Vasundhara
Deedo IDDP-PUN-46EHCompletion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 27% of its units are booked.
Kothrud-Ext, Pune 411038 · by Dake-Ranjekar Jv
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2027
- This projectRegistered 7 Feb 2023, completion promised 31 Dec 2026, revised to 30 Apr 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Mortgage · Oct 2026No amount
- Primary sale · Sep 2026
- Mortgage · Sep 2026No amount
- Family transfer · Sep 2026No amount
- Mortgage · Sep 2026No amount
- Primary sale · Aug 2026
- Primary sale · Aug 2026
- Mortgage · Aug 2026No amount
- Rental · Aug 2026
- Mortgage · Aug 2026No amount
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2026 | Vasundhara · 104 | Mortgage | — | View Mortgage, Oct 2026 | |
| Sep 2026 | Vasundhara · 104 | Primary sale | 1,051 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Vasundhara · 103 | Mortgage | — | View Mortgage, Sep 2026 | |
| Sep 2026 | Vasundhara · 3 | Family transfer | 858 sq ft | View Family transfer, Sep 2026 | |
| Sep 2026 | Vasundhara · 101 | Mortgage | — | View Mortgage, Sep 2026 | |
| Aug 2026 | Vasundhara · 103 | Primary sale | 884 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | Vasundhara · 101 | Primary sale | 783 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | Vasundhara · 201 | Mortgage | — | View Mortgage, Aug 2026 | |
| Aug 2026 | Vasundhara · 8 | Rental | — | View Rental, Aug 2026 | |
| Aug 2026 | Vasundhara · 204 | Mortgage | — | View Mortgage, Aug 2026 |
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100049328
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100049328 | 7 Feb 2023 | 31 Dec 2026 | 30 Apr 2027 | Dake-Ranjekar Jv | Project page |
Documents138
1 document held by Deedo, 137 filings listed on MahaRERA's project page
Finance
- PAN CardJV PAN.pdf · uploaded 17 Jan 2023Source
Legal
Show all 138 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)Plan upload.pdf · uploaded 17 Jan 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 17 Jan 2023Source
- 1 Declaration about Commencement CertificateVasundhara Format D.pdf · uploaded 17 Jan 2023Source
- 1 Declaration in FORM BDAKE RANJEKAR JV FORM B.pdf · uploaded 17 Jan 2023Source
- 1 CERSAI detailsVasundhara CERSAI Undertaking.pdf · uploaded 17 Jan 2023Source
- 1 Proforma of Allotment letterVasundhara Allotment Letter.pdf · uploaded 17 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Disclosure of Interest in Entities.pdf · uploaded 18 Jan 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A Bank declaration.pdf · uploaded 18 Jan 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)VASUNDHARA FORM 3.pdf · uploaded 23 Jan 2023Source
- 1 Proforma of Agreement for saleAFS .pdf · uploaded 23 Jan 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation- Allotment 19012023.pdf · uploaded 23 Jan 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report AFS 23012023.pdf · uploaded 24 Jan 2023Source
- 1 Copy of the legal title reportFormat A Search.pdf · uploaded 25 Jan 2023Source
- 2 Copy of the legal title reportMain Search.pdf · uploaded 25 Jan 2023Source
- 2 a Details of encumbrances concerned to FinanceLegal Encumbrance-25012023.pdf · uploaded 27 Jan 2023Source
- 2 b Details of encumbrances concerned to LegalLegal Encumbrance-25012023.pdf · uploaded 27 Jan 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Disclosure of Interest in Entities-RavindraRanjekar.pdf · uploaded 27 Jan 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Disclosure of Interest in Entities-Dake.pdf · uploaded 27 Jan 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentSHEET NO 1.pdf · uploaded 1 Feb 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentSHEET NO 2.pdf · uploaded 1 Feb 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentSHEET NO 3.pdf · uploaded 1 Feb 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentSHEET NO 4.pdf · uploaded 1 Feb 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentSHEET NO 5.pdf · uploaded 1 Feb 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentSHEET NO 6.pdf · uploaded 1 Feb 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentSHEET NO 7.pdf · uploaded 1 Feb 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentSHEET NO 8.pdf · uploaded 1 Feb 2023Source
