Residential / Group Housing · 2 buildings · 82 unitsRERA P52100001521

Marvel Aquanas

Deedo IDDP-PUN-7654

Completion was pushed back 4 years and 3 months to Mar 2024, and that date has passed too; MahaRERA lists it: nclt insolvency listing; 83% of its units are booked.

Kharadi, Pune 411014 · Property rates in Kharadi · by Marvel Realtors And Developers Ltd · 71% of its projects kept the RERA date

Delivery6 yrs 11 mo latePromised Dec 2019 · revised Mar 2024 · that date has passed tooRegulatoryNCLT insolvency listing3 MahaRERA listings and orders on recordSales83% booked68 of 82 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 years and 3 months to Mar 2024, and that date has passed too

  • This projectRegistered 28 Jul 2017, completion promised 31 Dec 2019, revised to 31 Mar 2024, and still not shown completed today.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

All 11 deeds →
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Sep 2026Not on recordRental—View Rental, Sep 2026
Aug 2026Not on recordRental—View Rental, Aug 2026
May 2026A · 2001Rental—View Rental, May 2026
Apr 2026A · 1602Rental—View Rental, Apr 2026
Mar 2026Not on recordRental—View Rental, Mar 2026
Mar 2025Main building · 2102Mortgage—View Mortgage, Mar 2025
Oct 2024Unit 1202Resale1,933 sq ftView Resale, Oct 2024
Oct 2024B · 1202Mortgage—View Mortgage, Oct 2024
Aug 2024Unit 1202Other1,933 sq ftView Other, Aug 2024
Jun 2024Unit 1202Primary sale1,933 sq ftView Primary sale, Jun 2024

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory record3

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

  • Regulatory order25 Nov 2023Matched by RERA number

    Regulatory order: PROJECT NAME: MARVEL AQUANAS (Regulatory Case No.94 of 2023) dated 22 November 2023.

  • Suo motu order2 Jan 2023Matched by RERA number

    Suo motu order: Secretary, MahaRERA Versus MARVEL REALTORS & DEVELOPERS LTD. (Suo Motu Case No.290 of 2022) dated 02 January 2023.

  • Listed as an NCLT insolvency projectMatched by RERA number

    Listed as NCLT project: MARVEL AQUANAS

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100001521
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210000152128 Jul 201731 Dec 201931 Mar 2024Marvel Realtors And Developers LtdProject page
Documents144

2 documents held by Deedo, 142 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Finance

  • PAN CardMRDL Pan.PDF · uploaded 12 Jul 2017Source

Legal

  • Legal Title reportTitle Report.pdf · uploaded 12 Jul 2017Source
  • Declaration Form BAffidevit.pdf · uploaded 20 Jul 2017Source
  • Declaration Form BAffidevit Co-Pramoters.pdf · uploaded 20 Jul 2017Source
  • OtherNew Doc 2019-08-26_compressed.pdf · uploaded 27 Aug 2019Source

Migrated

  • 1 PAN CardMRDL Pan.PDF · uploaded 12 Jul 2017Source
Show all 144 documentsShow fewer documents

Migrated

  • 1 Copy of the legal title reportTitle Report.pdf · uploaded 12 Jul 2017Source
  • 1 Details of encumbrancesMortgage Deed Index II.pdf · uploaded 12 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 12 Jul 2017Source
  • 1 Building Plan Approval (IOD)Sheet No1.pdf · uploaded 12 Jul 2017Source
  • 2 Building Plan Approval (IOD)Sheet No2.pdf · uploaded 12 Jul 2017Source
  • 3 Building Plan Approval (IOD)Sheet No3.pdf · uploaded 12 Jul 2017Source
  • 4 Building Plan Approval (IOD)Sheet No4.pdf · uploaded 12 Jul 2017Source
  • 5 Building Plan Approval (IOD)Sheet No5.pdf · uploaded 12 Jul 2017Source
  • 6 Building Plan Approval (IOD)Sheet No6.pdf · uploaded 12 Jul 2017Source
  • 7 Building Plan Approval (IOD)Sheet No7.pdf · uploaded 12 Jul 2017Source
  • 8 Building Plan Approval (IOD)Sheet No8.pdf · uploaded 12 Jul 2017Source
  • 9 Building Plan Approval (IOD)Sheet No9.pdf · uploaded 12 Jul 2017Source
  • 10 Building Plan Approval (IOD)Sheet No10.pdf · uploaded 12 Jul 2017Source
  • 11 Building Plan Approval (IOD)Sheet No11.pdf · uploaded 12 Jul 2017Source
  • 12 Building Plan Approval (IOD)Sheet No12.pdf · uploaded 12 Jul 2017Source
  • 13 Building Plan Approval (IOD)Sheet No13.pdf · uploaded 12 Jul 2017Source
  • 14 Building Plan Approval (IOD)Sheet No14.pdf · uploaded 12 Jul 2017Source
  • 15 Building Plan Approval (IOD)Sheet No15.pdf · uploaded 12 Jul 2017Source
  • 16 Building Plan Approval (IOD)Sheet No16.pdf · uploaded 12 Jul 2017Source
  • 17 Building Plan Approval (IOD)Sheet No121.pdf · uploaded 12 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 12 Jul 2017Source
  • 1 Declaration in FORM BAffidevit.pdf · uploaded 20 Jul 2017Source
  • 2 Declaration in FORM BAffidevit Co-Pramoters.pdf · uploaded 20 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects Certificate Aquanas.pdf · uploaded 23 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate.pdf · uploaded 23 Jul 2017Source
  • 1 Certificates of CA (Form 3)C A Certificate Aquanas.pdf · uploaded 23 Jul 2017Source
  • 1 Proforma of Allotment letterAllotment Letter and Unit Agreement.pdf · uploaded 24 Jul 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)AQUANAS.pdf · uploaded 31 Mar 2018Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)AQUANAS AB BUILDING.pdf · uploaded 30 Nov 2018Source
  • 1 OtherNew Doc 2019-08-26_compressed.pdf · uploaded 27 Aug 2019Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Aquanas.pdf · uploaded 8 Jan 2020Source
  • 2 Copy of Layout Approval (in case of layout)Layout 1_compressed_compressed.pdf · uploaded 10 Jan 2020Source
  • 1 Declaration about Commencement CertificateForm D_DOCC.pdf · uploaded 12 Jan 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A_March 2020.pdf · uploaded 12 Jan 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A_March 2021.pdf · uploaded 12 Jan 2022Source
  • 1 Disclosure of sold/ booked inventoryAquanas_Sold Unsold_11 January.pdf · uploaded 12 Jan 2022Source
  • 2 Disclosure of sold/ booked inventoryAquanas_Sold Unsold_11 January.pdf · uploaded 14 Jan 2022Source
  • 1 CERSAI detailsAsset Based Cersai Report.pdf · uploaded 14 Jan 2022Source
  • 2 CERSAI detailsAsset Based Cersai Report.pdf · uploaded 25 Jan 2022Source
  • 3 Disclosure of sold/ booked inventoryAquanas_Sold Unsold_11 January.pdf · uploaded 25 Jan 2022Source
  • 2 Details of encumbrancesEncumbrance certificate.pdf · uploaded 2 Feb 2022Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)Society Registration Certificate - Marvel Aquanas Project.pdf · uploaded 15 Feb 2022Source
  • 2 Declaration about Commencement CertificateForm D Declaration About Commencement.PDF · uploaded 20 Dec 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A- Engineer's Certificate for Quality Assurance.PDF · uploaded 20 Dec 2022Source
  • 4 Disclosure of sold/ booked inventorySold Unsold.PDF · uploaded 20 Dec 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Form 5 Rera Certificates _for FY 17-18 (2).pdf · uploaded 20 Dec 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 Rera Certificates _for FY 18-19 (2).pdf · uploaded 20 Dec 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 Rera Certificates _for FY 19-20 (2).pdf · uploaded 20 Dec 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 Rera Certificates _for FY 20-21.pdf · uploaded 20 Dec 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Rera Certificates _for FY 21-22.pdf · uploaded 20 Dec 2022Source
  • 3 Declaration about Commencement CertificateFormat D_Declaration about Commencement.PDF · uploaded 6 Oct 2023Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_26092023191051.PDF · uploaded 6 Oct 2023Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer certificate.PDF · uploaded 6 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2 -A_26092023191122.PDF · uploaded 6 Oct 2023Source
  • 5 Disclosure of sold/ booked inventoryDiscolsure of sold unsold inventory.PDF · uploaded 6 Oct 2023Source
  • 3 CERSAI detailsCERSAI_Search_Report_200282743113_For_Asset_Based_Search_06_10_2023_15_36_50_843.pdf · uploaded 6 Oct 2023Source
  • 2 Certificates of CA (Form 3)Form-3 _30-06-2023.PDF · uploaded 6 Oct 2023Source
  • 3 Certificates of CA (Form 3)Form 3_30-09-2023.PDF · uploaded 6 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 _Rera Certificate_For FY 22-23.pdf · uploaded 6 Oct 2023Source
  • 4 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-1_2017-18.PDF · uploaded 3 Aug 2024Source
  • 5 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-2_2017-18.PDF · uploaded 3 Aug 2024Source
  • 6 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-3_2017-18.PDF · uploaded 3 Aug 2024Source
  • 7 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-4_2017-18.PDF · uploaded 3 Aug 2024Source
  • 8 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-1_2018-19.PDF · uploaded 3 Aug 2024Source
  • 9 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-2_2018-19.PDF · uploaded 3 Aug 2024Source
  • 10 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-3_2018-19.PDF · uploaded 3 Aug 2024Source
  • 11 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-4_2018-19.PDF · uploaded 3 Aug 2024Source
  • 12 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-1_2019-20.PDF · uploaded 3 Aug 2024Source
  • 13 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-2_2019-20.PDF · uploaded 3 Aug 2024Source
  • 14 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-3_2019-20.PDF · uploaded 3 Aug 2024Source
  • 15 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-4_2019-20.PDF · uploaded 3 Aug 2024Source
  • 16 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-1_2020-21.PDF · uploaded 3 Aug 2024Source
  • 17 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-2_2020-21.PDF · uploaded 3 Aug 2024Source
  • 18 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-3_2020-21.PDF · uploaded 3 Aug 2024Source
  • 19 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-4_2020-21.PDF · uploaded 3 Aug 2024Source
  • 20 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-1_2021-22.PDF · uploaded 3 Aug 2024Source
  • 21 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-2_2021-22.PDF · uploaded 3 Aug 2024Source
  • 22 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-3_2021-22.PDF · uploaded 3 Aug 2024Source
  • 23 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-4_2021-22.PDF · uploaded 3 Aug 2024Source
  • 24 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-1_2022-23.PDF · uploaded 3 Aug 2024Source
  • 25 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-2_2022-23.PDF · uploaded 3 Aug 2024Source
  • 26 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-3_2022-23.PDF · uploaded 3 Aug 2024Source
  • 27 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-4_2022-23.PDF · uploaded 3 Aug 2024Source
  • 28 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-3_2023-24.PDF · uploaded 3 Aug 2024Source
  • 29 Certificates of CA (Form 3)Aquanas_Form 3_Qtr-4_2023-24.PDF · uploaded 3 Aug 2024Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)01 Form 1 31-03-2020.pdf · uploaded 13 Aug 2024Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)02 Form-1-31-03-21.pdf · uploaded 13 Aug 2024Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)03 Form 1-31-12-21.pdf · uploaded 13 Aug 2024Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)04 Form 1 31-03-22.pdf · uploaded 13 Aug 2024Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)05 Form-1-30-06-22.pdf · uploaded 13 Aug 2024Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)06 Form-1-30-09-22.pdf · uploaded 13 Aug 2024Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)07 Form 1-31-12-22.pdf · uploaded 13 Aug 2024Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)08 Form 1-31-03-23.pdf · uploaded 13 Aug 2024Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)09 Form 1-31-06-23.pdf · uploaded 13 Aug 2024Source
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)10 Form-1-31-12-23.pdf · uploaded 13 Aug 2024Source
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)11 Form 1 31-03-24.pdf · uploaded 13 Aug 2024Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)01 Form 2-31-03-2018.pdf · uploaded 13 Aug 2024Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)02 Form 2-31-03-2019.pdf · uploaded 13 Aug 2024Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)03 Form 2-31-03-20.pdf · uploaded 13 Aug 2024Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)04 Form 2-31-03-21.pdf · uploaded 13 Aug 2024Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)05 Form-2 31-12-21.pdf · uploaded 13 Aug 2024Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)06 Form 2-31-03-22.pdf · uploaded 13 Aug 2024Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)07 Form 2-30-06-22.pdf · uploaded 13 Aug 2024Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)08 Form 2 30-09-22.pdf · uploaded 13 Aug 2024Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)09 Form 2-31-12-22.pdf · uploaded 13 Aug 2024Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)10 Form-2-31-03-23.pdf · uploaded 13 Aug 2024Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)11 Form 2- 30-06-23.pdf · uploaded 13 Aug 2024Source
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)12 Form 2-31-12-23.pdf · uploaded 13 Aug 2024Source
  • 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)13 Form 1-31-03-24.pdf · uploaded 13 Aug 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A- (2023-2024).pdf · uploaded 13 Aug 2024Source
  • 6 Disclosure of sold/ booked inventory01 SoldUnsold-31-3-23.pdf · uploaded 13 Aug 2024Source
  • 7 Disclosure of sold/ booked inventory02 SoldUnsold-30-06-23.pdf · uploaded 13 Aug 2024Source
  • 8 Disclosure of sold/ booked inventory03 SoldUnsold 30-09-23.pdf · uploaded 13 Aug 2024Source
  • 9 Disclosure of sold/ booked inventory04 SoldUnsold-30-12-23.pdf · uploaded 13 Aug 2024Source
  • 10 Disclosure of sold/ booked inventory05 SoldUnsold-31-3-24.pdf · uploaded 13 Aug 2024Source

Technical

  • DocumentSheet No1.pdf · uploaded 12 Jul 2017Source
  • DocumentSheet No2.pdf · uploaded 12 Jul 2017Source
  • DocumentSheet No3.pdf · uploaded 12 Jul 2017Source
  • DocumentSheet No4.pdf · uploaded 12 Jul 2017Source
  • DocumentSheet No5.pdf · uploaded 12 Jul 2017Source
  • DocumentSheet No6.pdf · uploaded 12 Jul 2017Source
  • DocumentSheet No7.pdf · uploaded 12 Jul 2017Source
  • DocumentSheet No8.pdf · uploaded 12 Jul 2017Source
  • DocumentSheet No9.pdf · uploaded 12 Jul 2017Source
  • DocumentSheet No10.pdf · uploaded 12 Jul 2017Source
  • DocumentSheet No11.pdf · uploaded 12 Jul 2017Source
  • DocumentSheet No12.pdf · uploaded 12 Jul 2017Source
  • DocumentSheet No13.pdf · uploaded 12 Jul 2017Source
  • DocumentSheet No14.pdf · uploaded 12 Jul 2017Source
  • DocumentSheet No15.pdf · uploaded 12 Jul 2017Source
  • DocumentSheet No16.pdf · uploaded 12 Jul 2017Source
  • DocumentSheet No121.pdf · uploaded 12 Jul 2017Source
  • DocumentLayout Plan.pdf · uploaded 12 Jul 2017Source
  • DocumentLayout 1_compressed_compressed.pdf · uploaded 10 Jan 2020Source

Technical (Architect)

  • Document11 Form 1 31-03-24.pdf · uploaded 13 Aug 2024Source

Technical (Engineer)

  • Document13 Form 1-31-03-24.pdf · uploaded 13 Aug 2024Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 5, 5

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
3.5 BHK, 4.5 BHK82 units in all
Address
S NO 69/4 AND 5, S.No. 69 / 4 (P) + S.No. 69 / 5 (P), KHARADIPIN 411014
Village
Kharadi
Land area for this project
18,038 sq m (1,94,159 sq ft)
Permissible built-up area
17,666 sq m (1,90,153 sq ft)
Sanctioned built-up area
14,366 sq m (1,54,632 sq ft)
Recreational open space
1,168 sq m (12,569 sq ft)
Designated bank account
220
Developed in phases
Yes

Survey, CTS, gat or plot numbers

55S NO 69/4S NO 69/4

Land as published on MahaRERA's project page

S NO 69/4 AND 5

Boundaries

North
Amenity Area
South
30 Mtr Dp Road
East
Plot Boundary
West
Plot Boundary

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking82 units

68 of 82 units booked (83%), as the promoter reported to MahaRERA

3.5 BHK · 36 units4.5 BHK · 46 units
BuildingTypeCarpet areaUnitsBooked
A3.5 BHK145.41 sq m · 1,565 sq ft10
A3.5 BHK145.57 sq m · 1,567 sq ft10
A3.5 BHK152.02 sq m · 1,636 sq ft11
A3.5 BHK152.77 sq m · 1,644 sq ft77
A3.5 BHK153.15 sq m · 1,648 sq ft66
A3.5 BHK166.5 sq m · 1,792 sq ft10
A3.5 BHK176.45 sq m · 1,899 sq ft11
A4.5 BHK256.61 sq m · 2,762 sq ft11
Show all 39 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
A4.5 BHK256.78 sq m · 2,764 sq ft22
A4.5 BHK257.13 sq m · 2,768 sq ft33
A4.5 BHK257.34 sq m · 2,770 sq ft55
A4.5 BHK259.11 sq m · 2,789 sq ft11
A4.5 BHK262.57 sq m · 2,826 sq ft10
A4.5 BHK268.47 sq m · 2,890 sq ft11
A4.5 BHK273.02 sq m · 2,939 sq ft32
A4.5 BHK273.03 sq m · 2,939 sq ft32
A4.5 BHK274 sq m · 2,949 sq ft10
A4.5 BHK274.31 sq m · 2,953 sq ft10
A4.5 BHK290.1 sq m · 3,123 sq ft10
B3.5 BHK140.64 sq m · 1,514 sq ft10
B3.5 BHK143.17 sq m · 1,541 sq ft66
B3.5 BHK143.55 sq m · 1,545 sq ft77
B3.5 BHK145.3 sq m · 1,564 sq ft11
B3.5 BHK151.67 sq m · 1,633 sq ft10
B3.5 BHK151.98 sq m · 1,636 sq ft11
B3.5 BHK171.88 sq m · 1,850 sq ft11
B4.5 BHK193.12 sq m · 2,079 sq ft10
B4.5 BHK196.54 sq m · 2,116 sq ft22
B4.5 BHK198.49 sq m · 2,137 sq ft11
B4.5 BHK199.34 sq m · 2,146 sq ft11
B4.5 BHK199.54 sq m · 2,148 sq ft44
B4.5 BHK199.81 sq m · 2,151 sq ft11
B4.5 BHK199.88 sq m · 2,151 sq ft77
B4.5 BHK205.18 sq m · 2,209 sq ft11
B4.5 BHK210.08 sq m · 2,261 sq ft11
B4.5 BHK210.99 sq m · 2,271 sq ft10
B4.5 BHK215.98 sq m · 2,325 sq ft11
B4.5 BHK223.47 sq m · 2,405 sq ft10
B4.5 BHK292.91 sq m · 3,153 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals80

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRahul Malwadkar—
EngineerAvinash Mate—
Registered real estate agent360 Realtors LLP—
Registered real estate agentAarti Ajay Chaube—
Registered real estate agentAbhijit Sahebrao Sabbarwar—
Registered real estate agentAddressofchoice Realty Pvt Ltd—
Registered real estate agentA K Properties—
Registered real estate agentAmeeth Kothari—
Show all 80 professionalsShow fewer professionals
RoleNameRegistration no.
Registered real estate agentAmrut Shantaram Ghorpade—
Registered real estate agentAnupam Vinodkumar Gadodia—
Registered real estate agentArthur Morris—
Registered real estate agentAshish Tandon—
Registered real estate agentAshwin Bhishma Vohra—
Registered real estate agentAtul Ramchandra Mazire—
Registered real estate agentBillion Yards Infratech—
Registered real estate agentCBRE South Asia Private Limited—
Registered real estate agentchanderjeet chaturbhuj bhatia—
Registered real estate agentChirag Saunak Kapadia—
Registered real estate agentDipen Loomba—
Registered real estate agentElara Marketing Services Private Limited—
Registered real estate agentGladwin Baptist—
Registered real estate agentGlobal Realtors—
Registered real estate agentHDFC Realty Limited—
Registered real estate agentHiren Natvarlal Trivedi—
Registered real estate agentHitendra Panditrao Choudhary—
Registered real estate agentICICI Home Finance Company Limited—
Registered real estate agentJanet Dorairaj—
Registered real estate agentJN Realtors and Property Managers—
Registered real estate agentJones Lang Lasalle Property Consultants (India) Private Limited—
Registered real estate agentKey2home Property Advisors—
Registered real estate agentKhozem Taher Bayadwala—
Registered real estate agentKhushnum Nitin Chauhan—
Registered real estate agentKiran Girish Padiyar—
Registered real estate agentLaxmikant Tanaji Dhanwade—
Registered real estate agentLoveena Leonardo—
Registered real estate agentMahek Kapadia—
Registered real estate agentMahesh Nanikram Lalchandani—
Registered real estate agentMakaan Hunt Pvt Ltd—
Registered real estate agentManjusha Mahesh Bellur—
Registered real estate agentMoses Doming Mascarenhas—
Registered real estate agentMy Home Real Estate—
Registered real estate agentNikhil Jain—
Registered real estate agentNitin Shankar Kadde—
Registered real estate agentPadmakshi Mondial Wealth Management Private Limited—
Registered real estate agentPankaj Kumar Chaurasia—
Registered real estate agentParesh Lachman Hardwani—
Registered real estate agentParvez Fida Shaikh—
Registered real estate agentPearlquest Associates Pvt Ltd—
Registered real estate agentPearl Realtors—
Registered real estate agentPramod Pandurang Potpelwar—
Registered real estate agentPrasad Hanmant Kulkarni—
Registered real estate agentPremlata Estate Solutions Pvt. Ltd.—
Registered real estate agentPropbuying Realtors Pvt Ltd—
Registered real estate agentPropengine Realtech LLP—
Registered real estate agentProperty Chef Consulting Services—
Registered real estate agentProperty Pointer Private Limited—
Registered real estate agentPropfinder India Private Limited—
Registered real estate agentPropozone Technologies Private Limited—
Registered real estate agentRahul Anand Gaikwad—
Registered real estate agentRajendra Kumar Rathore—
Registered real estate agentRajnish Kumar Jain—
Registered real estate agentRavi Chaitanya Varma—
Registered real estate agentR-Constellation Pvt. Ltd.—
Registered real estate agentRicha Bijlani—
Registered real estate agentSamson Daniel Massy—
Registered real estate agentShalini Ravi Varma—
Registered real estate agentSharmila Swaminathan Iyer—
Registered real estate agentShrradhaa Daven Kakkad—
Registered real estate agentSomnath Dnyaneshwar Hingane—
Registered real estate agentS Satyanarayan Patro—
Registered real estate agentSubhash Chandrakant Sonkamble—
Registered real estate agentUrvi Anchan—
Registered real estate agentVijay Anand—
Registered real estate agentVijay Purshottam Manakikar—
Registered real estate agentVikas Das—
Registered real estate agentVivek G Pungaliya—
Registered real estate agentWg Cdr Verindar Kumar Jandial—
Registered real estate agentYashodhar Purushottam Karmarkar—
Registered real estate agentYatish Lalwani—
Registered real estate agentZodiac Realtors and Developers—

Source: MahaRERA project page. Contact details are not shown.

Marvel Aquanas in numbers

Registered deals, summarised

Deedo has 11 registered documents at Marvel Aquanas, from Apr 2015 to Sep 2026: 2 sales, 5 leave and licence agreements, 3 mortgages.

How many properties have been sold at Marvel Aquanas?
2 sales are registered at Marvel Aquanas, 1 of them a resale.
Are properties at Marvel Aquanas rented out?
Yes: 5 leave and licence agreements are registered at Marvel Aquanas, at a median rent since Apr 2015 of about ₹67,000 a month with a deposit of about ₹2,09,000.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Marvel Aquanas by Deedo, last updated with deals registered in Sep 2026.

Latest deal · Rental · Sep 2026

Under ₹25 L total

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and orders · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology