Prajakta
Deedo IDDP-PUN-BE1TMahaRERA shows it completed; no MahaRERA orders on record; 81% of its units are booked.
Karve Nagar, Pune 411052 · by Vishva Gangotree Buildcon
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 15 Jun 2022, completion promised 30 Jun 2026.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100046043
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100046043 | 15 Jun 2022 | 30 Jun 2026 | 30 Jun 2026 | Vishva Gangotree Buildcon | Project page |
Documents162
2 documents held by Deedo, 160 filings listed on MahaRERA's project page
Finance
Legal
Show all 162 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)plan 1.pdf · uploaded 23 May 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentplan 1.pdf · uploaded 23 May 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentplan 2.pdf · uploaded 23 May 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentcommencement.pdf · uploaded 23 May 2022Source
- 1 Declaration about Commencement Certificatedeclaration commencement.pdf · uploaded 23 May 2022Source
- 1 Declaration in FORM Bform b.pdf · uploaded 23 May 2022Source
- 1 CERSAI detailsCERSAI_Search_Report.pdf · uploaded 23 May 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA cert comp.pdf · uploaded 23 May 2022Source
- 1 Proforma of Allotment letterAgreement to sale.pdf · uploaded 23 May 2022Source
- 2 Proforma of Allotment letterALLOTMENT L.pdf · uploaded 23 May 2022Source
- 1 Copy of the legal title reportRERA-Title Search-Prajakta Apartment-Scan copy.pdf · uploaded 28 May 2022Source
- 2 Copy of Layout Approval (in case of layout)DWG1 (1)_compressed.pdf · uploaded 15 Dec 2022Source
- 3 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 15 Dec 2022Source
- 4 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 15 Dec 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentCC1_compressed.pdf · uploaded 15 Dec 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Prajakta.pdf · uploaded 28 Mar 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Prajakta-Architect Certificate-16-11-22.pdf · uploaded 28 Mar 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Prajakta.pdf · uploaded 28 Mar 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Prajakta-17-10-22.pdf · uploaded 28 Mar 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Prajakta-10-1-23.pdf · uploaded 28 Mar 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Prajakta-Architect Certificate-4-5-23.pdf · uploaded 3 Jun 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Prajakta-19-4-23.pdf · uploaded 3 Jun 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Prajakta-Architect Certificate-19-07-23.pdf · uploaded 26 Sep 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Prajakta-19-07-23.pdf · uploaded 26 Sep 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Prajakta form 3 march 2023.pdf · uploaded 26 Sep 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Jun-23 CA Form 3 Prajakata 21-07-23_compressed.pdf · uploaded 26 Sep 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Prajakta - Architect Certificate-18-10-2023.pdf · uploaded 20 Oct 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Prajakta-16-10-23.pdf · uploaded 20 Oct 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Certificate-Prajakta.pdf · uploaded 16 Jan 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng Cer - Prajakta.pdf · uploaded 16 Jan 2024Source
- 1 Disclosure of sold/ booked inventoryPR.pdf · uploaded 20 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Prajakta_CA Cert.pdf · uploaded 20 Jan 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Prajakta.pdf · uploaded 27 Feb 2024Source
- 3 Copy of Layout Approval (in case of layout)1-1 LAYOUT-compressed.pdf · uploaded 29 Mar 2024Source
- 5 Building Plan Approval / NA Order for plotted development1-7.pdf · uploaded 29 Mar 2024Source
- 6 Building Plan Approval / NA Order for plotted development2-7.pdf · uploaded 29 Mar 2024Source
- 7 Building Plan Approval / NA Order for plotted development3-7.pdf · uploaded 29 Mar 2024Source
- 8 Building Plan Approval / NA Order for plotted development4-7-compressed.pdf · uploaded 29 Mar 2024Source
- 9 Building Plan Approval / NA Order for plotted development5-7.pdf · uploaded 29 Mar 2024Source
- 10 Building Plan Approval / NA Order for plotted development6-7-compressed.pdf · uploaded 29 Mar 2024Source
