 09 19.pdf · uploaded 19 Sep 2017Source
  • Declaration Form BForm 1 B GRACE LAND REV 01 2017 09 19.pdf · uploaded 20 Sep 2017Source
  • Declaration Form BAffidavit _ Bhushan Nalawade RERA_0001.pdf · uploaded 5 Jun 2023Source
Show all 178 documentsShow fewer documents

Legal

  • Declaration Form Btitle report.pdf · uploaded 25 Feb 2026Source
  • Declaration Form Btitle report (2)_compressed_compressed.pdf · uploaded 25 Feb 2026Source
  • Declaration Form Bform b.pdf · uploaded 7 Apr 2026Source
  • Declaration Form BMCPL DA 1.pdf · uploaded 7 Apr 2026Source
  • Declaration Form BMCPL DA 2.pdf · uploaded 7 Apr 2026Source
  • Declaration Form BMCPL DA 3.pdf · uploaded 7 Apr 2026Source
  • Declaration Form BMCPL DA 4.pdf · uploaded 7 Apr 2026Source

Migrated

  • 1 PAN CardPan Card.pdf · uploaded 16 Jun 2017Source
  • 1 Copy of Layout Approval (in case of layout)1 IMG_20170616_134444.pdf · uploaded 16 Jun 2017Source
  • 2 Copy of Layout Approval (in case of layout)2 IMG_20170616_134628.pdf · uploaded 16 Jun 2017Source
  • 3 Copy of Layout Approval (in case of layout)3 IMG_20170616_134728.pdf · uploaded 16 Jun 2017Source
  • 4 Copy of Layout Approval (in case of layout)4 IMG_20170616_134835.pdf · uploaded 16 Jun 2017Source
  • 5 Copy of Layout Approval (in case of layout)5 IMG_20170616_134912.pdf · uploaded 16 Jun 2017Source
  • 6 Copy of Layout Approval (in case of layout)6 IMG_20170616_134950.pdf · uploaded 16 Jun 2017Source
  • 7 Copy of Layout Approval (in case of layout)7 IMG_20170616_135028.pdf · uploaded 16 Jun 2017Source
  • 8 Copy of Layout Approval (in case of layout)8 IMG_20170616_135103.pdf · uploaded 16 Jun 2017Source
  • 1 Building Plan Approval (IOD)IMG_20170616_134444.pdf · uploaded 16 Jun 2017Source
  • 2 Building Plan Approval (IOD)IMG_20170616_134628.pdf · uploaded 16 Jun 2017Source
  • 3 Building Plan Approval (IOD)IMG_20170616_134728.pdf · uploaded 16 Jun 2017Source
  • 4 Building Plan Approval (IOD)IMG_20170616_134835.pdf · uploaded 16 Jun 2017Source
  • 5 Building Plan Approval (IOD)IMG_20170616_134912.pdf · uploaded 16 Jun 2017Source
  • 6 Building Plan Approval (IOD)IMG_20170616_134950.pdf · uploaded 16 Jun 2017Source
  • 7 Building Plan Approval (IOD)IMG_20170616_135028.pdf · uploaded 16 Jun 2017Source
  • 8 Building Plan Approval (IOD)IMG_20170616_135103.pdf · uploaded 16 Jun 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentMCPL Commencement.pdf · uploaded 16 Jun 2017Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC BLACK.pdf · uploaded 16 Jun 2017Source
  • 1 Copy of the legal title reportMohol search and title report 1 years Bhugaon 2017.pdf · uploaded 17 Jun 2017Source
  • 1 Details of encumbrancesDetails of Encumbrances.pdf · uploaded 17 Jun 2017Source
  • 3 Commencement Certificates / NA Order for plotted development2.pdf · uploaded 21 Jun 2017Source
  • 1 Declaration in FORM BAffidavite Form B.pdf · uploaded 23 Jun 2017Source
  • 1 Proforma of Allotment letterRERA Agreement Grace Land AND Alottment Letter.pdf · uploaded 30 Jun 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA ARCHITECT FORM 1.pdf · uploaded 1 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA ENGINEER CERTFICATE.pdf · uploaded 3 Jul 2017Source
  • 1 Certificates of CA (Form 3)RERA CA CERTIFICATE BLACK N WHITE (2).pdf · uploaded 3 Jul 2017Source
  • 2 Certificates of CA (Form 3)RERA CA FORM ANNEXURE 01 SOLD INVENTORY.pdf · uploaded 3 Jul 2017Source
  • 3 Certificates of CA (Form 3)RERA CA FORM ANNEXURE 01 UNSOLD INVENTORY.pdf · uploaded 3 Jul 2017Source
  • 2 Details of encumbrancesForm 1 B GRACE LAND REV 01 2017 09 19.pdf · uploaded 19 Sep 2017Source
  • 2 Declaration in FORM BForm 1 B GRACE LAND REV 01 2017 09 19.pdf · uploaded 19 Sep 2017Source
  • 3 Declaration in FORM BForm 1 B GRACE LAND REV 01 2017 09 19.pdf · uploaded 20 Sep 2017Source
  • 3 Details of encumbrancesForm 1 B GRACE LAND REV 01 2017 09 19.pdf · uploaded 11 Oct 2017Source