- 2 Declaration about Commencement CertificateFormat D Commencement Plan revised.pdf · uploaded 1 Feb 2023Source
- 2 Proforma of Agreement for saleAFS REVISED.pdf · uploaded 1 Feb 2023Source
- 2 Deviation Report with respect to model copy of AgreementDeviation Report AFS 01022023.pdf · uploaded 1 Feb 2023Source
- 3 Proforma of Agreement for saleAFS REVISED 2.pdf · uploaded 2 Feb 2023Source
- 3 Deviation Report with respect to model copy of AgreementDeviation Report AFS 02022023.pdf · uploaded 2 Feb 2023Source
- 4 Proforma of Agreement for saleAFS REVISED 3.pdf · uploaded 4 Feb 2023Source
- 4 Deviation Report with respect to model copy of AgreementDeviation Report AFS 04022023.pdf · uploaded 4 Feb 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 March 2023.pdf · uploaded 9 Aug 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 June 2023.pdf · uploaded 9 Aug 2023Source
- 3 a Details of encumbrances concerned to FinanceEncumbrance Certificate CF Vasundhara.pdf · uploaded 22 Dec 2023Source
- 3 b Details of encumbrances concerned to LegalEncumbrance Certificate CF Vasundhara.pdf · uploaded 22 Dec 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)DAKE - RANJEKAR JV 30-09-23.pdf · uploaded 31 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)DAKE - RANJEKAR JV 31-12-23.pdf · uploaded 31 Jan 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)DAKE - RANJEKAR JV 31-03-24.pdf · uploaded 31 Jan 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)DAKE RANJEKAR JV 30-06-2024.pdf · uploaded 31 Jan 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)VASUNDHARA FORM 3 - 30-09-2024.pdf · uploaded 31 Jan 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)DAKE - RANJEKAR JV 31-12-24.pdf · uploaded 31 Jan 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)DAKE - RANJEKAR JV 31-12-24.pdf · uploaded 31 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)vasundhara architect certificate 19-6-24.pdf · uploaded 15 Feb 2025Source
- 1 Copy of Layout Approval (in case of layout)01 - LAYOUT.pdf · uploaded 17 Feb 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 17 Feb 2025Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 17 Feb 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 17 Feb 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 17 Feb 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 17 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 17 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 17 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 17 Feb 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 17 Feb 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 17 Feb 2025Source
- 4 Building Plan Approval / NA Order for plotted development05 - A WING.pdf · uploaded 17 Feb 2025Source
- 8 Building Plan Approval / NA Order for plotted development09 - B WING.pdf · uploaded 17 Feb 2025Source
- 7 Building Plan Approval / NA Order for plotted development08 - B WING.pdf · uploaded 17 Feb 2025Source
- 6 Building Plan Approval / NA Order for plotted development07 - B WING.pdf · uploaded 17 Feb 2025Source
- 5 Building Plan Approval / NA Order for plotted development06 - B WING.pdf · uploaded 17 Feb 2025Source
- 3 Building Plan Approval / NA Order for plotted development04 - A WING.pdf · uploaded 17 Feb 2025Source
