Pristine Allure Part2
Deedo IDDP-PUN-0A3XCompletion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record; 85% of its units are booked.
Kharadi, Pune 411014 · Property rates in Kharadi · by Mahalaxmi Shelters
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2028
- This projectRegistered 15 May 2023, completion promised 31 Dec 2027, revised to 30 Apr 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Oct 2026
- Rental · Oct 2026
- Rental · Oct 2026
- Mortgage · Sep 2026No amount
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Mortgage · Aug 2026No amount
- Mortgage · Aug 2026No amount
- Rental · Aug 2026
- Rental · Aug 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2026 | Wing H · 5 | Primary sale | 814 sq ft | View Primary sale, Oct 2026 | |
| Oct 2026 | Unit C/104 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Unit E303 | Rental | — | View Rental, Oct 2026 | |
| Sep 2026 | Main building · 905 | Mortgage | — | View Mortgage, Sep 2026 | |
| Sep 2026 | -1 | Primary sale | 1,436 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Wing H · 404 | Primary sale | 1,096 sq ft | View Primary sale, Sep 2026 | |
| Aug 2026 | Main building · 101 | Mortgage | — | View Mortgage, Aug 2026 | |
| Aug 2026 | Main building · 705 | Mortgage | — | View Mortgage, Aug 2026 | |
| Aug 2026 | Unit 1002 | Rental | — | View Rental, Aug 2026 | |
| Aug 2026 | Unit E105 | Rental | — | View Rental, Aug 2026 |
6 buildings
Open a building to see every flat, floor by floor.
- A Wing13 floors · 78 units96% booked
- B Wing13 floors · 78 units91% booked
- G Wing13 floors · 78 units68% booked
- Wing ASize not on record
- Wing BSize not on record
- Wing GSize not on record
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100050873
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100050873 | 15 May 2023 | 31 Dec 2027 | 30 Apr 2028 | Mahalaxmi Shelters | Project page |
Documents119
1 document held by Deedo, 118 filings listed on MahaRERA's project page
Finance
Legal
Show all 119 documentsShow fewer documents
Migrated
- 1 b Details of encumbrances concerned to LegalSelf Declaration regarding financial encumbrances.pdf · uploaded 10 Apr 2023Source
- 1 Copy of Layout Approval (in case of layout)layout 1.pdf · uploaded 10 Apr 2023Source
- 2 Copy of Layout Approval (in case of layout)2-29.pdf · uploaded 10 Apr 2023Source
- 1 Building Plan Approval / NA Order for plotted development9 - 29-compressed.pdf · uploaded 10 Apr 2023Source
- 2 Building Plan Approval / NA Order for plotted development10-29-compressed.pdf · uploaded 10 Apr 2023Source
- 3 Building Plan Approval / NA Order for plotted development11-29.pdf · uploaded 10 Apr 2023Source
- 4 Building Plan Approval / NA Order for plotted development12-29-compressed.pdf · uploaded 10 Apr 2023Source
- 5 Building Plan Approval / NA Order for plotted development13-29.pdf · uploaded 10 Apr 2023Source
- 6 Building Plan Approval / NA Order for plotted development25-29-compressed.pdf · uploaded 10 Apr 2023Source
- 7 Building Plan Approval / NA Order for plotted development26-29.pdf · uploaded 10 Apr 2023Source
- 1 Declaration in FORM Bform B.pdf · uploaded 11 Apr 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects certificate.pdf · uploaded 11 Apr 2023Source
- 1 Deviation Report with respect to Allotment letterNo deviation in allotment letter.pdf · uploaded 11 Apr 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineering certificate.pdf · uploaded 12 Apr 2023Source
- 1 Proforma of Allotment letterProforma Allotment Letter_compressed.pdf · uploaded 12 Apr 2023Source
- 1 Deviation Report with respect to model copy of AgreementNo Deviaton Agreement to Sale.pdf · uploaded 12 Apr 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Mahalaxmi Shelters Document_compressed.pdf · uploaded 13 Apr 2023Source
- 2 a Details of encumbrances concerned to FinanceSelf Declaration regarding encumbrances.pdf · uploaded 18 Apr 2023Source
- 2 b Details of encumbrances concerned to LegalSelf Declaration regarding encumbrances.pdf · uploaded 18 Apr 2023Source
- 1 Declaration about Commencement CertificateFormat 2.pdf · uploaded 20 Apr 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsPRITAM GOYAL.pdf · uploaded 24 Apr 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsSACHIN GOYAL.pdf · uploaded 24 Apr 2023Source
- 1 Copy of the legal title report1 (2).pdf · uploaded 26 Apr 2023Source
- 1 CERSAI detailsilovepdf_merged.pdf · uploaded 26 Apr 2023Source
- 1 Proforma of Agreement for saleRera Draft - Allure Part 2-2.pdf · uploaded 26 Apr 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameNEW 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same_page-0001.pdf · uploaded 27 Apr 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentkharadi cc_compressed.pdf · uploaded 2 May 2023Source
- 3 a Details of encumbrances concerned to FinanceSelf Declaration regarding financial encumbrances.pdf · uploaded 17 May 2023Source
- 3 b Details of encumbrances concerned to LegalSelf Declaration regarding financial encumbrances.pdf · uploaded 17 May 2023Source
- 2 Declaration in FORM BFORM B DECLARATION.pdf · uploaded 17 May 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM B DECLARATION.pdf · uploaded 17 May 2023Source
- 2 Proforma of Agreement for saleAgreement Draft Flat Agr ABG, Pristine Allure Part 2.pdf · uploaded 17 May 2023Source
- 2 Deviation Report with respect to model copy of AgreementAllure Deviation Rera.pdf · uploaded 17 May 2023Source
- 1 Other – Finance1.pdf · uploaded 22 Jun 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)architects certificate part2 - 2nd edition.pdf · uploaded 18 Aug 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineers certificate part 2- 2nd edition.pdf · uploaded 18 Aug 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Till 30 June 23.pdf · uploaded 23 Sep 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate till 30 june 23.pdf · uploaded 23 Sep 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA 2 Arc Cert 230930.pdf · uploaded 17 Oct 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)RERA 2 Engg Cert 230930.pdf · uploaded 17 Oct 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Allure Part-2.pdf · uploaded 20 Oct 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 20 Oct 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)PART 2.pdf · uploaded 15 Feb 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Part-2.pdf · uploaded 15 Feb 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 part 2 dec 23.pdf · uploaded 4 Mar 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A -Quality Assurance Part 2 23-24.pdf · uploaded 16 May 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Part 2.pdf · uploaded 18 May 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Part 2.pdf · uploaded 18 May 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Part 2 240331.pdf · uploaded 27 May 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form-5 Part 2.pdf · uploaded 7 Aug 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)20240809 Arc Cert Part 2_page-0001.pdf · uploaded 14 Aug 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)20240809 Engg Cert Part 2.pdf · uploaded 14 Aug 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)240630 Form 3 Part 2.pdf · uploaded 17 Aug 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 3 Part 2_compressed.pdf · uploaded 18 Oct 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)240930 Form-1 Part 2.pdf · uploaded 18 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Part 2_compressed.pdf · uploaded 18 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)240930 Form-2 Part 2.pdf · uploaded 18 Oct 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)240930 Form-1 Part 2.pdf · uploaded 18 Oct 2024Source
- 1 a Details of encumbrances concerned to FinanceFinancial Encumbrances Allure Part 2_page-0001.pdf · uploaded 11 Nov 2024Source
- 1 b Details of encumbrances concerned to LegalFinancial Encumbrances Allure Part 2_page-0001.pdf · uploaded 11 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)241231 Form 1 Part 3.pdf · uploaded 28 Jan 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)241231 Form 1 Part 2.pdf · uploaded 28 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Pristine Allure Part 2.pdf · uploaded 28 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Part 2-Form 2 - 31122024.pdf · uploaded 28 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)250331 Architects Certificate Allure Part 2.pdf · uploaded 6 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)250331 CA Certificate Allure Part 2.pdf · uploaded 6 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)250331 Engineers Certificate Allure Part 2.pdf · uploaded 6 May 2025Source
- Form 1Form 1 - Pristine Allure Part 2 as on June 2025.pdf · uploaded 22 Sep 2025Source
- Form 2Form 2 - Prisitne Allure Part 2 as on June 2025.pdf · uploaded 22 Sep 2025Source
- Form 3Form 3 - Pristine Allure Part 2 as on June 2025.pdf · uploaded 22 Sep 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 - Pristine Allure Part 2 as on June 2025.pdf · uploaded 22 Sep 2025Source
- Form 2A (FY 2024-2025)Form 2A - Pristine Allure Part 2 FY 20224-25.pdf · uploaded 24 Sep 2025Source
- Form 5 (FY 2024-2025)Form 5 - Pristine Allure Part 2 FY 2024-25.pdf · uploaded 26 Sep 2025Source
- Form 1Form 1 - Pristine Allure Part 2 as on Sept 2025.pdf · uploaded 19 Dec 2025Source
- Form 2Form 2 - Pristine Allure Part 2 as on Sept 2025.pdf · uploaded 19 Dec 2025Source
- Form 3Form 3 - Pristine Allure Part 2 as on Sept 2025.pdf · uploaded 19 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 - Pristine Allure Part 2 as on Sept 2025.pdf · uploaded 19 Dec 2025Source
- Form 1Form 1 - Pristine Allure Part 2 as on Dec 2025.pdf · uploaded 27 Jan 2026Source
- Form 2Form 2 - Pristine Allure Part 2 as on Dec 2025.pdf · uploaded 27 Jan 2026Source
- Form 3Form 3 - Pristine Allure Part 2 as on Dec 2025.pdf · uploaded 27 Jan 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Pristine Allure Part 2 as on Dec 2025.pdf · uploaded 27 Jan 2026Source
- Form 1260331 Architects Certificate Allure Part 2.pdf · uploaded 20 Apr 2026Source
- Form 2260331 Engineers Certificate Allure Part 2.pdf · uploaded 20 Apr 2026Source
- Form 3260331 CA Certificate Allure Part 2.pdf · uploaded 20 Apr 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - PRISTINE ALLURE PART2.pdf · uploaded 20 Apr 2026Source
- Form 1260630 - Architects Certificate Allure Part 2.pdf · uploaded 10 Jul 2026Source
- Form 2Pristine_Allure_Part2_Form2_Q1_2026-27_10-07-2026_05-10.pdf · uploaded 10 Jul 2026Source
- Form 3Pristine_Allure_Part2_Form3_Q1_2026-27_10-07-2026_05-08_doc1.pdf · uploaded 10 Jul 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - PRISTINE ALLURE PART 2 AS ON JUNE 2026.pdf · uploaded 10 Jul 2026Source
- Form 2A (FY 2025-2026)Form 2A - Pristine Allure Part 2 FY 2025-26.pdf · uploaded 23 Sep 2026Source
- Form 5 (FY 2025-2026)Form 5 - Pristine Allure Part 2 FY 2025-26.pdf · uploaded 23 Sep 2026Source
Technical
- Document9 - 29-compressed.pdf · uploaded 10 Apr 2023Source
- Documentlayout 1.pdf · uploaded 10 Apr 2023Source
- Document2-29.pdf · uploaded 10 Apr 2023Source
- Document10-29-compressed.pdf · uploaded 10 Apr 2023Source
- Document11-29.pdf · uploaded 10 Apr 2023Source
- Document12-29-compressed.pdf · uploaded 10 Apr 2023Source
- Document13-29.pdf · uploaded 10 Apr 2023Source
- Document25-29-compressed.pdf · uploaded 10 Apr 2023Source
- Document26-29.pdf · uploaded 10 Apr 2023Source
Technical (Architect)
- DocumentForm 3 Part 2_compressed.pdf · uploaded 18 Oct 2024Source
- Document240930 Form-1 Part 2.pdf · uploaded 18 Oct 2024Source
- Document241231 Form 1 Part 3.pdf · uploaded 28 Jan 2025Source
- Document241231 Form 1 Part 2.pdf · uploaded 28 Jan 2025Source
- Document250331 Architects Certificate Allure Part 2.pdf · uploaded 6 May 2025Source
- Document260930 - Architects Certificate Allure Part 2..pdf · uploaded 7 Oct 2026Source
Technical (Engineer)
- Document240930 Form-2 Part 2.pdf · uploaded 18 Oct 2024Source
- Document240930 Form-1 Part 2.pdf · uploaded 18 Oct 2024Source
- DocumentPart 2-Form 2 - 31122024.pdf · uploaded 28 Jan 2025Source
- Document250331 Engineers Certificate Allure Part 2.pdf · uploaded 6 May 2025Source
- DocumentPristine_Allure_Part2_Form2_Q2_2026-27_07-10-2026_16-15.pdf · uploaded 7 Oct 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel S.NO.20/2A/2B/1/1/PLOTA
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2.5 BHK, 2BHK, 3BHK, 1BHK234 units in all
- Address
- S.no.20/2a/2b/1/1/Plot-A, Hadapsar Bypass Road, KharadiPIN 411014
- Village
- Kharadi
- Location
- 18.53898, 73.93421
- Land area for this project
- 3,820 sq m (41,119 sq ft)
- Permissible built-up area
- 22,608 sq m (2,43,352 sq ft)
- Sanctioned built-up area
- 22,608 sq m (2,43,352 sq ft)
- Recreational open space
- 1,013 sq m (10,898 sq ft)
- Designated bank account
- 76
- Developed in phases
- Yes
- Also registered as
- Pristin ॲLyuar Part 2, प्रिस्टीन ॲल्यूअर पार्ट 2
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S.NO.20/2A/2B/1/1/PLOT-A
Boundaries
- North
- S No 20 Part
- South
- S No 20 Part
- East
- S No 20 2a 2b 1 1 Plot A
- West
- S No 20 2a 2b 1 1 Plot A
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking234 units
199 of 234 units booked (85%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | 2.5 BHK | 72.14 sq m · 777 sq ft | 13 | 13 |
| A Wing | 2.5 BHK | 72.78 sq m · 783 sq ft | 13 | 12 |
| A Wing | 2BHK | 61.97 sq m · 667 sq ft | 2 | 2 |
| A Wing | 2BHK | 62.28 sq m · 670 sq ft | 12 | 12 |
| A Wing | 2BHK | 62.5 sq m · 673 sq ft | 1 | 0 |
| A Wing | 2BHK | 64.87 sq m · 698 sq ft | 1 | 0 |
| A Wing | 3BHK | 77.47 sq m · 834 sq ft | 10 | 10 |
| A Wing | 3BHK | 77.68 sq m · 836 sq ft | 1 | 1 |
Show all 27 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | 3BHK | 79.32 sq m · 854 sq ft | 12 | 12 |
| A Wing | 3BHK | 79.53 sq m · 856 sq ft | 1 | 1 |
| A Wing | 3BHK | 80.36 sq m · 865 sq ft | 12 | 12 |
| B Wing | 1BHK | 43.15 sq m · 464 sq ft | 2 | 2 |
| B Wing | 1BHK | 49.27 sq m · 530 sq ft | 2 | 2 |
| B Wing | 2BHK | 62.46 sq m · 672 sq ft | 22 | 22 |
| B Wing | 2BHK | 62.67 sq m · 675 sq ft | 1 | 0 |
| B Wing | 2BHK | 62.67 sq m · 675 sq ft | 1 | 0 |
| B Wing | 2BHK | 62.9 sq m · 677 sq ft | 46 | 45 |
| B Wing | 2BHK | 63.11 sq m · 679 sq ft | 2 | 0 |
| B Wing | 2BHK | 63.11 sq m · 679 sq ft | 2 | 0 |
| G Wing | 1BHK | 43.15 sq m · 464 sq ft | 2 | 1 |
| G Wing | 1BHK | 49.27 sq m · 530 sq ft | 2 | 0 |
| G Wing | 2BHK | 62.46 sq m · 672 sq ft | 22 | 14 |
| G Wing | 2BHK | 62.67 sq m · 675 sq ft | 1 | 0 |
| G Wing | 2BHK | 62.67 sq m · 675 sq ft | 1 | 0 |
| G Wing | 2BHK | 62.9 sq m · 677 sq ft | 46 | 38 |
| G Wing | 2BHK | 63.11 sq m · 679 sq ft | 2 | 0 |
| G Wing | 2BHK | 63.11 sq m · 679 sq ft | 2 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals2
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Engineer | Praful Jagtap | — |
| Engineer | Sumit Pardeshi | — |
Source: MahaRERA project page. Contact details are not shown.
Pristine Allure Part2 in numbers
Registered deals, summarised
Deedo has 553 registered documents at Pristine Allure Part2, from Dec 2021 to Oct 2026: 251 sales, 22 leave and licence agreements, 277 mortgages. The median registered sale since Dec 2021 works out to about ₹10,800 per sq ft, at a median of ₹77 L a deal; 0% of sales were resales.
- What is the price per sq ft at Pristine Allure Part2?
- The median registered sale since Dec 2021 works out to about ₹10,800 per sq ft, at a median of ₹77 L a deal; 0% of sales were resales.
- How many properties have been sold at Pristine Allure Part2?
- 251 sales are registered at Pristine Allure Part2, 1 of them a resale.
- Are properties at Pristine Allure Part2 rented out?
- Yes: 22 leave and licence agreements are registered at Pristine Allure Part2, at a median rent since Dec 2021 of about ₹32,000 a month with a deposit of about ₹64,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Pristine Allure Part2 by Deedo, last updated with deals registered in Oct 2026.
Latest deal · Primary sale · Oct 2026
₹1–1.5 Cr