  • 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf · uploaded 8 Oct 2021Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ARCHITECT CERTIFICATE (2017-18).pdf · uploaded 8 Oct 2021Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ARCHITECT CERTIFICATE (2018-19).pdf · uploaded 8 Oct 2021Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ARCHITECTCERTIFICATE (2019-20).pdf · uploaded 8 Oct 2021Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 ENGINEER CERTIFICATE (2017-18).pdf · uploaded 8 Oct 2021Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 ENGINEER CERTIFICATE (2018-19).pdf · uploaded 8 Oct 2021Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 ENGINEER CERTIFICATE (2019-20).pdf · uploaded 8 Oct 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Check Engineer certificate FY 2019-20.pdf · uploaded 8 Oct 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quality Check Engineer Certificate FY 2020-21.pdf · uploaded 8 Oct 2021Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of sold booked inventory.pdf · uploaded 8 Oct 2021Source
  • 4 Certificates of CA (Form 3)FORM 3 (2017-18).pdf · uploaded 8 Oct 2021Source
  • 5 Certificates of CA (Form 3)FORM 3 (2018-19).pdf · uploaded 8 Oct 2021Source
  • 6 Certificates of CA (Form 3)FORM 3 (2019-20).pdf · uploaded 8 Oct 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)FORM 5 (2017-18).pdf · uploaded 11 Oct 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 5 (2018-19).pdf · uploaded 11 Oct 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 (2019-20).pdf · uploaded 11 Oct 2021Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA FORM 1.pdf · uploaded 27 Mar 2022Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate - Quarter (1).pdf · uploaded 4 May 2023Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate - Quarter (2).pdf · uploaded 4 May 2023Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate - Quarter (3).pdf · uploaded 4 May 2023Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate - Quarter (4).pdf · uploaded 4 May 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)F5 2021.pdf · uploaded 4 May 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FY 2122.pdf · uploaded 4 May 2023Source
  • 7 Certificates of CA (Form 3)March 2023 - Form 3 Grace Land_compressed.pdf · uploaded 1 Jun 2023Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form No 2_ 31-03-2022.pdf · uploaded 2 Jun 2023Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form No 2_Qurter 1 _ 30-06-2022_0001.pdf · uploaded 2 Jun 2023Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form No 2_Qurter 2_ 30-09-2022_0001.pdf · uploaded 2 Jun 2023Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form No 2_Qurter 3_ 31-12-2022_0001.pdf · uploaded 2 Jun 2023Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form No 2_Qurter 4_ 31-03-2023_0001_0001.pdf · uploaded 2 Jun 2023Source
  • 8 Certificates of CA (Form 3)FORM 3 - March 2022.pdf · uploaded 2 Jun 2023Source
  • 9 Certificates of CA (Form 3)FORM 3 - June 2022.pdf · uploaded 2 Jun 2023Source
  • 10 Certificates of CA (Form 3)FORM 3 - September 2022.pdf · uploaded 2 Jun 2023Source
  • 11 Certificates of CA (Form 3)FORM 3 - December 2022.pdf · uploaded 2 Jun 2023Source
  • 12 Certificates of CA (Form 3)Form 3- March 2023.pdf · uploaded 2 Jun 2023Source
  • 4 Declaration in FORM BAffidavit _ Bhushan Nalawade RERA_0001.pdf · uploaded 5 Jun 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Assurance Certificate 2021-2022_0001.pdf · uploaded 5 Jun 2023Source
  • 2 Disclosure of sold/ booked inventoryScan CIRCULAR 29 Grace Land_0001.pdf · uploaded 5 Jun 2023Source
  • 9 Copy of Layout Approval (in case of layout)PAGE 1_11zon.pdf · uploaded 23 Sep 2023Source
  • 10 Copy of Layout Approval (in case of layout)PAGE 2_11zon.pdf · uploaded 23 Sep 2023Source
  • 11 Copy of Layout Approval (in case of layout)PAGE 3_11zon (1).pdf · uploaded 23 Sep 2023Source
  • 12 Copy of Layout Approval (in case of layout)PAGE 3A_11zon.pdf · uploaded 23 Sep 2023Source
  • 9 Building Plan Approval (IOD)PAGE 4_11zon.pdf · uploaded 23 Sep 2023Source
  • 10 Building Plan Approval (IOD)PAGE 5_11zon.pdf · uploaded 23 Sep 2023Source
  • 11 Building Plan Approval (IOD)PAGE 7_11zon.pdf · uploaded 23 Sep 2023Source
  • 12 Building Plan Approval (IOD)PAGE 8_11zon.pdf · uploaded 23 Sep 2023Source
  • 13 Building Plan Approval (IOD)PAGE 9_11zon.pdf · uploaded 23 Sep 2023Source
  • 4 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed_compressed.pdf · uploaded 23 Sep 2023Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 1 _ Architect's Certificate Quarter-4_2022-2023_0001.pdf · uploaded 23 Sep 2023Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 1 _ Architect's Certificate Quarter-1_2023-2024_0001.pdf · uploaded 23 Sep 2023Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form -2.pdf · uploaded 23 Sep 2023Source