- 11 Building Plan Approval / NA Order for plotted development7-7.pdf · uploaded 29 Mar 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentC C LAYOUT 3342.pdf · uploaded 29 Mar 2024Source
- 4 Commencement Certificates / NA Order for plotted developmentC C 3342.pdf · uploaded 29 Mar 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch.pdf · uploaded 26 Apr 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng.pdf · uploaded 26 Apr 2024Source
- 2 Disclosure of sold/ booked inventoryPrajakta.pdf · uploaded 26 Apr 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Prajakta.pdf · uploaded 26 Apr 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Prajakta.pdf · uploaded 26 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Prajakta.pdf · uploaded 4 May 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cert - Prajakta.pdf · uploaded 17 Jul 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng Cert_Prajakta.pdf · uploaded 17 Jul 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Prajakta.pdf · uploaded 20 Jul 2024Source
- 3 Disclosure of sold/ booked inventoryPJ.pdf · uploaded 27 Jul 2024Source
- 12 Building Plan Approval / NA Order for plotted development1-9.pdf · uploaded 13 Aug 2024Source
- 13 Building Plan Approval / NA Order for plotted development2-9.pdf · uploaded 13 Aug 2024Source
- 14 Building Plan Approval / NA Order for plotted development3-9.pdf · uploaded 13 Aug 2024Source
- 15 Building Plan Approval / NA Order for plotted development4-9.pdf · uploaded 13 Aug 2024Source
- 16 Building Plan Approval / NA Order for plotted development5-9.pdf · uploaded 13 Aug 2024Source
- 17 Building Plan Approval / NA Order for plotted development6-9.pdf · uploaded 13 Aug 2024Source
- 18 Building Plan Approval / NA Order for plotted development7-9.pdf · uploaded 13 Aug 2024Source
- 19 Building Plan Approval / NA Order for plotted development8-9.pdf · uploaded 13 Aug 2024Source
- 20 Building Plan Approval / NA Order for plotted development9-9.pdf · uploaded 13 Aug 2024Source
- 5 Commencement Certificates / NA Order for plotted developmentC C 1079-compressed.pdf · uploaded 13 Aug 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Prajakta.pdf · uploaded 19 Oct 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Prajakta.pdf · uploaded 19 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryPrajakta-Sold unsold.pdf · uploaded 19 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 -Prajakta.pdf · uploaded 7 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Prajakta.pdf · uploaded 18 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Prajakta.pdf · uploaded 18 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng_Prajakta.pdf · uploaded 18 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryPrajakta.pdf · uploaded 20 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENG-Prajakta.pdf · uploaded 12 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_CH.pdf · uploaded 18 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Prajakta.pdf · uploaded 18 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 -CH.pdf · uploaded 18 Apr 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Prajakta.pdf · uploaded 18 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng_CH.pdf · uploaded 18 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng_Prajakta.pdf · uploaded 18 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryPrajakta.pdf · uploaded 19 Apr 2025Source
- Form 5 (FY 2022-2023)Prajakta.pdf · uploaded 27 Sep 2025Source
- Form 5 (FY 2023-2024)Form 5 - Prajakta.pdf · uploaded 27 Sep 2025Source
- Form 5 (FY 2024-2025)Form 5 - Prajakta.pdf · uploaded 27 Sep 2025Source
- Withdrawal Update Form 1ARCH-Prajakta.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 2ENG-Prajakta.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 3Form 3 - Prajakta (2).pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 1Form 1_Prajakta.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Prajakta.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3Form 3 -Prajakta.pdf · uploaded 20 Jan 2026Source
- Form 2A (FY 2022-2023)Form 2A - March 2023.pdf · uploaded 28 Jan 2026Source
- Form 2A (FY 2023-2024)Form 2A - March 2024.pdf · uploaded 28 Jan 2026Source
- Form 2A (FY 2024-2025)Form 2A - March 2025.pdf · uploaded 28 Jan 2026Source
- Withdrawal Update Form 1Form 1 - Prajakta.pdf · uploaded 18 Apr 2026Source
- Withdrawal Update Form 2Form 2 - Prajakta.pdf · uploaded 18 Apr 2026Source
- Withdrawal Update Form 3Form 3 - Prajakta.pdf · uploaded 18 Apr 2026Source
- Form 2A (FY 2025-2026)Form 2A-Prajakta- 2025-26.pdf · uploaded 14 May 2026Source
- Form 5 (FY 2025-2026)Form 5 - Prajakta - 2025-26.pdf · uploaded 26 May 2026Source
- Occupational CertificateOccupancy Certificate-Prajakta.pdf · uploaded 13 Jul 2026Source
Technical
- Documentplan 1.pdf · uploaded 23 May 2022Source
- Documentplan 2.pdf · uploaded 23 May 2022Source
- Documentplan 1.pdf · uploaded 23 May 2022Source
- DocumentDWG1 (1)_compressed.pdf · uploaded 15 Dec 2022Source
- Document1.pdf · uploaded 15 Dec 2022Source
- Document2.pdf · uploaded 15 Dec 2022Source
- Document1-1 LAYOUT-compressed.pdf · uploaded 29 Mar 2024Source
- Document1-7.pdf · uploaded 29 Mar 2024Source
- Document2-7.pdf · uploaded 29 Mar 2024Source
- Document3-7.pdf · uploaded 29 Mar 2024Source
- Document4-7-compressed.pdf · uploaded 29 Mar 2024Source
- Document5-7.pdf · uploaded 29 Mar 2024Source
- Document6-7-compressed.pdf · uploaded 29 Mar 2024Source
- Document7-7.pdf · uploaded 29 Mar 2024Source
- Document1-9.pdf · uploaded 13 Aug 2024Source
- Document2-9.pdf · uploaded 13 Aug 2024Source
- Document3-9.pdf · uploaded 13 Aug 2024Source
- Document4-9.pdf · uploaded 13 Aug 2024Source
- Document5-9.pdf · uploaded 13 Aug 2024Source
- Document6-9.pdf · uploaded 13 Aug 2024Source
- Document7-9.pdf · uploaded 13 Aug 2024Source
- Document8-9.pdf · uploaded 13 Aug 2024Source
- Document9-9.pdf · uploaded 13 Aug 2024Source
- Document1-9_compressed.pdf · uploaded 17 Jul 2025Source
- Document1-9_compressed.pdf · uploaded 17 Jul 2025Source
- Document2-9_compressed.pdf · uploaded 17 Jul 2025Source
- Document3-9_compressed.pdf · uploaded 17 Jul 2025Source
- Document4-9_compressed.pdf · uploaded 17 Jul 2025Source
- Document5-9_compressed.pdf · uploaded 17 Jul 2025Source
- Document6-9_compressed.pdf · uploaded 17 Jul 2025Source
- Document7-9_compressed.pdf · uploaded 17 Jul 2025Source
- Document8-9_compressed.pdf · uploaded 17 Jul 2025Source
- Document9-9_compressed.pdf · uploaded 17 Jul 2025Source
- DocumentC C 4303_compressed.pdf · uploaded 17 Jul 2025Source
- DocumentLayout Approval (for more than 1 building).pdf · uploaded 27 Feb 2026Source
- DocumentLayout Approval (for more than 1 building).pdf · uploaded 2 Mar 2026Source
- DocumentLayout Approval (for more than 1 building).pdf · uploaded 2 Mar 2026Source
- Document1 Building Plan Approval.pdf · uploaded 2 Mar 2026Source
- Document2 Building Plan Approval.pdf · uploaded 2 Mar 2026Source
- Document3 Building Plan Approval.pdf · uploaded 2 Mar 2026Source
- Document4 Building Plan Approval.pdf · uploaded 2 Mar 2026Source
- Document5 Building Plan Approval.pdf · uploaded 2 Mar 2026Source
- Document6 Building Plan Approval.pdf · uploaded 2 Mar 2026Source
- Document7 Building Plan Approval.pdf · uploaded 2 Mar 2026Source
- Document8 Building Plan Approval.pdf · uploaded 2 Mar 2026Source
- Document9 Building Plan Approval.pdf · uploaded 2 Mar 2026Source
Technical (Architect)
Technical (Engineer)
- DocumentPrajakta.pdf · uploaded 19 Oct 2024Source
- DocumentEng_Prajakta.pdf · uploaded 18 Jan 2025Source
- DocumentENG-Prajakta.pdf · uploaded 12 Feb 2025Source
- DocumentEng_CH.pdf · uploaded 18 Apr 2025Source
- DocumentEng_Prajakta.pdf · uploaded 18 Apr 2025Source
- DocumentForm 2 - Prajakta.pdf · uploaded 18 Apr 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel CTS 694
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- —57 units in all
- Address
- CTS 694, Vitthal Mandir Road, KarvenagarPIN 411052
- Village
- Karve Nagar, Haveli taluka
- Land area for this project
- 1,591 sq m (17,125 sq ft)
- Permissible built-up area
- 5,867 sq m (63,156 sq ft)
- Sanctioned built-up area
- 5,867 sq m (63,156 sq ft)
- Designated bank account
- 43
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
CTS 694
Boundaries
- North
- D P Road
- South
- D P Road
- East
- Sr No 1
- West
- Sr No 1
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking57 units
57 units registered
| Type | Carpet area | Units |
|---|---|---|
| — | — | 57 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Abhiraj Mahadik | — |
| Architect | Sandeep Hardikar & Associates | — |
| Chartered accountant | Chandorkar & Limaye | — |
| Engineer | Tushar Shivarkar | — |
Source: MahaRERA project page. Contact details are not shown.