- 2 Building Plan Approval / NA Order for plotted development03 - A WING.pdf · uploaded 17 Feb 2025Source
- 1 Building Plan Approval / NA Order for plotted development02 - PARKING PLAN.pdf · uploaded 17 Feb 2025Source
- 1 Declaration about Commencement CertificateFormat d.pdf · uploaded 17 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A-FY 2023-24.pdf · uploaded 17 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A-FY 2023-24.pdf · uploaded 17 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sep 2024.pdf · uploaded 18 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vasundhara Form 1 Dec 2024.pdf · uploaded 18 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form5ranjekar31mar24.pdf · uploaded 18 Feb 2025Source
- Form 1Form 1 Architects Certificate- Updated.pdf · uploaded 29 May 2025Source
- Form 2Form 2 Engineer Certificate.pdf · uploaded 29 May 2025Source
- Form 3Form 3.pdf · uploaded 29 May 2025Source
- Disclosure of Sold and Booked InventorySold and unsold Q4 .pdf · uploaded 29 May 2025Source
- Form 2A (FY 2023-2024)Form 2A FY 2023-24.pdf · uploaded 29 May 2025Source
- Form 2A (FY 2024-2025)Form 2A FY 2024-25.pdf · uploaded 29 May 2025Source
- Form 1Form 1 Architect Certificate Q3 31122025.pdf · uploaded 7 Feb 2026Source
- Form 1Form 1 Architects Certificate-Updated.pdf · uploaded 7 Feb 2026Source
- Form 2Form 2 Engineer Certificate Q3 31122025.pdf · uploaded 7 Feb 2026Source
- Form 2Form 2 Engineer Certificate.pdf · uploaded 7 Feb 2026Source
- Form 3Form 3 Chartered Accountant Certificate Q3 31122025.pdf · uploaded 7 Feb 2026Source
- Form 3Form 3 Q2 FY 2025-26.pdf · uploaded 7 Feb 2026Source
- Disclosure of Sold and Booked InventorySold Unsold 31122025.pdf · uploaded 7 Feb 2026Source
- Disclosure of Sold and Booked InventoryQ2 Sold Unsold FY 2025-26.pdf · uploaded 7 Feb 2026Source
- Form 1Form 1 Architect Certificate 30062025.pdf · uploaded 13 Feb 2026Source
- Form 2Form 2 Engineer Certificate 30062025.pdf · uploaded 13 Feb 2026Source
- Form 3Form 3 Chartered Accountant Certficate 30062025.pdf · uploaded 13 Feb 2026Source
- Disclosure of Sold and Booked InventorySold Unsold.pdf · uploaded 13 Feb 2026Source
- Withdrawal Update Form 1Form 1 Architects Certificate Q4 FY 2025-26.pdf · uploaded 20 Jun 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate 31032026.pdf · uploaded 20 Jun 2026Source
- Withdrawal Update Form 3Q4 FY 2025- 26 Vasundhara FORM 3 Chartered Accountant.pdf · uploaded 20 Jun 2026Source
Technical
- DocumentPlan upload.pdf · uploaded 17 Jan 2023Source
- DocumentSHEET NO 1.pdf · uploaded 1 Feb 2023Source
- DocumentSHEET NO 2.pdf · uploaded 1 Feb 2023Source
- DocumentSHEET NO 3.pdf · uploaded 1 Feb 2023Source
- DocumentSHEET NO 4.pdf · uploaded 1 Feb 2023Source
- DocumentSHEET NO 5.pdf · uploaded 1 Feb 2023Source
- DocumentSHEET NO 6.pdf · uploaded 1 Feb 2023Source
- DocumentSHEET NO 7.pdf · uploaded 1 Feb 2023Source
- DocumentSHEET NO 8.pdf · uploaded 1 Feb 2023Source
- Document01 - LAYOUT.pdf · uploaded 17 Feb 2025Source
- Document02 - PARKING PLAN.pdf · uploaded 17 Feb 2025Source
- Document03 - A WING.pdf · uploaded 17 Feb 2025Source
- Document04 - A WING.pdf · uploaded 17 Feb 2025Source
- Document05 - A WING.pdf · uploaded 17 Feb 2025Source
- Document06 - B WING.pdf · uploaded 17 Feb 2025Source
- Document07 - B WING.pdf · uploaded 17 Feb 2025Source
- Document08 - B WING.pdf · uploaded 17 Feb 2025Source
- Document09 - B WING.pdf · uploaded 17 Feb 2025Source
- Document1 Layout.pdf · uploaded 9 Apr 2026Source
- Document2 A Wing.pdf · uploaded 9 Apr 2026Source
- Document3 A Wing.pdf · uploaded 9 Apr 2026Source
- Document4 A Wing.pdf · uploaded 9 Apr 2026Source
- Document5 A WING.pdf · uploaded 9 Apr 2026Source
- Document6 B Wing.pdf · uploaded 9 Apr 2026Source
- Document7 B Wing.pdf · uploaded 9 Apr 2026Source
- Document8 B Wing.pdf · uploaded 9 Apr 2026Source
- Document9 B Wing.pdf · uploaded 9 Apr 2026Source
Technical (Architect)
Technical (Engineer)
- DocumentForm 2 Engineer Certificate.pdf · uploaded 17 Feb 2025Source
- DocumentForm 2 Engineer Certificate.pdf · uploaded 17 Feb 2025Source
- DocumentForm 2 Engineer Certificate.pdf · uploaded 17 Feb 2025Source
- DocumentForm 2 Engineer Certificate.pdf · uploaded 17 Feb 2025Source
- DocumentForm 2 Engineer Certificate.pdf · uploaded 17 Feb 2025Source
- DocumentForm 2 Engineer Certificate.pdf · uploaded 17 Feb 2025Source
- DocumentForm 2 Engineer Certificate.pdf · uploaded 17 Feb 2025Source
- DocumentForm 2 Engineer Certificate.pdf · uploaded 17 Feb 2025Source
- DocumentForm 2 Engineer Certificate 31032026.pdf · uploaded 20 Jun 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel PLOT NO. 2, S. NO. 96/3/1U/5
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- A WING 2.5BHK, A WING 2BHK, A WING 3BHK, B WING 2.5BHK, B WING 2BHK, B WING 3BHK103 units in all
- Address
- S. NO. 96/3/1U/5, PLOT NO. 2, KOTHRUD, TALUKA HAVELI, PUNE 411038, PAUD ROAD, KothrudPIN 411038
- Village
- Kothrud-Ext, Haveli taluka
- Location
- 18.50997, 73.79276
- Land area for this project
- 3,475 sq m (37,403 sq ft)
- Permissible built-up area
- 11,110 sq m (1,19,584 sq ft)
- Sanctioned built-up area
- 11,110 sq m (1,19,584 sq ft)
- Recreational open space
- 426 sq m (4,584 sq ft)
- Designated bank account
- 220
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S. NO. 96/3/1U/5, PLOT NO. 2, KOTHRUD, TALUKA HAVELI, PUNE 411038
Boundaries
- North
- S No 96 3 1 Hill Slope And Forest
- South
- Common Road And Plot No 33 And 34
- East
- S No 96 3 1u Plot No 1
- West
- Bhusari Colony
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking103 units
28 of 103 units booked (27%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| A WING 2.5BHK | 81.12 sq m · 873 sq ft | 3 | 3 |
| A WING 2.5BHK | 82.1 sq m · 884 sq ft | 1 | 1 |
| A WING 2.5BHK | 86.74 sq m · 934 sq ft | 9 | 4 |
| A WING 2BHK | 72.73 sq m · 783 sq ft | 1 | 1 |
| A WING 2BHK | 78.12 sq m · 841 sq ft | 16 | 1 |
| A WING 2BHK | 78.8 sq m · 848 sq ft | 1 | 0 |
| A WING 3BHK | 98.02 sq m · 1,055 sq ft | 1 | 1 |
| A WING 3BHK | 108.03 sq m · 1,163 sq ft | 20 | 6 |
Show all 13 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| A WING 3BHK | 108.34 sq m · 1,166 sq ft | 1 | 1 |
| B WING 2.5BHK | 86.7 sq m · 933 sq ft | 9 | 5 |
| B WING 2BHK | 78.1 sq m · 841 sq ft | 20 | 1 |
| B WING 2BHK | 78.8 sq m · 848 sq ft | 1 | 0 |
| B WING 3BHK | 108 sq m · 1,163 sq ft | 20 | 4 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Manoj Tatooskar | — |
| Chartered accountant | A N Shetty | — |
| Chartered accountant | Phule Wagh & Associates LLP | — |
| Engineer | ANIRUDDHA RANJEKAR Ravindra Ranjekar | — |
Source: MahaRERA project page. Contact details are not shown.
Vasundhara in numbers
Registered deals, summarised
Deedo has 135 registered documents at Vasundhara, from Feb 2018 to Oct 2026: 62 sales, 31 leave and licence agreements, 35 mortgages. The median registered sale since Feb 2018 works out to about ₹14,500 per sq ft, at a median of ₹1.57 Cr a deal; 0% of sales were resales.
- What is the price per sq ft at Vasundhara?
- The median registered sale since Feb 2018 works out to about ₹14,500 per sq ft, at a median of ₹1.57 Cr a deal; 0% of sales were resales.
- How many properties have been sold at Vasundhara?
- 62 sales are registered at Vasundhara.
- Are properties at Vasundhara rented out?
- Yes: 31 leave and licence agreements are registered at Vasundhara, at a median rent since Feb 2018 of about ₹25,000 a month with a deposit of about ₹50,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Vasundhara by Deedo, last updated with deals registered in Oct 2026.
Latest deal · Mortgage · Oct 2026
Exact price & Index II