Gateway
Deedo IDDP-PUN-JV28Its promised completion date, Jun 2026, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 4% of its units are booked.
Kharadi, Pune 411014 · Property rates in Kharadi · by Raichandani Constructions Private Limited · 0% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
Its promised completion date, Jun 2026, has passed and MahaRERA does not show it completed
- This projectRegistered 3 Jan 2023, completion promised 30 Jun 2026, and still not shown completed today.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Sep 2026 | Gateway · 1 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | Gateway · 10 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | Gateway · 3 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | Gateway · 2 | Rental | — | View Rental, Sep 2026 | |
| Mar 2026 | Gateway · 204 | Primary sale | 693 sq ft | View Primary sale, Mar 2026 | |
| Mar 2026 | Gateway · 2 | Rental | — | View Rental, Mar 2026 | |
| Mar 2026 | Gateway · 1 | Rental | — | View Rental, Mar 2026 | |
| Feb 2026 | Gateway · 4 | Rental | — | View Rental, Feb 2026 | |
| Feb 2026 | Gateway · 3 | Rental | — | View Rental, Feb 2026 | |
| Feb 2026 | Gateway · 2 | Rental | — | View Rental, Feb 2026 |
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100048395
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100048395 | 3 Jan 2023 | 30 Jun 2026 | 30 Jun 2026 | Raichandani Constructions Private Limited | Project page |
Documents124
1 document held by Deedo, 123 filings listed on MahaRERA's project page
Finance
- PAN CardRCPL - PAN.pdf · uploaded 17 Nov 2022Source
Legal
Show all 124 documentsShow fewer documents
Migrated
- 1 b Details of encumbrances concerned to LegalDeclaration Regarding Encumbrance.pdf · uploaded 17 Nov 2022Source
- 2 b Details of encumbrances concerned to LegalDeclaration Regarding Encumbrance_Legal.pdf · uploaded 17 Nov 2022Source
- 1 Copy of Layout Approval (in case of layout)Kharadi 43-Dawa-SANCTION PLAN-1-4-10-2022_compressed_compressed-compressed.pdf · uploaded 17 Nov 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentKharadi 43-Dawa-SANCTION PLAN-2-4-10-2022-compressed-compressed.pdf · uploaded 17 Nov 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCC-1692-22 Compressed.pdf · uploaded 17 Nov 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200252035274_For_Asset_Based_Search_14_11_2022_15_20_06_876.pdf · uploaded 17 Nov 2022Source
- 1 Proforma of Allotment letterModel Allotment Letter.pdf · uploaded 17 Nov 2022Source
- 1 Copy of the legal title reportRERA Title Report.pdf · uploaded 18 Nov 2022Source
- 2 Copy of the legal title reportSupplimentary Search And Title report.pdf · uploaded 18 Nov 2022Source
- 1 Declaration about Commencement CertificateCommencement Declaration Gateway.pdf · uploaded 22 Nov 2022Source
- 1 Declaration in FORM BAffidavit Declaration Gateway.pdf · uploaded 22 Nov 2022Source
- 1 Deviation Report with respect to Allotment letterDeviation Allotment .pdf · uploaded 22 Nov 2022Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report RERA DAWA_Compressed.pdf · uploaded 22 Nov 2022Source
- 1 Proforma of Agreement for saleMaster Agreement Draft.pdf · uploaded 1 Dec 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 10 Dec 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameRAICHANDANI.pdf · uploaded 20 Dec 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT CERTIFICATE Q4 2022-2023.pdf · uploaded 12 Aug 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT CERTIFICATE Q4 2022-2023.pdf · uploaded 12 Aug 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT CERTIFICATE Q1 2023-2024.pdf · uploaded 12 Aug 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Q4 2023-2024 (new ).pdf · uploaded 12 Aug 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENIGNEER CERTIFICATE Q4 2022-2023.pdf · uploaded 12 Aug 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT CERTIFICATE Q1 2023-2024.pdf · uploaded 8 Sep 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Q1 2023-2024.pdf · uploaded 8 Sep 2023Source
- 1 Disclosure of sold/ booked inventoryGATEWAY Q4 SOLD- UNSOLD INVENTRY.PDF · uploaded 8 Sep 2023Source
- 2 Disclosure of sold/ booked inventoryGATEWAY Q1 SOLD - UNSOLD INVENTRY.PDF · uploaded 8 Sep 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)GATEWAY CA CERTIFIACTE Q4 2022-2023_compressed.pdf · uploaded 8 Sep 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q1 CA CERTIFICATE FY 2023-2024_compressed (1).pdf · uploaded 8 Sep 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Gateway Q2.pdf · uploaded 19 Oct 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Gateway Q2.pdf · uploaded 19 Oct 2023Source