  • 13 Certificates of CA (Form 3)form 3 _ Chartedred Accountants Certificate_0001_compressed_compressed.pdf · uploaded 23 Sep 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form No 2A.pdf · uploaded 23 Jan 2024Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Sept 2023_11zon.pdf · uploaded 8 Mar 2024Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Dec 2023_11zon.pdf · uploaded 8 Mar 2024Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Sep 2023.pdf · uploaded 8 Mar 2024Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Dec 2023.pdf · uploaded 8 Mar 2024Source
  • 14 Certificates of CA (Form 3)Form 3 Dec2023_11zon.pdf · uploaded 8 Mar 2024Source
  • 2 Declaration about Commencement CertificateDECLARATION - COMMENCEMENT.pdf · uploaded 12 Mar 2024Source
  • 3 Disclosure of sold/ booked inventorySOLD AND UNSOLD - GRACELAND_11zon.pdf · uploaded 12 Mar 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 2022-23.pdf · uploaded 28 May 2024Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 6 Jul 2024Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 6 Jul 2024Source
  • 4 Disclosure of sold/ booked inventorySold and unsold inventory list 20240704164837.pdf · uploaded 6 Jul 2024Source
  • 15 Certificates of CA (Form 3)Form 3.pdf · uploaded 6 Jul 2024Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE.pdf · uploaded 11 Nov 2024Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE (1).pdf · uploaded 11 Nov 2024Source
  • 5 Certificates of CA (Form 3)RERA FORM 3 - CA CERTIFICATE_11zon.pdf · uploaded 2 Dec 2024Source
  • 2 Disclosure of sold/ booked inventoryCircular 29 - June 2024_11zon.pdf · uploaded 2 Dec 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - FY 2023-24.pdf · uploaded 2 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 FY 2023-24.pdf · uploaded 5 Dec 2024Source
  • 1 Certificates of CA (Form 3)Form 3 of Grace Land as on 30-09-2024.pdf · uploaded 11 Feb 2025Source
  • 2 Certificates of CA (Form 3)Form 3 of Grace Land as on 31-12-2024.pdf · uploaded 11 Feb 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)MCPL RERA FORM2 Q2 2024-25.pdf · uploaded 13 Feb 2025Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)MCPL RERA FORM 2 Q3 2024-25.pdf · uploaded 13 Feb 2025Source
  • 3 Certificates of CA (Form 3)Form 3 - Sept 2024.pdf · uploaded 22 Feb 2025Source
  • 4 Certificates of CA (Form 3)Form 3 - Dec 2024.pdf · uploaded 22 Feb 2025Source
  • 1 Disclosure of sold/ booked inventoryCircular 29 Dec 2024.pdf · uploaded 22 Feb 2025Source
  • Form 1Form 1 - Neuleaf Techd as on Sep 2025.pdf · uploaded 8 Nov 2025Source
  • Form 2Form 2 - Neuleaf Techd as on Sep 2025.pdf · uploaded 8 Nov 2025Source
  • Form 3Form 3 - Neuleaf Techd as on Sep 2025.pdf · uploaded 8 Nov 2025Source
  • Disclosure of Sold and Booked InventoryCircular- 29 - Neuleaf Techd as on Sep 2025.pdf · uploaded 8 Nov 2025Source
  • Form 5 (FY 2024-2025)Form 5 -Neuleaf Techd FY 2024-2025.pdf · uploaded 11 Nov 2025Source
  • Form 1FORM 1 ARCHITECT CERTIFICATE .pdf · uploaded 2 Feb 2026Source
  • Form 2FORM-2_0001.pdf · uploaded 2 Feb 2026Source
  • Form 3FORM-3_0001.pdf · uploaded 2 Feb 2026Source
  • Disclosure of Sold and Booked InventoryCircular- 29.pdf · uploaded 2 Feb 2026Source
  • Othersdoc04856920260202211830.pdf · uploaded 2 Feb 2026Source
  • Withdrawal Update Form 1rera form 1_0001.pdf · uploaded 25 Feb 2026Source
  • Withdrawal Update Form 1rera form 1_0001.pdf · uploaded 25 Feb 2026Source
  • Withdrawal Update Form 2form 2 Dec 2025.pdf · uploaded 25 Feb 2026Source
  • Withdrawal Update Form 2form 2 Dec 2025.pdf · uploaded 25 Feb 2026Source
  • Withdrawal Update Form 3form 3 Dec 2025.pdf · uploaded 25 Feb 2026Source
  • Withdrawal Update Form 3form 3 Dec 2025.pdf · uploaded 25 Feb 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 3 Aug 2026Source
  • Withdrawal Update Form 1mcpl FORM 1 JULY.pdf · uploaded 3 Aug 2026Source
  • Withdrawal Update Form 2Form 2 (1).pdf · uploaded 3 Aug 2026Source
  • Withdrawal Update Form 2mcpl JULY FORM 2.pdf · uploaded 3 Aug 2026Source
  • Withdrawal Update Form 3form 3 (2).pdf · uploaded 3 Aug 2026Source
  • Withdrawal Update Form 3mcpl FORM 3 JULY.pdf · uploaded 3 Aug 2026Source

