Vitthal Heights
Deedo IDDP-PUN-TMKDIts promised completion date, Jul 2025, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 42% of its units are booked.
Kiwale, Pune 412101 · Property rates in Kiwale · by Pawana Associates Llp
Buying a flat here?
See every deed registered on it.
Its promised completion date, Jul 2025, has passed and MahaRERA does not show it completed
- This projectRegistered 14 Jan 2020, completion promised 31 Jul 2025, and still not shown completed today.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100024025
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100024025 | 14 Jan 2020 | 31 Jul 2025 | 31 Jul 2025 | Pawana Associates LLP | Project page |
Documents132
1 document held by Deedo, 131 filings listed on MahaRERA's project page
Finance
- PAN CardPan card PA partnership.pdf · uploaded 24 Dec 2019Source
Legal
Show all 132 documentsShow fewer documents
Migrated
- 1 Building Plan Approval / NA Order for plotted developmentPlan Pass 01.pdf · uploaded 24 Dec 2019Source
- 2 Building Plan Approval / NA Order for plotted developmentPlan Pass 02.pdf · uploaded 24 Dec 2019Source
- 3 Building Plan Approval / NA Order for plotted developmentPlan Pass 03.pdf · uploaded 24 Dec 2019Source
- 4 Building Plan Approval / NA Order for plotted developmentPlan Pass 04.pdf · uploaded 24 Dec 2019Source
- 5 Building Plan Approval / NA Order for plotted developmentPlan Pass 05.pdf · uploaded 24 Dec 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 24 Dec 2019Source
- 1 Details of encumbrancesencumbursment certificate.pdf · uploaded 26 Dec 2019Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng Cert_compressed.pdf · uploaded 30 Dec 2019Source
- 1 Proforma of Allotment letterAllotment Letter.Pdf · uploaded 30 Dec 2019Source
- 1 Declaration in FORM Bform b_compressed.pdf · uploaded 8 Jan 2020Source
- 2 Proforma of Allotment letterFlat Agreement - 2 (1).pdf · uploaded 8 Jan 2020Source
- 1 Copy of Layout Approval (in case of layout)Plan Pass 01.pdf · uploaded 9 Jan 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERT.pdf · uploaded 12 Jan 2020Source
- 1 Declaration about Commencement CertificateC C DECLARATION.pdf · uploaded 26 Feb 2022Source
- 1 Disclosure of sold/ booked inventorySold Unsold Wing A.pdf · uploaded 26 Feb 2022Source
- 2 Disclosure of sold/ booked inventorySold Unsold Wing B.pdf · uploaded 26 Feb 2022Source
- 2 Copy of Layout Approval (in case of layout)Adobe_Scan_Feb_27,_2022-1-2-1[1].pdf · uploaded 27 Feb 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentAdobe_Scan_Feb_27,_2022-1-2-2[1].pdf · uploaded 27 Feb 2022Source
- 7 Building Plan Approval / NA Order for plotted developmentPLAN 3.pdf · uploaded 27 Feb 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Kaagaz_20220226_200539524478.pdf · uploaded 27 Feb 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Kaagaz_20220226_200703603688.pdf · uploaded 27 Feb 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Kaagaz_20220226_20080909534.pdf · uploaded 27 Feb 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Kaagaz_20220226_200539524478.pdf · uploaded 27 Feb 2022Source
- 1 CERSAI detailsCERSAI_Search_Report.pdf · uploaded 27 Feb 2022Source
- 2 CERSAI detailsCersai Undertaking.pdf · uploaded 27 Feb 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 MARCH 2021.pdf · uploaded 27 Feb 2022Source
- 3 Disclosure of sold/ booked inventorySold Unsold Wing B.pdf · uploaded 13 Mar 2022Source
- 4 Disclosure of sold/ booked inventorySold Unsold Wing A.pdf · uploaded 13 Mar 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Rera Certificate Pawana Associates.pdf · uploaded 30 Sep 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 WING A SEP 22.pdf · uploaded 1 Feb 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 WING B SEP 22.pdf · uploaded 1 Feb 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 SEP 22_compressed.pdf · uploaded 1 Feb 2023Source
- 5 Disclosure of sold/ booked inventoryInventory WING A_compressed.pdf · uploaded 1 Feb 2023Source
- 6 Disclosure of sold/ booked inventoryInventory WING B_compressed.pdf · uploaded 1 Feb 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 SEP 22_compressed.pdf · uploaded 1 Feb 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentSanction Plan_30-12-2022_Vitthal Heights_1.pdf · uploaded 3 Feb 2023Source
- 9 Building Plan Approval / NA Order for plotted developmentSanction Plan_30-12-2022_Vitthal Heights_2.pdf · uploaded 3 Feb 2023Source
- 10 Building Plan Approval / NA Order for plotted developmentSanction Plan_30-12-2022_Vitthal Heights_3 (1).pdf · uploaded 3 Feb 2023Source
- 11 Building Plan Approval / NA Order for plotted developmentSanction Plan_30-12-2022_Vitthal Heights_4.pdf · uploaded 3 Feb 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCC_30-12-2022_Vitthal Heights.pdf · uploaded 3 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Pawana Associates- Form 5.pdf · uploaded 24 Jul 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)PAWANA ASSOCIATES FORM -1_A-WING_01 MAR 2020.pdf · uploaded 14 Aug 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)PAWANA ASSOCIATES FORM -1_B-WING_01 MAR 2020.pdf · uploaded 14 Aug 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)PAWANA ASSOCIATES FORM -1_A-WING_02 MAR 2021.pdf · uploaded 14 Aug 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)PAWANA ASSOCIATES FORM -1_B-WING_02 MAR 2021.pdf · uploaded 14 Aug 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)PAWANA ASSOCIATES FORM -1_B-WING_03 MAR 2022.pdf · uploaded 14 Aug 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)PAWANA ASSOCIATES FORM -1_B-WING_03 MAR 2022.pdf · uploaded 14 Aug 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)PAWANA ASSOCIATES FORM -1_A-WING_03 MAR 2022.pdf · uploaded 14 Aug 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)PAWANA ASSOCIATES FORM -1_B-WING_03 MAR 2022.pdf · uploaded 14 Aug 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)PAWANA ASSOCIATES FORM -1_A-WING_03 MAR 2022.pdf · uploaded 14 Aug 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)PAWANA ASSOCIATES FORM 2 MAR 2020.pdf · uploaded 14 Aug 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)PAWANA ASSOCIATES FORM 2 MAR 2021.pdf · uploaded 14 Aug 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)PAWANA ASSOCIATES FORM 3 MAR 2020_compressed.pdf · uploaded 14 Aug 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)PAWANA ASSOCIATES FORM 3 MAR 2021_compressed.pdf · uploaded 14 Aug 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)PAWANA ASSOCIATES FORM 3 MAR 2022_compressed (1).pdf · uploaded 14 Aug 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)RERA FORM 5 PAWANA ASSOCIATES F Y 22-23.pdf · uploaded 30 Sep 2023Source
- 12 Building Plan Approval / NA Order for plotted developmentPA BP1 2024.pdf · uploaded 30 Mar 2024Source
- 13 Building Plan Approval / NA Order for plotted developmentPA BP2 2024.pdf · uploaded 30 Mar 2024Source
- 14 Building Plan Approval / NA Order for plotted developmentPA BP3 2024.pdf · uploaded 30 Mar 2024Source
- 15 Building Plan Approval / NA Order for plotted developmentPA BP4 2024.pdf · uploaded 30 Mar 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentPA CC1 2024.pdf · uploaded 30 Mar 2024Source
- Form 5 (FY 2023-2024)FORM 5 - PAWANA ASSOCIATES.pdf · uploaded 30 Sep 2024Source
- Form 1FORM 1 FY 23-24 Q3.pdf · uploaded 3 Jun 2025Source
- Form 2FORM 2 FY 23-24 Q3.pdf · uploaded 3 Jun 2025Source
- Form 3FORM 3 FY 23-24 Q3.pdf · uploaded 3 Jun 2025Source
- Form 1FORM 1 FY 23-24 Q4.pdf · uploaded 3 Jun 2025Source
- Form 2FORM 2 FY 23-24 Q4.pdf · uploaded 3 Jun 2025Source
- Form 3FORM 3 FY 23-24 Q4.pdf · uploaded 3 Jun 2025Source
- Disclosure of Sold and Booked InventoryInv FY 23-24 Q4.pdf · uploaded 3 Jun 2025Source
- Form 1FORM 1 FY 24-25 Q1.pdf · uploaded 3 Jun 2025Source
- Form 2FORM 2 FY 24-25 Q1.pdf · uploaded 3 Jun 2025Source
- Form 3FORM 3 FY 24-25 Q1.pdf · uploaded 3 Jun 2025Source
- Disclosure of Sold and Booked InventoryInv FY 24-25 Q1.pdf · uploaded 3 Jun 2025Source
- Form 1FORM 1 FY 24-25 Q2.pdf · uploaded 3 Jun 2025Source
- Form 2FORM 2 FY 24-25 Q2.pdf · uploaded 3 Jun 2025Source
- Form 3FORM 3 FY 24-25 Q2.pdf · uploaded 3 Jun 2025Source
- Disclosure of Sold and Booked InventoryInv FY 24-25 Q2.pdf · uploaded 3 Jun 2025Source
- Form 1FORM 1 FY 24-25 Q3.pdf · uploaded 3 Jun 2025Source
- Form 2FORM 2 FY 24-25 Q3.pdf · uploaded 3 Jun 2025Source
- Form 3FORM 3 FY 24-25 Q3.pdf · uploaded 3 Jun 2025Source
- Disclosure of Sold and Booked InventoryInv FY 24-25 Q3.pdf · uploaded 3 Jun 2025Source
- Form 1FORM 1 FY 24-25 Q4.pdf · uploaded 3 Jun 2025Source
- Form 2FORM 2 FY 24-25 Q4.pdf · uploaded 3 Jun 2025Source
- Form 3FORM 3 FY 24-25 Q4.pdf · uploaded 3 Jun 2025Source
- Disclosure of Sold and Booked InventoryInv FY 24-25 Q4.pdf · uploaded 3 Jun 2025Source
- Form 5 (FY 2019-2020)2019-20.pdf · uploaded 1 Jul 2025Source
- Form 5 (FY 2020-2021)2020-21.pdf · uploaded 1 Jul 2025Source
- Form 5 (FY 2021-2022)2021-22.pdf · uploaded 1 Jul 2025Source
- Form 5 (FY 2022-2023)2022-23.pdf · uploaded 1 Jul 2025Source
- Withdrawal Update Form 1Form 1 June 25.pdf · uploaded 2 Sep 2025Source
- Withdrawal Update Form 1Form 1 June 25.pdf · uploaded 2 Sep 2025Source
- Withdrawal Update Form 2Form 2 June 25.pdf · uploaded 2 Sep 2025Source
- Withdrawal Update Form 2Form 2 June 25.pdf · uploaded 2 Sep 2025Source
- Withdrawal Update Form 3Form 3 June 25.pdf · uploaded 2 Sep 2025Source
- Withdrawal Update Form 3Form 3 June 25.pdf · uploaded 2 Sep 2025Source
- Form 5 (FY 2024-2025)Form 5 Pawana associated LLP F Y 24-25.pdf · uploaded 3 Oct 2025Source
- Withdrawal Update Form 1Form 1 June 25.pdf · uploaded 3 Jan 2026Source
- Withdrawal Update Form 2Form 2 June 25.pdf · uploaded 3 Jan 2026Source
- Withdrawal Update Form 3Form 3 June 25.pdf · uploaded 3 Jan 2026Source
- Form 2A (FY 2019-2020)Form 2A FY 2019-20.pdf · uploaded 7 Jan 2026Source
- Form 2A (FY 2020-2021)Form 2A FY 2020-21.pdf · uploaded 7 Jan 2026Source
- Form 2A (FY 2021-2022)Form 2A FY 2021-22.pdf · uploaded 7 Jan 2026Source
- Form 2A (FY 2022-2023)Form 2A FY 2022-23.pdf · uploaded 7 Jan 2026Source
- Form 2A (FY 2023-2024)Form 2A Fy 2023-24.pdf · uploaded 7 Jan 2026Source
- Form 2A (FY 2024-2025)Form 2A FY 2024-25.pdf · uploaded 7 Jan 2026Source
Technical
- DocumentPlan Pass 01.pdf · uploaded 24 Dec 2019Source
- DocumentPlan Pass 02.pdf · uploaded 24 Dec 2019Source
- DocumentPlan Pass 03.pdf · uploaded 24 Dec 2019Source
- DocumentPlan Pass 04.pdf · uploaded 24 Dec 2019Source
- DocumentPlan Pass 05.pdf · uploaded 24 Dec 2019Source
- DocumentPlan Pass 01.pdf · uploaded 9 Jan 2020Source
- DocumentAdobe_Scan_Feb_27,_2022-1-2-1[1].pdf · uploaded 27 Feb 2022Source
- DocumentAdobe_Scan_Feb_27,_2022-1-2-2[1].pdf · uploaded 27 Feb 2022Source
- DocumentPLAN 3.pdf · uploaded 27 Feb 2022Source
- DocumentSanction Plan_30-12-2022_Vitthal Heights_1.pdf · uploaded 3 Feb 2023Source
- DocumentSanction Plan_30-12-2022_Vitthal Heights_2.pdf · uploaded 3 Feb 2023Source
- DocumentSanction Plan_30-12-2022_Vitthal Heights_3 (1).pdf · uploaded 3 Feb 2023Source
- DocumentSanction Plan_30-12-2022_Vitthal Heights_4.pdf · uploaded 3 Feb 2023Source
- DocumentPA BP1 2024.pdf · uploaded 30 Mar 2024Source
- DocumentPA BP2 2024.pdf · uploaded 30 Mar 2024Source
- DocumentPA BP3 2024.pdf · uploaded 30 Mar 2024Source
- DocumentPA BP4 2024.pdf · uploaded 30 Mar 2024Source
Technical (Architect)
- DocumentForm 1 June 25.pdf · uploaded 3 Jan 2026Source
Technical (Engineer)
- DocumentForm 2 June 25.pdf · uploaded 3 Jan 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 73/1/1/2/2
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, Shop127 units in all
- Address
- 73/1/1/2/2, Kiwale, Survey No 73/1/1/2/2, Adarsh Nagar, KiwalePIN 412101
- Village
- Pimpri Chinchawad (M Corp.), Haveli taluka
- Location
- 18.66116, 73.72866
- Land area for this project
- 2,874 sq m (30,936 sq ft)
- Permissible built-up area
- 11,763 sq m (1,26,615 sq ft)
- Sanctioned built-up area
- 5,164 sq m (55,585 sq ft)
- Recreational open space
- 269 sq m (2,895 sq ft)
- Designated bank account
- 171
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
73/1/1/2/2, KIWALE
Boundaries
- North
- 18 Meter Wide D P Road
- South
- Indra Park Society
- East
- Part Of Survey No 73
- West
- 12 Meter Wide D P Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking127 units
53 of 127 units booked (42%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | 1BHK | 36.69 sq m · 395 sq ft | 9 | 8 |
| A Wing | 2BHK | 51.92 sq m · 559 sq ft | 12 | 0 |
| A Wing | 2BHK | 53.21 sq m · 573 sq ft | 12 | 7 |
| A Wing | 2BHK | 56.17 sq m · 605 sq ft | 10 | 7 |
| A Wing | 2BHK | 57.08 sq m · 614 sq ft | 11 | 1 |
| A Wing | 2BHK | 86.59 sq m · 932 sq ft | 1 | 0 |
| A Wing | Shop | 15.64 sq m · 168 sq ft | 1 | 0 |
| A Wing | Shop | 16.66 sq m · 179 sq ft | 1 | 0 |
Show all 24 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | Shop | 16.93 sq m · 182 sq ft | 1 | 1 |
| A Wing | Shop | 21.05 sq m · 227 sq ft | 4 | 3 |
| A Wing | Shop | 21.37 sq m · 230 sq ft | 1 | 0 |
| A Wing | Shop | 21.92 sq m · 236 sq ft | 1 | 0 |
| A Wing | Shop | 23.39 sq m · 252 sq ft | 1 | 1 |
| A Wing | Shop | 23.4 sq m · 252 sq ft | 1 | 1 |
| A Wing | Shop | 23.97 sq m · 258 sq ft | 1 | 0 |
| A Wing | Shop | 26.57 sq m · 286 sq ft | 2 | 2 |
| A Wing | Shop | 27.76 sq m · 299 sq ft | 2 | 2 |
| A Wing | Shop | 28.42 sq m · 306 sq ft | 1 | 1 |
| B Wing | 1BHK | 36.69 sq m · 395 sq ft | 9 | 8 |
| B Wing | 2BHK | 51.92 sq m · 559 sq ft | 12 | 0 |
| B Wing | 2BHK | 55.87 sq m · 601 sq ft | 12 | 4 |
| B Wing | 2BHK | 56.17 sq m · 605 sq ft | 10 | 3 |
| B Wing | 2BHK | 57.08 sq m · 614 sq ft | 11 | 4 |
| B Wing | 2BHK | 86.59 sq m · 932 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals7
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Shekhar Kokane | — |
| Chartered accountant | CA Ganesh Kankate | — |
| Chartered accountant | Ca Manatu Kumbhar | — |
| Chartered accountant | Kishor Mavkar | — |
| Engineer | Ajinkya Lahigude | — |
| Other | Anand Gaikwad | — |
| Other | Deltacom Structural Consultants Pvt Ltd | — |
Source: MahaRERA project page. Contact details are not shown.