- 3 Disclosure of sold/ booked inventoryPromoters Disclosure.pdf · uploaded 19 Oct 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Signed_compressed.pdf · uploaded 20 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)GATEWAY FORM 5 2022-2023.pdf · uploaded 20 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A FY 2022-23.pdf · uploaded 21 Oct 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 q3 - gateway.pdf · uploaded 8 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 q3 - gateway.pdf · uploaded 8 Jan 2024Source
- 4 Disclosure of sold/ booked inventorysold booked q3 - gateway.pdf · uploaded 8 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)gateway.pdf · uploaded 22 Jan 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)GATEWAY FORM 1 Q4 2023-2024.pdf · uploaded 20 Apr 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)GATEWAY Q4 FORM 2 2023-2024.pdf · uploaded 20 Apr 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)GATEWAY FORM 5 Q4 2023-2024_compressed.pdf · uploaded 24 Apr 2024Source
- 3 a Details of encumbrances concerned to FinanceGateway Encumbrances.pdf · uploaded 20 May 2024Source
- 4 a Details of encumbrances concerned to FinanceGateway Encumbrances.pdf · uploaded 20 May 2024Source
- 5 a Details of encumbrances concerned to FinanceGateway Encumbrances.pdf · uploaded 20 May 2024Source
- 3 b Details of encumbrances concerned to LegalGateway Encumbrances.pdf · uploaded 20 May 2024Source
- 4 b Details of encumbrances concerned to LegalGateway Encumbrances.pdf · uploaded 20 May 2024Source
- 5 b Details of encumbrances concerned to LegalGateway Encumbrances.pdf · uploaded 20 May 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)RCPL GATEWAY Q4 MARCH 2023-2024.pdf · uploaded 11 Jun 2024Source
- 5 Disclosure of sold/ booked inventorygateway sold unsold.pdf · uploaded 13 Jun 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)RCPL - ARCHITECT CERTIFICATE GATEWAY Q1 2024-2025.pdf · uploaded 19 Jul 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Gateway Form 2 Q1 2024-25_compressed.pdf · uploaded 20 Jul 2024Source
- 6 Disclosure of sold/ booked inventoryGateway Sold Unsold Q1 2024-25.pdf · uploaded 20 Jul 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Gateway form 3 Q1 2024-2025.pdf · uploaded 22 Jul 2024Source
- 2 Disclosure of sold/ booked inventoryGateway Sold Unsold.pdf · uploaded 28 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Gateway Form 1.pdf · uploaded 30 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Gateway Form 2.pdf · uploaded 30 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Gateway_Form 3_Sep24s.pdf · uploaded 7 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Scan2024-12-09_182338 Gateway.pdf · uploaded 9 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Gateway Q3 Form 1.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)GATEWAY FORM 2 Q3 2024-2025.pdf · uploaded 22 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryGateway Q3 Sold Unsold.pdf · uploaded 22 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)GATEWAY FORM 3 Q3 2024-2025 S.pdf · uploaded 30 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)GATEWAY FORM 1 Q4 2024-2025.pdf · uploaded 20 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Gateway form 3 Q4 2024-2025.pdf · uploaded 20 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Gateway Form 2 Q4 2024-2025.pdf · uploaded 20 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryGATEWAY SOLD UNSOLD Q4 2024-2025.pdf · uploaded 20 Apr 2025Source
- Form 1GATEWAY FORM1 01-07-23.pdf · uploaded 30 Jul 2025Source
- Form 2GATEWAY FORM2 20-07-23.pdf · uploaded 30 Jul 2025Source
- Form 3GATEWAY FORM3 03-08-23_compressed.pdf · uploaded 30 Jul 2025Source
- Disclosure of Sold and Booked InventoryGATEWAY SOLD-UNSOLD INVENTORY 31-03-23.pdf · uploaded 30 Jul 2025Source
- Form 1GATEWAY FORM1 13-07-23.pdf · uploaded 30 Jul 2025Source
- Form 2GATEWAY FORM2 30-07-23.pdf · uploaded 30 Jul 2025Source
- Form 3GATEWAY FORM3 31-08-23.pdf · uploaded 30 Jul 2025Source
- Disclosure of Sold and Booked InventoryGATEWAY SOLD-UNSOLD INVENTORY 30-06-23.pdf · uploaded 30 Jul 2025Source
- Form 1GATEWAY FORM1 03-10-23.pdf · uploaded 30 Jul 2025Source
- Form 2GATEWAY FORM2 05-10-23.pdf · uploaded 30 Jul 2025Source
- Form 3GATEWAY FORM3 20-10-23.pdf · uploaded 30 Jul 2025Source
- Disclosure of Sold and Booked InventoryGATEWAY SOLD-UNSOLD INVENTORY 30-09-23.pdf · uploaded 30 Jul 2025Source
- Form 1GATEWAY FORM1 04-01-24.pdf · uploaded 30 Jul 2025Source
- Form 2GATEWAY FORM2 05-01-24.pdf · uploaded 30 Jul 2025Source
- Form 3GATEWAY FORM3 22-01-24.pdf · uploaded 30 Jul 2025Source
- Disclosure of Sold and Booked InventoryGATEWAY SOLD-UNSOLD INVENTORY 31-12-23.pdf · uploaded 30 Jul 2025Source
- Form 1GATEWAY FORM 1 Q4 2023-2024.pdf · uploaded 31 Jul 2025Source
- Form 2GATEWAY Q4 FORM 2 2023-2024.pdf · uploaded 31 Jul 2025Source
- Form 3GATEWAY FORM 3 Q4 2023-2024_compressed.pdf · uploaded 31 Jul 2025Source
- Disclosure of Sold and Booked InventoryGATEWAY SOLD UNSOLD INVENTORY 31-03-24.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 1gateway form 1 Q1 2025-2026.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 2GATEWAY FORM 2 Q1 2025-2026_signed (2) (1).pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 3Form-3 Gateway Jun-25 (1).pdf · uploaded 31 Jul 2025Source
- Form 5 (FY 2024-2025)Gateway FY-2024-25.pdf · uploaded 30 Sep 2025Source
- Form 2A (FY 2024-2025)FORM 2A GATEWAY.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 1GATEWAY FORM 1.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 2GATEWAY FORM 2_signed.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 3Gateway (1) (1) (1).pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 1GATEWAY FORM 1 Q3.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2GATEWAY FORM 2 Q3.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3GATEWAY FORM 3 Q3.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1Gateway Form 1 Q4 2025-2026.pdf · uploaded 27 Apr 2026Source
- Withdrawal Update Form 2Gateway form 2 Q4 2025-2026.pdf · uploaded 27 Apr 2026Source
- Withdrawal Update Form 3Gateway Form 3 Q4 2025-2026.pdf · uploaded 27 Apr 2026Source
- Withdrawal Update Form 1Gateway Form 1 Q1 2026-27.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 1Gateway Form 1 Q1 2026-27.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2Gateway Form2 Q1 FY 2026-27 (1)_signed.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2Gateway Form2 Q1 FY 2026-27 (1)_signed.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3Gateway Form 3 Q1 2026-27.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3Gateway Form 3 Q1 2026-27.pdf · uploaded 20 Jul 2026Source
- Form 5 (FY 2025-2026)RCPL Gateway Form 5.pdf · uploaded 27 Sep 2026Source
Technical
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 43/1P/5, 43/1P/6 KHARADI
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Unit types
- Office space, Shop52 units in all
- Address
- Sr No 43/1e/10, 43/1p/5, 43/1p/6 Kharadi, Kharadi, KharadiPIN 411014
- Village
- Pune (M Corp.), Pune City taluka
- Location
- 18.56199, 73.93941
- Land area for this project
- 1,023 sq m (11,011 sq ft)
- Permissible built-up area
- 4,914 sq m (52,893 sq ft)
- Sanctioned built-up area
- 1,776 sq m (19,117 sq ft)
- Designated bank account
- 76
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SR NO 43/1E/10, 43/1P/5, 43/1P/6 KHARADI
Boundaries
- North
- Pune Nagar Road
- South
- 6mtr Road
- East
- Sr No 43p
- West
- Sr No 43p
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking52 units
2 of 52 units booked (4%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 20.83 sq m · 224 sq ft | 5 | 0 |
| Office space | 24.73 sq m · 266 sq ft | 4 | 0 |
| Office space | 36.38 sq m · 392 sq ft | 4 | 0 |
| Office space | 40.23 sq m · 433 sq ft | 5 | 0 |
| Office space | 42.41 sq m · 456 sq ft | 8 | 0 |
| Office space | 50.6 sq m · 545 sq ft | 7 | 0 |
| Office space | 51.2 sq m · 551 sq ft | 1 | 0 |
| Office space | 77.17 sq m · 831 sq ft | 7 | 0 |
Show all 12 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 85.3 sq m · 918 sq ft | 8 | 0 |
| Office space | 106.97 sq m · 1,151 sq ft | 1 | 0 |
| Shop | 135.1 sq m · 1,454 sq ft | 1 | 1 |
| Shop | 138.21 sq m · 1,488 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals8
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Jay Aeram & Associates | — |
| Chartered accountant | Milani Gattani & Co | — |
| Chartered accountant | Pushpa Bogati | — |
| Chartered accountant | Pushpak Bogati | — |
| Engineer | Dna Consultants | — |
| Engineer | Ganesh Raut | — |
| Engineer | Laxman Ghatage | — |
| Engineer | Siddharth Sawant | — |
Source: MahaRERA project page. Contact details are not shown.
Gateway in numbers
Registered deals, summarised
Deedo has 17 registered documents at Gateway, from Dec 2025 to Sep 2026: 3 sales, 14 leave and licence agreements. The median registered sale since Dec 2025 works out to about ₹8,600 per sq ft, at a median of ₹1.6 Cr a deal; 0% of sales were resales.
- What is the price per sq ft at Gateway?
- The median registered sale since Dec 2025 works out to about ₹8,600 per sq ft, at a median of ₹1.6 Cr a deal; 0% of sales were resales.
- How many properties have been sold at Gateway?
- 3 sales are registered at Gateway.
- Are properties at Gateway rented out?
- Yes: 14 leave and licence agreements are registered at Gateway, at a median rent since Dec 2025 of about ₹9,000 a month with a deposit of about ₹15,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Gateway by Deedo, last updated with deals registered in Sep 2026.
Latest deal · Rental · Sep 2026
Under ₹10k / month