Technical

  • Document1 IMG_20170616_134444.pdf · uploaded 16 Jun 2017Source
  • Document2 IMG_20170616_134628.pdf · uploaded 16 Jun 2017Source
  • Document3 IMG_20170616_134728.pdf · uploaded 16 Jun 2017Source
  • Document4 IMG_20170616_134835.pdf · uploaded 16 Jun 2017Source
  • Document5 IMG_20170616_134912.pdf · uploaded 16 Jun 2017Source
  • Document6 IMG_20170616_134950.pdf · uploaded 16 Jun 2017Source
  • Document7 IMG_20170616_135028.pdf · uploaded 16 Jun 2017Source
  • Document8 IMG_20170616_135103.pdf · uploaded 16 Jun 2017Source
  • DocumentIMG_20170616_134444.pdf · uploaded 16 Jun 2017Source
  • DocumentIMG_20170616_134628.pdf · uploaded 16 Jun 2017Source
  • DocumentIMG_20170616_134728.pdf · uploaded 16 Jun 2017Source
  • DocumentIMG_20170616_134835.pdf · uploaded 16 Jun 2017Source
  • DocumentIMG_20170616_134912.pdf · uploaded 16 Jun 2017Source
  • DocumentIMG_20170616_134950.pdf · uploaded 16 Jun 2017Source
  • DocumentIMG_20170616_135028.pdf · uploaded 16 Jun 2017Source
  • DocumentIMG_20170616_135103.pdf · uploaded 16 Jun 2017Source
  • DocumentPAGE 1_11zon.pdf · uploaded 23 Sep 2023Source
  • DocumentPAGE 2_11zon.pdf · uploaded 23 Sep 2023Source
  • DocumentPAGE 3_11zon (1).pdf · uploaded 23 Sep 2023Source
  • DocumentPAGE 3A_11zon.pdf · uploaded 23 Sep 2023Source
  • DocumentPAGE 4_11zon.pdf · uploaded 23 Sep 2023Source
  • DocumentPAGE 5_11zon.pdf · uploaded 23 Sep 2023Source
  • DocumentPAGE 7_11zon.pdf · uploaded 23 Sep 2023Source
  • DocumentPAGE 8_11zon.pdf · uploaded 23 Sep 2023Source
  • DocumentPAGE 9_11zon.pdf · uploaded 23 Sep 2023Source

Technical (Architect)

  • DocumentARCHITECT CERTIFICATE.pdf · uploaded 11 Nov 2024Source
  • Documentmcpl FORM 1 JULY.pdf · uploaded 3 Aug 2026Source

Technical (Engineer)

  • DocumentENGINEER CERTIFICATE (1).pdf · uploaded 11 Nov 2024Source
  • DocumentMCPL RERA FORM2 Q2 2024-25.pdf · uploaded 13 Feb 2025Source
  • DocumentMCPL RERA FORM 2 Q3 2024-25.pdf · uploaded 13 Feb 2025Source
  • Documentmcpl JULY FORM 2.pdf · uploaded 3 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsParde No 4 At Post Bhugaon

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
Shop, 2BHK, 1BHK, 3BHK, Office space208 units in all
Address
Parde No 4 At Post Bhugaon Tal Mulashi Dist Pune, Taluka- Mulshi, BhugaonPIN 412115
Village
Kothrud, Haveli taluka
Designated bank account
85
Developed in phases
Yes

Survey, CTS, gat or plot numbers

Parde No 4 At Post Bhugaon

Boundaries

North
Parde No 3 and S no 218
South
Pune Mulashi Road
East
By S No 218 265 266
West
Remaining Part of Parde No 4

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking208 units

151 of 208 units booked (73%), as the promoter reported to MahaRERA

Shop · 25 units2BHK · 103 units1BHK · 4 units3BHK · 56 unitsOffice space · 20 units
BuildingTypeCarpet areaUnitsBooked
AShop15.53 sq m · 167 sq ft10
AShop27.56 sq m · 297 sq ft20
AShop30.32 sq m · 326 sq ft10
AShop31.19 sq m · 336 sq ft10
AShop31.21 sq m · 336 sq ft11
AShop32.26 sq m · 347 sq ft11
AShop32.67 sq m · 352 sq ft20
AShop35.88 sq m · 386 sq ft21
Show all 41 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
AShop70.9 sq m · 763 sq ft11
AShop72.94 sq m · 785 sq ft11
AShop96.81 sq m · 1,042 sq ft11
B2BHK72.95 sq m · 785 sq ft5135
C1BHK52.06 sq m · 560 sq ft21
C1BHK52.52 sq m · 565 sq ft22
C2BHK66.74 sq m · 718 sq ft1411
C2BHK67.07 sq m · 722 sq ft129
C2BHK71.18 sq m · 766 sq ft76
C2BHK71.19 sq m · 766 sq ft76
C2BHK71.51 sq m · 770 sq ft1211
C3BHK94.83 sq m · 1,021 sq ft76
C3BHK94.98 sq m · 1,022 sq ft75
C3BHK96.64 sq m · 1,040 sq ft1411
C3BHK96.78 sq m · 1,042 sq ft77
C3BHK96.8 sq m · 1,042 sq ft75
C3BHK98.74 sq m · 1,063 sq ft76
C3BHK98.76 sq m · 1,063 sq ft77
DOffice space44.41 sq m · 478 sq ft51
DOffice space58.32 sq m · 628 sq ft51
DOffice space87.7 sq m · 944 sq ft53
DOffice space92.07 sq m · 991 sq ft51
DShop11.84 sq m · 127 sq ft11
DShop12.74 sq m · 137 sq ft11
DShop12.89 sq m · 139 sq ft11
DShop17.18 sq m · 185 sq ft11
DShop17.25 sq m · 186 sq ft11
DShop18.21 sq m · 196 sq ft11
DShop21.46 sq m · 231 sq ft11
DShop39.15 sq m · 421 sq ft11
DShop39.28 sq m · 423 sq ft11
DShop39.42 sq m · 424 sq ft11
DShop114.03 sq m · 1,227 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals2

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
Chartered accountantAmol Shamrao Deshmukh—
EngineerVishal Bhosale—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology