Royal Park
Deedo IDDP-PUN-RBMHMahaRERA shows it completed; no MahaRERA orders on record; 55% of its units are booked.
Kiwale, Pune 412101 · by Gaikwad Hapse Associates
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 24 Feb 2023, completion promised 30 Oct 2026.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100049775
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100049775 | 24 Feb 2023 | 30 Oct 2026 | 30 Oct 2026 | Gaikwad Hapse Associates | Project page |
Documents166
2 documents held by Deedo, 164 filings listed on MahaRERA's project page
Finance
- PAN CardFIRM PAN CARD.pdf · uploaded 28 Jan 2023Source
Legal
Show all 166 documentsShow fewer documents
Migrated
- 1 a Details of encumbrances concerned to FinanceNO ENCUMBRANCE WITH RESPECT TO LEGAL.pdf · uploaded 28 Jan 2023Source
- 1 b Details of encumbrances concerned to LegalNO ENCUMBRANCE WITH RESPECT TO LEGAL.pdf · uploaded 28 Jan 2023Source
- 1 Copy of Layout Approval (in case of layout)PLAN 1 LAYOUT.PDF · uploaded 28 Jan 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentNA ORDER.pdf · uploaded 28 Jan 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 28 Jan 2023Source
- 1 Deviation Report with respect to model copy of AgreementNO DEVIATION IN AGREEMENT FOR SALE.pdf · uploaded 28 Jan 2023Source
- 2 Copy of Layout Approval (in case of layout)PLAN 2.PDF · uploaded 31 Jan 2023Source
- 3 Copy of Layout Approval (in case of layout)PLAN 3.PDF · uploaded 31 Jan 2023Source
- 4 Copy of Layout Approval (in case of layout)PLAN 4.PDF · uploaded 31 Jan 2023Source
- 5 Copy of Layout Approval (in case of layout)PLAN 5.PDF · uploaded 31 Jan 2023Source
- 6 Copy of Layout Approval (in case of layout)PLAN 6.PDF · uploaded 31 Jan 2023Source
- 7 Copy of Layout Approval (in case of layout)PLAN 7.PDF · uploaded 31 Jan 2023Source
- 8 Copy of Layout Approval (in case of layout)PLAN 8.PDF · uploaded 31 Jan 2023Source
- 9 Copy of Layout Approval (in case of layout)PLAN 9.PDF · uploaded 31 Jan 2023Source
- 10 Copy of Layout Approval (in case of layout)PLAN 10.PDF · uploaded 31 Jan 2023Source
- 11 Copy of Layout Approval (in case of layout)PLAN 11.PDF · uploaded 31 Jan 2023Source
- 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMENT.pdf · uploaded 31 Jan 2023Source
- 1 Declaration in FORM BFORM B BUILDER_FINAL.pdf · uploaded 31 Jan 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFIACTE FINAL.pdf · uploaded 31 Jan 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE.pdf · uploaded 31 Jan 2023Source
- 1 CERSAI detailsCERSAI REPORT_merged.pdf · uploaded 31 Jan 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA CERTIFICATE FINAL.pdf · uploaded 31 Jan 2023Source
- 1 Proforma of Agreement for saleRERA AGREEMENT TO SALE.pdf · uploaded 31 Jan 2023Source
- 1 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 31 Jan 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBANK ACCOUNT.pdf · uploaded 31 Jan 2023Source
- 1 Deviation Report with respect to Allotment letterNO DEVIATION REPORT WITH RESPECT TO ALLOTMENT LETTER.pdf · uploaded 31 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsBG Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 8 Feb 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsMG Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 8 Feb 2023Source
- 2 a Details of encumbrances concerned to FinanceNO ENCUMBRANCE IN FINANCE.pdf · uploaded 15 Feb 2023Source
- 2 b Details of encumbrances concerned to LegalNO ENCUMBRANCE IN FINANCE.pdf · uploaded 15 Feb 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 FINAL_.pdf · uploaded 23 May 2023Source
- 1 Other – LegalSUPPLEMENTARY DEED_.pdf · uploaded 23 May 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's Certificate.pdf · uploaded 25 Aug 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Enggineering Certificate (2).pdf · uploaded 25 Aug 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Ca Certificate_compressed (1).pdf · uploaded 31 Aug 2023Source
- 2 Proforma of Agreement for saleAgreement Draft For E Registartion.pdf · uploaded 28 Oct 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS CERTIFICATE.pdf · uploaded 18 Nov 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATES.pdf · uploaded 18 Nov 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATES.pdf · uploaded 18 Nov 2023Source
- 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY (ROYAL PARK) (2).pdf · uploaded 20 Nov 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificates-SEPT 23.pdf · uploaded 5 Dec 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate 2024.pdf · uploaded 16 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Enggineering Certificate - Copy.pdf · uploaded 16 Jan 2024Source
- 2 Disclosure of sold/ booked inventory1 Disclosure of sold_ booked inventory.pdf · uploaded 16 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FROM 2A.pdf · uploaded 17 Jan 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)from 5 rera update.pdf · uploaded 17 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)from 3 jan 2024_1.pdf · uploaded 25 Jan 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 31-08-2023 collection _compressed.pdf · uploaded 19 Mar 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30-09-2023 collection.pdf · uploaded 19 Mar 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31-12-2023 collection.pdf · uploaded 19 Mar 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificates 04-17-2024 .pdf · uploaded 25 Apr 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg certificate 04-16-2024 .pdf · uploaded 25 Apr 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate from 3 04-26-2024 .pdf · uploaded 26 Apr 2024Source
- 3 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY (ROYAL PARK) (5).pdf · uploaded 11 Jun 2024Source
- 4 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY (ROYAL PARK) (6).pdf · uploaded 9 Aug 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE 10 AUG 2024.pdf · uploaded 10 Aug 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECH CERTIFICATE 11-08-2024.pdf · uploaded 13 Aug 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)GetUserDocumentFileContent.pdf · uploaded 18 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3.pdf · uploaded 18 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects certificate 22-10-2024.pdf · uploaded 28 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineering certificates 16-10-24.pdf · uploaded 28 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY (ROYAL PARK) (7).pdf · uploaded 12 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 16-12-2024 let (16-10-2024)_compressed (1).pdf · uploaded 16 Dec 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)engg certificate 17-01-2025.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects certificate .pdf · uploaded 22 Jan 2025Source
- 1 Disclosure of sold/ booked inventory1 Disclosure of sold_ booked inventory.pdf · uploaded 13 May 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate 05-21-2025 .pdf · uploaded 21 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate 12-05-2025.pdf · uploaded 21 May 2025Source
- Form 1FORM 1Sep_24.pdf · uploaded 30 Oct 2025Source
- Form 1Form-1.pdf · uploaded 30 Oct 2025Source
- Form 1Form-1.pdf · uploaded 30 Oct 2025Source
- Form 1Form-1.pdf · uploaded 30 Oct 2025Source
- Form 1Form 1 Mar _24.pdf · uploaded 30 Oct 2025Source
- Form 1FORM 1 Dec_23.pdf · uploaded 30 Oct 2025Source
- Form 1FORM 1 Dec_23.pdf · uploaded 30 Oct 2025Source
- Form 1FORM 1 Sep_23.pdf · uploaded 30 Oct 2025Source
- Form 1Form-1_page-0001 (1).pdf · uploaded 30 Oct 2025Source
- Form 2FORM 2 Sep_24.pdf · uploaded 30 Oct 2025Source
- Form 2Form-2.pdf · uploaded 30 Oct 2025Source
- Form 2Form-2.pdf · uploaded 30 Oct 2025Source
- Form 2Form-2.pdf · uploaded 30 Oct 2025Source
- Form 2FORM 2 Mar_24.pdf · uploaded 30 Oct 2025Source
- Form 2Form-2.pdf · uploaded 30 Oct 2025Source
- Form 2Form-2.pdf · uploaded 30 Oct 2025Source
- Form 2FROM 2 Sep_23.pdf · uploaded 30 Oct 2025Source
- Form 2Form-2.pdf · uploaded 30 Oct 2025Source
- Form 3From 3 SEP 2024.pdf · uploaded 30 Oct 2025Source
- Form 3Form-3.pdf · uploaded 30 Oct 2025Source
- Form 3Form-3.pdf · uploaded 30 Oct 2025Source
- Form 3Form-3.pdf · uploaded 30 Oct 2025Source
- Form 3FORM 3 Mar_24.pdf · uploaded 30 Oct 2025Source
- Form 3FORM 3 Dec_23 (2).pdf · uploaded 30 Oct 2025Source
- Form 3FORM 3 Dec_23 (2).pdf · uploaded 30 Oct 2025Source
- Form 3FORM 3 Sep_23(2).pdf · uploaded 30 Oct 2025Source
- Form 3Ca Certificate_compressed (1).pdf · uploaded 30 Oct 2025Source
- Disclosure of Sold and Booked InventoryQ2 24-25 july to oct sold inventory.pdf · uploaded 30 Oct 2025Source
- Disclosure of Sold and Booked InventoryQ3 24-25 oct to dec sold inventory.pdf · uploaded 30 Oct 2025Source
- Disclosure of Sold and Booked InventoryQ4 24-25 jan to march sold inventory.pdf · uploaded 30 Oct 2025Source
- Disclosure of Sold and Booked InventoryQ1 24-25 April to June sold inventory (1).pdf · uploaded 30 Oct 2025Source
- Disclosure of Sold and Booked InventoryQ4 jan to march 23-24 sold inventory.pdf · uploaded 30 Oct 2025Source
- Disclosure of Sold and Booked InventoryQ3 23-24 oct to dec.pdf · uploaded 30 Oct 2025Source
- Disclosure of Sold and Booked InventoryQ3 23-24 oct to dec.pdf · uploaded 30 Oct 2025Source
- Disclosure of Sold and Booked InventoryQ2 july to sep 23-24.pdf · uploaded 30 Oct 2025Source
- Disclosure of Sold and Booked InventoryQ1 23-24 April to jun.pdf · uploaded 30 Oct 2025Source
- Form 2A (FY 2022-2023)31.03.23 2A.pdf · uploaded 30 Oct 2025Source
- Form 2A (FY 2023-2024)31.03.24 2A.pdf · uploaded 30 Oct 2025Source
- Form 2A (FY 2024-2025)31.03.25 2A.pdf · uploaded 30 Oct 2025Source
- Form 5 (FY 2022-2023)Form No 5 Ms Gaikwad Hapse Associates 2022-23.pdf · uploaded 30 Oct 2025Source
- Form 5 (FY 2024-2025)Form-5 Sign.pdf · uploaded 31 Oct 2025Source
- Withdrawal Update Form 1Form-1.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 1Form-1.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 2Form-2.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 2Form-2.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 3form 3 june Sign_.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 3Form-3 Sign_removed 2.pdf · uploaded 6 Nov 2025Source
- Form 5 (FY 2023-2024)Gaikwad Hapse Associates Form-5 23-24_ sign.pdf · uploaded 25 Nov 2025Source
- Form 1Form-1 Mar_24.pdf · uploaded 28 Nov 2025Source
- Form 2Form-2 Mar_24.pdf · uploaded 28 Nov 2025Source
- Form 3From-3 Mar_24 Sign.pdf · uploaded 28 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold-Booked Inventory Mar_24.pdf · uploaded 28 Nov 2025Source
- Withdrawal Update Form 1Form-1 Dec_25.pdf · uploaded 12 Jun 2026Source
- Withdrawal Update Form 1Form-1 Mar_26.pdf · uploaded 12 Jun 2026Source
- Withdrawal Update Form 1Form-1 Mar_26.pdf · uploaded 12 Jun 2026Source
- Withdrawal Update Form 2Form-2 Dec_25.pdf · uploaded 12 Jun 2026Source
- Withdrawal Update Form 2Form-2 Mar_26.pdf · uploaded 12 Jun 2026Source
- Withdrawal Update Form 2Form-2 Mar_26.pdf · uploaded 12 Jun 2026Source
- Withdrawal Update Form 3FORM 3 royal park Dec_25 Sign.pdf · uploaded 12 Jun 2026Source
- Withdrawal Update Form 3Form-3 Mar_26 Sign.pdf · uploaded 12 Jun 2026Source
- Withdrawal Update Form 3Form-3 April_26 Sign.pdf · uploaded 12 Jun 2026Source
- Withdrawal Update Form 1Form-1 Sign.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2Form-2 Jun_26 Sign.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3FORM 3 NJAJun_26 Sign.pdf · uploaded 20 Jul 2026Source
- Form 2A (FY 2025-2026)Form 2A.pdf · uploaded 10 Aug 2026Source
- Occupational CertificateCompletion certificate.pdf · uploaded 27 Aug 2026Source
Technical
- DocumentPLAN 1 LAYOUT.PDF · uploaded 28 Jan 2023Source
- DocumentNA ORDER.pdf · uploaded 28 Jan 2023Source
- DocumentPLAN 2.PDF · uploaded 31 Jan 2023Source
- DocumentPLAN 3.PDF · uploaded 31 Jan 2023Source
- DocumentPLAN 4.PDF · uploaded 31 Jan 2023Source
- DocumentPLAN 5.PDF · uploaded 31 Jan 2023Source
- DocumentPLAN 6.PDF · uploaded 31 Jan 2023Source
- DocumentPLAN 7.PDF · uploaded 31 Jan 2023Source
- DocumentPLAN 8.PDF · uploaded 31 Jan 2023Source
- DocumentPLAN 9.PDF · uploaded 31 Jan 2023Source
- DocumentPLAN 10.PDF · uploaded 31 Jan 2023Source
- DocumentPLAN 11.PDF · uploaded 31 Jan 2023Source
- Document1 Layout.pdf · uploaded 12 Aug 2026Source
- Document2.pdf · uploaded 12 Aug 2026Source
- Document3-5.pdf · uploaded 12 Aug 2026Source
- Document6-11.pdf · uploaded 12 Aug 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 74/2/1
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- —196 units in all
- Address
- 74/2/1, Chinchwad, KiwalePIN 412101
- Village
- Pimpri Chinchawad (M Corp.), Haveli taluka
- Location
- 18.66116, 73.72866
- Land area for this project
- 5,000 sq m (53,820 sq ft)
- Permissible built-up area
- 18,895 sq m (2,03,379 sq ft)
- Sanctioned built-up area
- 18,895 sq m (2,03,379 sq ft)
- Recreational open space
- 500 sq m (5,382 sq ft)
- Designated bank account
- 171
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
74/2/1
Boundaries
- North
- Property Of Sakshi Construction S No 74 1b
- South
- Property Of Survey No 75
- East
- Property Of Narayan Hapse And Vishnu Hapse
- West
- 12 Mtrs Dp Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking196 units
196 units registered
| Type | Carpet area | Units |
|---|---|---|
| — | — | 196 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals8
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ar Usha Rangarajan Landmark Design Group | — |
| Architect | Ip Associates | — |
| Chartered accountant | Ca Amod Dinkar Bhate | — |
| Chartered accountant | Dolly Gandhi And Associates | — |
| Chartered accountant | Navdeep Jindal | — |
| Chartered accountant | Rupesh Choudhari | — |
| Engineer | G A Bhilare Consultants Pvt Ltd | — |
| Engineer | Rakesh Ashok Deore | — |
Source: MahaRERA project page. Contact details are not shown.